YAKIMA SCHOOL DISTRICT #7 — public works contracts
2,459 public works projects and 4,019 intents to pay prevailing wages name YAKIMA SCHOOL DISTRICT #7 as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: School District.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 269 | 277 | 115 | 168 | 279 | 325 | 290 | 166 | 125 | 125 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 28, 2026 | Eisenhower HS Backstop Repairs per Kyle Soptich | NWAP INC | $6,473 |
| Sep 16, 2026 | YAKIMA SCHOOL DISTRICT 3802500274 | S C I DOOR | $10,013 |
| Sep 16, 2026 | BUS BARN NONE | S C I DOOR | $968 |
| Sep 11, 2026 | Gamewell Repairs to Fire System 3802500286 | INTERWEST TECHNOLOGY SYS INC | $5,464 |
| Sep 8, 2026 | Fire - Yakima Public Schools-Insp - Yakima Public Schools - 2026 - Five-Year Fire Sprinkler Inspection 3802500214 | MCKINSTRY CO LLC | $31,562 |
| Sep 4, 2026 | TRANSPORTATION NONE | S C I DOOR | $2,955 |
| Aug 26, 2026 | Whitney Elementary - make-up air unit 3802500222 | ALL SEASONS HTNG/AIR CON INC | $46,924 |
| Aug 26, 2026 | Lewis and Clark MS Track 380250237 | BEYNON SPORTS SURFACES INC | $409,380 |
| Aug 25, 2026 | Fire - Yakima Public Schools-RP - Yakima Public Schools - 2026 - Whitney Elementary Tunnel Repairs WO 5006131 | MCKINSTRY CO LLC | $27,338 |
| Aug 25, 2026 | Yakima School District - Additional Troubleshooting AIS 2026-0266 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Aug 21, 2026 | Eisenhower High School Stadium PO 3802500091 | FIELDTURF USA INC | $11,989 |
| Aug 21, 2026 | Replaced faceplate gasket on the sprinkler system at Franklin Middle School 10014268 | INLAND FIRE PROTECTION INC | $963 |
| Aug 19, 2026 | 26-11582 Yakima SD Data Center Servers & Proxmox Conversion 3972500139 | Ednetics Inc | $207,453 |
| Aug 19, 2026 | 193596 Yakima School PO 3802500277 | GUARDIAN SECURITY SYSTEMS INC | $4,479 |
| Aug 18, 2026 | System Inspections 3802500199 | ABC FIRE CONTROL INC | $8,810 |
| Aug 14, 2026 | AC DAVIS E BUILDING 3802500166 | KONE INC | $23,234 |
| Jul 27, 2026 | Barge Lincoln Elementary | ACTION ROOTER & PLUMBING SVC | $400 |
| Jul 24, 2026 | 331 N 1st St | ACTION ROOTER & PLUMBING SVC | $400 |
| Jul 23, 2026 | Robertson - Replacement of HVAC unit in room 202 3802500249 | ALL SEASONS HTNG/AIR CON INC | $15,720 |
| Jul 23, 2026 | McKinley - Replacement of HVAC unit in P20 3802500250 | ALL SEASONS HTNG/AIR CON INC | $15,057 |
| Jul 23, 2026 | WASHINGTON MIDDLE SCHOOL NONE | S C I DOOR | $1,269 |
| Jul 20, 2026 | Yakima School Summer Dryers 3802500197 | PRINGLES POWER VAC INC | $14,756 |
| Jul 20, 2026 | Yakima School Summer Hoods 3802500197 | PRINGLES POWER VAC INC | $17,356 |
| Jul 16, 2026 | Fire - Yakima Public Schools-Insp - Yakima Public Schools - 2026 - Annual Fire Sprinkler Inspection 3802500198 | MCKINSTRY CO LLC | $10,650 |
| Jul 13, 2026 | Lewis & Clark Middle School Courtyard Improvements PO#3802500238 | BEYNON SPORTS SURFACES INC | $167,736 |
| Jul 13, 2026 | YSD - Eisenhower Chiller 1 VSD Logic Board AIS 2026-0230 | APPLIED INDUSTRIAL SYSTEMS LLC | $14,249 |
| Jul 13, 2026 | YSD-Eisenhower CH2 Cond Fan Motor & Pressure Transducer Replace AIS 2026-0228 | APPLIED INDUSTRIAL SYSTEMS LLC | $7,130 |
| Jul 13, 2026 | Adams Elementary School Parking Lot & Courtyard Improvements PO#3802500239 | BEYNON SPORTS SURFACES INC | $414,725 |
| Jul 13, 2026 | YSD - Eisenhower Chiller 1 Systems 1 IGBT Module AIS 2026-0229 | APPLIED INDUSTRIAL SYSTEMS LLC | $13,361 |
| Jul 8, 2026 | YAKIMA SCHOOL DISTRICT 3802500210 | S C I DOOR | $20,832 |
| Jul 6, 2026 | PDC OpWall Repairs 3802500235 | NWAP INC | $1,556 |
| Jul 6, 2026 | Facilities Bldg OpWall Repairs 3802500236 | NWAP INC | $1,200 |
| Jun 24, 2026 | Yakima School District - Davis CH 2 Cond. Fan Motor Replace 3802500187 | APPLIED INDUSTRIAL SYSTEMS LLC | $2,520 |
| Jun 24, 2026 | YSD-Eisenhower HS, CH #1 Sys 2/4 Bleed Resistors Troubleshoot Replace 3802500204 | APPLIED INDUSTRIAL SYSTEMS LLC | $1,580 |
| Jun 12, 2026 | PLANNED MAINTENANCE QT-275048 | CUMMINS INC | $6,396 |
| Jun 12, 2026 | 26-11420 Yakima SD E-Rate Firewalls 3972500089 | Ednetics Inc | $119,505 |
| Jun 11, 2026 | Whitney Elementary Concrete Pumping Whitney Elementary Concrete Pumping | POPPOFF INC | — |
| Jun 9, 2026 | Bus Depot | ACTION ROOTER & PLUMBING SVC | $1,800 |
| Jun 5, 2026 | Main entrance auto operator not function correctly 10375 | AG FAB | — |
| May 27, 2026 | Clean Bus Washrack 7992500135 | NORTHERN ENVIRONMENTAL LLC | $4,738 |
| May 26, 2026 | Ridgeview ES Mini Pitch Site 38025000192 | BEYNON SPORTS SURFACES INC | $57,412 |
| May 26, 2026 | Roosevelt Water Damage 3802500203 | STEPHENS & SONS CONST INC | $99,724 |
| May 15, 2026 | OpWall Maintenance per Kyle Soptich | NWAP INC | $3,309 |
| May 13, 2026 | Annual Maintenance at Zaepfel 2025 3802300119/3802500092 | FIELDTURF USA INC | $4,381 |
| May 11, 2026 | Eisenhower High School AGFABF*826D9 | AG FAB | $835 |
| May 11, 2026 | Yakima School District - Maintenance Agreement AIS 2026-0080 | APPLIED INDUSTRIAL SYSTEMS LLC | $19,200 |
| May 11, 2026 | 70891-7 - Annual Fire/Life Safety Systems Inspection 70891-7 | GUARDIAN SECURITY SYSTEMS INC | $36,708 |
| May 8, 2026 | 9228278 Hobart DW no power Hobart DW Repair, power 9228278 | HOBART | $4,832 |
| May 4, 2026 | Roosevelt Elementary School 26-9697 | RESTORATION 1 INLAND NW | — |
| Apr 24, 2026 | SYSTEM REPAIR 3802500176 | ABC FIRE CONTROL INC | $1,050 |
| Apr 20, 2026 | Davis High School | ACTION ROOTER & PLUMBING SVC | $700 |
| Apr 20, 2026 | Eisenhower High School | ACTION ROOTER & PLUMBING SVC | $700 |
| Apr 13, 2026 | Parking lot sweeping 3802500169 | PRO SWEEP NW LLC | $12,362 |
| Apr 6, 2026 | 26-797 Sewer Repair 3802500163 / 7187265 | CENTRAL MECHANICAL SERVICES | $3,352 |
| Apr 2, 2026 | McClure Elementary HVAC Replacement 3802500156 | ALL SEASONS HTNG/AIR CON INC | $16,484 |
| Apr 2, 2026 | Robertson Elementary HVAC Replacement 3802500143 | ALL SEASONS HTNG/AIR CON INC | $29,957 |
| Apr 2, 2026 | Whitney Elementary Commons Interior 26-141 | PAINT SMITH CO | $6,860 |
| Apr 2, 2026 | Lift repairs 7992500119 | EQUIPMENT SALES CO INC | $9,006 |
| Apr 2, 2026 | Discovery Early Learning Center HVAC addition 3802500145 | ALL SEASONS HTNG/AIR CON INC | $36,667 |
| Apr 2, 2026 | Resource Building HVAC Installation 3802500144 | ALL SEASONS HTNG/AIR CON INC | $16,704 |
| Mar 23, 2026 | Transportation EV Chargers 3802500077 | Titan Electrical LLC | $51,674 |
| Mar 12, 2026 | Yakima school shop 3802500129 | YAKIMA MECHANICAL INC | $19,557 |
| Mar 10, 2026 | AC Davis Bldg B New Jack Packing | KONE INC | $16,420 |
| Feb 23, 2026 | 104 N 4th Ave | ACTION ROOTER & PLUMBING SVC | $750 |
| Feb 20, 2026 | DEPT OF TRANSPORTATION NONE | S C I DOOR | $635 |
| Feb 17, 2026 | Transportation 3802500133 | Don's Fences LLC | $16,803 |
| Feb 10, 2026 | (title withheld) 7154005 / 32713129 | CENTRAL MECHANICAL SERVICES | — |
| Feb 5, 2026 | ADAMS ELEMENTARY 3802500130 | S C I DOOR | $966 |
| Feb 5, 2026 | RIDGEVIEW ELEMENTARY 3802500131 | S C I DOOR | $694 |
| Jan 9, 2026 | LC Port 311 install two systems 3802500088 | ALL SEASONS HTNG/AIR CON INC | $23,287 |
| Jan 7, 2026 | INSPECTIONS 3802500118 | ABC FIRE CONTROL INC | $8,331 |
| Jan 5, 2026 | Admin Door Opener Admin Building | AG FAB | $454 |
| Dec 23, 2025 | 2025 PLANNED MAINTENANCE QT-263631 | CUMMINS INC | $8,711 |
| Dec 18, 2025 | Pump Dispenser 82209 | CDASSE | — |
| Dec 17, 2025 | Door Graphics 1627 | VISPRO SIGNS | $2,608 |
| Dec 16, 2025 | Ridgeview/Roosevelt/MLK Elementary Schools 3802500094 | LESLIE & CAMPBELL INC | $20,144 |
| Dec 11, 2025 | Robertson Elementary 25-8703 | RESTORATION 1 INLAND NW | — |
| Dec 5, 2025 | Lewis & Clark Middle School | ACTION ROOTER & PLUMBING SVC | $400 |
| Dec 4, 2025 | CLEAN HEAT EXCHANGERS ON 4 HEATING UNITS AT IKE 3802000351 | YAKIMA MECHANICAL INC | $38,126 |
| Dec 2, 2025 | FRANKLIN MIDDLE SCHOOL 37217 | PENDLETON EXCAVATING INC | $4,777 |
| Nov 26, 2025 | Ridgeview Emergency 3802500093 | Titan Electrical LLC | $9,206 |
| Nov 24, 2025 | DAVIS HIGH SCHOOL | YAKIMA MECHANICAL INC | $498 |
| Nov 18, 2025 | Transportation 2008-6624 | ECOMODUS LLC | $60,215 |
| Nov 18, 2025 | 104 N 4th Ave | ACTION ROOTER & PLUMBING SVC | $400 |
| Nov 18, 2025 | District Wide Annual Fire Extinguisher Inspections 3802400224 | INLAND FIRE PROTECTION INC | $15,148 |
| Nov 17, 2025 | Maint Sept 2025-Aug 2026 3802400042 | KONE INC | $40,337 |
| Oct 23, 2025 | Parking lot sweeping 3802500072 | PRO SWEEP NW LLC | $12,362 |
| Oct 21, 2025 | Adams Elementary PO #3802400250 | NORTHWEST STRIPING/SEALING LLC | $5,237 |
| Oct 21, 2025 | Ridgeview Elementary PO #: 3802400249 | NORTHWEST STRIPING/SEALING LLC | $9,617 |
| Oct 21, 2025 | YAKIMA PUBLIC SCH-FOOD SERVICE 3902400125 | NORTH WEST HANDLING SYS INC | $14,187 |
| Oct 16, 2025 | Fuel Polishing 799240006 | CDASSE | — |
| Oct 10, 2025 | Pump Motor Dispenser 7992400066 | CDASSE | — |
| Oct 6, 2025 | MLK INSTALL CHAINLINK FENCE 3802500055 | Don's Fences LLC | $16,975 |
| Sep 30, 2025 | Yakima School District � Eisenhower Chiller 2/System 1 IGBT Module 3802400236 | APPLIED INDUSTRIAL SYSTEMS LLC | $12,750 |
| Sep 30, 2025 | 80977-1 - Innovations Center 80977-1 | GUARDIAN SECURITY SYSTEMS INC | $450 |
| Sep 30, 2025 | 80975-1 - Discovery Lab Fire System Inspection 80975-1 | GUARDIAN SECURITY SYSTEMS INC | $1,528 |
| Sep 24, 2025 | ROBERTSON ES EWF 3802400246 | NORTHWEST PLAYGROUND EQUIP INC | $56,404 |
| Sep 8, 2025 | Bus lift repair 7992500067 | EQUIPMENT SALES CO INC | $5,884 |
| Sep 8, 2025 | Ridgeview Elementary School 25-6549 | RESTORATION 1 INLAND NW | — |
| Sep 8, 2025 | Irrigation Repair Adams Elementary | TTC CONSTRUCTION INC | — |
| Sep 4, 2025 | 104 N 4th Ave | ACTION ROOTER & PLUMBING SVC | $400 |
| Aug 28, 2025 | MCCLURE ELEMANTARY PORTABLE VCT INSTALL PO:3802400251 | GREAT FLOORS | $2,791 |
| Aug 26, 2025 | Drop Tests on 42 Doors 3802400205 | CONTINENTAL DOOR CO LLC | $17,828 |
| Aug 25, 2025 | INSPECTIONS 3802400235 | ABC FIRE CONTROL INC | $6,876 |
| Aug 25, 2025 | Inspections 3802400209/3802400211/3802400212/3802400213 | ABC FIRE CONTROL INC | $9,627 |
| Aug 12, 2025 | Parking lot sweep 3802400242 | PRO SWEEP NW LLC | $12,362 |
| Aug 11, 2025 | Yakima School District Trap Clean 3802400098 | BAKER COMMODITIES INC | $7,344 |
| Aug 8, 2025 | YV TECH ROOM D ONLY FIRE SCIENCE PO 701240001 | GREAT FLOORS | $9,219 |
| Aug 6, 2025 | Fire - Yakima Public Schools-Yakima Public Schools Fire Wet System Dry System & Fire Hydrants 2025 Annual Inspections 3802400202 | MCKINSTRY CO LLC | $10,650 |
| Aug 1, 2025 | 901 Whitman | ACTION ROOTER & PLUMBING SVC | $600 |
| Jul 29, 2025 | Spill Buckets 7992400112 | CDASSE | $32,867 |
| Jul 29, 2025 | Suction pump repair and 4th spill Bkt 7992400118 | CDASSE | $46,230 |
| Jul 22, 2025 | Main Enterance 3802400219 | AG FAB | $2,231 |
| Jun 30, 2025 | LC - INSTALL FENCE THAT WAS DAMAGED BY CAR 3802400228 | Don's Fences LLC | $5,003 |
| Jun 26, 2025 | West Valley Jr High - Mold 04032025 | SERVPRO/N EVRTT/LK STVNS/MNROE | $3,515 |
| Jun 23, 2025 | School Hoods 3802400192 | PRINGLES POWER VAC INC | $16,318 |
| Jun 17, 2025 | Whitney Elementary - replace gas furnace 3802400115 | ALL SEASONS HTNG/AIR CON INC | $8,500 |
| Jun 11, 2025 | #4 Slow Flow 7992400066 | CDASSE | — |
| Jun 9, 2025 | Eisenhower HS 304530 3802400200 | NOR-PAC SEATING COMPANY INC | $2,860 |
| Jun 6, 2025 | Yakima School District - Life Safety Systems Inspections PO#3802400199 | GUARDIAN SECURITY SYSTEMS INC | $49,216 |
| Jun 6, 2025 | YVC HEAD CHANGE PR2512150 | JOHNSON CONTROLS FIRE PRTTN LP | $46,886 |
| Jun 4, 2025 | Yakima School District- Chiller Maintenance Agreement AIS 2025-0120 | APPLIED INDUSTRIAL SYSTEMS LLC | $18,260 |
| Jun 4, 2025 | Yakima School District- Qty. 2 IGBT Power Modules AIS 2025-0138 | APPLIED INDUSTRIAL SYSTEMS LLC | $25,626 |
| Jun 3, 2025 | AC Davis Pump and oil 343913959 | KONE INC | $24,827 |
| May 14, 2025 | 104 N 4th Ave | ACTION ROOTER & PLUMBING SVC | $3,000 |
| May 7, 2025 | LLD Test Annual 79174 | CDASSE | — |
| Apr 22, 2025 | TRANSPORTATION NONE | S C I DOOR | $2,070 |
| Apr 16, 2025 | INSPECTIONS 3802400141 | ABC FIRE CONTROL INC | $7,429 |
| Apr 14, 2025 | Fire - Yakima Public Schools-YV Tech Inspection Repairs 38024000092 | MCKINSTRY CO LLC | $1,538 |
| Apr 14, 2025 | Fire - Yakima Public Schools-Yakima Public Schools Fire Inspection Repairs 3802400071 | MCKINSTRY CO LLC | $12,065 |
| Apr 2, 2025 | Yakima Admin Bldg OpWall Maint 3802400163 | NWAP INC | $2,448 |
| Apr 2, 2025 | PDC OpWall Maint 3802400162 | NWAP INC | $2,448 |
| Mar 14, 2025 | District wide Grease trap cleaning 3802400098 | BAKER COMMODITIES INC | $6,503 |
| Feb 20, 2025 | Fire - Yakima Public Schools-Yakima Public Schools - Franklin Middle School Air Leak on Dry System WO# 9964525 | MCKINSTRY CO LLC | $507 |
| Feb 19, 2025 | 200 AREA WO-94052 | CUMMINS INC | $1,341 |
| Feb 19, 2025 | MAIN BUILDING WO-94051 | CUMMINS INC | $1,548 |
| Feb 19, 2025 | 400 AREA GENERATOR WO-94053 | CUMMINS INC | $1,346 |
| Feb 17, 2025 | Eisenhower South Elevator 3802300202 | KONE INC | $7,581 |
| Feb 14, 2025 | RESOURCE CENTER NONE | S C I DOOR | $409 |
| Feb 13, 2025 | 104 N 4th Ave | ACTION ROOTER & PLUMBING SVC | $1,400 |
| Feb 3, 2025 | Valve Bldg B - AC Davis YSD 3802400132 | KONE INC | $22,924 |
| Feb 3, 2025 | Jack rebuild Bldg D AC Davis 3802400128 | KONE INC | $23,485 |
| Jan 30, 2025 | Hoover Elementary | ACTION ROOTER & PLUMBING SVC | $400 |
| Jan 29, 2025 | (title withheld) 78719 | CDASSE | — |
| Jan 29, 2025 | Fire - Yakima Public Schools-Yakima Public Schools - Franklin Middle School Lower Sprinkler Head in Boiler Room WO# 9964113 | MCKINSTRY CO LLC | $623 |
| Jan 22, 2025 | TECH CENTER NONE | S C I DOOR | $512 |
| Jan 22, 2025 | 101 S 6TH AVE NONE | S C I DOOR | $1,254 |
| Jan 22, 2025 | LC - SONNY FIELD INSTALL FENCE AROUND FIELD 3802400099 | Don's Fences LLC | $19,832 |
| Jan 17, 2025 | Eisenhower 3802300225 | MILLER GLASS CORPORATION | $5,164 |
| Jan 16, 2025 | MAIN BUILDING WO-93926 | CUMMINS INC | $559 |
| Jan 15, 2025 | Yakima School - Eisenhower HS CH System Control & Operation Cons. 3802400056 | APPLIED INDUSTRIAL SYSTEMS LLC | $6,800 |
| Dec 30, 2024 | BUS BARN NONE | S C I DOOR | $6,065 |
| Dec 24, 2024 | Hoover Elementary | ACTION ROOTER & PLUMBING SVC | $1,200 |
| Dec 20, 2024 | BUS GARAGE NONE | S C I DOOR | $3,254 |
| Dec 19, 2024 | Slow Flow #4 7992400066 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 19, 2024 | DAVIS HIGH SCHOOL | YAKIMA MECHANICAL INC | $1,029 |
| Dec 17, 2024 | Maintenance 2024-2025 3802400042 | KONE INC | $38,855 |
| Dec 16, 2024 | Fire - Yakima Public Schools-Yakima Public Schools 2024 Repair Leaking Sprinkler Head WO# 9954308 | MCKINSTRY CO LLC | $606 |
| Dec 16, 2024 | Davis HS Auditorium Wall Mural 24-674 | PAINT SMITH CO | $6,682 |
| Dec 13, 2024 | Fire - McKinley Elementary Yakima SD-McKinley Elementary Yakima SD Leaking Pipe in Hallway WO# 9959759 | MCKINSTRY CO LLC | $468 |
| Dec 3, 2024 | Wilson Middle School 3802400073 | AG FAB | $14,431 |
| Dec 3, 2024 | (title withheld) NONE | S C I DOOR | $409 |
| Nov 26, 2024 | BUS DEPOT NONE | S C I DOOR | $977 |
| Nov 22, 2024 | 24-01857 Yakima SD District Centegix Gateways 3702400019 | Ednetics Inc | $70,386 |
| Nov 19, 2024 | Yakima School District- Ridgeview Elementary 24-0717-STR | BAXTER CONSTRUCTION LLC | $56,000 |
| Nov 19, 2024 | District Wide Annual Fire Sprinkler Inspections PO#3802300224 | MCKINSTRY CO LLC | $10,940 |
| Nov 14, 2024 | Yakima SD #304306 3802300244 | NOR-PAC SEATING COMPANY INC | $10,228 |
| Nov 8, 2024 | Hoover Elementary | ACTION ROOTER & PLUMBING SVC | $1,500 |
| Oct 31, 2024 | 24-01796 Yakima SD Gemini Remediation T&M T&M | Ednetics Inc | — |
| Oct 28, 2024 | YAKIMA VALLEY SCHOOL QT-234624 | CUMMINS INC | $7,455 |
| Oct 24, 2024 | Yakima School District- Ridgeview Elementary 24-0717-MIT | BAXTER CONSTRUCTION LLC | $29,871 |
| Oct 23, 2024 | Martin Luther King | ACTION ROOTER & PLUMBING SVC | $400 |
| Oct 23, 2024 | West Valley Middle School | ACTION ROOTER & PLUMBING SVC | $600 |
| Oct 18, 2024 | Eisenhower HS Gate Driver Replace Warranty AIS 2024-0298 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Oct 14, 2024 | DISCOVERY LAB SCHOOL 4145914 | NORTHWEST PLAYGROUND EQUIP INC | $58,103 |
| Oct 1, 2024 | (title withheld) | ACTION ROOTER & PLUMBING SVC | $500 |
| Sep 21, 2024 | Discovery Lab Early Learning-Install Chainlink Fence 3802300261 | Don's Fences LLC | $27,194 |
| Sep 20, 2024 | Barge Lincoln 3802300255 | AG FAB | $3,033 |
| Sep 20, 2024 | Annual Fire Extinguisher Maintenance 3802300224 | INLAND FIRE PROTECTION INC | $12,372 |
| Sep 19, 2024 | Kitchen Hood Inspections for Yakima School District 3802300223 | INLAND FIRE PROTECTION INC | $5,047 |
| Sep 19, 2024 | Fire Extinguisher Maintenance and Kitchen Hood Inspections 3802300131 | INLAND FIRE PROTECTION INC | $3,526 |
| Sep 17, 2024 | Maintenance July 2024 3802100027 | KONE INC | $3,062 |
| Sep 17, 2024 | Maintenance for June 2024 3802100027 | KONE INC | $3,062 |
| Sep 17, 2024 | Maintenance August 2024 3802100027 | KONE INC | $3,062 |
| Sep 3, 2024 | Early Learning Center 3802300262 | CUSTOM WINDOW TINT/GRPHCS INC | $4,289 |
| Aug 27, 2024 | MLK And Ridgeview Service Call AIS 2024-0254 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Aug 20, 2024 | Yakima School District Eisenhower HS 24-0022-STR | BAXTER CONSTRUCTION LLC | — |
| Aug 19, 2024 | Yakima SD HRU-8 Replacement 3802300250 | A T S AUTOMATION INC | $51,657 |
| Jul 31, 2024 | Grease Trap Services 3802300116 | BAKER COMMODITIES INC | $5,345 |
| Jul 29, 2024 | YV Tech OpWall Repairs 3802300245 | NWAP INC | $3,585 |
| Jul 26, 2024 | Yakima School District- Washington Middle School 24-0414-STR | BAXTER CONSTRUCTION LLC | $225,000 |
| Jul 10, 2024 | Yakima Valley School Main Building Yakima Valley Schools Main Building | JOHNSON CONTROLS FIRE PRTTN LP | $1,143 |
| Jul 10, 2024 | Eisenhower HS Stadium Field Maintenance PO#3802300119 - Invoice #716053 | FIELDTURF USA INC | $3,195 |
| Jul 8, 2024 | Zaepfel Stadium - Field Maintenance 3 Visits PO#3802300162 | FIELDTURF USA INC | $10,705 |
| Jul 1, 2024 | Yakima School District- Washington Middle School 24-0414-MIT | BAXTER CONSTRUCTION LLC | $65,000 |
| Jun 25, 2024 | WALK OFF CARPET JB23-198093 | GREAT FLOORS | $4,250 |
| Jun 25, 2024 | Yakima School Hoods/DW 3802300209 | PRINGLES POWER VAC INC | $16,318 |
| Jun 22, 2024 | Sonny Field 3802300233 | Don's Fences LLC | $3,786 |
| Jun 19, 2024 | McClure Elementary School 3802300226 | Don's Fences LLC | $3,422 |
| Jun 10, 2024 | Barge-Lincoln | ACTION ROOTER & PLUMBING SVC | $1,000 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.