WASHOUGAL, CITY OF — public works contracts
829 public works projects and 1,521 intents to pay prevailing wages name WASHOUGAL, CITY OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: City.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 97 | 82 | 80 | 99 | 130 | 130 | 128 | 118 | 132 | 59 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 22, 2026 | BOOSTER#2/RESERVOIR #1-CHANGE OUT 3/4 BYPASS CAP AND ADD 3 GALLONS OF COOLANT Repair | PACIFIC POWER GROUP LLC | — |
| Sep 11, 2026 | (title withheld) PO 683 | PACIFIC POWER GROUP LLC | $1,439 |
| Sep 11, 2026 | (title withheld) PO 684 | PACIFIC POWER GROUP LLC | $3,224 |
| Sep 11, 2026 | (title withheld) PO 681 | PACIFIC POWER GROUP LLC | $1,839 |
| Aug 26, 2026 | ANNUAL FULL PM, 2HR LBT 00902 | PACIFIC POWER GROUP LLC | $13,771 |
| Aug 20, 2026 | B Street Sewer Lateral Liner 2026-031 | CLARK COUNTY PLMBING/DRAIN LLC | $7,514 |
| Aug 7, 2026 | 2026 Paving Improvements 2026-GEN-010 | WESTERN UNITED CIVIL GRP LLC | $961,689 |
| Jul 27, 2026 | Woodburn Road Guardrail Replacement 2026-030 | DIRT & AGGREGATE INTERCHNG INC | $10,575 |
| May 13, 2026 | PORTABLE 150KW - 6YR CSS, REPAIRS PO # 00846 | PACIFIC POWER GROUP LLC | $3,109 |
| May 4, 2026 | Z Street Concrete Work 2025-986 | MEYER CONCRETE LLC | $3,917 |
| May 1, 2026 | LOWER WELL FIELD - 6 YR. CSS & BATTERY WSC 06225 - Quote 91254 | PACIFIC POWER GROUP LLC | $3,792 |
| Apr 30, 2026 | Q Street Stormwater Infiltration Pond ST-2025-02 403-09-594-500-5063 | WINDSOR MEP ENGINEERS LLC | $231,910 |
| Apr 28, 2026 | Jemtegaard Trail Realignment ST-2023-01 | DAYBREAK CONSTRUCTION | $206,150 |
| Apr 22, 2026 | 2026 Water Improvements WT-2024-02 | SWOFFORD EXCAVATING LLC | $1,346,314 |
| Apr 15, 2026 | PORTABLE 150KW - CALLOUT WSC 06225 - PORTABLE 150KW - CALLOUT | PACIFIC POWER GROUP LLC | — |
| Apr 15, 2026 | LOWER WELL FIELD - LOW COOLANT LVL WSC 06225 - LOWER WELL FIELD - LOW COOLANT LVL - CALLOUT | PACIFIC POWER GROUP LLC | — |
| Feb 6, 2026 | 2026 Washougal On-Call Tree Removal & Trimming/Pruning 2024-GEN-055 | NEW DAY ARBORIST | $50,000 |
| Feb 6, 2026 | 2025 Washougal On-Call Tree Removal & Trimming/Pruning 2024-GEN-055 | NEW DAY ARBORIST | $50,000 |
| Jan 30, 2026 | 2026 On-Call HVAC Preventative Maintenance & Inspection Services 2025-GEN-073 | BLAIRCO INC | $50,000 |
| Jan 13, 2026 | 2026 Electrical On-Call Maintenance Services at Washougal City Facilities 2024-GEN-057 | SARKINEN PLUMBING INC | $50,000 |
| Dec 30, 2025 | Well 7 PO00779 | MATHER & SONS PUMP SERV INC | $40,927 |
| Dec 30, 2025 | Woodburn Hills # 3 PO00780 | MATHER & SONS PUMP SERV INC | $32,725 |
| Dec 23, 2025 | WELL #3- TRANSFORMER MODULE WELL #3- TRANSFORMER MODULE | PACIFIC POWER GROUP LLC | — |
| Dec 19, 2025 | Green Stormwater Infrastructure Maintenance & Irrigation Services 2025-026 | SOUND NATIVE PLANTS INC | $50,000 |
| Dec 11, 2025 | 32nd Street Safety - North TP-2023-01 | WESTERN UNITED CIVIL GRP LLC | $616,268 |
| Oct 31, 2025 | Police Department Flooring Est. No. 10333 | 360 FLOORS & DESIGN LLC | $7,406 |
| Oct 21, 2025 | LS #11 - REPLACE THE TIMING BELTS, SERPENTINE BELT, THERMOSTAT AND GASKET 716 | PACIFIC POWER GROUP LLC | $2,627 |
| Oct 21, 2025 | PORTABLE UNIT - STARTUP PREP 041 | PACIFIC POWER GROUP LLC | $5,564 |
| Oct 14, 2025 | Woodburn Hill Reservoir Tank Repairs 2025-019 | INLAND POTABLE SERVICES INC | $5,312 |
| Oct 8, 2025 | LIFT STATION #11 - QUOTE REPAIRS LIFT STATION #11 - QUOTE REPAIRS | PACIFIC POWER GROUP LLC | — |
| Sep 29, 2025 | PORTABLE DETROIT- S/C PORTABLE DETROIT- S/C | PACIFIC POWER GROUP LLC | — |
| Sep 18, 2025 | 2 Hour Load Bank Tests PO00748 | PACIFIC POWER GROUP LLC | $14,373 |
| Sep 18, 2025 | Police Station - 2 Hour Load Bank Tests PO00749 | PACIFIC POWER GROUP LLC | $1,396 |
| Aug 21, 2025 | City of Washougal City Hall Community Center 631008-25 | Securitas Technology Corp | $7,547 |
| Aug 11, 2025 | 32nd St Rail Crossing Project 2024-RFP-056 | STACY & WITBECK INC | — |
| Aug 11, 2025 | WATER OFFICE- REPAIR WATER OFFICE- REPAIR | PACIFIC POWER GROUP LLC | — |
| Aug 8, 2025 | PW Operations Center Security Install PW OPS 2025 | Securitas Technology Corp | $32,051 |
| Jul 8, 2025 | Washougal Town Center Revitalization 4147577 | NORTHWEST PLAYGROUND EQUIP INC | $321,640 |
| Jun 30, 2025 | Booster Pump Station HVAC Installation 2025-022 | BLAIRCO INC | $7,676 |
| Jun 23, 2025 | Thermoplastic Striping & Surface Preparation 2025-GEN-067 | A-LINE ASPHALT MAINTENANCE INC | $82,322 |
| Jun 20, 2025 | Public Works Shop AC Replacement 2025-020 | BLAIRCO INC | $8,645 |
| Jun 20, 2025 | Hathaway Park Security Lighting PK-2025-01 | ECHO ELECTRIC LLC | $59,027 |
| Jun 18, 2025 | Street Sweeping Services 101-08-542-315-5048 | MCDONALD EXCAVATING INC | $6,727 |
| Jun 12, 2025 | (title withheld) 151732 | CORRECT EQUIPMENT INC | $1,477 |
| Jun 12, 2025 | 2025 Generator Maintenance Services 2025-021 | PACIFIC POWER GROUP LLC | $14,321 |
| May 30, 2025 | 2025 Chip Fog Seal PM-2025-01 | SIERRA SANTA FE CORP | $384,997 |
| May 15, 2025 | 2025 Joint Agency Slurry Seal 2025-018 | BLACKLINE INC | $418,003 |
| May 13, 2025 | 2025 Crack Seal and Mastic Repairs Piggyback 2025-017 | B C V INC | $109,900 |
| Apr 9, 2025 | #681 T ST PUMP STATION #13 - GAS PRESSURE REG RPL PO 681 | PACIFIC POWER GROUP LLC | $1,821 |
| Apr 4, 2025 | Towncenter Dog Park 024-A-AEPA-KCDA | ASTROTURF CORPORATION | $341,771 |
| Mar 26, 2025 | WWTP-ANNUAL PM, 2 HR. LBT Quote #84834 | PACIFIC POWER GROUP LLC | $3,311 |
| Mar 26, 2025 | 2-HOUR LOAD BANK TEST 350KW CAT Quote #84835 | PACIFIC POWER GROUP LLC | $1,469 |
| Feb 20, 2025 | Well #5 Rebuild 2025-015 | TEAM ELECTRIC CO INC | $4,880 |
| Feb 13, 2025 | BOOSTER STATION #1 WO-297513 | CUMMINS INC | $1,164 |
| Feb 13, 2025 | WATER OFFICE WO-297496 | CUMMINS INC | $791 |
| Feb 6, 2025 | 2025 On-Call HVAC Maintenance Services FA-2022-03 | BLAIRCO INC | $50,000 |
| Feb 4, 2025 | Washougal Towncenter Revitalization FA-2023-05 | COLF CONSTRUCTION LLC | $6,780,499 |
| Jan 22, 2025 | Lower Hathaway Park Repairs NA | HERO FENCE | $9,500 |
| Jan 21, 2025 | #681 T ST Pump Station #13-No Start - Service Call/Repair Callout/repair | PACIFIC POWER GROUP LLC | — |
| Jan 21, 2025 | 2025 Electrical On-Call Maintenance Services at COW Facilities 2024-GEN-057 | SARKINEN PLUMBING INC | — |
| Jan 15, 2025 | Washougal Concrete On-Call Services 2024-GEN-058 | Check Point Concrete LLC | $50,000 |
| Jan 13, 2025 | WWTP- 6yr CSS with Samples QT # 83061 | PACIFIC POWER GROUP LLC | $4,074 |
| Jan 13, 2025 | 2024 Washougal On-Call Tree Removal & Trimming/Pruning 2024-GEN055 | NEW DAY ARBORIST | $50,000 |
| Dec 31, 2024 | #681 T ST PUMP STATION#13 - callout #681 T ST PUMP STATION#13 | PACIFIC POWER GROUP LLC | — |
| Dec 10, 2024 | City Of Washougal GVWA-24-5122-R Hartwood Barn- SEA24299010 | PAUL DAVIS RESTORATION | — |
| Nov 26, 2024 | CITY OF WASHOUGAL WO-296310 | CUMMINS INC | $1,349 |
| Nov 19, 2024 | 2024 HVAC Maintenance 3rd Quarter Inv# i9668 | BLAIRCO INC | $5,929 |
| Nov 5, 2024 | Demolition of Multiple Buildings - Parcel# 73450000, Parcel# 73460000 FA-2023-05 | RAZ CONSTRUCTION CO | $53,599 |
| Oct 15, 2024 | WATER OFFICE WO-295505 | CUMMINS INC | $1,386 |
| Oct 7, 2024 | Hamllik Park Basketball Court PK-2022-04 | CLARK AND SON'S EXCAVATING INC | $178,954 |
| Oct 2, 2024 | 2024 Chip/Fog Seal 2024-GEN-053 | SIERRA SANTA FE CORP | $298,777 |
| Sep 25, 2024 | Community Center HVAC Replacement FA2024-013 | BLAIRCO INC | $14,373 |
| Sep 20, 2024 | 2023 Slurry Seal Piggyback PM-2023-01 | BLACKLINE INC | $74,353 |
| Aug 28, 2024 | 2024 Paving Improvements PM-2024-01 | WESTERN UNITED CIVIL GRP LLC | $1,448,932 |
| Aug 28, 2024 | 2024 Crack Seal PM-2024-01 | B C V INC | $166,100 |
| Aug 14, 2024 | Stormwater Filter Facility Maintenance ST-2024-03 | JEFFRIES CONSTRUCTION LLC | $84,196 |
| Aug 13, 2024 | Evergreen Way Sidewalk Connection TP-2024-03 | COLF CONSTRUCTION LLC | $396,630 |
| Aug 13, 2024 | Public Works Building A Improvements FA-2022-03 | A C SCHOMMER & SONS INC | $1,591,407 |
| Jul 25, 2024 | Community Center Modifications FA-2024-04 | A C SCHOMMER & SONS INC | $178,390 |
| Jul 23, 2024 | Railroad Crossing Signing & Striping TP-ARPA2023-07 | WESTERN UNITED CIVIL GRP LLC | $117,545 |
| Jul 22, 2024 | 2024 Homeless Encampment Biohazard Removal, Disposal, Mitigation, & Structure Demolition 2024-GEN-048 | RIVER CITY ENVIRONMENTAL INC | $3,298 |
| Jul 11, 2024 | G STREET SB WO-293811 | CUMMINS INC | $2,416 |
| Jul 2, 2024 | PLANNED MAINTENANCE QT-206765 | CUMMINS INC | $28,050 |
| Jul 2, 2024 | CITY OF WASHOUGAL WO-293619 | CUMMINS INC | $549 |
| Jun 13, 2024 | PMA-BOOSTER STATION #4 WO-293138 | CUMMINS INC | $1,450 |
| Jun 11, 2024 | (title withheld) WT-2019-05 | CORRECT EQUIPMENT INC | $303,586 |
| May 20, 2024 | PMA-BOOSTER STATION #4 WO-292614 | CUMMINS INC | $1,036 |
| May 20, 2024 | PMA-BOOSTER STATION #3 WO-292613 | CUMMINS INC | $993 |
| May 8, 2024 | 32nd & Evergreen Way Street Lights REQ00674 | MILL PLAIN ELECTRIC INC | $10,255 |
| Apr 16, 2024 | (title withheld) Inv# 10196 | PRESTIGE ELECTRIC LLC | $326 |
| Apr 15, 2024 | Biosolids Handling Facilities SS-2024-02 | STELLAR J CORPORATION | $26,038,481 |
| Apr 10, 2024 | Well 12 Rehabilitation Inv# 0000041637 | MATHER & SONS PUMP SERV INC | $18,134 |
| Mar 19, 2024 | 2024 Electrical On-Call Maintenance Services PW-ELECTRICIAN | ACCURATE ELECTRIC UNLIMITD INC | $49,263 |
| Mar 14, 2024 | RAS Line Inv# 10165 | PRESTIGE ELECTRIC LLC | $1,135 |
| Feb 21, 2024 | 2024 On-Call Tree Trimming Services 10-10-235 | ARBORSCAPE LTD INC | $48,648 |
| Jan 8, 2024 | I Street Sewer Installation Inv# 3670967 | CLARK COUNTY PLMBING/DRAIN LLC | $7,486 |
| Jan 3, 2024 | Community Garden tree removal C-2023 | ARBORSCAPE LTD INC | $3,766 |
| Jan 3, 2024 | Urgent Tree removal 2023 | ARBORSCAPE LTD INC | $2,511 |
| Jan 2, 2024 | (330-1356) Operations B & C Lighting 12/05/23 | ACCURATE ELECTRIC UNLIMITD INC | $6,295 |
| Jan 2, 2024 | (179-1029) A St Data 04518 | ACCURATE ELECTRIC UNLIMITD INC | $13,291 |
| Dec 14, 2023 | City of Washougal Janitorial Services 2023-GEN-033 | VANCOUVER JANITORIAL SERVICES LLC | $141,548 |
| Dec 7, 2023 | Pump #6 Inv# 10050 | PRESTIGE ELECTRIC LLC | $3,038 |
| Nov 30, 2023 | Pump Station No. 1 Improvements SS-2020-01 | COLF CONSTRUCTION LLC | $2,165,492 |
| Nov 21, 2023 | Public Works Bldg. B Damage Post Remediation FA-2023-02 | TRI MOUNTAIN CONSTRUCTION LLC | $42,000 |
| Nov 17, 2023 | Abatement AB-2023-01 | SWOFFORD EXCAVATING LLC | $8,517 |
| Nov 15, 2023 | Well 6 Inv# 0000039627 & 39628 | MATHER & SONS PUMP SERV INC | $15,445 |
| Oct 31, 2023 | Columbia River Trail Lighting Project 2307019 | ELITE CONTRACTING CO INC | $102,251 |
| Oct 20, 2023 | PW Bldg. B & C Concrete Floor Installation 2023-GEN-040 | HI TECH CONCRETE CONSTRUCTION | $34,153 |
| Oct 16, 2023 | Exterior Painting Public Works Bldg. B, C, and Containers 2023-GEN-041 | S&W PAINTING | $10,850 |
| Oct 16, 2023 | 23 AC GRIND AND OVERLAY 2023-GEN-035 | GRANITE CONSTRUCTION COMPANY | $659,610 |
| Sep 21, 2023 | Stormwater Tracts Fencing Pending | DALLUMBUILDCOMPANY LLC | $41,723 |
| Sep 19, 2023 | C020358400101 WASHOUGAL CITY HALL - WASHOUGAL, WA - Additional Access 397852-18 | Stanley Convergent Security Solutions | $9,886 |
| Sep 7, 2023 | 2023 Chip/Fog Seal PM-2023-01 | SIERRA SANTA FE CORP | $196,638 |
| Aug 28, 2023 | Stormwater Improvements City Wide ST-2023-03 | ADVANCED EXCAVATING SPCLTS LLC | $287,500 |
| Aug 24, 2023 | Bldg. B & C Gutters Call General Maintenance | CLARK COUNTY CONSTRUCTION INC | $8,407 |
| Aug 21, 2023 | N. Columbia Ridge Way Tree trimming and removal 2023 | ARBORSCAPE LTD INC | — |
| Aug 16, 2023 | Generator Repair WO-287372 | CUMMINS INC | $1,185 |
| Aug 4, 2023 | Evergreen Way Sidewalk Project 41st Court to 42nd Street TP-2023-02 | ADVANCED EXCAVATING SPCLTS LLC | $149,132 |
| Aug 1, 2023 | PW Exterior Painting FA-2022-03 | PROFESSIONAL APPLICATORS LLC | $13,682 |
| Jul 13, 2023 | WWR Alder Removal 2020 | ARBORSCAPE LTD INC | $3,476 |
| Jul 12, 2023 | Swale #20 Tree Removal 2023-009 | CONFLUENCE TREE CARE LLC | $6,727 |
| Jun 28, 2023 | City of Washougal GVWA-23-1480-E | PAUL DAVIS RESTORATION | — |
| Jun 28, 2023 | (330-1307) Hathaway Upper Lighting Trever Munsch | ACCURATE ELECTRIC UNLIMITD INC | $3,201 |
| Jun 27, 2023 | Washougal Schools Fire Alarm Inspections 97992200200 | SIGNALING SYSTEM SOLUTIONS INC | $17,034 |
| Jun 27, 2023 | Washougal Schols Extinguisher Inspections 9792200199 | SIGNALING SYSTEM SOLUTIONS INC | $3,146 |
| Jun 27, 2023 | Washougal Schools Backflows 9792200193 | SIGNALING SYSTEM SOLUTIONS INC | $1,410 |
| Jun 23, 2023 | Sewer Liner Installation 3670711 | CLARK COUNTY PLMBING/DRAIN LLC | $7,459 |
| Jun 23, 2023 | Sewer Liner Installation 3670712 | CLARK COUNTY PLMBING/DRAIN LLC | $7,459 |
| Jun 22, 2023 | 2111 43RD STREET SIDEWALK | P D Badertscher Const LLC | $14,083 |
| Jun 15, 2023 | 2023 Crack Seal PM-2023-01 | B C V INC | $162,000 |
| Jun 14, 2023 | (330-1298) Public Works Lighting Retro FA-2022-03 | ACCURATE ELECTRIC UNLIMITD INC | $12,228 |
| Jun 6, 2023 | Washougal River Road Overpass & North of E Street on Washougal River Road C-2023 | ARBORSCAPE LTD INC | $6,760 |
| Jun 6, 2023 | Washougal Post Office C- 2023 | ARBORSCAPE LTD INC | $4,056 |
| May 31, 2023 | Hartwood Park c -2023 | ARBORSCAPE LTD INC | $8,111 |
| May 31, 2023 | On-Call Sidewalk Repair/Replacement TP-2023-03 | CLARK AND SON'S EXCAVATING INC | — |
| May 16, 2023 | Social Service Pre-Fab Restroom Installation FA-2021-01 | CLARK COUNTY CONSTRUCTION INC | $198,867 |
| May 12, 2023 | Social Services Exterior Painting FA-2021-01 | CLARK COUNTY CONSTRUCTION INC | $42,206 |
| May 10, 2023 | Social Service Lighting Upgrades FA-2021-01 | CLARK COUNTY CONSTRUCTION INC | $38,192 |
| May 10, 2023 | Permit Center Upstairs Wall Installation FA-ARPA2023-04 | CLARK COUNTY CONSTRUCTION INC | $12,260 |
| May 2, 2023 | Striping ST2023 | A-LINE ASPHALT MAINTENANCE INC | $4,747 |
| Apr 19, 2023 | homeless encampment clean up 123 | CLARK AND SON'S EXCAVATING INC | $5,500 |
| Apr 18, 2023 | Generator Repair WO-285363 | CUMMINS INC | $1,224 |
| Apr 17, 2023 | Washougal AST 2023-GEN-019 | 3 KINGS ENVIRONMENTAL INC | $1,500 |
| Apr 11, 2023 | City Hall Security Improvements FA-ARPA2023-03 | PACIFIC TECH CONSTRUCTION INC | $68,633 |
| Apr 10, 2023 | Public Works Bldg. D Concrete Floor Installation FA-2023-02 | STATELINE LLC | $22,026 |
| Apr 10, 2023 | T Street - Generator 507524-00 | PACIFIC POWER GROUP LLC | $1,480 |
| Apr 4, 2023 | Public Works Building D Overhead Doors Installation FA-2023-02 | CLARK COUNTY CONSTRUCTION INC | $49,150 |
| Apr 4, 2023 | City Hall Side Chamber Repairs 001-04-518-205.5041 | CLARK COUNTY CONSTRUCTION INC | $4,774 |
| Mar 23, 2023 | CoW-Fiber Optic BackBone 4523076 | ADVANCED ELECTRICAL TECHNLGIES | $7,889 |
| Mar 19, 2023 | Social Services Stairway, Brick Tucking, & Soffits FA-2021-01 | CLARK COUNTY CONSTRUCTION INC | $66,510 |
| Mar 17, 2023 | Police Dept. Service Inv# 23S-13578 | BLAIRCO INC | $5,318 |
| Feb 28, 2023 | Street Light Maintenance Inv# 17983 | ACCURATE ELECTRIC UNLIMITD INC | — |
| Feb 17, 2023 | 2023 On Call HVAC Maintenance FA-2022-03 | BLAIRCO INC | $50,000 |
| Feb 13, 2023 | (title withheld) Inv# 9618 | PRESTIGE ELECTRIC LLC | $2,806 |
| Feb 9, 2023 | Police Station 507523-00 | PACIFIC POWER GROUP LLC | $368 |
| Feb 2, 2023 | 2021-2023 City of Washougal Janitorial Services 10-45-297 | Innovative Services NW | $91,880 |
| Jan 29, 2023 | Social Services Carpet, Conference Room Improvements FA-2021-01 | CLARK COUNTY CONSTRUCTION INC | $56,263 |
| Jan 24, 2023 | 333 Love Street House Demolition 2022-GEN-015 | MICHAEL GREEN CONSTRUCTION INC | $19,393 |
| Jan 23, 2023 | Stormwater Facility 19 Fencing Upgrade 2022-GEN-010 | J & A FENCING | $27,264 |
| Jan 16, 2023 | WASHOUGAL WASTE WATER 52650 | DIETRICH TRUCKING LLC | $2,000 |
| Jan 10, 2023 | Social Services Siding Replacement Est# 607 | CLARK COUNTY CONSTRUCTION INC | $20,542 |
| Jan 10, 2023 | Social Services Windows Replacement FA-2021-01 | CLARK COUNTY CONSTRUCTION INC | $98,644 |
| Jan 6, 2023 | (title withheld) 2023 | ARBORSCAPE LTD INC | — |
| Dec 27, 2022 | City Of Washougal GVWA-23-1480-E | PAUL DAVIS RESTORATION | — |
| Dec 18, 2022 | Social Services Interior Improvements FA-2021-01 | CLARK COUNTY CONSTRUCTION INC | $45,040 |
| Dec 15, 2022 | Generator Repair WO-267267 | CUMMINS INC | $693 |
| Dec 11, 2022 | Love Street House Demolition 2022-GEN-013 | SWOFFORD EXCAVATING LLC | $17,886 |
| Nov 30, 2022 | Police Department IT Room Access Control Upgrade Q-303177 | STANLEY CONVERGENT SEC SOL INC | $5,890 |
| Nov 30, 2022 | Lower Hathaway Play Structure Demo & Install PK-2022-05 | WESTERN UNITED CIVIL GRP LLC | $29,593 |
| Nov 18, 2022 | City of Washougal City Hall & Community Center Access Control Upgrade Q-256150 | STANLEY CONVERGENT SEC SOL INC | $23,500 |
| Nov 18, 2022 | Public Works Fuel Inv# 17787 | ACCURATE ELECTRIC UNLIMITD INC | $4,546 |
| Nov 16, 2022 | Columbia Ridge Way Inv# 22-110803 | ARBORSCAPE LTD INC | $2,701 |
| Nov 15, 2022 | Social Services HVAC Replacement FA-2021-01 | BLAIRCO INC | $30,022 |
| Oct 26, 2022 | 2022 Crack Seal - Piggy Back COV PM-2022-01 | B C V INC | $157,000 |
| Oct 26, 2022 | 39th Street & Evergreen Way Intersection Improvements 10-10-237 | HAAG & SHAW INC | $152,727 |
| Oct 24, 2022 | Campen Creek Bank Stabilization REQ00484 | WESTERN UNITED CIVIL GRP LLC | $75,663 |
| Oct 21, 2022 | Social Services Roof & Gutter FA-2022-01 | J R SWIGART CO INC | $89,094 |
| Oct 21, 2022 | PW Bldg. A Roof Replacement FA-2022-03 | J R SWIGART CO INC | $91,294 |
| Sep 30, 2022 | SIDEWALK REPAIR AT 2478 N 3RD ST | P D Badertscher Const LLC | $5,841 |
| Sep 30, 2022 | STORM WATER FACILITY 52 PLANTER IN FILL | P D Badertscher Const LLC | $17,615 |
| Sep 29, 2022 | PW Ops Center Security Upgrades 2022-GEN-007 | ABLE FENCE CO INC | $5,854 |
| Sep 25, 2022 | Cemetery Building / Rental House Shop Painting Painting Projects | CLARK COUNTY CONSTRUCTION INC | $21,062 |
| Sep 14, 2022 | City of Washougal - Found During Planned Maintenance WO-280525 | CUMMINS INC | $4,160 |
| Sep 7, 2022 | 2022 Chip Seal for City of Washougal PM-2022-01 | SIERRA SANTA FE CORP | $123,923 |
| Sep 7, 2022 | (title withheld) Inv# 22-082204 | ARBORSCAPE LTD INC | $3,473 |
| Aug 31, 2022 | Community Center A/C Inv# 22S-13116 | BLAIRCO INC | $1,699 |
| Aug 29, 2022 | Pump 1 at Pump Station 4 Inv# 9394 | PRESTIGE ELECTRIC LLC | $2,969 |
| Aug 26, 2022 | Booster Station #4 WO-375321 | CUMMINS INC | $3,548 |
| Aug 26, 2022 | City of Washougal Water Office WO-2776811 | CUMMINS INC | $726 |
| Aug 26, 2022 | Booster Station #3 WO-275320 | CUMMINS INC | $5,579 |
| Aug 24, 2022 | Emergency Service Call WWTP 4522236 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Aug 22, 2022 | STORMWATER FILTER VAULT MAINTENANCE 403-09-531-415-5041 | R C NORTHWEST INC | $53,723 |
| Aug 18, 2022 | Police Station -Generator Repairs 502386-00 | PACIFIC POWER GROUP LLC | $4,090 |
| Aug 17, 2022 | 2201 C street inv 22-081505 | ARBORSCAPE LTD INC | $2,315 |
| Aug 17, 2022 | Sewer Easement Inv# 22-080801 | ARBORSCAPE LTD INC | $4,631 |
| Aug 17, 2022 | SE 30th ROW Cleanup Inv# 22-080904 | ARBORSCAPE LTD INC | $3,686 |
| Jul 26, 2022 | (330-1225) Public Works Security Lighting 10-20-108 | ACCURATE ELECTRIC UNLIMITD INC | $7,843 |
| Jul 20, 2022 | 24th & E ST MEDIAN FILL | P D Badertscher Const LLC | $13,962 |
| Jul 19, 2022 | 1615 C Street Dead Pine Rem 2022 70501 | ARBORSCAPE LTD INC | $6,444 |
| Jul 19, 2022 | WWTP VFD 10-20-108 | ACCURATE ELECTRIC UNLIMITD INC | — |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.