SOUND TRANSIT — public works contracts
2,719 public works projects and 9,013 intents to pay prevailing wages name SOUND TRANSIT as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: Transportation District.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 572 | 461 | 666 | 852 | 667 | 557 | 579 | 695 | 681 | 651 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 28, 2026 | Century Yard 41067719 | Performance Systems Intgn LLC | $21,566 |
| Sep 28, 2026 | FWTC Garage Grout Cap Restoration RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $78,649 |
| Sep 28, 2026 | KING COUNTY LINK LIGHT RA WO-423871 | CUMMINS INC | $1,599 |
| Sep 28, 2026 | M02-CU-1 Repl Uppr Lwr Cond Coils 26-13633029 | TRANE | $20,662 |
| Sep 23, 2026 | FWLE Fencing Abutment F1, F5 & G JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $167,514 |
| Sep 18, 2026 | Tukwila Comm Cab ACU Retrofit RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $66,523 |
| Sep 17, 2026 | Northgate Communication Cabinet ACU Retrofit RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $51,759 |
| Sep 15, 2026 | TACOMA DOME STATION INV0030560 | DAVIS DOOR SERVICE INC | $2,277 |
| Sep 15, 2026 | TACOMA DOME STATION INV0033673 | DAVIS DOOR SERVICE INC | $4,542 |
| Sep 14, 2026 | Veteran Trail Catch Basin Easement RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $60,134 |
| Sep 10, 2026 | ST Union Station Slip Hazard Repair JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $285,058 |
| Sep 8, 2026 | On-Call Fence Maintenance/Repair Services RP 0048-26 | SECOMA FENCE INC | $192,125 |
| Sep 8, 2026 | Auburn Mini-Split HVAC System RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $41,804 |
| Sep 4, 2026 | REPAIRS TO VAV-5 DO-5281 233215OD | MACDONALD-MILLER FAC SOLNS LLC | $5,533 |
| Sep 2, 2026 | CHILLER SHUT DOWN FACCENTRAL-2026-1694/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $506 |
| Sep 2, 2026 | Tacoma OMF Roof Repair JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $46,814 |
| Sep 2, 2026 | ST - EMERGENCY REPAIR - LBR EXIT DEVICE s3869173 | BLDRS' HDWR & SUPPLY CO INC | $835 |
| Sep 1, 2026 | Mercer Island RR drain cleanout 18930-OB 2026-2053 | WESTERN MECH CONTRACTORS LLC | — |
| Aug 31, 2026 | Northgate TC storm drain 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,642 |
| Aug 31, 2026 | Federal Way TC Bi-annual maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $2,027 |
| Aug 28, 2026 | Angle Lake Clean Agent Work RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $116,846 |
| Aug 27, 2026 | Arbor care - Clearance Prune / Crown Clean - AN 1372965 WO #421590 1372965 | SIGNATURE LANDSCAPE SVCS LLC | $12,721 |
| Aug 26, 2026 | SWITCHGEAR ROOM S3869209 | BLDRS' HDWR & SUPPLY CO INC | $4,550 |
| Aug 25, 2026 | Inspection Repair - Extinguisher 05925543 | Performance Systems Intgn LLC | $1,078 |
| Aug 20, 2026 | PMA-505 UNION STATION WO-423178 | CUMMINS INC | $1,778 |
| Aug 20, 2026 | KDM Link Station Mosaic Art Install JC-0083-25G WO-012 | G L Y CONSTRUCTION INC | $17,527 |
| Aug 19, 2026 | 122323 - RVS - Ladder Replacement Release # 234134OD, EAMS # FACLINK-2026-2175 | GRAVITEC SYSTEMS INC | $38,694 |
| Aug 19, 2026 | Angle Lake Catering Sink Retrofit RTA/SW 001-26 | TITAN MECHANICAL INC | $22,850 |
| Aug 19, 2026 | KING COUNTY LINK LIGHT RA WO-423092 | CUMMINS INC | $1,129 |
| Aug 17, 2026 | ST- EMERGENCY REPAIR ELECTRIC STRIKE S3869044 | BLDRS' HDWR & SUPPLY CO INC | $1,504 |
| Aug 17, 2026 | Water Main Break 748391 | A-ADVANCED SEPTIC SERVICES LLC | — |
| Aug 13, 2026 | REPAIRS TO EF-3 DO-5283 FACCENTRAL-2026-1539/233213OD | MACDONALD-MILLER FAC SOLNS LLC | $2,778 |
| Aug 13, 2026 | SIGNAGE MAINTENANCE SERVICES AND ON-CALL SIGNAGE FABRICATION AND INSTALLATION RTA/RP-0206-24A | TUBE ART DISPLAYS INC | $9,000,000 |
| Aug 5, 2026 | SOUND TRANSIT EXTERIOR EXIT DEVICE TRIM REPLACEMENT S3867377 | BLDRS' HDWR & SUPPLY CO INC | $3,755 |
| Aug 5, 2026 | EF INDUCTION MOTOR FAIL 228821DO/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $71,393 |
| Jul 28, 2026 | Redmond Whse main line jetting 18930-OB | WESTERN MECH CONTRACTORS LLC | — |
| Jul 28, 2026 | Tukwila Sounder pump swap 18930-OB | WESTERN MECH CONTRACTORS LLC | — |
| Jul 24, 2026 | L300 MLTTC Garage Entrance Panel Replacement JC-0083-25G | G L Y CONSTRUCTION INC | $109,957 |
| Jul 24, 2026 | REPLACE SIGNS 228812 | TUBE ART DISPLAYS INC | $3,328 |
| Jul 17, 2026 | 122279 - Lynnwood Station - Ladders and Anchors PO # 226434, Release # 233265OD, EAMS # FACLINK-2026-1273 | GRAVITEC SYSTEMS INC | $96,416 |
| Jul 16, 2026 | NMOW Security and Fencing JC-0083-25G | G L Y CONSTRUCTION INC | $449,891 |
| Jul 15, 2026 | (title withheld) 219966 OB/2307 12 OD | HB WORKPLACES | $3,931 |
| Jul 15, 2026 | System Wide Art Cleaning Services RTA/RP 0036-26 | Rich Lehl Studio, LLC | $613,098 |
| Jul 14, 2026 | Inspection of 5 Monorail Hoists at Multiple locations. P26-06-5009 | WASHINGTON CRANE & HOIST LLC | $2,497 |
| Jul 10, 2026 | 122251 - Redmond Tech Garage HLL Updates PO # 182434 OB, Release # 23077OD, EAMS # FC-26-1456 | GRAVITEC SYSTEMS INC | $45,328 |
| Jul 10, 2026 | NURSING ROOM S3868099 | BLDRS' HDWR & SUPPLY CO INC | $924 |
| Jul 10, 2026 | Sounder blackwater tank clean PO 233239 | FLOHAWKS | — |
| Jul 9, 2026 | HVAC SYSTEM NEED CLEANED FACCENTRAL-2026-1479/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $601 |
| Jul 9, 2026 | REPAIRS TO FAN MOTOR DO-4332 24704OD | MACDONALD-MILLER FAC SOLNS LLC | $70,798 |
| Jul 7, 2026 | Pioneer Square Station Prefontaine Lighting JC-0083-25G | G L Y CONSTRUCTION INC | $367,559 |
| Jul 6, 2026 | King St # 581 2nd hose bib leak 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,717 |
| Jul 6, 2026 | Issaquah TC water heater rplc 18930-OB | WESTERN MECH CONTRACTORS LLC | $15,828 |
| Jul 1, 2026 | Link Operations and Maintenance Facility South and North DB 0175-23 | HOFFMAN CONSTRUCTION CO OF WA | $68,750,118 |
| Jun 26, 2026 | 121849 - South Bellevue Parking Garage II Work Order - Faccentral-2026-1212, PO 182434 OB, Realease # 232815 OD | GRAVITEC SYSTEMS INC | $30,841 |
| Jun 26, 2026 | BT102 Burien Transit Center & Roadwork Project RTA/CO 0016-25 | JOHANSEN CONSTRUCTION CO LLC | $6,092,484 |
| Jun 23, 2026 | King County TRANSIT Light Rail - Seattle N/A | Ground Penetrating Radar Systems, Inc | — |
| Jun 17, 2026 | BOARD ROOM HOT FACCENTRAL-2026-1404/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $716 |
| Jun 16, 2026 | ST Sodo & Boeing UPS & Electrical JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $177,593 |
| Jun 16, 2026 | TIBS Tile Repairs JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $228,211 |
| Jun 16, 2026 | UNION STATION NORTH ENTRY AUTO OPERATOR REPAIR s3868187 | BLDRS' HDWR & SUPPLY CO INC | $740 |
| Jun 9, 2026 | Tukwila Station 583 drain flooding Tukwila Station 583 | WESTERN MECH CONTRACTORS LLC | — |
| Jun 8, 2026 | GENERATOR SERVICES 2026 PO 231510 OB | PACIFIC POWER GROUP LLC | $287,885 |
| Jun 8, 2026 | VAV_M_21 ISSUES, REMOTE ACCESS FACCENTRAL-2026-258/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $2,097 |
| Jun 4, 2026 | South Bellevue Garage Stair 4 Repair JC-0083-25G | G L Y CONSTRUCTION INC | $401,904 |
| Jun 4, 2026 | Maintenance and Emergency Service 04224 | WESTERN MECHANICAL & CONTROLS | — |
| Jun 4, 2026 | Platform Tile Replacement At Northgate Station RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $103,616 |
| Jun 3, 2026 | (title withheld) PO 232363 OP / SA24183 | SAYBR CONTRACTORS INC | $5,608 |
| Jun 3, 2026 | Scaffolding Project for Union Station East Entrance Bridge SA24172 | MCCLONE CONSTRUCTION CO LLC | $244,775 |
| Jun 2, 2026 | Artwork Fabrication and Installation Services RTA/RP 0040-25 | PRACTIK LLC | $1,916,365 |
| Jun 1, 2026 | VAV M 21 NOT HEATING FACCENTRAL-2026-1202/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $438 |
| Jun 1, 2026 | Union Station 24223 | CONVERGINT TECHNOLOGIES LLC | $8,980 |
| May 29, 2026 | Stadium and SODO Lighting JC-0083-25G | G L Y CONSTRUCTION INC | $471,157 |
| May 26, 2026 | (title withheld) RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $26,390 |
| May 26, 2026 | L300 MLTTC Utility Painting JC-0083-25G | G L Y CONSTRUCTION INC | $10,164 |
| May 22, 2026 | Sound Transit Bark 231732OB | AARDVARK BARK BLNG/LND SVS LLC | — |
| May 20, 2026 | Annual Crane Inspections. 20 units. PS-05-1032 | WASHINGTON CRANE & HOIST LLC | $5,599 |
| May 18, 2026 | WESTLAKE CUSTOMER SERVICE S3867537 | BLDRS' HDWR & SUPPLY CO INC | $9,978 |
| May 18, 2026 | UNION STATION NORTH ENTRY DOORS AND INTERIOR DOORS S3867650 | BLDRS' HDWR & SUPPLY CO INC | $997 |
| May 11, 2026 | King Street Bridge (WO#FACCENTRAL-2026-1120 229573 OB | EAGLE PRO PAINTING LLC | — |
| May 11, 2026 | Union Station: WO# FACCENTRAL-2026-1119 229573 OB | EAGLE PRO PAINTING LLC | — |
| May 11, 2026 | Weller Street Bridge: (WO# FACCENTRAL-2026-1121) 229573 OB | EAGLE PRO PAINTING LLC | — |
| May 6, 2026 | ST Union Station Flagpole Replacement JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $96,322 |
| May 5, 2026 | Redmond EOC Cabling & Electrical 230628 OD | C T S | $74,242 |
| Apr 30, 2026 | Union Station east door storm drain clog 18930-OB | WESTERN MECH CONTRACTORS LLC | $443 |
| Apr 30, 2026 | Everett OPS sink line clog 18930-OB | WESTERN MECH CONTRACTORS LLC | $800 |
| Apr 30, 2026 | Union Station main line backup 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,055 |
| Apr 30, 2026 | Union plumbing rprs found QM 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,046 |
| Apr 29, 2026 | Redmond Tech Quarterly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,638 |
| Apr 29, 2026 | Puyallup garage Qrtrly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $815 |
| Apr 29, 2026 | Union Station Qrtly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $6,765 |
| Apr 29, 2026 | Issaquah TC Qrtrly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $2,152 |
| Apr 26, 2026 | Stride Program Startup and Operations RTA/RP 0222-23 | M V PUBLIC TRANSPORTATION INC | $431,597,114 |
| Apr 24, 2026 | Arbor care - Cut tree into pieces - AN 1271302 WO #388537 AN 1271302 | SIGNATURE LANDSCAPE SVCS LLC | $3,240 |
| Apr 24, 2026 | (title withheld) JC-0083-25G | G L Y CONSTRUCTION INC | $70,226 |
| Apr 24, 2026 | 1201 Cleanup Phase 2 JC-0083-25G | G L Y CONSTRUCTION INC | $45,948 |
| Apr 24, 2026 | Arbor Care- Tree Care- AN 1203976 WO #374653 AN 1203976 | SIGNATURE LANDSCAPE SVCS LLC | $8,646 |
| Apr 21, 2026 | Tukwila Sounder Pump failure 18930-OB | WESTERN MECH CONTRACTORS LLC | $14,742 |
| Apr 16, 2026 | Tacoma Dome Station Art Glass Installation JC-0083-25G | G L Y CONSTRUCTION INC | $35,271 |
| Apr 15, 2026 | Handyperson Services 230678 OB | TALAKAI CONSTRUCTION LLC | — |
| Apr 14, 2026 | Rmvl Overhang branches and hazard trees Rmvl Overhang branches | DAVEY TREE SURGERY CO | $4,247 |
| Apr 13, 2026 | 2ND FLR SE TEMP ADJUSTMENT 260320-0147 | MACDONALD-MILLER FAC SOLNS LLC | $623 |
| Apr 13, 2026 | VAV 2/17 RED 260320-0126 | MACDONALD-MILLER FAC SOLNS LLC | $1,095 |
| Apr 10, 2026 | Federal Way TC Qrtly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $2,025 |
| Apr 10, 2026 | Union Station Qrtly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $6,765 |
| Apr 10, 2026 | Union Station water leak by gutter 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,055 |
| Apr 10, 2026 | Mercer Island smoke & dye test 18930-OB | WESTERN MECH CONTRACTORS LLC | $3,886 |
| Apr 10, 2026 | Issaquah TC Qrtrly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $2,152 |
| Apr 9, 2026 | (title withheld) RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $464,682 |
| Apr 3, 2026 | DSTT Architectural Improvements - PSS SYM JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $134,481 |
| Mar 31, 2026 | KING COUNTY LINK LIGHT RA WO-416184 | CUMMINS INC | $1,587 |
| Mar 25, 2026 | 122203 - UWS Corrections PO# 226434 OB, WO# 229476OD, EAMS # FACLINK-2026-448. | GRAVITEC SYSTEMS INC | $54,717 |
| Mar 24, 2026 | Tukwila station PO #58831 | ATWORK! COMMERCIAL ENT LLC | $7,680 |
| Mar 22, 2026 | SET UP REJOTE ACCESS 2026-258/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $983 |
| Mar 19, 2026 | Sound Transit Parking Lot Stripping, Seattle 2026 NA | PUGET PAVING & CONST INC | $5,850 |
| Mar 19, 2026 | OMFE Gravel Parking Lot Striping NA | PUGET PAVING & CONST INC | $5,950 |
| Mar 19, 2026 | Sound transit flock camera power 2025-0136 | OGDEN ELECTRIC | $38,960 |
| Mar 18, 2026 | 122238 - UWS Headhouse Roof - 2026 PO # 182434 OB, Release # 223363OD (FACLINK-2025-902) & Release # 223364OD (FACLINK-2025-901) | GRAVITEC SYSTEMS INC | $76,700 |
| Mar 17, 2026 | Puyallup Station Sleeve Installation Ratification 23466 OR | UNITED HDD LLC | $22,900 |
| Mar 13, 2026 | GARDEN LVL CRAC UNITS NOT COOL 2026-631/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $661 |
| Mar 11, 2026 | Issaquah Transit Station Pit Pump out 217456OB | ELEVATOR SUPPORT COMPANY LLC | $6,752 |
| Mar 11, 2026 | Issaquah Transit Station Pit Pump out 217456OB | ELEVATOR SUPPORT COMPANY LLC | $7,090 |
| Mar 11, 2026 | P216.21698 - Sound Transit DES 09321 | NRC ENVIRONMENTAL SERVICES INC | — |
| Mar 11, 2026 | Federal Way Station Pit Pump out 217456OB | ELEVATOR SUPPORT COMPANY LLC | $7,090 |
| Mar 11, 2026 | IDS 901 and 902 mod pit work 217456OB | ELEVATOR SUPPORT COMPANY LLC | $31,278 |
| Mar 11, 2026 | CNTL/JACE ACCESS-EXPRT DATA 2026-486/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $1,651 |
| Mar 11, 2026 | WS 303 Pit Seal 217456OB | ELEVATOR SUPPORT COMPANY LLC | $70,939 |
| Mar 11, 2026 | Northgate Bird Deterrent RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $152,434 |
| Mar 10, 2026 | DSTT Architectural Improvements Phase 1 JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $258,421 |
| Mar 9, 2026 | Lynnwood Transit Center Misc. Repairs JC-0083-25C | CENTENNIAL CONTRACTORS ENT INC | $84,859 |
| Mar 6, 2026 | (title withheld) 2026-258/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $3,994 |
| Mar 3, 2026 | Roosevelt Station Valve Vault RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $111,209 |
| Feb 26, 2026 | 2025 Inspection Repairs Inspection Repairs | Performance Systems Intgn LLC | $58,716 |
| Feb 26, 2026 | (title withheld) 228168 OP SA23691 | BLDRS' HDWR & SUPPLY CO INC | $7,230 |
| Feb 19, 2026 | Transit Security Sound Transit RTA/RP 0025-21 | DAY WIRELESS SYSTEMS | $746,460 |
| Feb 14, 2026 | GARDEN LEVEL IS COLD 2026-215/ | MACDONALD-MILLER FAC SOLNS LLC | $1,276 |
| Feb 14, 2026 | (title withheld) 2026-312/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $1,045 |
| Feb 13, 2026 | 2025 Service Calls OB 190970 | Performance Systems Intgn LLC | $28,407 |
| Feb 13, 2026 | SOUTH GARAGE DOOR REPLACEMENT 200884OB 11/22-11/23 | BLDRS' HDWR & SUPPLY CO INC | $6,280 |
| Feb 12, 2026 | Monitoring Installation - Sound Transit Union Station 190970 OB | Performance Systems Intgn LLC | $5,669 |
| Feb 12, 2026 | Monitoring Installation of AES Radio OB 190970 PO 56492 OC | Performance Systems Intgn LLC | $3,868 |
| Feb 12, 2026 | 2025 Emergency Service Calls OB 190970 | Performance Systems Intgn LLC | $17,331 |
| Feb 12, 2026 | 2025 Inspections OB 190970 | Performance Systems Intgn LLC | $147,243 |
| Feb 12, 2026 | 2025 Repairs 2025 Repairs | Performance Systems Intgn LLC | $15,333 |
| Feb 11, 2026 | U District Station AHU-01 Troubleshooting 26-12998835 | TRANE | $3,297 |
| Feb 10, 2026 | 10-Ton Truck Crane Hoist Motor Only Replacement Kevin Mulligan | WASHINGTON CRANE & HOIST LLC | $25,834 |
| Feb 10, 2026 | SOUND TRANSIT OPS & MAINT BLDG W1001316466 | CONVERGINT TECHNOLOGIES LLC | $5,040 |
| Feb 10, 2026 | Redmond Technology Station - Leak Repair FACCENTRAL 2025-843 Priority 1 | Performance Systems Intgn LLC | $3,350 |
| Feb 10, 2026 | Storm Water Maintenance 194277 OB | BRAVO ENVIRONMENTAL NW INC | $733,546 |
| Feb 9, 2026 | T Line Safety Improvements RTA/JC 0083-25 | FORMA CONSTRUCTION COMPANY | $71,096 |
| Feb 7, 2026 | ADVISE DUCT WRK REMOVAL 2026-38/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $685 |
| Feb 7, 2026 | BLDG COLD - CMPTR SCRN GREY 2026-258/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $940 |
| Feb 6, 2026 | Union Station Flagpole Demo REQ23798 | WESTERN HEMLOCK TREE/STMP SRV | $35,961 |
| Feb 2, 2026 | SOUND TRANSIT SOUTH BELLEVUE GARAGE S3866051 | BLDRS' HDWR & SUPPLY CO INC | $1,276 |
| Feb 2, 2026 | VAV3-1 CHECK HEATING 2026-215/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $940 |
| Feb 2, 2026 | Puyallup garage Qrtrly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $815 |
| Feb 2, 2026 | On Call Critical Area Landscape Maintenance Services RTA-RP 0040-23B | WESTGRO CORPORATION | $340,542 |
| Feb 2, 2026 | Union Station p-trap replacements 18930-OB | WESTERN MECH CONTRACTORS LLC | $456 |
| Feb 2, 2026 | Union Statin Garden Level Urinal 18930-OB | WESTERN MECH CONTRACTORS LLC | $955 |
| Jan 23, 2026 | Coiling Door Maintenance 208325 OB | PRECISION DOOR SERVICE | $500,000 |
| Jan 22, 2026 | (title withheld) 226860 OP | MACDONALD-MILLER FAC SOLNS LLC | $3,795 |
| Jan 22, 2026 | FP385990 RPLC BLOWER MOTOR+ 226860 OP | MACDONALD-MILLER FAC SOLNS LLC | $5,552 |
| Jan 22, 2026 | (title withheld) 226860 OP | MACDONALD-MILLER FAC SOLNS LLC | $3,795 |
| Jan 20, 2026 | BT 305 � Seattle/Shoreline Roadway & Station Improvements IFB No. RTA/CN 0173-24 | PIVETTA BROTHERS CONST INC | $27,338,075 |
| Jan 16, 2026 | Silver Platter Building - Corrective Repair 226736 | SNYDER ROOFING OF WASH LLC | $12,551 |
| Jan 16, 2026 | REPAIRS TO CAC-2 DO-4732 227877OD | MACDONALD-MILLER FAC SOLNS LLC | $811 |
| Jan 15, 2026 | 122190 - DSTT Ladder & Guardrail Procurement #: RTA/RP 0003-25, PO # 226434 OB, WO-228056OD. | GRAVITEC SYSTEMS INC | $35,200 |
| Jan 14, 2026 | Mercer Island P&R Garage main line clog 18930-OB | WESTERN MECH CONTRACTORS LLC | — |
| Jan 13, 2026 | Renton Transit Center & Roadway Improvement BT-105 | SHIMMICK CONSTRUCTION CO INC | $48,194,800 |
| Jan 12, 2026 | Tacoma Link 21st Street and Pacific Ave Rail Repair RTA/IB 0155-25 | STACY & WITBECK INC | $301,173 |
| Jan 6, 2026 | Stride Bus Rapid Transit, BT307 Kenmore/Bothell, SR 522 Roadwork & Stations RTA/CN 0168-24 | GUY F ATKINSON CONST LLC | $44,579,472 |
| Jan 5, 2026 | 594 Lynnwood TC clogged urinal 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,299 |
| Jan 5, 2026 | Everett TC leaking copper line 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,987 |
| Jan 5, 2026 | Issaquah TC hose bib water leak 18930-OB | WESTERN MECH CONTRACTORS LLC | $442 |
| Jan 5, 2026 | Puyallup garage Qrtrly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $815 |
| Jan 5, 2026 | Union Station leaking hose bib 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,047 |
| Jan 5, 2026 | Union Statin garden level MRR Toilet 18930-OB | WESTERN MECH CONTRACTORS LLC | $585 |
| Jan 5, 2026 | Union Station failed water heater 18930-OB | WESTERN MECH CONTRACTORS LLC | $8,225 |
| Jan 5, 2026 | Issaquah TC Qrtrly Maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $2,148 |
| Jan 5, 2026 | Union Station replace water heater 18930-OB | WESTERN MECH CONTRACTORS LLC | $15,789 |
| Jan 2, 2026 | Union Station sink not turning off 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,272 |
| Jan 2, 2026 | Union Station Thermostatic Valve 18930-OB | WESTERN MECH CONTRACTORS LLC | $6,982 |
| Jan 2, 2026 | Union Station Sept Qrtly maint 18930-OB | WESTERN MECH CONTRACTORS LLC | $6,753 |
| Jan 2, 2026 | (title withheld) 18930-OB | WESTERN MECH CONTRACTORS LLC | $1,173 |
| Dec 31, 2025 | (title withheld) FACCENTRAL 2025-2539 | MACDONALD-MILLER FAC SOLNS LLC | $2,631 |
| Dec 29, 2025 | WO# 356659 Sound Transit - SeaTac Corridor Blackberry Treatment 356659 | SIGNATURE LANDSCAPE SVCS LLC | $400 |
| Dec 26, 2025 | Agency-wide Vertical Conveyance Maintenance-Year 2 RTA/RP 0228-23A | SCHINDLER ELEVATOR CORP | $9,303,403 |
| Dec 18, 2025 | Mercer Island Toilet sewage backup 18930-OB | WESTERN MECH CONTRACTORS LLC | — |
| Dec 17, 2025 | CRAC-2 NEED LEAK CHECK DO-4513 209276OB | MACDONALD-MILLER FAC SOLNS LLC | $2,896 |
| Dec 12, 2025 | TPSS-18 816 N 2nd ST TACOMA, WA 98403 PO# TPSS-18(FACSOUTH 2025-3741) | ALL CITY FENCE CO | $8,321 |
| Dec 12, 2025 | TPSS-22 1106 S 8th ST TACOMA, WA 98403 PO# TPSS-22(FACSOUTH2025-3755) | ALL CITY FENCE CO | $4,038 |
| Dec 11, 2025 | Cable Installation Services 165931 2018011-01 | CDW GOVERNMENT LLC | $90,030 |
| Dec 11, 2025 | OMF East Cabling & AP Installation Services 165931 2018011-01 | CDW GOVERNMENT LLC | $44,355 |
| Dec 11, 2025 | OMF Central Cabling & AP Installation Services 165931 2018011-01 | CDW GOVERNMENT LLC | $36,365 |
| Dec 11, 2025 | 605 Cabling & AP Installation Services 165931 2018011-01 | CDW GOVERNMENT LLC | $8,520 |
| Dec 11, 2025 | 401 Cabling & AP Installation Services 165931 2018011-01 | CDW GOVERNMENT LLC | $44,695 |
| Dec 8, 2025 | TPSS-18 1109 S 8th ST TACOMA, WA 98403 PO# TPSS-18(FACSOUTH 2025-3741) | ALL CITY FENCE CO | $4,038 |
| Dec 5, 2025 | (title withheld) PO 227100 OB | AVI-SPL LLC | $185,470 |
| Dec 4, 2025 | TPSS-22 818 N 2nd ST TACOMA, WA 98403 TPSS-22(FACSOUTH2025-3755) | ALL CITY FENCE CO | $8,321 |
| Nov 30, 2025 | (title withheld) FACCENTRAL-2025-2608/209276OB | MACDONALD-MILLER FAC SOLNS LLC | $326 |
| Nov 18, 2025 | Chiller Troubleshooting and PM services August 25-11815357 | TRANE | $1,687 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.