WASHINGTON STATE UNIVERSITY — public works contracts
5,449 public works projects and 10,925 intents to pay prevailing wages name WASHINGTON STATE UNIVERSITY as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: 4-Year University.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 641 | 433 | 487 | 419 | 399 | 547 | 678 | 924 | 746 | 523 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 29, 2026 | Motorpool Tire Shop 56827 | WAYNE DALTON SALES & SERVICE | $720 |
| Sep 28, 2026 | (title withheld) PO0000056545 | CTI OF THE PALOUSE | $5,042 |
| Sep 27, 2026 | (title withheld) PO0000056792 | CTI OF THE PALOUSE | $33,397 |
| Sep 22, 2026 | WSU Tree Fruit Research PO0000056151 | SMITH EXCAVATION | $10,736 |
| Sep 22, 2026 | WSU Prosser IAREC-Boiler Maintenance PO#55658 | MACDONALD-MILLER FAC SOLNS LLC | $9,051 |
| Sep 21, 2026 | WSU Puyallup Millipore System | AUBURN MECHANICAL INC | $5,725 |
| Sep 17, 2026 | WSU RV Traffic Control Plan CC0109-DMZ5149 | Perfection Traffic Control, LLC. | $30,800 |
| Sep 16, 2026 | Vancouver Campus - Door Spring Change PO000055148 | OVERHEAD DOOR CO/PRTL VAN INC | $2,602 |
| Sep 15, 2026 | Pumping & Jetting Grease Interceptor 107842718 | ROTO ROOTER SERVICE | $1,250 |
| Sep 14, 2026 | Child Care Center 0000056364 | ELITE ENTRY SYSTEMS LLC | $1,596 |
| Sep 14, 2026 | Veterinary Teaching Hospital 0000056362 | ELITE ENTRY SYSTEMS LLC | $1,509 |
| Sep 14, 2026 | Creamery Revitalization 1T01655 | QUALITY CONTRACTORS LLC | — |
| Sep 13, 2026 | WSU Spokane-WSU Spokane PBS Chiller 2 Low Oil Alarm WO 5007643 | MCKINSTRY CO LLC | $688 |
| Sep 11, 2026 | Vancouver Library Install ADA Door Operators at Level 2 1T01442-SKA-0064 | SKANSKA USA BUILDING INC | $39,549 |
| Sep 9, 2026 | (title withheld) N/A | COLE INDUSTRIAL INC | — |
| Sep 9, 2026 | Coug Bldg. #3022 A/C-Running Warm 26-1103 | SALCIDO CONNECTION INC, THE | — |
| Sep 8, 2026 | BLDG #3056 - NO A/C 26-1042 | SALCIDO CONNECTION INC, THE | — |
| Sep 3, 2026 | Carpenter Hall Pad PO0000056054 | CTI OF THE PALOUSE | $19,630 |
| Sep 2, 2026 | PMA-WSU POWER PLANT WO-160845 | CUMMINS INC | $1,470 |
| Sep 2, 2026 | PMA-WSU POWER PLANT WO-160846 | CUMMINS INC | $1,470 |
| Sep 1, 2026 | Vet Bio Building 55817 | WAYNE DALTON SALES & SERVICE | $6,251 |
| Sep 1, 2026 | NCAA CAMERA-GESA FIELD PO0000055822 | M & M HARRISON ELECTRIC CO | $6,492 |
| Sep 1, 2026 | 5KVA XFORMER-IRRIGATION 55896 | Tolman Electric Inc | $5,272 |
| Aug 31, 2026 | Equipment Install PO0000056222 Version 1 | MBI Construction Srvcs Inc | $9,575 |
| Aug 27, 2026 | Washington State University Tri-Cities Wine Science Center 7076840718 | CAMPBELL COOL ELEC PLMB CORP | $1,305 |
| Aug 27, 2026 | Washington State University Tri-Cities Wine Science Center 7076840718 | CAMPBELL COOL ELEC PLMB CORP | $421 |
| Aug 25, 2026 | Washington State Irrigated Agricultural Extension Center PO 0000056228 | STRESS TECH/SUBERIZER INC | $6,794 |
| Aug 25, 2026 | WSU Ag Camera Work 37121 | PLUMB PERFECT | $1,243 |
| Aug 25, 2026 | Overlee Generator Heater PO0000056183 | WENATCHEE ELECTRIC LLC | $3,425 |
| Aug 25, 2026 | WSU Fine Arts Center Parking Elevators 1 & 2 Modernization 1S01002-039 | SCHINDLER ELEV DBA ELTEC SYS | $1,023,800 |
| Aug 24, 2026 | (title withheld) SALLY.HAND@WSU.EDU | PRO ARKH CONSTRUCTION LLC | $1,000 |
| Aug 21, 2026 | Feed Prep PO 0000052713 | OVRHD DR CO/LWSTN-CLRKSTN INC | $5,018 |
| Aug 21, 2026 | WSU Screen & Refinish - Upper Gym PO0000053660 | T & T CONTRACTORS INC | $17,820 |
| Aug 21, 2026 | GATHER INFO VALVE REPLC 260717-0094 | MACDONALD-MILLER FAC SOLNS LLC | $647 |
| Aug 20, 2026 | WSU Steptoe apts Replace section in Boiler PO0000055794 | ATLAS BOILER/EQUIPMENT CO INC | $9,873 |
| Aug 19, 2026 | WSU Spokane-PH1 Sculpture Revisions PO0000052631 | CLEARWATER SUMMIT GROUP INC | $5,237 |
| Aug 18, 2026 | PUMP PO #0000055837 | Tolman Electric Inc | $4,185 |
| Aug 17, 2026 | Hulbert Hall Entrance PO0000055381 | CTI OF THE PALOUSE | $17,246 |
| Aug 12, 2026 | 40074988 WSU - IAREC LEAK SEARCH FS15806 MULTIPURPOSE BLDG CHILLER CIRCUIT ONE LEAK SEARCH | APOLLO MECHANICAL CONTRACTORS | $2,527 |
| Aug 10, 2026 | Wegner Hall Windows Replacements PO0000055418 | PRINCETON BUILDING CO | $43,973 |
| Aug 10, 2026 | Regents Hall Concrete Replacement PO0000054982 | PRINCETON BUILDING CO | $33,696 |
| Aug 10, 2026 | Abelson Renovate Classroom 201 1T01442-SKA-0061 | SKANSKA USA BUILDING INC | $289,441 |
| Aug 10, 2026 | Washington State University recreation center TIPS contract #2602010 | PLAE VERTICAL INC | $210,071 |
| Aug 7, 2026 | VTH Seam Repair 55547 | KRUGS FLOOR COVERING LLC | $2,813 |
| Aug 7, 2026 | Stimpson Wall Rebuild PO0000055380 | CTI OF THE PALOUSE | $27,862 |
| Aug 6, 2026 | Re-stripe WSU Campus Roadways PO0000054141 | STRIPECO LLC | $7,236 |
| Aug 6, 2026 | WSU Bike Lane Striping PO 00000555684 | STRIPECO LLC | $4,003 |
| Aug 5, 2026 | Wenatchee Overley Lab Replace Rotten Fascia 1T01442-SKA-0050 | SKANSKA USA BUILDING INC | $117,910 |
| Aug 5, 2026 | WSU Facility Services-Chiller 3 refrigerant charge 1SO1008-003 | MCKINSTRY CO LLC | $10,214 |
| Aug 5, 2026 | (title withheld) BEE AUTOCLAVE | FARMERS ELECTRIC II LLC | $9,771 |
| Aug 5, 2026 | Todd CCB Learning Lab Relocation 1T01442-SKA-0058 | SKANSKA USA BUILDING INC | $293,560 |
| Jul 30, 2026 | College of Nursing Relocation PO0000054990 | BELLINGHAM TRANSFER & STORAGE INC | $1,425 |
| Jul 28, 2026 | Stephenson North Trip Step PO0000055095 | CTI OF THE PALOUSE | $5,064 |
| Jul 28, 2026 | Stephenson North Column Bases PO0000055096 | CTI OF THE PALOUSE | $10,760 |
| Jul 28, 2026 | Chinook 05944404 | Performance Systems Intgn LLC | $642 |
| Jul 28, 2026 | WSU Pool Lighting Retro 26010401 | CNC ELECTRIC LLC | $54,925 |
| Jul 28, 2026 | (title withheld) 26-0796 | SALCIDO CONNECTION INC, THE | — |
| Jul 27, 2026 | Boiler Cleaning 0000055204 | BF POWER VAC | $6,895 |
| Jul 22, 2026 | PARKING LOT ASPHALT REPAIRS &STRIPING SPC009197 | C21 CONSTRUCTION LLC | $94,500 |
| Jul 22, 2026 | WSU Prosser - Rework Lexan Greenhouse PO0000052736 | SIERRA ELECTRIC INC | $6,790 |
| Jul 17, 2026 | McCrosky Front Steps PO0000052532 | CTI OF THE PALOUSE | $37,120 |
| Jul 16, 2026 | The Table Kitchen and Bar 05851552 | Performance Systems Intgn LLC | $1,105 |
| Jul 15, 2026 | Terrell Library Elevator 3 Modenization 1S01007-002 | EMPYREAN ELEVATOR LLC | $515,364 |
| Jul 15, 2026 | Terrell Library Elevator 5 Modernization 1S01007-004 | EMPYREAN ELEVATOR LLC | $469,604 |
| Jul 15, 2026 | Terrell Library Elevator 4 Modification 1S01007-003 | EMPYREAN ELEVATOR LLC | $475,014 |
| Jul 14, 2026 | Cub Cafe P0000053216 | GRANITE WORKS LLC | $7,584 |
| Jul 13, 2026 | WSU ROTUNDA WSU SSDH | JOHNSON CONTROLS FIRE PRTTN LP | $44,621 |
| Jul 13, 2026 | FP-8XC59U CHRAC-01-2022 REMOVE PO0000053968 | MACDONALD-MILLER FAC SOLNS LLC | $2,886 |
| Jul 9, 2026 | Catering Kitchen PCU 05872453 | Performance Systems Intgn LLC | $1,316 |
| Jul 9, 2026 | WSU Tree Fruit Research Center Project PO0000054936 | AG SUPPLY COMPANY OF WENATCHEE | — |
| Jul 9, 2026 | Holland Library Elevator 8 Modernization 1S01007-005 | EMPYREAN ELEVATOR LLC | $611,135 |
| Jul 8, 2026 | 40073995 WSU-IAREC WALK IN COOLER DIAGNOSIS PO0000054614 FS15410 WALK-IN COOLER DIAGNOSIS | APOLLO MECHANICAL CONTRACTORS | $773 |
| Jul 8, 2026 | J26410063 Bloomberg Full Installation PO0000054851 | CONFERENCE TECHNOLOGIES INC | $84,266 |
| Jul 6, 2026 | WSU TFREC perimeter road chip seal overlay paving project PO0000054065 | A & W PAVING INC | $9,600 |
| Jul 6, 2026 | Lateral Conversion 1001753 | IRRIGATION SPECIALISTS INC | — |
| Jul 6, 2026 | FP-UXFYCV CHRAC-01-2025;REMOVE PO 0000053969 | MACDONALD-MILLER FAC SOLNS LLC | $3,259 |
| Jul 1, 2026 | WSU Tri-Cities Wine Science Center - Install Back-Up Generator 1T01628 | SIERRA ELECTRIC INC | $220,200 |
| Jun 30, 2026 | WSU College of Nursing Work Station Demo PO0000054870 | BURTON CONSTRUCTION INC | $3,666 |
| Jun 30, 2026 | 40074247 WSU IAREC THERMOSTAT REPLACEMENT FS15537 THERMOSTATS REPLACEMENT IN WEST BLDG WALK IN COOLER | APOLLO MECHANICAL CONTRACTORS | $964 |
| Jun 30, 2026 | Presidential Arboretum Site Improvements 1T01442-SKA-0060 | SKANSKA USA BUILDING INC | $49,108 |
| Jun 30, 2026 | (title withheld) WSUCG184541326 | AFFORDABLE ASBESTOS ABT SPOK | $9,698 |
| Jun 29, 2026 | Terrell DSC Panels PO0000053703 | DIVERSIFICATION INC | $31,673 |
| Jun 26, 2026 | SRC Flooring Project PO0000054797 | ESSENTIAL CONSTRUCTS LLC | $62,234 |
| Jun 26, 2026 | WSU French 346 Panels 0000054113 | ONE WORKPLACE | $13,478 |
| Jun 26, 2026 | WSU Puyallup Research and Extension Center | AUBURN MECHANICAL INC | $1,888 |
| Jun 26, 2026 | Calibrate Meter 84474 | CDASSE | — |
| Jun 25, 2026 | Othello Farm Pump 7.5 HP pump | FARMERS ELECTRIC II LLC | $3,560 |
| Jun 23, 2026 | Washington State Irrigated Agricultural Extension Center PO 0000054363 | STRESS TECH/SUBERIZER INC | $16,669 |
| Jun 23, 2026 | Nitrogen system modifications 0000052908 | PLUMBCO INC | $8,866 |
| Jun 22, 2026 | Martin Stadium PO0000052649 | COAST TO COAST TURF LLC | $769,250 |
| Jun 20, 2026 | floor refinishing PO000053728 | CLASSIC WOOD FLRS/CRPNTRY LLC | $4,800 |
| Jun 18, 2026 | 2026 Annual Fire Test & Inspect N/A | Vyanet Operating Group Inc | $915 |
| Jun 18, 2026 | 2026 Annual Fire Test & Inspect N/A | Vyanet Operating Group Inc | $915 |
| Jun 18, 2026 | Fire Service on Zn 75 - 1 Flr Hall by Rm 109A PO0000054009 | Vyanet Operating Group Inc | — |
| Jun 17, 2026 | (title withheld) PO0000054304 | FLOORING CONNECTIONS INTL INC | $8,738 |
| Jun 17, 2026 | Schlage replacement PO0000052502 | A M HARDWARE INC | — |
| Jun 16, 2026 | Eastlick West Steps/Pad PO0000053476 | CTI OF THE PALOUSE | $41,062 |
| Jun 15, 2026 | Daggy Hall North Entrance PO0000048953 | CTI OF THE PALOUSE | $26,523 |
| Jun 15, 2026 | WSU Todd Hall Addition PO0000053885 | JOHNSON CONTROLS FIRE PRTTN LP | $22,707 |
| Jun 12, 2026 | Master Maintenance Agreement No. 1S01007 Elevator Maintenance and Repair IS01007 | EMPYREAN ELEVATOR LLC | — |
| Jun 12, 2026 | 40073605 TM WSU TC LEAK SEARCH WSU TC 04224 TM DUCTLESS UNIT LEAK SEARCH | APOLLO MECHANICAL CONTRACTORS | — |
| Jun 11, 2026 | (title withheld) PO0000051862 | PELLA INLAND NORTHWEST INC | $3,902 |
| Jun 11, 2026 | Washington Football Video & Audio C35094 | DAKTRONICS INC | — |
| Jun 9, 2026 | Prosser Repair Large On-Site Septic System 1T01442-SKA-0034 | SKANSKA USA BUILDING INC | $211,250 |
| Jun 8, 2026 | Pumping 1500 gallons from Grease Interceptor 105366561 | ROTO ROOTER SERVICE | $934 |
| Jun 8, 2026 | Window Repair WSU Extension, Nespelem PO0000054277 | ROSSERS GLASS & CONSTRUCTION | $1,379 |
| Jun 8, 2026 | Pumping 5, 55 gallon Grease Drums 105159454 | ROTO ROOTER SERVICE | $505 |
| Jun 8, 2026 | Pumping 1000 gallon single compartment concrete Grease Interceptor 105159711 | ROTO ROOTER SERVICE | $799 |
| Jun 8, 2026 | Pumping 5, 55 gallon Grease Drums 105160093 | ROTO ROOTER SERVICE | $510 |
| Jun 8, 2026 | Pumping 260 gallons from 6, 55 gallon Grease Drums 105151024 | ROTO ROOTER SERVICE | $513 |
| Jun 5, 2026 | FHL Bldg.#3046 Cold Rm#5 WIC N/A | SALCIDO CONNECTION INC, THE | — |
| Jun 4, 2026 | WSU PO 0000052605 | JOHNSON CONTROLS FIRE PRTTN LP | $2,341 |
| Jun 4, 2026 | WSU PO0000047258 | JOHNSON CONTROLS FIRE PRTTN LP | $1,637 |
| Jun 4, 2026 | WSU PO0000042215 | JOHNSON CONTROLS FIRE PRTTN LP | $3,370 |
| Jun 4, 2026 | Murrow Greenhouse Roof Repairs PO0000054258 | MODERN GLASS COMPANY | $1,620 |
| Jun 4, 2026 | WSU PO0000049915 | JOHNSON CONTROLS FIRE PRTTN LP | $2,462 |
| Jun 3, 2026 | Washington State University 1-137031150777 | JOHNSON CONTROLS INC | $1,400 |
| Jun 3, 2026 | Washington State Irrigated Agricultural Extension Center PO 0000047427 | STRESS TECH/SUBERIZER INC | $5,435 |
| Jun 2, 2026 | PMA-WSU PUYALLUP WO-421810 | CUMMINS INC | $1,116 |
| Jun 2, 2026 | WASHINGTON UNIVERSITY STUDENT PO0000052155 | WON-DOOR CORPORATION | $20,028 |
| Jun 2, 2026 | PMA-WSU POWER PLANT WO-159553 | CUMMINS INC | $11,224 |
| Jun 1, 2026 | Vancouver Irrigation Well Improvements 1T01624 | WESTERN UNITED CIVIL GRP LLC | $295,000 |
| Jun 1, 2026 | PO #? Cold Rm #1 Bldg 3004 N/A | SALCIDO CONNECTION INC, THE | — |
| Jun 1, 2026 | (title withheld) 48826 | KRUGS FLOOR COVERING LLC | $8,628 |
| May 28, 2026 | 1st Floor AV Circuit PO0000050761 | PRIME ELECTRIC LLC | $3,209 |
| May 27, 2026 | WSU TREE FRUIT RESEARCH CENTER 53949 | BARGREEN ELLINGSON INC | $46,071 |
| May 27, 2026 | PO# 51537 Cleveland Hall Base 48826 | KRUGS FLOOR COVERING LLC | $8,628 |
| May 27, 2026 | hood cleaning 00004462 | EXHAUST HOOD & DUCT SERVICE LLC | $63,000 |
| May 26, 2026 | REPLACE SPRINGS ON SOUTH DOOR EMERGENCY | DOOR-TECH INC | $2,076 |
| May 23, 2026 | Ruby Park Pad PO0000053711 | CTI OF THE PALOUSE | $10,741 |
| May 21, 2026 | 40073399 LEAKING R22 ON MULITPURPOSE BLDG CHILLER TM LEAKING R22 ON MULITPURPOSE BLDG CHILLER TM | APOLLO MECHANICAL CONTRACTORS | — |
| May 21, 2026 | Overley standby generator PO0000053872 | WENATCHEE ELECTRIC LLC | $10,001 |
| May 21, 2026 | 40072566 MINI SPLIT LEAK REPAIR WSU - IAREC PO0000052697 WSU - IAREC MINI SPLIT LEAK REPAIR | APOLLO MECHANICAL CONTRACTORS | $2,087 |
| May 21, 2026 | UPS to IDF Project PO0000053937 | Trion Electric LLC | $17,339 |
| May 21, 2026 | Pharmacy 1125 | OVRHD DR CO/LWSTN-CLRKSTN INC | $1,158 |
| May 19, 2026 | WSU Shunt Test D011989 | Dahl Electric Inc | $459 |
| May 19, 2026 | Lighty Terrazzo Project 1T01592 | NORTH AMERICAN TERRAZZO INC | $34,510 |
| May 19, 2026 | FHL Nitrogen Generator Compressor Venting 0000053731 | WELLS & WADE MECHANICAL | $3,886 |
| May 18, 2026 | CCRS BLDG-RTU REPAIR PO0000052973 | AIR DIXON LLC | $2,662 |
| May 15, 2026 | Washington State - GESA Field LED Retrofit PO0000052677 | MUSCO SPORTS LIGHTING LLC | $1,995,000 |
| May 15, 2026 | WSU Puyallup Research and Extension Center | AUBURN MECHANICAL INC | $1,162 |
| May 14, 2026 | FP12225-1280 GC-4 REPL VALVE PO0000052233 | MACDONALD-MILLER FAC SOLNS LLC | $7,220 |
| May 14, 2026 | (title withheld) PO0000052504 | MACDONALD-MILLER FAC SOLNS LLC | $1,233 |
| May 14, 2026 | (title withheld) PO0000052504 | MACDONALD-MILLER FAC SOLNS LLC | $1,063 |
| May 14, 2026 | WSU Taylor Sports Door Repairs 184821 None | MODERN GLASS COMPANY | $1,182 |
| May 13, 2026 | Puyallup Extension - Risk Mitigation Pruning PO0000053152 | SALISH SEA TREE CARE & CON LLC | $1,620 |
| May 13, 2026 | PDXASP WSU On Site 04/14 & 04/16 PO# 1T01001 SII - 5005012140 | SIEMENS INDUSTRY INC | $5,251 |
| May 13, 2026 | (title withheld) PO0000053386 | COLE INDUSTRIAL INC | $9,800 |
| May 13, 2026 | MCCOY HALL STEAM TUNNELS WSUCGM41326 | AFFORDABLE ASBESTOS ABT SPOK | $8,100 |
| May 13, 2026 | WSU Prosser Chiller Service Agreement PO#0000053369 | MACDONALD-MILLER FAC SOLNS LLC | $8,298 |
| May 12, 2026 | Pump Septic Tank 104786079 | ROTO ROOTER SERVICE | $886 |
| May 12, 2026 | Grimes Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $2,328 |
| May 12, 2026 | USDA Perimeter Fence and Interior Fence 1T01613 | PEARSON FARM & FENCE LLC | $209,875 |
| May 11, 2026 | Housing Food Services Bldg Steps PO0000053409 | CTI OF THE PALOUSE | $3,980 |
| May 8, 2026 | (title withheld) PO0000052805 | COLE INDUSTRIAL INC | $3,659 |
| May 7, 2026 | Signs at Innov Bldg PO0000051763 | BALDWIN SIGN CO | $9,238 |
| May 7, 2026 | Spokane Academic Center Exterior Doors and Operators 1T01442-SKA-0051 | SKANSKA USA BUILDING INC | $55,408 |
| May 6, 2026 | (title withheld) WSUCGSXXXXXXXXX | AFFORDABLE ASBESTOS ABT SPOK | $9,720 |
| May 6, 2026 | WSU 25-26 Utility Tunnel Repairs Near McCluskey Services Building 1T01616 | PRINCETON BUILDING CO | $147,650 |
| May 6, 2026 | Prosser West Bldg. Renovate 2nd Floor Labs 1T01442-SKA-0047 | SKANSKA USA BUILDING INC | $101,875 |
| May 5, 2026 | Tri-Cities CIC Bldg Install ADA Door Openers 1T01442-SKA-0049 | SKANSKA USA BUILDING INC | $22,062 |
| May 4, 2026 | Stephenson Complex 1245 | OVRHD DR CO/LWSTN-CLRKSTN INC | $373 |
| Apr 29, 2026 | Spokane Ignite Building Cameras PO0000053118 | POWERCOM INC | $11,166 |
| Apr 24, 2026 | Eastlick North Stairs/Pads PO0000047859 | CTI OF THE PALOUSE | $85,428 |
| Apr 23, 2026 | Rental @5722 Sleater Kinney Rd 144425 | SUNSET AIR INC | $482 |
| Apr 23, 2026 | Martin Stadium-Repair of Elevator 3 PO0000053240 | OTIS ELEVATOR CO | $18,144 |
| Apr 22, 2026 | Maintenance on pumps at Sunrise Orchard PO0000052173 | GRAY'S ELECTRIC INC | $2,277 |
| Apr 22, 2026 | Cattle Feeding Lab 2026-018408 | OVRHD DR CO/LWSTN-CLRKSTN INC | $1,559 |
| Apr 22, 2026 | Maintenance on pump at Columbia View Orchard PO0000052173 | GRAY'S ELECTRIC INC | $1,174 |
| Apr 22, 2026 | Pacaar Rollup Door Repair 2026 po 0000051736 | OVRHD DR CO/LWSTN-CLRKSTN INC | $7,293 |
| Apr 21, 2026 | Wenatchee Sunrise Orchard Emergency Irrigation Line Repairs 1T01442-SKA-0059 | SKANSKA USA BUILDING INC | $18,300 |
| Apr 21, 2026 | (title withheld) PO0000051756 | COLE INDUSTRIAL INC | $2,964 |
| Apr 17, 2026 | 40072156 MINISPLIT TROUBLESHOOT WSU - IAREC PO0000052157 WSU - IAREC MINISPLIT TROUBLESHOOT & COIL CLEANING | APOLLO MECHANICAL CONTRACTORS | $2,008 |
| Apr 16, 2026 | 40072777 WSU IAREC REFR INSTLL PO0000052682 WSU - IAREC REFRIG INSTALL | APOLLO MECHANICAL CONTRACTORS | $8,906 |
| Apr 15, 2026 | 40072168 WSU TC DX UNIT NOT COOLING WSU TC UNIT NOT COOLING | APOLLO MECHANICAL CONTRACTORS | $764 |
| Apr 14, 2026 | PUMPING SEWER SYSTEM PO0000051157 | BERT'S EXCAVATING | $11,642 |
| Apr 14, 2026 | PMA-WSU POWER PLANT WO-159668 | CUMMINS INC | $10,118 |
| Apr 8, 2026 | SCUE Door Pivot Replacements PO 0000052869 | MODERN GLASS COMPANY | $7,498 |
| Apr 8, 2026 | Inspection 6023161 | Performance Systems Intgn LLC | $12,471 |
| Mar 31, 2026 | IRRIGATION PUMP TROUBLESHOOT PO-52442 | Tolman Electric Inc | $913 |
| Mar 30, 2026 | WSU Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $7,923 |
| Mar 30, 2026 | West Mall Stairs 2026 PO0000052564 | CTI OF THE PALOUSE | $17,344 |
| Mar 27, 2026 | (title withheld) 0000039798 | KOLLMAR INC | $4,185 |
| Mar 26, 2026 | USDA Bldg 305 Cold Rm #10 N/A | SALCIDO CONNECTION INC, THE | — |
| Mar 25, 2026 | 184379 Greenhouse Glass Repair PO0000051167 | MODERN GLASS COMPANY | $7,376 |
| Mar 25, 2026 | 184179 Greenhouse Glass Repair PO 0000051166 | MODERN GLASS COMPANY | $2,704 |
| Mar 25, 2026 | 184178 Greenhouse Glass Repairs PO 0000051168 | MODERN GLASS COMPANY | $2,899 |
| Mar 25, 2026 | Boiler Camera PO0000052420 | WENATCHEE ELECTRIC LLC | $7,742 |
| Mar 25, 2026 | WSU Tri Cities PO0000050897 | PERFECTION GLASS INC | $6,087 |
| Mar 24, 2026 | Washington State University PO0000051791 | JOHNSON CONTROLS INC | $77,682 |
| Mar 23, 2026 | Gleason Institute for Neuroscience Relocation to Spokane Campus 1T01442-SKA-0053 | SKANSKA USA BUILDING INC | $19,140 |
| Mar 23, 2026 | Field Repair of Vacuum Pump PO 0000051079 | ROGERS MACHINERY CO INC | $573 |
| Mar 22, 2026 | WSU TFREC FHL CA walkin Cooler #2 PO0000052008 | WENATCHEE ELECTRIC LLC | $8,029 |
| Mar 22, 2026 | 3005 Bug Room PO0000048679 | WENATCHEE ELECTRIC LLC | $10,749 |
| Mar 20, 2026 | GESA Field Upgrades 1T01442-SKA-0056 | SKANSKA USA BUILDING INC | $21,626 |
| Mar 20, 2026 | Valve Service PO0000050657 | Hydro Tech | $5,617 |
| Mar 17, 2026 | Central Receiving and Delivery PO 0000051505 | OVRHD DR CO/LWSTN-CLRKSTN INC | $3,726 |
| Mar 16, 2026 | Replace Domestic Water and Heating Skids 1T01442-SKA-0040 | SKANSKA USA BUILDING INC | $165,603 |
| Mar 16, 2026 | BLDG 1034- WIC 02162026 | AIRE PRO INC | $1,376 |
| Mar 16, 2026 | Spokane Medicine Building Outdoor Art Project 1T01442-SKA-0052 | SKANSKA USA BUILDING INC | $29,599 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.