4,137 public works projects and 9,224 intents to pay prevailing wages name TACOMA, CITY OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: City, 1st Class.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 384 | 563 | 453 | 340 | 445 | 486 | 563 | 863 | 645 | 440 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 25, 2026 | City of Tacoma - Police Headquarters-ProjectBF- AHU-5 SF flex connector WO 5006064 | MCKINSTRY CO LLC | $3,133 |
| Sep 21, 2026 | 130162-Lock broken 130162-Lock broken | ROBBLEE'S TOTAL SECURITY INC | $1,019 |
| Sep 15, 2026 | Tacoma Power 4600015835 | K & D SERVICES INC | — |
| Sep 15, 2026 | Community Revitalization Program 2025-2026 CRP2025-26 | REBUILDING TOGETHER SOUTH SND | — |
| Sep 14, 2026 | The Pantages Theater-Woman's room in the basement, value is leaking WO 5009690 | MCKINSTRY CO LLC | $1,378 |
| Sep 9, 2026 | Canyon Road Raise and Lower Gate Boxes CW2283025 | PUGET PAVING & CONST INC | $53,900 |
| Sep 2, 2026 | Tacoma Water C3226-2026 | QUALITY FENCE BUILDERS INC | $15,000 |
| Sep 1, 2026 | CITY OF TACOMA FLEET CONFERENCE ROOM SIGNED PROPOSAL | GREAT FLOORS | $9,526 |
| Aug 31, 2026 | 25-WA-251157 City of Tacoma - Grandview Pump Station CW2284537/C4789 | GARLAND/DBS INC | $47,591 |
| Aug 31, 2026 | Project 25-WA-251173 Tacoma Municipal Bldg. - 16th & 17th floor roofs CW2282226/C4605 | GARLAND/DBS INC | $923,336 |
| Aug 27, 2026 | Tacoma Police Headquarters HVAC Decarbonization Upgrades Re-bid PW26-0049F; CW2282927 | MORGAN MECHANICAL INC | $2,311,355 |
| Aug 26, 2026 | GRFF Ozone System Replacement Project CW2283378 | AWARD CONSTRUCTION INC | $5,932,611 |
| Aug 20, 2026 | (title withheld) 15122 | LANDSCAPE STRUCTURES INC | $163,269 |
| Aug 19, 2026 | Tacoma Water Emergency Rpr CW2281934 | PETERSEN BROTHERS INC | $6,034 |
| Aug 17, 2026 | Artistic Tile Medallions installation CW2282454 | 1ST CHOICE HOME IMPRVMNT INC | $15,689 |
| Aug 17, 2026 | J11723 - Center for Urban Waters (S) INV 23692 | WEST COAST MECH SLTNS LLC | $536 |
| Aug 13, 2026 | Harborview & McCormick Park CW2280769-spec#PW26-0056D | BARE ORNAMENTAL IRON LLC | $16,352 |
| Aug 12, 2026 | (title withheld) 66312131 | FLOHAWKS | — |
| Aug 12, 2026 | Central Wastewater Treatment Plant Mixed Liquor Channel Pipe Replacement ES26-0002F | STELLAR J CORPORATION | $1,509,900 |
| Aug 12, 2026 | City of Tacoma CW2280091/DES 09321 | GRAYMAR ENVIRONMENTAL SERV LLC | $200,000 |
| Aug 12, 2026 | J11514 - Center for Urban Waters (S) 74866-005374 INV 23614 | WEST COAST MECH SLTNS LLC | $908 |
| Aug 10, 2026 | TACOMA CITY OF INV0032324 | DAVIS DOOR SERVICE INC | $1,041 |
| Aug 4, 2026 | Community Revitalization Program 2025-2026 CRP2025-26 | REBUILDING TOGETHER SOUTH SND | — |
| Aug 4, 2026 | Community Revitalization Program 2025-2026 CRP2025-26 | REBUILDING TOGETHER SOUTH SND | — |
| Aug 3, 2026 | (title withheld) 66315153 | FLOHAWKS | — |
| Jul 31, 2026 | Library Emergency Side Sewer Repair JOC#CT25-0217F | SAYBR CONTRACTORS INC | $53,700 |
| Jul 30, 2026 | Tacoma Dome East Wall Power Installation CW2282709 | APEX MECHANICAL LLC | $820,500 |
| Jul 29, 2026 | City of Tacoma CTP 66311501 | FLOHAWKS | $2,053 |
| Jul 28, 2026 | 2026 WASTEWATER CURED-IN PLACE PIPE REHABILITATION ES26-0037F / ENV-04026-03 | INSITUFORM TECHNOLOGIES LLC | $1,588,154 |
| Jul 27, 2026 | 2026 Stormwater CIPP Rehabilitation ES26-0042F / ENV-03034-10 | INSITUFORM TECHNOLOGIES LLC | $754,434 |
| Jul 24, 2026 | Energy Control Center - Tacoma Uitlities 21727847592 | ROTO ROOTER SERVICES CO | $1,942 |
| Jul 24, 2026 | Tacoma Public Utilities 21727848910 | ROTO ROOTER SERVICES CO | $2,842 |
| Jul 23, 2026 | J11509 - Center for Urban Waters (S) W-74866-005370 - INV 23389 | WEST COAST MECH SLTNS LLC | $575 |
| Jul 22, 2026 | J11176 - Center for Urban Waters (S) 219876-26-390 - INV 23356 | WEST COAST MECH SLTNS LLC | $13,099 |
| Jul 21, 2026 | 8 Mile Pit TW26-0025N | MCCALLUM ROCK DRILLING INC | $184,000 |
| Jul 21, 2026 | P216.23569 - City of Tacoma DES 09321 | NRC ENVIRONMENTAL SERVICES INC | — |
| Jul 15, 2026 | P216.23304 - City of Tacoma DES 09321 | NRC ENVIRONMENTAL SERVICES INC | — |
| Jul 14, 2026 | East Division Ln and East F St. Sanitary Replacement CW2283036, ES25-0141F | R L ALIA COMPANY | $736,368 |
| Jul 14, 2026 | City of Tacoma - Police Headquarters-AHU-5 fan making loud noises. WO 5004068 | MCKINSTRY CO LLC | $1,304 |
| Jul 14, 2026 | Full Fueling Log | MASCOTT EQUIPMENT CO INC | $942 |
| Jul 14, 2026 | TACOMA CITY OF INV0026313 | DAVIS DOOR SERVICE INC | $397 |
| Jul 14, 2026 | Tacoma Municipal Bldg. - Streets & Grounds Bldg. Lower Roof CW2283545/C4692 | GARLAND/DBS INC | $215,254 |
| Jul 13, 2026 | Vault reset 4522-26 | OMEGA MORGAN CRANES LLC | $1,347 |
| Jul 10, 2026 | H2S Vessel Change out service CW2251710 | PACIFIC COAST CARBON LLC | $42,134 |
| Jul 10, 2026 | Alder Lake Stacel & Camp DN-4202026-00014450 | NORTHWEST PLAYGROUND EQUIP LLC | $94,835 |
| Jul 2, 2026 | TACOMA CITY OF INV0028715 | DAVIS DOOR SERVICE INC | $2,769 |
| Jun 30, 2026 | 2026-2030 Movable Bridge O&M YR 1 CW2281281 | ORION MARINE CONTRACTORS INC | $3,962,340 |
| Jun 29, 2026 | Bay Door 3 #368995793 | PRECISION DOOR SERVICE | $726 |
| Jun 29, 2026 | City of Tacoma - Municipal Building-Broadway fountain mier work WO 5004039 | MCKINSTRY CO LLC | $1,594 |
| Jun 29, 2026 | P216.23331 - Tacoma Public Utilities DES 09321 | NRC ENVIRONMENTAL SERVICES INC | — |
| Jun 29, 2026 | TMB Camera Upgrade | CONVERGINT TECHNOLOGIES LLC | $219,049 |
| Jun 25, 2026 | North End Wastewater Treatment Plant Outfall Lid Replacement Project CW2282496 | PEASE PIPING INC | $239,978 |
| Jun 16, 2026 | CITY OF TACOMA FS 09 SIGNED PROPOSAL | GREAT FLOORS | $16,917 |
| Jun 15, 2026 | Tacoma Fire Station 11 Cleaning and Painting C4641 | TRU COLORS CONTRACTING INC | $48,788 |
| Jun 15, 2026 | City of Tacoma - Municipal Services Center PO 9000011142 | GARLAND/DBS INC | $2,127 |
| Jun 12, 2026 | Water Main Replacement Project CW2281885 | MILES RESOURCES LLC | $1,127,950 |
| Jun 11, 2026 | CITY OF TACOMA W1001534373 | CONVERGINT TECHNOLOGIES LLC | $907 |
| Jun 8, 2026 | Fire Station 11 West facing back door C2956 | PRECISION DOOR SERVICE | $1,861 |
| Jun 8, 2026 | Fire Station 11 ER C2956 | PRECISION DOOR SERVICE | $662 |
| Jun 5, 2026 | Public Work Street Operations C3038-2026 | QUALITY FENCE BUILDERS INC | $15,000 |
| Jun 5, 2026 | TPU Nursing Room/ ABN-3 Lactation Room Linda Brent, 253-502-8257 | Print NW LLC | $2,131 |
| Jun 5, 2026 | TACOMA 24' SAILBOAT N/A | QUIGG BROS INC | $18,000 |
| Jun 5, 2026 | Tacoma Convention Center 2026 7.0 SA11735-7 (5002424) | MCKINSTRY CO LLC | $74,405 |
| May 28, 2026 | CTP Biofilter Media Replacement ENV-04018-16 | ROGNLINS INC | $466,569 |
| May 27, 2026 | North End Treatment Plant Trickling Filter Upgrade CW2281127 | MCCLURE & SONS INC | $24,145,313 |
| May 26, 2026 | REPAIR GOULDS 3996 ROTATING ASSEMBLY TBD | BECKWITH & KUFFEL INC | — |
| May 26, 2026 | City of Tacoma - Vacant Space Plumbing Repairs Signed Proposal | MCKINSTRY CO LLC | $24,748 |
| May 25, 2026 | S Cedar St Active Transportation Enhancements PW25-0197F | NORTHWEST CASCADE INC | $1,747,672 |
| May 21, 2026 | City of Tacoma - Lining Project Task Authorization | MCKINSTRY CO LLC | $12,172 |
| May 20, 2026 | Tacoma 32' Carver Vessel N/A | QUIGG BROS INC | $18,000 |
| May 18, 2026 | City of Tacoma - 5/1/26-4/30/27 Service Support Program Services Contract | A T S AUTOMATION INC | $45,476 |
| May 18, 2026 | CITY OF TACOMA FS 16 SIGNED PROPOSAL | GREAT FLOORS | $67,371 |
| May 13, 2026 | COT Park Plaza North Drain System Cleaning PW250296N | DICKSON COMPANY | $159,765 |
| May 7, 2026 | CITY OF TACOMA POINT DEFINACE SENIOR CENTER KITCHEN CW2277784, SUB AGREEMENT CC4480 | GREAT FLOORS | $14,144 |
| May 4, 2026 | SWM Main Receiving Building Tipping Floor Resurfacing ES26-0004F | Combined Construction Inc | $1,584,000 |
| May 1, 2026 | Q-14694 | TMB 248 | System Refresh - Rallybar | CW2254726 CW2254726 | CONTINUANT INC | $14,643 |
| May 1, 2026 | Q-15188 | TMB 408 | AV Refresh Dual Displays | CW2254726 CW2254726 | CONTINUANT INC | $16,793 |
| Apr 30, 2026 | Tacoma Fire Department - Station 8 CW2274852 | NORTHSIDE METAL CARPORTS LLC | $48,181 |
| Apr 30, 2026 | 25-WA-260361 City of Tacoma - Nisqually Contract C4556 CW2281386 | GARLAND/DBS INC | $101,937 |
| Apr 28, 2026 | The Pantages Theater-Sink leaking into room below WO 9999053 | MCKINSTRY CO LLC | $709 |
| Apr 23, 2026 | Community Revitalization Program 2025-2026 CRP2025-26 | REBUILDING TOGETHER SOUTH SND | — |
| Apr 23, 2026 | Community Revitalization Program 2025-2026 CRP2025-26 | REBUILDING TOGETHER SOUTH SND | — |
| Apr 21, 2026 | Tacoma, City of INV0026806 | DAVIS DOOR SERVICE INC | $1,625 |
| Apr 20, 2026 | Swasey Library Bollard Replacement 26-0489 | ASPHALT PATCH SYSTEMS | — |
| Apr 15, 2026 | Specification:TW23-0048N - 2025 Cathodic Protection Installation:Enumclaw Pipeline 1 CW2278712 | MESA PRODUCTS INC | $297,276 |
| Apr 15, 2026 | Community Revitalization Program 2025-2026 CRP2025-26 | REBUILDING TOGETHER SOUTH SND | — |
| Apr 15, 2026 | Community Revitalization Program 2025-2026 CRP2025-26 | REBUILDING TOGETHER SOUTH SND | — |
| Apr 14, 2026 | City of Tacoma - Municipal Building-They have a few PVC lines coming off the newly installed pump that aren't pushing water out like the other two. He thinks there may be debris in the lines. Chris WO 9998004 | MCKINSTRY CO LLC | $1,875 |
| Apr 10, 2026 | Media Supply for change outs C2571-V5 | PACIFIC COAST CARBON LLC | $81,705 |
| Apr 10, 2026 | Odor Control Media Services 2026 CW2280315 | PACIFIC COAST CARBON LLC | $231,940 |
| Apr 10, 2026 | Odor Control Media Services 2026 CW2280315 | PACIFIC COAST CARBON LLC | $231,940 |
| Apr 10, 2026 | Odor Control Media Services 2026 CW2280315 | PACIFIC COAST CARBON LLC | $231,940 |
| Apr 10, 2026 | VOC & Siloxane Change out CW2251710 | PACIFIC COAST CARBON LLC | $52,619 |
| Apr 9, 2026 | Central Treatment Plant Building A Renovation ES25-0195F | PEASE CONSTRUCTION INC | $818,150 |
| Apr 9, 2026 | Tacoma Dome Convention Center INV0025918 | DAVIS DOOR SERVICE INC | $1,016 |
| Apr 9, 2026 | CITY OF TACOMA CUSHMAN HOUSE SIGNED PROPOSAL | GREAT FLOORS | $15,091 |
| Apr 3, 2026 | center for urban waters building operations and maintenance 219876-25-window | K & L CLEANING INC | $20,020 |
| Apr 2, 2026 | City of Tacoma - Puyallup Avenue Sewer Utility Project Gulch - Vault Section CW2271119 | GEOENGINEERS INC | $38,950 |
| Apr 2, 2026 | Tacoma Dome Convention Center INV0025444 | DAVIS DOOR SERVICE INC | $910 |
| Apr 1, 2026 | City of Tacoma - Municipal Building-Install new drain pipe covers WO 9990653 | MCKINSTRY CO LLC | $1,840 |
| Apr 1, 2026 | (title withheld) CW2276176 | CONST GRP INTERNATIONAL LLC | — |
| Mar 27, 2026 | City of Tacoma - Municipal Building-ProjectBF- Pump replacement for fountain Frost Park WO 9987799 | MCKINSTRY CO LLC | $29,948 |
| Mar 27, 2026 | Park Plaza N Drain System Cleaning PW25-0296N | DICKSON COMPANY | $144,845 |
| Mar 27, 2026 | Tacoma Dome INV0025444 | DAVIS DOOR SERVICE INC | $910 |
| Mar 24, 2026 | CTP Locker Room HVAC Bldg A CW2274246 | HERMANSON COMPANY LLC | $75,128 |
| Mar 20, 2026 | Neighborhood & Community Services 2025 C2597-2026 | QUALITY FENCE BUILDERS INC | $5,000 |
| Mar 20, 2026 | Tacoma Power C2891-2026 | QUALITY FENCE BUILDERS INC | $5,000 |
| Mar 20, 2026 | (title withheld) C2657-2026 | QUALITY FENCE BUILDERS INC | $5,000 |
| Mar 19, 2026 | City of Tacoma - Municipal Services Center-Leak in hydronic system (glycol system) and air handler actuator valve to be installed WO 9995484 | MCKINSTRY CO LLC | $3,644 |
| Mar 17, 2026 | City of Tacoma - Police Headquarters-AHU-5 return fan making a lot of noise WO 9995483 | MCKINSTRY CO LLC | $759 |
| Mar 17, 2026 | TFD Station 4 9000010732 | SCHNEIDER SIMPSON SHEET METAL | $9,287 |
| Mar 10, 2026 | Parking Services CW2278819_PW25-0178F_RFB_ | MORGAN MECHANICAL INC | $682,757 |
| Mar 6, 2026 | Tacoma Well 5A 4500562342 | PUMPTECH LLC | $241,336 |
| Mar 5, 2026 | Q-07082024MG | Logitech SWYTECH Video Collaboration B2B | Rm. CUW-341 | CW2254726 CW2254726 | CONTINUANT INC | $2,040 |
| Mar 2, 2026 | Q-006016 | Visibility Rm. 900 Upgrade | CW2254726 CW2254726 | CONTINUANT INC | $42,315 |
| Mar 2, 2026 | TMB 335, 608, & 3rd Floor Customer Kiosk: Q-004467 | CW2254726 CW2254726 | CONTINUANT INC | $57,503 |
| Mar 2, 2026 | PW Facilities C2573-2026 | QUALITY FENCE BUILDERS INC | $15,000 |
| Mar 2, 2026 | CUW Commencement Bay Rms. 101 N. & 101 S. | Q-003972: CW2254726 CW2254726 | CONTINUANT INC | $128,796 |
| Feb 26, 2026 | City of Tacoma Municipal Building - PRV Isolation Valves Signed Proposal | MCKINSTRY CO LLC | $21,954 |
| Feb 26, 2026 | City of Tacoma Police Station NE - Split System Install Signed Proposal | MCKINSTRY CO LLC | $68,037 |
| Feb 24, 2026 | TCC - RS2 - Control Board and Panel Upgrades | CONVERGINT TECHNOLOGIES LLC | $84,501 |
| Feb 24, 2026 | Tacoma Well 13A Pump Replacement 4500562342 | PUMPTECH LLC | $167,998 |
| Feb 24, 2026 | (title withheld) 66302064 | FLOHAWKS | $1,539 |
| Feb 23, 2026 | TPD - HEADQUARTERS - Battery Replacement WSC 06225 - Quote 89020 | PACIFIC POWER GROUP LLC | $1,282 |
| Feb 20, 2026 | Tacoma Dome INV0023758 | DAVIS DOOR SERVICE INC | $829 |
| Feb 18, 2026 | Fuel Lines and Fuel/Water Separator Assembly Replacement WSC 06225 - Quote 89832 | PACIFIC POWER GROUP LLC | $3,528 |
| Feb 17, 2026 | Tacoma Fire Department - Station 8 CW2274852 | NORTHSIDE METAL CARPORTS LLC | $27,511 |
| Feb 16, 2026 | Beacon Senior Center DW Repair 9136474 9136474 | HOBART | — |
| Feb 13, 2026 | City of Tacoma - Municipal Building-BRANDON/JUSTIN - Installation of Shut Off Valves on Domestic Lines WO 9990480 | MCKINSTRY CO LLC | $8,157 |
| Feb 11, 2026 | Tacoma Municipal Bldg TS Q020126-0087 | Legacy Telecommunications, LLC | $360 |
| Feb 9, 2026 | Green River Watershed Operations Heavy Equipment Services 4600013653 | STAFFORD EXCAVATING LLC | $97,870 |
| Feb 6, 2026 | CITY OF TACOMA FS 08 SIGNED PROPOSAL FS 08 | GREAT FLOORS | $66,731 |
| Feb 6, 2026 | CITY OF TACOMA EOC BUILDING SIGNED PROPOSAL | GREAT FLOORS | $15,279 |
| Feb 5, 2026 | Carbon Media Change Outs CW2251710 | PACIFIC COAST CARBON LLC | $53,314 |
| Jan 30, 2026 | Environmental Services 2026 C2574-2026 | QUALITY FENCE BUILDERS INC | $10,000 |
| Jan 30, 2026 | CTP AEROBIC DIGESTERS QUAD A RESTORATION AND IMPROVEMENTS CW2276596 Spec. No. ES24-0017F | GENERAL MECHANICAL INC | $1,676,442 |
| Jan 30, 2026 | China Lake Pump Station Emergency Repair CW2279526 | NORTHWEST CASCADE INC | $250,000 |
| Jan 26, 2026 | Venue& Event - C4431 Venue& Event - C4431 | AA ASPHALTING LLC | — |
| Jan 26, 2026 | City of Tacoma - Fire Dept. Training Facility - Replace Motor/Controller 22171 | COMMERCIAL HARDWARE SRVCS INC | $3,039 |
| Jan 16, 2026 | 52-WA-250255 City of Tacoma Venues and Events C3609 | GARLAND/DBS INC | — |
| Jan 16, 2026 | City of Tacoma - Water Feature Pump Replacement Email NTP | MCKINSTRY CO LLC | $21,340 |
| Jan 15, 2026 | Street Initiative Package #30 CW2278387 | R L ALIA COMPANY | $4,131,851 |
| Jan 15, 2026 | City of Tacoma - Parking Office-Preventative Maintenance - General Tune UP & Filter Replacement WO 9991442 | MCKINSTRY CO LLC | $1,125 |
| Jan 15, 2026 | Tacoma Police Station Kandle Park 127014 | MCKINSTRY CO LLC | $55,103 |
| Jan 15, 2026 | City of Tacoma - Police Station KandlePark Split System Inst 127011 | MCKINSTRY CO LLC | $55,103 |
| Jan 12, 2026 | City of Tacoma - Frost Wtr Feature Piping Pressure Test Signed Proposal | MCKINSTRY CO LLC | $3,925 |
| Jan 9, 2026 | TMB CLEANING PROPOSAL 429879 | GREAT FLOORS | $19,919 |
| Jan 8, 2026 | Greater Tacoma Convention & Trade Center CW2254798 | SCHINDLER ELEVATOR CORP | $417,350 |
| Jan 8, 2026 | Tacoma Dome-Boiler 2 Stepper Motor Failure WO 9990628 | MCKINSTRY CO LLC | $1,274 |
| Jan 8, 2026 | The Pantages Theater-Water leaking in the dressing room WO 9990769 | MCKINSTRY CO LLC | $862 |
| Jan 6, 2026 | City of Tacoma - Lighthouse Senior Center-Multi Zone HVAC unit not working in upstairs has error code 5115. WO 9990206 | MCKINSTRY CO LLC | $733 |
| Jan 5, 2026 | Public Works - C3779 Public Works - C3779 | AA ASPHALTING LLC | — |
| Jan 5, 2026 | Environmental Service - C3138 Environmental Service - C3138 | AA ASPHALTING LLC | — |
| Jan 5, 2026 | Generation (Power) - C3139 Generation (Power) - C3139 | AA ASPHALTING LLC | — |
| Jan 5, 2026 | NE POLICE SUBSTATION WO-414367 | CUMMINS INC | $606 |
| Jan 5, 2026 | T&D (Power) - C3135 T&D (Power) - C3135 | AA ASPHALTING LLC | — |
| Jan 5, 2026 | Rail - C3159 Rail - C3159 | AA ASPHALTING LLC | — |
| Jan 5, 2026 | Water - C3140 Water - C3140 | AA ASPHALTING LLC | — |
| Jan 5, 2026 | Conduit and Pathway Additions 25-1236J | INTRACOMMUNICATION NTWK SYS IN | $14,156 |
| Jan 5, 2026 | (title withheld) 25-1235J | INTRACOMMUNICATION NTWK SYS IN | $34,564 |
| Dec 24, 2025 | Jet a line 66297851/cw2273582 | FLOHAWKS | $786 |
| Dec 22, 2025 | Emergency work 66300256,66300225,66300283,66300293 | FLOHAWKS | — |
| Dec 19, 2025 | RECOVERY & TRANSFER CENTER NO START - CALLOUT RECOVERY & TRANSFER CENTER NO START - CALLOUT | PACIFIC POWER GROUP LLC | — |
| Dec 18, 2025 | Backflow Testing NA | DM PLUMBING/BACKFLW TSTNG LLC | $569 |
| Dec 18, 2025 | WASTE WATER SITE WO-417926 | CUMMINS INC | $2,706 |
| Dec 17, 2025 | City of Tacoma-Water CW2270720 | CONST GRP INTERNATIONAL LLC | $30,000 |
| Dec 16, 2025 | TPD Sector 3 - Coolant Temp. Sensor & Rain Cap Replacement Quote # 88638 | PACIFIC POWER GROUP LLC | $1,681 |
| Dec 16, 2025 | E Portland Ave (E 56th St. to 64th St.) CW2277807 | MILES RESOURCES LLC | $1,370,702 |
| Dec 16, 2025 | MUNICIPAL COMPLEX - FUEL FILTER/ WP INSP-CALLOUT MUNICIPAL COMPLEX - FUEL FILTER/ WP INSP-CALLOUT | PACIFIC POWER GROUP LLC | — |
| Dec 11, 2025 | City of Tacoma - Municipal Building-MON 11/10 JEREMY/CHASE - TUE 11/11 CHASE/JBD - 11/12 AND 11/13 CHASE. FINISH UP 11/20 (IF NEEDED). - Broadway Fountain Pump WO 9986143 | MCKINSTRY CO LLC | $31,096 |
| Dec 10, 2025 | City of Tacoma Police Station Split System Install 126986 | MCKINSTRY CO LLC | $55,103 |
| Dec 10, 2025 | City of Tacoma - Fleet Services/Police Warehouse-EF-1 switch and coil replacement. WO 9985326 | MCKINSTRY CO LLC | $3,192 |
| Dec 10, 2025 | Oven repairs 16800-1 | Commercial Technician Svcs Inc | — |
| Dec 5, 2025 | CITY OF TACOMA FS 04 CITY OF TACOMA FS 04 | GREAT FLOORS | $21,246 |
| Dec 4, 2025 | The Pantages Theater-Boiler not working enough to heat space. WO 9987792 | MCKINSTRY CO LLC | $1,350 |
| Dec 3, 2025 | City of Tacoma - Solid Waste-ProjectBF-Johnson control T-stat upgrade TA 2023-02, PO 4500604956 | MCKINSTRY CO LLC | $671 |
| Nov 26, 2025 | TMB Fiber Fix 25-1107J | INTRACOMMUNICATION NTWK SYS IN | $2,391 |
| Nov 25, 2025 | Tacoma Convention Center-Domestic hot water boiler has a bad flow switch. Found on PM WO 9987410 | MCKINSTRY CO LLC | $1,733 |
| Nov 25, 2025 | 27818 Intercom 27818 | ABSCO ALARMS INC | $1,672 |
| Nov 25, 2025 | 27146 Network Bridge job 27146 | ABSCO ALARMS INC | $10,782 |
| Nov 24, 2025 | ES24-0298D Reservation Junction Cathodic Protection System Repair CW2272576 | MESA PRODUCTS INC | $43,439 |
| Nov 21, 2025 | TMB CLEANING SIGNED PROPOSAL | GREAT FLOORS | $56,081 |
| Nov 19, 2025 | 25-WA-251155 City of Tacoma - Dome Gutter Cleaning 25-WA-251155 | GARLAND/DBS INC | $9,416 |
| Nov 14, 2025 | Municipal Service Center 111325 | NEXT LEVEL RESTORATION LLC | $4,013 |
| Nov 14, 2025 | Central Wastewaster Treatment Plant BSST transfer Pump Replacement ES25-0092F | ROGNLINS INC | $895,702 |
| Nov 13, 2025 | TMB CLEANING, TMB LOBBY, AND RESTROOMS, TMBN RR PROPOSAL 429879 | GREAT FLOORS | $19,919 |
| Nov 12, 2025 | Tacoma Water Mitsubishi VRF ODU Replacement CW2276520 | CAPITAL HEATING & COOLING | $88,914 |
| Nov 12, 2025 | ABN Entry and Atrium Replacement PS25-0117F | PEASE CONSTRUCTION INC | $1,296,600 |
| Nov 11, 2025 | CITY OF TACOMA CUSHMAN HOUSE SIGNED PROPOSAL | GREAT FLOORS | $15,091 |
| Nov 9, 2025 | Tacoma Convention Center-CH-01 Freon detector went off this morning WO 9986380 | MCKINSTRY CO LLC | $1,778 |
| Nov 8, 2025 | MEDIA & COMM OFF- 6YR CSS, BATTERY, Block Heater Replacement Quote # 87860 | PACIFIC POWER GROUP LLC | $3,065 |
| Nov 7, 2025 | TACOMA RAIL PORTABLE LINO REPAIR SIGNED PROPOSAL | GREAT FLOORS | $2,096 |
| Nov 6, 2025 | KM_CUW Art Exhibit Repairs 2501684 | TITAN ELECTRIC INC | $1,800 |
| Nov 6, 2025 | Tacoma Dome-Boiler two has high gas pressure alarm WO 9986042 | MCKINSTRY CO LLC | $741 |
| Nov 4, 2025 | Wynoochee Lake Coho Boat Ramp Repair PG25-0186N | ROGNLINS INC | $81,392 |
| Nov 3, 2025 | HVAC Repairs CW2274246 | HERMANSON COMPANY LLC | — |
| Nov 3, 2025 | 25-WA-250794 City of Tacoma - Fire Station #10 25-WA-250794 | GARLAND/DBS INC | $28,813 |
| Nov 3, 2025 | 25-WA-25498C City of Tacoma - Fire Station #4 25-WA-25498C | GARLAND/DBS INC | $170,954 |
| Nov 3, 2025 | Cla-Val Conversion 4500636396 | CIMCO-GC SYSTEMS LLC | $3,762 |
| Oct 24, 2025 | The Pantages Theater-No air moving on the first floor. WO 9983650 | MCKINSTRY CO LLC | $2,804 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.