WASHINGTON STATE UNIVERSITY - SPOKANE — public works contracts
597 public works projects and 726 intents to pay prevailing wages name WASHINGTON STATE UNIVERSITY - SPOKANE as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: 4-Year University.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 53 | 48 | 45 | 54 | 51 | 34 | 36 | 46 | 36 | 46 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 22, 2026 | Spring replacement N/A | WAYNE DALTON SALES & SERVICE | $2,027 |
| Aug 26, 2026 | Rm 210E Access Control NL293782 | CompuNet, Inc. | $2,768 |
| Aug 26, 2026 | Rm 125D Access Control NL293785 | CompuNet, Inc. | $2,876 |
| Aug 18, 2026 | WSU/GOAL LINE CAMERA'S PO0000055821 | POWERCOM INC | $9,204 |
| Aug 17, 2026 | WSU Nespelem build 002 | FOUR BEARZ CONTRACTING | $10,800 |
| Jul 24, 2026 | (title withheld) PO0000053745 | MOUNTAIN DOG SIGN COMPANY INC | $2,456 |
| Jul 8, 2026 | 20015783 PM WSU SPOKANE SPC000546-C22842 PM WSU SPOKANE | APOLLO MECHANICAL CONTRACTORS | $902 |
| Jul 1, 2026 | 20015782 WSU SPOKANE AUTOCLAVE PM FS00502 SPC000546-C22842 PM WSU SPOKANE AUTOCLAVE 25-26 | APOLLO MECHANICAL CONTRACTORS | $5,060 |
| Jun 19, 2026 | (title withheld) PO 0000052988 | MOUNTAIN DOG SIGN COMPANY INC | $3,314 |
| Jun 4, 2026 | WSU Spokane - PBS CH2 Startup after VFD Replace AIS 2026-0180 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| May 18, 2026 | WSU Spokane Phase 1 Bldg. Chiller Emerg. Call AIS 2026-0172 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| May 18, 2026 | WSU Spokane - HSB Chiller #2 Circuit B EEV Replacement PO0000053510 | APPLIED INDUSTRIAL SYSTEMS LLC | $9,720 |
| May 12, 2026 | WSU Spokane - PBS Building Chiller #2 Oil Addition PO000005369 | APPLIED INDUSTRIAL SYSTEMS LLC | $2,389 |
| Apr 29, 2026 | WSU Spokane � HSB CH3 Process Chiller Emerg Call PO0000052275 | APPLIED INDUSTRIAL SYSTEMS LLC | $1,054 |
| Apr 29, 2026 | 20014533 WSU SPOKANE PM 412 E SPOKANE FALLS RD WSU SPOKANE PLANNED MAINTENANCE412 E SPOKANE FALLS RD | APOLLO MECHANICAL CONTRACTORS | $902 |
| Apr 21, 2026 | WSU Commons 2nd & 3rd FL PO0000052234 | OPENSQUARE | $102,963 |
| Apr 15, 2026 | 20014293 WSU-SPOKANE PM WSU-SPOKANE PLANNED MAINT AGREEMENT | APOLLO MECHANICAL CONTRACTORS | $5,521 |
| Apr 8, 2026 | WSU Spokane - HSB Chiller #1 and #2 Troubleshoot and Repair PO0000052128 | APPLIED INDUSTRIAL SYSTEMS LLC | $2,831 |
| Apr 8, 2026 | WSU Spokane - HSB Chiller #2 Circuit B Faulting PO0000052341 | APPLIED INDUSTRIAL SYSTEMS LLC | $3,819 |
| Mar 19, 2026 | Sculpture Installation PO0000052276 | TRESKO MONUMENT INC | $5,120 |
| Mar 4, 2026 | 20005995 WSU SPOKANE 22-23 PREVENTATIVE MAINTENANCE WSU SPOKANE 22-23 PREVENTATIVE MAINTENANCE | APOLLO MECHANICAL CONTRACTORS | $5,302 |
| Mar 4, 2026 | 20013113 24-25 PM VISIT WSU SPOKANE SPC000546-C22842 WSU SPOKANE PM 24-25 | APOLLO MECHANICAL CONTRACTORS | $5,521 |
| Mar 4, 2026 | 20010043 24-25 PM VISIT WSU SPOKANE SPC000546-C22842 WSU SPOKANE PM 24-25 | APOLLO MECHANICAL CONTRACTORS | $5,407 |
| Mar 4, 2026 | 20006970 WSU SPOKANE 22-23 PREVENTATIVE MAINTENANCE WSU SPOKANE 22-23 PREVENTATIVE MAINTENANCE | APOLLO MECHANICAL CONTRACTORS | $5,302 |
| Mar 4, 2026 | 20005665 WSU SPOKANE REPLACE CONTRACTORS 3RD FL PGS AUTO CLAVE WSU SPOKANE REPLACE CONTRACTORS 3RD FL PGS AUTO CLAVE | APOLLO MECHANICAL CONTRACTORS | $527 |
| Mar 4, 2026 | 20005279 WSU SPOKANE BASEMENT AUTOCLAVE CONTROLS WSU BASEMENT AUTOCLAVE CONTROLS | APOLLO MECHANICAL CONTRACTORS | $524 |
| Mar 4, 2026 | 20008519 24-25 PM VISIT WSU SPOKANE SPC000546-C22842 WSU SPOKANE PM 24-25 | APOLLO MECHANICAL CONTRACTORS | $5,302 |
| Mar 4, 2026 | 20010980 24-25 PM VISIT WSU SPOKANE SPC000546-C22842 WSU SPOKANE PM 24-25 | APOLLO MECHANICAL CONTRACTORS | $5,407 |
| Mar 4, 2026 | 2005399 SS00078 WSU SPOKANE 22-23 PM SPC000546-C22842 WSU SPOKANE PM 22-23 | APOLLO MECHANICAL CONTRACTORS | $4,864 |
| Mar 4, 2026 | 20007971 WSU SPOKANE 23-24 PREVENTATIVE MAINTENANCE WSU SPOKANE 23-24 PREVENTATIVE MAINTENANCE | APOLLO MECHANICAL CONTRACTORS | $5,302 |
| Mar 4, 2026 | 20005664 WSU SPOKANE 3RD FLOOR PBS BLDG STEAM LINE WSU SPOKANE REPAIR 3RD FLOOR PBS BLDG STEAM LINE | APOLLO MECHANICAL CONTRACTORS | $408 |
| Mar 2, 2026 | 20005078 WSU SPOKANE PBS 3RD FLOOR AUTOCLAVE WSU SPOKANE PBS 3RD FLOOR AUTOCLAVE | APOLLO MECHANICAL CONTRACTORS | $2,230 |
| Feb 2, 2026 | (title withheld) PO0000051036 | MOUNTAIN DOG SIGN COMPANY INC | $7,501 |
| Jan 28, 2026 | 200004895 4TH FLOOR PBS AUTOCLAVE - PUMP SEAL GASKET REPLACEMENT 22-23 HVAC MAINT & REPAIRS`` | APOLLO MECHANICAL CONTRACTORS | — |
| Jan 28, 2026 | 20004701 PLANNED MAINTENANCE AUTO CLAVE 9122 SS00078 21-22 MAINTENANCE CONSOLIDATED AUTOCLAVE | APOLLO MECHANICAL CONTRACTORS | $5,302 |
| Jan 23, 2026 | WSU Spokane Medicine Phase 1 WSU PO0000048802 | ADVANCED FIRE SYSTEMS INC | $4,623 |
| Jan 19, 2026 | 20012041 SS00078 25-26 AUTOCLAVE PM MAINT WSU-SPOKANE PLANNED MAINT AGREEMENT | APOLLO MECHANICAL CONTRACTORS | $902 |
| Jan 19, 2026 | 20011893 WSU SPOKANE VIVARIAUM CLEAN SIDE DOOR GASKET FILING 20011893 WSU SPOKANE HEALTH SCIENCES VIVARIUM DOOR GASKET | APOLLO MECHANICAL CONTRACTORS | $586 |
| Jan 19, 2026 | 20012036 SS00078 25-26 PM MAINT WSU-SPOKANE PLANNED MAINT AGREEMENT | APOLLO MECHANICAL CONTRACTORS | $5,412 |
| Jan 12, 2026 | 2026-0012 WSU Spokane - Emergency Call Troubleshoot MCB Master Control Board AIS 2026-0012 | APPLIED INDUSTRIAL SYSTEMS LLC | $4,122 |
| Jan 7, 2026 | WSU-WSU Diagnostics for PBS Chillers 2 & 3 PO0000049887 | MCKINSTRY CO LLC | $4,255 |
| Dec 19, 2025 | Ignite Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $2,856 |
| Nov 18, 2025 | Generator Load Bank Testing PO0000047486 | WESTERN STATES EQUIPMENT CO | $5,197 |
| Nov 12, 2025 | 1211 Sectional Boiler PO0000044350 | MID MOUNTAIN BOILER/STEAM INC | $3,404 |
| Nov 11, 2025 | Academic Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $1,548 |
| Nov 11, 2025 | HERB Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $1,548 |
| Nov 11, 2025 | Health Science Bldg Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $1,548 |
| Nov 11, 2025 | Nursing Bldg Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $1,548 |
| Nov 10, 2025 | PBS Bldg Generator Generator Maintenance | WESTERN STATES EQUIPMENT CO | $1,929 |
| Oct 28, 2025 | Break room 61799 | The Drain Specialists | — |
| Oct 28, 2025 | Dental Hygeine 0000048813 | The Drain Specialists | — |
| Sep 19, 2025 | Ignite Building Gen Maintenance Ignite Building | WESTERN STATES EQUIPMENT CO | $2,856 |
| Sep 12, 2025 | Riverpoint Median Sprinkler Repair PO0000047766 | C & C YARD CARE INC | $763 |
| Aug 27, 2025 | Tree Trimming Spokane Falls Blvd. 0000046856 | HEINDL TREE CARE INC | $6,982 |
| Aug 4, 2025 | WSU Spokane- HERB, CH2, SYS2 SOL VALVE and REFRIG AIS 2025-0191 | APPLIED INDUSTRIAL SYSTEMS LLC | $3,539 |
| Aug 4, 2025 | WSU Spokane- SAC Chiller #1 and #2 Relief Valve Replacement AIS 2025-0185 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Jul 25, 2025 | HSB Lift Station PO0000046556 | BIG SKY INDUSTRIAL SERVICES | — |
| Jun 24, 2025 | WSU Spokane- SAC CHILLER #2 COMPRESSOR ORINGS REPLACEMENT AIS 2025-0184 | APPLIED INDUSTRIAL SYSTEMS LLC | $5,738 |
| Jun 24, 2025 | Compressor service and repairs PO 0000044519 | ROGERS MACHINERY CO INC | $1,598 |
| Jun 24, 2025 | WSU Spokane- SAC Bldg. CH #1 and #2 Flow Issues AIS 2025-0182 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Jun 9, 2025 | WSU Spokane- HERB CH #2 Electronic Expansion Valve, System 2 Replace AIS 2025-0173 | APPLIED INDUSTRIAL SYSTEMS LLC | $6,124 |
| Jun 9, 2025 | WSU Spokane- HERB Chiller #1 Slide Valve Service Call AIS 2025-0172 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Jun 2, 2025 | WSU Spokane- SAC Chiller #2, Circuit A Repairs AIS 2025-0133 | APPLIED INDUSTRIAL SYSTEMS LLC | $6,142 |
| Jun 2, 2025 | WSU Spokane- SAC Bldg. Chiller 1 alarms 2025-0116 AIS | APPLIED INDUSTRIAL SYSTEMS LLC | $8,087 |
| Apr 25, 2025 | WSU Innovation Center - Ignite NW-Replace RTU motor PO0000042042 | MCKINSTRY CO LLC | $3,063 |
| Apr 22, 2025 | Troubleshoot Generator Tech-Ignite Ctr/120 N Pine St | WESTERN STATES EQUIPMENT CO | $714 |
| Apr 10, 2025 | Tech-Ignite Bldg Load Test PO0000040467 | WESTERN STATES EQUIPMENT CO | $2,669 |
| Mar 30, 2025 | WSU Campus parking lot spring cleaning PO0000043419 | Mr. B's Clean Sweep Inc | $7,913 |
| Mar 20, 2025 | 2025-0068 WSU Spokane- PBS Process Chiller Water Pressure Issue Approved by Bill | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Mar 12, 2025 | Proposal 236 HERB Building 41895 | ADVANCED FIRE SYSTEMS INC | $4,676 |
| Mar 5, 2025 | Replace garage door springs 509-358-7552 | WAYNE DALTON SALES & SERVICE | $1,012 |
| Feb 24, 2025 | WSU Health Science Bldg-WSU Dental Lab - relocating a sink drain line approximately 40� in the dental lab at the HSB/eastern building PO0000042223 | MCKINSTRY CO LLC | $5,120 |
| Feb 6, 2025 | Add Reptacle for Refrigerator S035369 | POWER CITY ELECTRIC INC | $2,275 |
| Jan 29, 2025 | (title withheld) 41710 | The Drain Specialists | $556 |
| Jan 21, 2025 | HERB Chiller #1 Refrigerant Leak Repair 0000041411 | APPLIED INDUSTRIAL SYSTEMS LLC | $5,837 |
| Jan 7, 2025 | Replace 1 section 24Q000346 | MID MOUNTAIN BOILER/STEAM INC | $8,954 |
| Jan 7, 2025 | Replace 1 section - 2 1184 | MID MOUNTAIN BOILER/STEAM INC | — |
| Dec 30, 2024 | WSU Fall Cleaning SPC005624 | WESTCOAST WINDOW CLEANING INC | $37,264 |
| Dec 30, 2024 | Spring and Fall WSU Cleaning SPC005624 | WESTCOAST WINDOW CLEANING INC | $75,750 |
| Dec 30, 2024 | Spring and Fall 2024 Window Cleaning SPC005624 | WESTCOAST WINDOW CLEANING INC | $73,746 |
| Dec 17, 2024 | WSU Spokane Smokeguard Service & Repair PO0000035347 | DUPREE BUILDING SPECIALTIES | $4,360 |
| Dec 17, 2024 | 2024-0330 WSU Spokane- Maintenance Agreement SPC006405 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Dec 17, 2024 | WSU HERB - CH2 Emergency Call CKT 1 Low Refrig Temp AIS 2024-0292 | APPLIED INDUSTRIAL SYSTEMS LLC | $1,210 |
| Nov 14, 2024 | WSU-Opinion on Repairing vs Replacing Chiller Control Panel PO0000038247 | MCKINSTRY CO LLC | $1,264 |
| Oct 30, 2024 | WSU Spokane-WSU Chiller #2 Board Replacement PO0000038247 | MCKINSTRY CO LLC | $4,516 |
| Oct 18, 2024 | Riverfront Office WSU Spo Signs PO 0000034321 | MOUNTAIN DOG SIGN COMPANY INC | $3,374 |
| Oct 10, 2024 | Nursing ArctiChill, Chiller #3 Server Room Control Panel Upgrade 0000038973 | APPLIED INDUSTRIAL SYSTEMS LLC | $9,978 |
| Aug 29, 2024 | IGNITE Chiller System 1, Comp. #1 Addl Refrigerant and Contactor AIS2024-0235 | APPLIED INDUSTRIAL SYSTEMS LLC | $3,515 |
| Aug 28, 2024 | Nursing Cooling Tower Troubleshooting and Repair AIS 2024-0198 | APPLIED INDUSTRIAL SYSTEMS LLC | $6,467 |
| Aug 23, 2024 | WSU Spokane 2 - Quinton Jacobs | JOHNSON CONTROLS FIRE PRTTN LP | $699 |
| Aug 20, 2024 | WSU Ignite Lab Sink PO0000036335 | PROFESSIONAL PIPING INC | $5,169 |
| Aug 19, 2024 | Med Bldg Varying Signage PO 0000031122 | MOUNTAIN DOG SIGN COMPANY INC | $4,122 |
| Aug 19, 2024 | Green 2,Green 5 0000036880 | C&H ASPHALT | $23,386 |
| Aug 12, 2024 | WSU Spokane - PBS Bldg. CH2 Config Data Loss AIS 2024-0246 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Jul 29, 2024 | IGNITE Chiller System 1, Comp. #1 Replacement Approved by Bill | APPLIED INDUSTRIAL SYSTEMS LLC | $11,659 |
| Jul 17, 2024 | WSU- Nursing- CH2 alarms Approved by Bill | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Jul 17, 2024 | WSU- Nursing- CH1 oil pressure alarms Approved by Bill | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Jul 16, 2024 | Health Sciences Building PO00000035075 | ARROW CONCRETE & ASPH SPC LLC | $15,350 |
| Jul 1, 2024 | New Blade Sign Panels PO 0000033582 | MOUNTAIN DOG SIGN COMPANY INC | $1,878 |
| Jun 25, 2024 | Compressor Repair PO 00000027612 | ROGERS MACHINERY CO INC | $1,493 |
| Jun 20, 2024 | HERB Bldg Repair Cooling Tower Piping PO0000034653 | MCCLINTOCK & TURK INC | $8,275 |
| Jun 18, 2024 | WSU Spokane - SAC BLDG, Chiller, Low Oil Pressure Faults Approved by Bill | APPLIED INDUSTRIAL SYSTEMS LLC | $2,290 |
| Jun 12, 2024 | PBS Restoration Relocation PO0000033380 | BELLINGHAM TRANSFER & STORAGE INC | $3,902 |
| Jun 6, 2024 | Removal of Hoods PO0000034858 | 1ST AIR MECHANICAL INC | $2,171 |
| Jun 6, 2024 | School of Pharmacy 5099390607 | SERVPRO OF JACKSON HOLE | — |
| Jun 6, 2024 | HSB Bldg Emergency Valve Repair PO0000031235 | MCCLINTOCK & TURK INC | $1,500 |
| May 22, 2024 | PBS Chiller 1 Guide Vane 0000035279 | APPLIED INDUSTRIAL SYSTEMS LLC | $6,718 |
| May 22, 2024 | Nursing Building Chiller 2 HPCO Repair 0000035282 | APPLIED INDUSTRIAL SYSTEMS LLC | $1,088 |
| May 22, 2024 | WSU Spokane Nursing CH2 Compressor A1 Oil fault 0000035280 | APPLIED INDUSTRIAL SYSTEMS LLC | $6,186 |
| May 2, 2024 | Phase One Building Chiller Copressor Contact Replaced PO0000033125 | APPLIED INDUSTRIAL SYSTEMS LLC | $3,813 |
| May 2, 2024 | HSB Building Chiller 2 oil fault PO0000034619 | APPLIED INDUSTRIAL SYSTEMS LLC | $812 |
| Apr 29, 2024 | IW (HERB) Building Chiller #2 Circuit #2 contractor Replacement PO0000034402 | APPLIED INDUSTRIAL SYSTEMS LLC | $1,609 |
| Apr 14, 2024 | WSU Campus parking lot Spring cleaning PO0000033750 | Mr. B's Clean Sweep Inc | $7,194 |
| Mar 26, 2024 | Ignite Bldg Chiller Troubleshooting & Repairs PO0000033429 | SNO VALLEY PROC SOLUTIONS INC | $12,293 |
| Mar 7, 2024 | WSU Spokane � Chiller Annual Service Proposal � IW (HERB) Building 2024 TBD | APPLIED INDUSTRIAL SYSTEMS LLC | $4,630 |
| Mar 7, 2024 | Chiller Annual Service Proposal � PBS Building 2024 TBD | APPLIED INDUSTRIAL SYSTEMS LLC | $9,058 |
| Mar 7, 2024 | WSU Spokane 2024 Jensen Byrd Pipe Replacement PO0000032490 | MCKINSTRY CO LLC | $2,673 |
| Mar 7, 2024 | WSU Spokane � Chiller Annual Service Proposal � Phase One Building 2024 TBD | APPLIED INDUSTRIAL SYSTEMS LLC | $2,315 |
| Mar 7, 2024 | HSB Building Chiller Annual Service per Proposal Dated 2/25/24. 509-358-7553 | APPLIED INDUSTRIAL SYSTEMS LLC | $5,950 |
| Mar 7, 2024 | WSU Spokane � Chiller Annual Service Proposal � Nursing Building 2024 TBD | APPLIED INDUSTRIAL SYSTEMS LLC | $3,434 |
| Mar 7, 2024 | WSU Spokane � Chiller Annual Service Proposal � SAC Building 2024 TBD | APPLIED INDUSTRIAL SYSTEMS LLC | $4,404 |
| Mar 7, 2024 | WSU Spokane � Chiller Annual Service Proposal � Spokane Technology (IGNITE) Building 2024 TBD | APPLIED INDUSTRIAL SYSTEMS LLC | $1,875 |
| Jan 28, 2024 | Window Replacement-HERB Room 440 PO0000031333 | MODERN GLASS COMPANY | $4,084 |
| Dec 18, 2023 | Med Bldg Founding Story Panel PO 0000028980 | MOUNTAIN DOG SIGN COMPANY INC | $1,700 |
| Nov 22, 2023 | WSU Spokane Nursing Bldg Service Aerco Boilers 56015 | ATLAS BOILER/EQUIPMENT CO INC | $5,529 |
| Nov 21, 2023 | Nursing Building Chiller #2 Comp. A1 Low Oil Pressure WSU20231227 | SNO VALLEY PROC SOLUTIONS INC | $3,728 |
| Nov 21, 2023 | PBS Building 19XRV Chiller 1 Control Panel Repair 20230472 | SNO VALLEY PROC SOLUTIONS INC | $6,109 |
| Nov 21, 2023 | 668 Riverpoint Blvd Office Furnishing Cleaning WSU 07-2023 | ABM ONSITE SERVICES-WEST | $1,290 |
| Nov 21, 2023 | PBS Building 19XRV Chiller 3 High Bearing Temperature Troubleshooting WSU20231226 | SNO VALLEY PROC SOLUTIONS INC | $576 |
| Oct 19, 2023 | PBS 19XRV Chiller 1 Control Panel Repairs PO0000028443 | SNO VALLEY PROC SOLUTIONS INC | $7,080 |
| Oct 19, 2023 | Nursing Bldg - Chiller #2 - BACNET Card Replacement PO0000023296 | SNO VALLEY PROC SOLUTIONS INC | $5,557 |
| Oct 16, 2023 | Replace cast section PO0000027142 | MID MOUNTAIN BOILER/STEAM INC | $6,064 |
| Sep 21, 2023 | HSB Chiller #2 - Compressor B Repair PO0000026105 | SNO VALLEY PROC SOLUTIONS INC | $8,676 |
| Sep 14, 2023 | PBS Bldg 19XRV Chiller Evap Cleaning PO0000027617 | SNO VALLEY PROC SOLUTIONS INC | $8,088 |
| Sep 14, 2023 | SAC Bldg Chiller Low Oil Pressure PO0000027616 | SNO VALLEY PROC SOLUTIONS INC | $823 |
| Sep 14, 2023 | HSB Bldg Chiller 2/System B Troubleshoot PO0000027615 | SNO VALLEY PROC SOLUTIONS INC | — |
| Sep 14, 2023 | SAC Bldg Chiller Flow Switch Repair PO0000027613 | SNO VALLEY PROC SOLUTIONS INC | $4,229 |
| Aug 1, 2023 | Medical Building Window Washing PO0000024869 | WESTCOAST WINDOW CLEANING INC | $7,310 |
| Jul 13, 2023 | WSU EWU Letters PO0000024495 | BALDWIN SIGN CO | $4,916 |
| Jul 5, 2023 | HVAC Upgrade Ignite Rm 122 0000024780 | 1ST AIR MECHANICAL INC | $1,842 |
| Jun 20, 2023 | WSU Nursing Bldg Boiler Service PO0000025476 | ATLAS BOILER/EQUIPMENT CO INC | $381 |
| Jun 14, 2023 | WSU Bio Med Boiler Diagnostic 0000005817 | COMBUSTION & CONTROL | — |
| Jun 14, 2023 | WSU Pharmaceutical Bldg PO0000024237 | JOHNSON CONTROLS FIRE PRTTN LP | $1,264 |
| Apr 30, 2023 | WSU HERB Bldg Backflow Replacement PO0000023852 | MCKINSTRY CO LLC | $9,810 |
| Apr 26, 2023 | WSU CCRS Room 234 PO0000023787 | MCKINSTRY CO LLC | $4,268 |
| Apr 24, 2023 | WSU Campus Marque Monument PO0000023331 | BALDWIN SIGN CO | $8,277 |
| Apr 19, 2023 | (title withheld) 22612 | AIR DIXON LLC | $513 |
| Apr 19, 2023 | chiller repair 0000022536 | AIR DIXON LLC | $294 |
| Apr 12, 2023 | WSUS Campus lot cleaning PO0000022665 | Mr. B's Clean Sweep Inc | $7,194 |
| Apr 3, 2023 | Nursing Bldg - Chiller #2 Troubleshooting 0000021617 | SNO VALLEY PROC SOLUTIONS INC | $1,635 |
| Apr 3, 2023 | PBS Bldg - Chiller 3 Control Panel Troubleshooting 0000022679 | SNO VALLEY PROC SOLUTIONS INC | $1,635 |
| Mar 20, 2023 | Regasket Boiler 22Q000293 PO0000016839 | MID MOUNTAIN BOILER/STEAM INC | $10,876 |
| Mar 19, 2023 | WSU HERB Bldg Repairs PO0000022220 | MCKINSTRY CO LLC | $9,204 |
| Mar 15, 2023 | HSB Bird Control PO0000020811 | WESTCOAST WINDOW CLEANING INC | $2,850 |
| Mar 14, 2023 | Fall Window Clenaing RQ0000014962 | WESTCOAST WINDOW CLEANING INC | $20,000 |
| Mar 2, 2023 | VFD UPGRADE PO0000017204 / 4522-847 | CONTROL SOLUTIONS NW INC | $1,917 |
| Mar 1, 2023 | WSU Spokane Nursing Bldg Boiler Service PO0000022056 | ATLAS BOILER/EQUIPMENT CO INC | $1,368 |
| Jan 17, 2023 | Install Video Surveillance P18589 | CAMTEK INC | $47,825 |
| Dec 9, 2022 | HSB Bldg - Chiller #3 Humidity Sensor Replacement. 0000016328 | SNO VALLEY PROC SOLUTIONS INC | $4,605 |
| Nov 11, 2022 | WSU SPOKANE U-FIT PO0000015478 | ALLSTAR GLASS COMPANY | $3,955 |
| Sep 14, 2022 | PBS Building Chilled Water Plant Troubleshooting 0000017296 | SNO VALLEY PROC SOLUTIONS INC | $2,082 |
| Sep 14, 2022 | PBS Building Chiller #1/#3 Troubleshooting and Repair 0000016330 | SNO VALLEY PROC SOLUTIONS INC | $1,369 |
| Sep 14, 2022 | SAC Building Chiller #1/#2 Troubleshooting and Repair 0000016331 | SNO VALLEY PROC SOLUTIONS INC | $1,377 |
| Sep 14, 2022 | PBS Building 19XRV Chiller IGV Motor Replacement 0000016654 | SNO VALLEY PROC SOLUTIONS INC | $5,908 |
| Sep 14, 2022 | Nursing Chiller #1, System A Repair 0000015573 | SNO VALLEY PROC SOLUTIONS INC | $5,472 |
| Sep 1, 2022 | Nursing Bldg - Chiller #1, Circuit A Oil Pressure Failure Troubleshooting 0000016329 | SNO VALLEY PROC SOLUTIONS INC | $2,536 |
| Aug 30, 2022 | Washington State Univ - UPS/BTS Annual Maintenance PO0000017045 | M C Dean Inc | $4,600 |
| Aug 19, 2022 | WSU Critical Research 0000015068 | JOHNSON CONTROLS FIRE PRTTN LP | $1,173 |
| Aug 1, 2022 | CCRS SHIPPING DOOR REPAIR PO0000015324 | OVERHEAD DOOR CO/SPO-C D'ALENE | $608 |
| Jul 20, 2022 | (title withheld) 0000012230 | 1ST AIR MECHANICAL INC | $1,090 |
| Jul 18, 2022 | WSU Sleep Lab Extra Work Authorization 13753 | RJ-Tabish Contracting LLC | $2,018 |
| Jul 18, 2022 | (title withheld) 15768 | RJ-Tabish Contracting LLC | $523 |
| Jul 8, 2022 | Nursing Bldg: Chiller #2 - System A Leak Repair PO0000013844 | SNO VALLEY PROC SOLUTIONS INC | $6,845 |
| Jul 8, 2022 | Chiller Maintenance services SPC000514 | SNO VALLEY PROC SOLUTIONS INC | $127,015 |
| Jun 23, 2022 | Nursing Boiler Repair PO0000012660 | MID MOUNTAIN BOILER/STEAM INC | $2,821 |
| Jun 21, 2022 | EWU Herb Bldg 240328 | RIVER CITY GLASS INC | $1,164 |
| Jun 13, 2022 | Spring Window Cleaning - WSU Spokane Campus PO0000007548 | WESTCOAST WINDOW CLEANING INC | $25,148 |
| Jun 7, 2022 | WSU-Spokane PO0000014550 | CARLSON SHEET METAL WORKS INC | $1,191 |
| May 26, 2022 | Nursing Chiller #2 System Leak Test 0000013121 | SNO VALLEY PROC SOLUTIONS INC | $2,126 |
| May 25, 2022 | WSU Cooling Tower Repair PO0000013915 | TRM SERVICES INC | $5,742 |
| May 18, 2022 | crack repair 12960 | C&H ASPHALT | $34,801 |
| May 4, 2022 | PBS Bldg Natural Gas PO0000011350 | MCCLINTOCK & TURK INC | $2,164 |
| May 4, 2022 | PBS Penthouse Drain PO0000012449 | MCCLINTOCK & TURK INC | $1,199 |
| May 4, 2022 | WSU Nursing Bldg. PO0000012568 | MCCLINTOCK & TURK INC | $1,428 |
| May 1, 2022 | NAHS Cedar Wall P.O. 13060 | RJ-Tabish Contracting LLC | $8,278 |
| Apr 22, 2022 | asphalt Repair Green 4 0000012468 | C&H ASPHALT | $5,761 |
| Apr 6, 2022 | (title withheld) PO0000008751 | C & C YARD CARE INC | $6,158 |
| Mar 30, 2022 | WSUS Campus lot cleaning PO0000012360 | Mr. B's Clean Sweep Inc | $6,649 |
| Mar 11, 2022 | WSU Sleep Lab JB21-036762 | GREAT FLOORS | $9,980 |
| Mar 4, 2022 | (title withheld) 23940 | CARUSO'S FLOORS | $10,900 |
| Feb 17, 2022 | HSB Building Chiller 2/Ckt. A Economizer Repair 0000010765 | SNO VALLEY PROC SOLUTIONS INC | $10,410 |
| Dec 21, 2021 | (title withheld) 9340 | 1ST AIR MECHANICAL INC | $1,613 |
| Dec 21, 2021 | Fire extinguisher Inspections PO0000008898 | GENERAL FIRE EQUIP CO INC | $2,627 |
| Dec 15, 2021 | Fall Window Cleaning � WSU Spokane Campus Pt. 2 PO0000007548 | WESTCOAST WINDOW CLEANING INC | $11,009 |
| Dec 15, 2021 | Fall Window Cleaning � WSU Spokane Campus PO0000007594 | WESTCOAST WINDOW CLEANING INC | $23,948 |
| Dec 6, 2021 | HSB Chiller 3 Troubleshoot 0000007539 | SNO VALLEY PROC SOLUTIONS INC | $1,635 |
| Dec 6, 2021 | PBS Chiller Sensor Replacement 0000007084 | SNO VALLEY PROC SOLUTIONS INC | $4,345 |
| Nov 23, 2021 | WSU HSB Bldg PO0000001402 | FLINT SERVICES | $19,678 |
| Nov 12, 2021 | Washington State University Spokane Campus PO000000005827 | JOHNSON CONTROLS FIRE PRTTN LP | $1,439 |
| Nov 11, 2021 | Ignite Bldg Stainless duct PO0000007378 | 1ST AIR MECHANICAL INC | $6,884 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.