WHATCOM COUNTY PUBLIC WORKS — public works contracts
465 public works projects and 1,166 intents to pay prevailing wages name WHATCOM COUNTY PUBLIC WORKS as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: County.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 68 | 58 | 92 | 79 | 31 | 66 | 38 | 73 | 79 | 58 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 29, 2026 | Noxious Weed Control-LE SNE Subzon 105465,105466 | All Season Spraying | $11,772 |
| Sep 10, 2026 | 2026 Swift Creek Channel Excavation 202609004 | WESTERN REFINERY SERVICES INC | $277,342 |
| Sep 3, 2026 | Install concrete septic lid LOA-2026-FRY-05 | TWILIGHT EXCAVATION INC | $3,229 |
| Aug 28, 2026 | Nooksack Knotweed Survey and Management 202608029 | SHELTERBELT | $20,000 |
| Aug 10, 2026 | REPAIR FLASHER 2026-mo-02 | SAIL ELECTRIC INC | $3,125 |
| Jul 14, 2026 | Swift Creek Action Plan 2026 Construction 456622 | WESTERN REFINERY SERVICES INC | $3,433,113 |
| Jul 13, 2026 | Austin Ct. Stormwater Improvements 26-19 | STREMLER GRAVEL INC | $377,321 |
| Jul 9, 2026 | Repairs to Gooseberry Dock LOA 2026-ERR-10 | Veca Electric & Tech LLC | $8,168 |
| Jun 15, 2026 | Whatcom County Public Works / Central Shop 2026-ERR-09 | GARY'S PLUMBING AND HTG LLC | $9,935 |
| Jun 3, 2026 | Central Shop NPDES Stormwater Improvements Phase 2 202605026 | RAM CONST GENERAL CONTRS LLC | $1,091,772 |
| May 20, 2026 | Drayton Harbor Road Landslide Repair CRP 923001 | STRIDER CONSTRUCTION CO INC | $2,227,877 |
| May 15, 2026 | (title withheld) 26-055 | SAFETY SIGNS INC | — |
| May 5, 2026 | Update for Central Shop VR Monitor System PO 104946 | ULTRA TANK SERVICES INC | $818 |
| Apr 17, 2026 | North Whatcom Fire & Rescue Station 12 Administration Bld | LUPUL CONTRACTING LLC | $30,884 |
| Apr 17, 2026 | ELECTRICAL REPAIRS TO FERRY DOCK 2026-ERR-06 | Veca Electric & Tech LLC | — |
| Apr 17, 2026 | Station #68 NWF&R Enterprise Fire Station #68 | LUPUL CONTRACTING LLC | $8,315 |
| Apr 13, 2026 | Repairs to fuel tanks at shop 104700 | ULTRA TANK SERVICES INC | $6,539 |
| Mar 20, 2026 | Point Roberts - Tyee Dr Landscape 2026 2026-ENG-01 | CIMA CONSTRUCTION INC | $8,704 |
| Mar 17, 2026 | Replace 480 Volt 3 Phase Meter Base 202602021 | Veca Electric & Tech LLC | $12,874 |
| Mar 9, 2026 | Central Shop LOA#2026-FM-037 | WESTERN PACIFIC FENCE LLC | $8,713 |
| Feb 23, 2026 | Repairs to 4 Way Flasher BB Lynden & Enterprise Rd 103749 OS | SAIL ELECTRIC INC | $9,221 |
| Jan 22, 2026 | Mosquito Lake Road Bridge No. 140 Emergency Scour Repair 202601018 | TRIMAXX CONSTRUCTION INC | $250,000 |
| Jan 15, 2026 | DWEWY ROAD EMERGENCY REPAIRS N/A | GRANITE CONSTRUCTION COMPANY | $66,525 |
| Dec 18, 2025 | Emergency Flood Work 12132025 | WESTERN REFINERY SERVICES INC | — |
| Nov 18, 2025 | Oat Coles Pump Service Sumas Nooksack Everson Subzone #19111000 | DARITECH INC | — |
| Nov 17, 2025 | GOOSEBERRY MOTOR SWAP 2025-FRY-09 | Veca Electric & Tech LLC | — |
| Nov 17, 2025 | INSTALL CIRCUIT BREAKER 2025-FRY-08 | Veca Electric & Tech LLC | — |
| Sep 11, 2025 | Spring Street Drainage Improvements Project SWLWSM-25-01 | STREMLER GRAVEL INC | $36,693 |
| Sep 10, 2025 | Lynden Everson (LE) Subzone #: 19101000 � Culvert Video Inspection Service 19101000 | BAYSIDE SERVICES | — |
| Sep 3, 2025 | Lake Whatcom Boulevard Road Repairs Whatcom County 10524 | HENIFIN CONSTRUCTION LLC | $54,724 |
| Sep 2, 2025 | Central Shop NPDES Stormwater Improvements Phase 1 M&O23-01 | MATIA CONTRACTORS INC | $1,282,186 |
| Aug 22, 2025 | 2025 Nooksack knotweed survey and management 202508005 | SHELTERBELT | $20,000 |
| Jul 17, 2025 | Bark install - Whatcom County Public Works 103312 OS | WINDWOOD ENTERPRISES INC | $7,910 |
| May 19, 2025 | TROUBLESHOOT HYDRAULIC PUMP 2025-FRY-07 | Veca Electric & Tech LLC | — |
| May 15, 2025 | Cougar Creek Neevel Levee Fish Passage, No 720010 202504013 | FABER CONSTRUCTION CORP | $1,412,851 |
| Apr 7, 2025 | Slater Road Bridge Inspection 2025-ENG-03 | SAFETY SIGNS INC | $5,389 |
| Apr 2, 2025 | North Fork Road/Kenney Creek Fish Passage 202503037 | STRIDER CONSTRUCTION CO INC | $3,810,389 |
| Jan 30, 2025 | Everson Goshen Rd Pavement Rehabilitation; CRP 923021 202501014 | GRANITE CONSTRUCTION COMPANY | $1,598,508 |
| Sep 20, 2024 | REPLACE LIGHT POLE FIXTURE 101180 00 OP | MILLS ELECTRIC | $2,342 |
| Aug 22, 2024 | Nooksack Knotweed Management Project 2024 202406039 | SHELTERBELT | — |
| Aug 21, 2024 | Swift Creek 24/25 Channel Excavation 21055 | WESTERN REFINERY SERVICES INC | $509,837 |
| Jul 31, 2024 | High Creek 2024-2025 Sediment Removal 202407011 | WILLIAMSON CONSTRUCTION LLC | $77,085 |
| Jul 26, 2024 | Mosquito Lake Road / Nooksack River Bridge No. 140 Inspection 24-095 | SAFETY SIGNS INC | — |
| Jul 16, 2024 | Northwest Soccer Fields Sewer Locate PO 202401031 | BAYSIDE SERVICES | $10,860 |
| Jun 6, 2024 | Lake Louise Road Pavement Rehabilitation CRP 921004 | LAKESIDE INDUSTRIES INC | $1,646,688 |
| May 22, 2024 | Whatcom County Pre-Level 21565 | WESTERN REFINERY SERVICES INC | $877,105 |
| May 20, 2024 | Drydocking, Repair, Maintenance of the Whatcom Chief Ferry 202404009 | LAKE UNION DRYDOCK CO | $1,180,380 |
| May 3, 2024 | Academy Road Stormwater Improvements 24-03 | PREMIUM SERVICES INC | $480,404 |
| Apr 29, 2024 | N. Lake Samish Drive Bridge #107 Replacement CRP No 913006 | CASCADE BRIDGE LLC | $9,670,615 |
| Mar 20, 2024 | (title withheld) Danny | SME SOLUTIONS LLC | — |
| Mar 18, 2024 | Swift Creek Action Plan 2024 Construction WO #23894 | WESTERN REFINERY SERVICES INC | $2,147,858 |
| Nov 10, 2023 | Unleaded gasoline tank for use 2023-ERR-07 | ULTRA TANK SERVICES INC | $9,999 |
| Oct 13, 2023 | Relocation of private electrical utility service impacted by roadway alignment shift following 2021 Flood events LOA=#2023-ENG-10 | ZUKERMAN ELECTRIC | $7,873 |
| Oct 10, 2023 | Cottonwood Drive Stormwater Inlet Repairs SWBB23-01 | STREMLER GRAVEL INC | $99,430 |
| Oct 4, 2023 | 2019-2022 Whatcom County Street Sweeping and Cleaning Service for Lake Whatcom Roads in the Watershed 201906030 | BAYSIDE SERVICES | $300,000 |
| Sep 22, 2023 | Pump 1,000 gallons of phased fuel LOA 2023-ERR-06 | ULTRA TANK SERVICES INC | $8,802 |
| Sep 13, 2023 | Small Area Paving-2023 360-8152815 | J Ritter Dirt & Asphalt LLC | $546,666 |
| Sep 5, 2023 | Smith Rd Pond Fencing 2023-PW0067 | DISCOUNT FENCE | $13,056 |
| Aug 16, 2023 | Apron Control Box Installation 2023-FRY-08 | Veca Electric & Tech LLC | $8,869 |
| Jul 31, 2023 | Whatcom County Street Sweeping and Cleaning Service for Lake Whatcom Roads in the Watershed 202305024 | BAYSIDE SERVICES | $85,000 |
| Jul 31, 2023 | Knotweed Management LOA #2023-NR-07 | SHELTERBELT | $9,990 |
| Jul 10, 2023 | Generator Battery Issue 2023-FRY-12 | ROCKWELL ELECTRIC INC | $1,401 |
| Jun 26, 2023 | Tank Water & Sediment Removal Service for 1 tank and Tank Circulated Biocide Preventative Maintenance Treatment for 1 tank. 1021362316 | FUELCARE INC | $6,754 |
| May 25, 2023 | HOT MIX ASPHALT PRE LEVEL 21565 | GRANITE CONSTRUCTION COMPANY | $564,790 |
| May 17, 2023 | On-call Temporary Traffic Control #22-47 | SAFETY SIGNS INC | — |
| Apr 25, 2023 | Nulle Road/Friday Creek Bridge No. 106 Rehabillitation CRP921021 | STRIDER CONSTRUCTION CO INC | $477,550 |
| Feb 7, 2023 | 2022 Flood Gate Install CRP No 922020 | STREMLER GRAVEL INC | $56,080 |
| Nov 6, 2022 | Birch Bay 2022 Planting Maintenance 202210015 | SQUALICUM MTN ECO REST INC | $64,617 |
| Oct 19, 2022 | North Fork Final Repair 22437 | RAM CONST GENERAL CONTRS LLC | — |
| Sep 30, 2022 | Lake Whatcom Catch Basin Replacement 202209030 | ULTRA TANK SERVICES INC | $37,778 |
| Sep 23, 2022 | Birch Bay Catch Basin Replacement 202209024 | ULTRA TANK SERVICES INC | $37,988 |
| Sep 22, 2022 | Contract On-Call Equipment with Operator, Project Labor, and Temporary Traffic Control 202208031 | MADRONA CONSTRUCTION | — |
| Sep 14, 2022 | BIRCH BAY DR AND HARBORVIEW RD 922019 | GRANITE CONSTRUCTION COMPANY | $274,910 |
| Sep 14, 2022 | HOT MIX ASPHALT PRE LEVL 2565 | GRANITE CONSTRUCTION COMPANY | $429,890 |
| Sep 5, 2022 | Clipper House - HVAC Issues Clipper House | D K SYSTEMS INC | $750 |
| Aug 22, 2022 | FREMONT STREET STORMWATER BYPASS 202208011 | HENIFIN CONSTRUCTION LLC | $36,438 |
| Aug 16, 2022 | 2022 & 2023 Swift Creek Channel Excavation 202208002 | WESTERN REFINERY SERVICES INC | $440,956 |
| Aug 12, 2022 | Knotweed Management, Nooksack River 2022 LOA# 2022-NR-09 | SHELTERBELT | $9,990 |
| Aug 11, 2022 | Small Area Paving Project - 2022 CRP922003 | LAKESIDE INDUSTRIES INC | $541,890 |
| Aug 1, 2022 | Mosquito Lake Road Bridge No. 140 Inspection 202107043 | SAFETY SIGNS INC | — |
| Jul 30, 2022 | Brookview Court Stormwater Improvements TBD | MATIA CONTRACTORS INC | $34,372 |
| Jul 6, 2022 | Fuel Tank Water & Sediment Removal Service Job: 80964796-PW | FUELCARE INC | $7,121 |
| Jul 2, 2022 | Neighborhood Native Landscaping Program 202206022 | WINDWOOD ENTERPRISES INC | $27,802 |
| Jun 4, 2022 | LE&SNE Subzone-LeveeMowing/Brush 360-778-6293 | Drake Harkness Trucking | $25,000 |
| Mar 2, 2022 | Goshen Road Shoulder Failure Repair 22293 | TIGER CONSTRUCTION LTD | $98,840 |
| Jan 21, 2022 | (title withheld) Dan Averill | SME SOLUTIONS LLC | — |
| Jan 18, 2022 | Potholing gas line at Lake Samish County Park 2021-ENG-11 | BAI ENVIRONMENTAL SERVICES | — |
| Jan 11, 2022 | North Fork- Emergency Trucking WO22437 | RAM CONST GENERAL CONTRS LLC | — |
| Jan 5, 2022 | Emergency Flood Response 2112 | RAM CONST GENERAL CONTRS LLC | — |
| Dec 16, 2021 | Birch Bay Lynden Road/California Creek Emergency Culvert Replacement 202112023 | RAM CONST GENERAL CONTRS LLC | — |
| Oct 15, 2021 | Knotweed Management, Nooksack River 2021-WDS-01 | SHELTERBELT | $9,980 |
| Sep 20, 2021 | Small Area Paving Project-2021 921006 | J Ritter Dirt & Asphalt LLC | $203,473 |
| Aug 4, 2021 | Marine Drive (Locust Ave to Alderwood Ave) Reconstruction and bicycle/pedestrian facilities 202107022 | STRIDER CONSTRUCTION CO INC | $3,123,449 |
| Jun 1, 2021 | LE&SNESubzone-Levee Mowing/Brush 202008007 | Drake Harkness Trucking | $25,000 |
| Nov 12, 2020 | Gooseberry Ferry Dock 2020-FRY-03 | Veca Electric & Tech LLC | $2,864 |
| Nov 11, 2020 | WHATCOM COUNTY PUBLIC WORKS SITE LOA # ERR-09 | PACIFIC ENVIRONMENTAL SRVCS CO | $4,011 |
| Oct 30, 2020 | Nootka Loop Check Valve 202010026 | P & P EXCAVATING LLC | $25,671 |
| Oct 16, 2020 | On-Call Equipment with Operator, Project Labor and Temporary Project Traffic Control 20-23 | SAFETY SIGNS INC | — |
| Sep 25, 2020 | LEEWARD WAY DRAINAGE IMPROVEMENTS PROJECT CRP 920015 | HENIFIN CONSTRUCTION LLC | $229,270 |
| Sep 15, 2020 | Whatcom Chief 2020 20200724 | FOSS MARITIME COMPANY LLC | $423,661 |
| Aug 28, 2020 | Knotweed Management LOA 2020 NR 02 | SHELTERBELT | — |
| Aug 11, 2020 | Small Area Paving Project 920002 | J Ritter Dirt & Asphalt LLC | $177,809 |
| Jul 28, 2020 | Swift Creek Channel Excavation & Oat Coles North Repository Development 202007012 | BOSS CONSTRUCTION INC | $644,555 |
| Jul 22, 2020 | REPLACE DROP TUBE UNLEAD REPLACE DROP TUBE UNLEAD | MASCOTT EQUIPMENT CO INC | $2,565 |
| Jul 1, 2020 | NORTHWEST DR & SLATER ROAD 919003 & 919022 | GRANITE CONSTRUCTION COMPANY | $1,146,047 |
| Jul 1, 2020 | E SMITH RD PAVEMENT REHAB 916006 & 918018 | GRANITE CONSTRUCTION COMPANY | $2,194,841 |
| Mar 11, 2020 | Cliffside Drive Curbing 2020-ENG-02 | KAMPS PAINTING COMPANY INC | $1,870 |
| Feb 14, 2020 | Demo-South Pass Road 90465 | HARKNESS CONTRACTING INC | $5,995 |
| Feb 6, 2020 | (title withheld) Verbal | APSCO LLC | $23,198 |
| Jan 7, 2020 | Lummi Island Terminal Preservation 919020 | PURCELL PAINTING & COATINGS | $329,000 |
| Dec 16, 2019 | Marine Drive 201907008 | IVERSON EARTH WORKS LLC | — |
| Nov 13, 2019 | BIRCH BAY DR PED FACILITY N/A | GRANITE CONSTRUCTION COMPANY | $8,724,841 |
| Oct 25, 2019 | Roadway Frost Depth Detectors 201910027 | RAZZ CONSTRUCTION INC | $120,500 |
| Oct 7, 2019 | (title withheld) 89932 000 OP | FUELCARE INC | $9,623 |
| Sep 30, 2019 | 2019 Drydocking, Repairs and Maintenance of the Whatcom Chief 201908004 | LAKE UNION DRYDOCK CO | $555,219 |
| Sep 26, 2019 | Lummi Island 89486 000 OP | WOODS LOGGING SUPPLY | $17,005 |
| Sep 24, 2019 | Lake Whatcom Boulevard PO 89828 000 OP | WESTERN REFINERY SERVICES INC | $9,380 |
| Sep 19, 2019 | Lake Whatcom Boulevard Radar Speed Sign CRP NO. 917012 | SAIL ELECTRIC INC | $27,450 |
| Sep 14, 2019 | Demo 1847 Marine Drive 201907008 | IVERSON EARTH WORKS LLC | — |
| Sep 13, 2019 | Birch Bay Drive / Pt. Whitehorn Road Drainage Improvements Bid No. 19-52 | IVERSON EARTH WORKS LLC | $820,609 |
| Sep 9, 2019 | ROW Tree York ST 2019-MO-15 | KEN'S TREE SERVICE LLC | $3,754 |
| Aug 20, 2019 | 1847 Marine - Sink 2019-RF-09 | CAZ ENVIRONMENTAL LLC | $1,270 |
| Aug 20, 2019 | Trout Lake Rd Tree Removal Trout Lake RD | KEN'S TREE SERVICE LLC | $7,391 |
| Aug 19, 2019 | Knotweed Management 2019-NR-02 | SHELTERBELT | $9,995 |
| Aug 16, 2019 | Repair Fence Veh Damage 89700 000 OP | DISCOUNT FENCE | $3,146 |
| Aug 12, 2019 | Agate Bay Stormwater Improvements 19-48 | OCEANSIDE CONSTRUCTION INC | $342,620 |
| Jul 11, 2019 | Massey Rd. /Sumas River Bridge No. 291 Rehabilitation CRP 915016 2019-ENG-09 | SAFETY SIGNS INC | $6,739 |
| Jun 17, 2019 | West Badger Road/Bertrand Creek Bridge No. 50 Replacement 20904017 | RAZZ CONSTRUCTION INC | $2,076,378 |
| Jun 12, 2019 | Small Area Paving Project 201906006 | WESTERN REFINERY SERVICES INC | $194,194 |
| May 30, 2019 | 2019-2020 Supply of Crushed Aggregate for BST 201905005 | COWDEN GRAVEL & READY MIX | $843,248 |
| May 29, 2019 | East Wiser Lake Road Solar-Powered LED Sign Installation 2019-ENG-07 | SAIL ELECTRIC INC | $9,735 |
| May 28, 2019 | 2019 Hot Mix Asphalt Prelevel 201905006 | LAKESIDE INDUSTRIES INC | $1,185,295 |
| May 14, 2019 | LE & SNE Subzone-Levee Mowing 201806009 | Drake Harkness Trucking | — |
| Apr 15, 2019 | Massey Road/Sumas Bridge No 291 201811018 | Coral Sales Company | $45,936 |
| Jan 7, 2019 | Twinview Levee Widening & Backsloping 201806006 | IVERSON EARTH WORKS LLC | — |
| Jan 6, 2019 | Birch Bay Drive Outfall Improvements 201812025 | IVERSON EARTH WORKS LLC | $37,594 |
| Dec 18, 2018 | (title withheld) | FUELCARE INC | $4,218 |
| Dec 4, 2018 | hazard Trees Rutsatz road 2018-MO-10 | KEN'S TREE SERVICE LLC | $4,286 |
| Nov 30, 2018 | Mosquito Lake Road Bridge Repair | SAFETY SIGNS INC | — |
| Oct 29, 2018 | Birch Bay Dr 88052 | KENDALLS TREE SERVICE LLC | $1,628 |
| Oct 9, 2018 | LE SUBZONE LEVEE VEGETATION MAINTENANCE - TREE REMOVAL 201806012 | HARKNESS CONTRACTING INC | — |
| Oct 5, 2018 | North Cottonwood Stormwater Improvements - Hazel Lane 201810004 | STRIDER CONSTRUCTION CO INC | $279,435 |
| Sep 28, 2018 | Whatcom Chief | FOSS MARITIME COMPANY | $594,012 |
| Sep 20, 2018 | Massey Rd./Sumas River Bridge No. 291 Rehabilitation 201809002 | CONCRETE TECHNOLOGY CORP | $109,256 |
| Sep 14, 2018 | North Pass Water Pipe Install 10647 | H D FOWLER CO INC | — |
| Sep 7, 2018 | LUMMI ISLAND FERRY REPAIRS 2018-REPAIRS | VECA ELECTRIC CO INC | $21,395 |
| Aug 22, 2018 | (title withheld) | FUELCARE INC | $6,491 |
| Jul 17, 2018 | (title withheld) | FUELCARE INC | $5,940 |
| Jul 11, 2018 | Water Truck Services PO 87262 | WESTERN REFINERY SERVICES INC | — |
| Jul 4, 2018 | False brome noxious weed treatment None given | SHELTERBELT | $4,123 |
| Jul 2, 2018 | Nooksack River Knotweed Survey and Control None given | SHELTERBELT | $9,995 |
| May 17, 2018 | Lummi Island Timber Dolphin Repair, CRP #908011 CRP 918011 | CARLSON CONSTRUCTION INC | $68,219 |
| May 10, 2018 | AGATE BAY STORMWATER IMPROVEMENTS PHASE 1 18-14 | COLACURCIO BROS INC | $570,410 |
| May 7, 2018 | Roberts Road/Anderson Creek Bridge No. 249 Replacement CRP No. 915020 | STRIDER CONSTRUCTION CO INC | $1,565,330 |
| Apr 19, 2018 | Retrofit & Repair electrical for Asphalt Tanks 2018-ERR-09 | VECA ELECTRIC CO INC | $5,126 |
| Apr 18, 2018 | 6011 Roberts Road Well Evaluation #2018-Eng.-02 | AQUATECH WELL DRLNG/PUMPS INC | $3,635 |
| Apr 17, 2018 | 2018 Hot Mix Asphalt Prelevel Contract bid#18-07 | LAKESIDE INDUSTRIES INC | $1,302,998 |
| Apr 5, 2018 | East Horton Rd | J Ritter Dirt & Asphalt LLC | $9,440 |
| Mar 2, 2018 | Annual Spill Response | WESTERN REFINERY SERVICES INC | — |
| Feb 26, 2018 | (title withheld) | FUELCARE INC | $9,084 |
| Feb 13, 2018 | Whatcom Chief 201707021 | FOSS MARITIME COMPANY | $433,752 |
| Feb 8, 2018 | LOA - Fence Repair - Bennett Dr. 86867 000 0P | WESTERN PACIFIC FENCE LLC | $5,696 |
| Dec 1, 2017 | Scutvick Road Tree Removal ROW 86316 000 OP | KEN'S TREE SERVICE LLC | $8,138 |
| Oct 30, 2017 | (title withheld) | FUELCARE INC | $9,279 |
| Oct 30, 2017 | Signal Repair on Slater & Ferndale Roads 48787 | SAIL ELECTRIC INC | $4,221 |
| Sep 28, 2017 | On Call Agreement 201705015 | SAFETY SIGNS INC | — |
| Sep 27, 2017 | 4- Way Flasher Repair at Smith & Northwest and Axton & Northwest | SAIL ELECTRIC INC | $7,010 |
| Sep 9, 2017 | Cottonwood Drive Stormwater Improvements 201708011 | IVERSON EARTH WORKS LLC | $85,552 |
| Aug 18, 2017 | Hazardous Cottonwood tree in 2300 block of Kelly road 86005 000 OP | KEN'S TREE SERVICE LLC | $2,170 |
| Aug 2, 2017 | Appel Farm Fish Barrier Correction and Floodgate Replacement 715008 | TRIMAXX CONSTRUCTION INC | $288,367 |
| Jul 10, 2017 | Nooksack Knotweed Management 85718 | SHELTERBELT | — |
| Jun 29, 2017 | Birch Bay Drive & Pedestrian Facility | WHATCOM BUILDERS INC | $13,400 |
| Jun 27, 2017 | 2017 Road Oil Tank Cleaning 201705025 | BAI ENVIRONMENTAL SERVICES | — |
| Jun 9, 2017 | Concrete Curb Median 85793 | KAMPS PAINTING COMPANY INC | $3,090 |
| May 30, 2017 | Breckenridge Road Bridge # 315 | URETEK USA INC | $17,000 |
| May 8, 2017 | Gooseberry Terminal Live Load Hanger | FLAME ON INCORPORATED | $3,804 |
| Mar 31, 2017 | 2017 HOT MIX ASPHALT PRELEVEL 17-07 | GRANITE CONSTRUCTION COMPANY | $1,545,861 |
| Mar 29, 2017 | Intercom/Security System 85523 | GUARDIAN SECURITY SYSTEMS INC | $6,587 |
| Mar 27, 2017 | Sandy Point Heights | J Ritter Dirt & Asphalt LLC | $8,370 |
| Mar 27, 2017 | Digout & Paving of Roadway in Birch Bay Area PO 85516 000 OP | WHATCOM BUILDERS INC | $9,676 |
| Mar 24, 2017 | Slater Road/Jordan Creek Fish Passage Barrier Removal CRP 915007 | RAZZ CONSTRUCTION INC | $2,713,911 |
| Mar 22, 2017 | Paving on Olson Rd and Northstar Rd PO 85444 000 OP | WESTERN REFINERY SERVICES INC | $8,599 |
| Mar 17, 2017 | 2641 BBL Rd / tree removal 854390000P | KENDALLS TREE SERVICE LLC | $1,557 |
| Mar 6, 2017 | Lummi Island Landing | BLUE STAR WELDING LLC | $20,541 |
| Mar 3, 2017 | Helwig Rd/ Tree Removal 84920 000 OP | KENDALLS TREE SERVICE LLC | $1,085 |
| Jan 26, 2017 | Lk Terrell/Unick Rd Intersection Control Beacon CRP #915026 | PIONEER CABLE CONTRACTORS INC | $31,250 |
| Jan 3, 2017 | Marine Drive/BNSF Bridge #172, Bicycle Warning System CRP #915012, WCC 201611002 | SAIL ELECTRIC INC | $101,420 |
| Nov 29, 2016 | Whatcom Chief Ferry 498 | BLUE STAR WELDING LLC | — |
| Oct 20, 2016 | Lynden Everson (LE) Subzone Levee Veg Maintenance PO #86112 | HARKNESS CONTRACTING INC | $40,000 |
| Oct 18, 2016 | GOOSEBERRY FERRY TERMINAL LED LIGHTS UPGRADE 916020 | EXPRESS ELECTRIC INC | $4,580 |
| Oct 4, 2016 | Blue Canyon Rd | WHATCOM BUILDERS INC | $7,378 |
| Aug 30, 2016 | Bridge Approach Stabilization Work-Various Locations 201608010 | URETEK USA INC | $44,900 |
| Aug 29, 2016 | 2016 Drydocking, Repair, and Maintenance Contract (Bid16-30) 201608003 | Lake Union Drydock Co. | $488,826 |
| Aug 26, 2016 | Lakeway Drive Crosswalk CRP 915017 | LARRY BROWN CONSTRUCTION INC | $296,252 |
| Aug 22, 2016 | On Call Contract 201606019 | RAM CONST GENERAL CONTR INC | — |
| Aug 19, 2016 | Nooksack River Knotweed Survey and Control None given | SHELTERBELT | — |
| Aug 16, 2016 | South Pass Road Failure Repair 915018 | GRANITE CONSTRUCTION COMPANY | $429,651 |
| Aug 4, 2016 | Marietta Structures Removal 712005 | J T MUENSCHER GEN CONTR INC | $72,695 |
| Aug 1, 2016 | Rock Rd. Cross Culverts PO # 84092 000 OP | WESTERN REFINERY SERVICES INC | $9,700 |
| Jul 11, 2016 | Remove 5 Big Leaf maple 84055000OP | URBAN FORESTER TREE SERV INC | $6,796 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.