SAN JUAN COUNTY PUBLIC WORKS — public works contracts
230 public works projects and 384 intents to pay prevailing wages name SAN JUAN COUNTY PUBLIC WORKS as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: County.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 15 | 6 | 16 | 15 | 41 | 62 | 24 | 17 | 17 | 6 |
Latest contracts (155)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Aug 13, 2026 | 2026 Countywide Road Striping Maintenance 26RD.011 | CONSTRUCTION AHEAD INC | $215,935 |
| Jun 19, 2026 | Lopez Road Shop Sewer Line Extension 26RD.010 | LOPEZ DIRT DOCTORS LLC | $28,880 |
| Jun 15, 2026 | Flaggers for 2026 Public Works Road Maintenance 26RD.009 | Smugglers Cove Flagging LLC | $30,000 |
| Jan 23, 2026 | Griffin Bay Marine Facility Repair 26RD.003 | RAPTOR EXCAVATING/CONTRNG LLC | $32,691 |
| Dec 18, 2025 | Olga Rd Culvert Emergency Embankment Repair 25RD.016 | ISLAND EXCAVATING INC | $22,000 |
| Dec 18, 2025 | Bailer Hill Rd Guardrail and Barrier Installation 25RD.015 | M2 INDUSTRIAL INC | $142,835 |
| Oct 22, 2025 | Bailer Hill Rd Culvert Installation 25RD.014 | MEM ENTERPRISES LLC | $47,740 |
| Jul 11, 2025 | 2025 Countywide Road Striping Maintenance 25RD.008 | CONSTRUCTION AHEAD INC | $233,594 |
| Jun 17, 2025 | Yacht Haven Road MP 0.27 Culvert Repair 25RD.010 | CT EXCAVATING LLC | $28,500 |
| May 27, 2025 | Flaggers for 2025 Public Works Road Maintenance 25RD.007 | Smugglers Cove Flagging LLC | $80,000 |
| Mar 3, 2025 | (title withheld) Christy | SME SOLUTIONS LLC | — |
| Feb 14, 2025 | Douglas/Bailer Hill Road Improvements 25RD.002 | TIGER CONSTRUCTION LTD | $3,218,945 |
| Dec 9, 2024 | (title withheld) Christy | SME SOLUTIONS LLC | — |
| Nov 20, 2024 | 2024 Eastsound Sidewalk Repairs 24RD.006 | LIONHEART CONCRETE | $37,000 |
| Nov 1, 2024 | 2024 Countywide Guardrail Repairs 24RD.005 | COLUMBIA RIVER CONTRACTORS INC | $92,944 |
| Sep 30, 2024 | (title withheld) Christy | SME SOLUTIONS LLC | — |
| Aug 22, 2024 | San Juan County Fairgrounds Improvements 24FR.117 | MIKE CARLSON ENTERPRISES INC | $468,898 |
| Jun 6, 2024 | 2024 Countywide Road Striping Maintenance 24RD.004 | SPECIALIZED PAVEMENT MRKG LLC | $265,418 |
| May 16, 2024 | (title withheld) Christi Boman | SME SOLUTIONS LLC | — |
| May 14, 2024 | Flaggers for San Juan County Chip Seal 2024 24RD.003 | Smugglers Cove Flagging LLC | $44,000 |
| Apr 26, 2024 | (title withheld) 161043 | SME SOLUTIONS LLC | — |
| Mar 20, 2024 | Flaggers for San Juan Island Shoulder Maintenance 24RD.001 | Smugglers Cove Flagging LLC | $12,500 |
| Oct 10, 2023 | Westcott Drive Culvert Failure (MP 0.15) 23RD.019 | Winters Family Construction | $33,000 |
| Sep 28, 2023 | Cattle Point Road Crack Sealing 23RD.018 | RICHARD LAWSON CONST INC | $11,550 |
| Sep 21, 2023 | Point Lawrence Rd Culvert Failure (MP 1.44) 23RD.016 | Winters Family Construction | $25,800 |
| Jun 21, 2023 | 2023 San Juan Island Culvert Replacements 23RD.012 | MIKE CARLSON ENTERPRISES INC | $57,100 |
| May 16, 2023 | Orcas Food Co-Op Prune Alley Access Ramp 23RD.010 | S & S CONCRETE CONST INC | $28,995 |
| May 16, 2023 | 2023 Road Striping Maintenance 23-2240 | STRIPE RITE INC | $204,676 |
| May 6, 2023 | Flaggers for San Juan County Chip Seal 2023 23RD.009 | Smugglers Cove Flagging LLC | $33,000 |
| Apr 18, 2023 | Bayhead Creek Culvert Replacement at Killebrew Lake Road 23RD.007 | MATIA CONTRACTORS INC | $815,925 |
| Apr 12, 2023 | Access Control System Supply and Installation 23RD.003 | SECURITY SOLUTIONS NORTHWEST | $65,777 |
| Apr 6, 2023 | (title withheld) 221011SMES | SME SOLUTIONS LLC | $10,991 |
| Apr 6, 2023 | (title withheld) 221011SMES | SME SOLUTIONS LLC | $11,451 |
| Feb 9, 2023 | Fish Trap Creek Culvert Replacement at Cormorant Bay Road 23RD.001 | NEPTUNE GENERAL CONTRACTORS | $691,930 |
| Jan 9, 2023 | 2022 Waldron Island Gravel Pit Expansion 22RD.017 | MIKE CARLSON ENTERPRISES INC | $52,073 |
| Dec 18, 2022 | WEST BEACH RD CULVERT 0222070 | INLAND COMPANY | $41,776 |
| Nov 4, 2022 | 2022 Traffic Barriers & Guardrail Repairs 22RD.006 | CONSTRUCTION AHEAD INC | $129,010 |
| Oct 25, 2022 | Olga Road Culvert Failure, CRP No. 0222010 22RD.014 | WILLIAMSON CONSTRUCTION LLC | $89,000 |
| Oct 18, 2022 | 2022 Lopez Island Culvert Replacements, CRP 22RD.013 | MATIA CONTRACTORS INC | $71,170 |
| Aug 25, 2022 | Beaverton Valley Rd Pavement Patch 22RD.011 | RICHARD LAWSON CONST INC | $8,185 |
| Jul 18, 2022 | 2022 Road Striping Maintenance 22RD.010 | SPECIALIZED PAVEMENT MRKG LLC | $283,999 |
| Jul 10, 2022 | Laporte Road Widening at Recent Washout 22RD.008 | Winters Family Construction | $12,000 |
| Jul 7, 2022 | Deer Harbor Rd MP 1.10 Slump 22RD.007 | TIGER CONSTRUCTION LTD | $323,310 |
| Jun 30, 2022 | BEAVERTON VALLEY ROAD CULVERT REPLACEMENT 22RD.005 | MEM ENTERPRISES LLC | $89,998 |
| Jun 8, 2022 | Flaggers for San Juan County Chip Seal 2022 22RD.004 | Smugglers Cove Flagging LLC | $30,000 |
| May 5, 2022 | Emergency Derelict Vessel Removal - Pile Point 22EN.009 | A1 MARINE LLC | $34,970 |
| Feb 11, 2022 | Point Lawrence Rd Culvert Failure 22RD.001 | Winters Family Construction | $23,284 |
| Jan 21, 2022 | Prune Alley Street Improvements 21RD.012 | MIKE CARLSON ENTERPRISES INC | $3,948,821 |
| Jan 19, 2022 | Eagle Cove Rd Culvert Failure CRP 0122010 | MEM ENTERPRISES LLC | — |
| Dec 9, 2021 | Deer Harbor Road Landside CRP 0421030-F | ISLAND EXCAVATING INC | — |
| Dec 9, 2021 | (title withheld) CRP 0421030-B | ISLAND EXCAVATING INC | — |
| Dec 9, 2021 | Doe Bay Washout CRP 0421030-A | ISLAND EXCAVATING INC | — |
| Dec 8, 2021 | Olga Road Culvert Obstruction CRP 0421030-G | EARTHWORKS COMPANY INC | — |
| Dec 7, 2021 | Guthrie Cove Rd Landslide CRP 0421030-D | ORCAS EXCAVATORS INC | — |
| Dec 7, 2021 | Crow Valley Rd Failure CRP 0421030-C | ORCAS EXCAVATORS INC | — |
| Dec 7, 2021 | West Beach Culvert Failure CRP 0421030-E | ORCAS EXCAVATORS INC | — |
| Sep 17, 2021 | Deer Harbor Road Slump At MP 0.65 CRP #0221010 | MIKE CARLSON ENTERPRISES INC | $129,932 |
| Sep 14, 2021 | San Juan County Sheriff's Office | BARRON HEATING & A/C INC | $23,856 |
| Jul 30, 2021 | Riparian Landscape Maintenance Services � San Juan Island 21EN.020 | NELSON'S NOXIOUS WEED SERV LLC | $35,000 |
| May 24, 2021 | San Juan Island Operations Center Construction Contract 21RD.006 | COLACURCIO BROS INC | $7,422,800 |
| May 5, 2021 | North Beach Road Streetscape Maintenance Phase I 21RD.004 | ALLPHASE BRUSH & LANDCLEARING | $10,800 |
| May 3, 2021 | Argyle Ave Sidewalk Extension 21RD.03 | KONNERUP CONSTRUCTION INC | $203,810 |
| Apr 6, 2021 | Burt Rd Drainage Easement Maintenance - CW01190 21EN.009 | BUFFUM BROS FARMS INC | $11,621 |
| Mar 30, 2021 | Riparian Landscape Maintenance Services � San Juan Island 21EN.011 | NELSON'S NOXIOUS WEED SERV LLC | $9,932 |
| Dec 3, 2020 | Odlin Park Eelgrass Marker Buoy Installation CRP No. 0519020 | JEN-JAY INC | $15,389 |
| Oct 19, 2020 | 2020 Countywide Guardrail Repairs tbd | PETERSEN BROTHERS INC | $59,272 |
| Oct 15, 2020 | Eastsound Water Quality Facility Landscaping TBD | ORCHARDS GARDENS & IRRIGAT LLC | $4,332 |
| Sep 2, 2020 | Missing Mountain Rd Permanent Fencing 20RD.017 | TRIPLE EIGHT CONSTRUCTION | $34,002 |
| Aug 26, 2020 | Lopez Village Ditch Retrofit � Weeks Rd 20EN.012 | GREEN EARTH LANDSCAPES LLC | $60,000 |
| Jul 3, 2020 | Orcas Landing Marine Facility Improvements MP 03190 | MYERS SCULPTURE | $34,808 |
| Feb 11, 2020 | Killebrew Lake Rd Emergency Maintenance 20RD.006 | ISLAND EXCAVATING INC | $77,713 |
| Dec 18, 2019 | Orcas Landing Marine Facility Improvements 19EN.024 | ZACKARYA LECK SCULPR/MTL DSGN | $15,458 |
| Jul 22, 2019 | West Beach Road Culvert Replacement CRP 020701 | MIKE CARLSON ENTERPRISES INC | $686,308 |
| Mar 15, 2019 | Orcas Tipping Floor Building Improvement 19SW.002 | ARTUS CONSTRUCTION COMPANY | $128,960 |
| Feb 21, 2019 | Orcas Road Improvements CRP 021402 | Razz Construction Inc. | $1,285,022 |
| Feb 18, 2019 | Shoulder Maintenance Orcas Road MP 0.13 19RD004 | Orcas Excavators, Inc. | $18,150 |
| Dec 21, 2018 | Z-Wall Extension Project | RICHARD LAWSON CONST INC | $56,112 |
| Dec 17, 2018 | District Court HVAC Replacement 18GR.007 | SAN JUAN HEATING LLC | $13,965 |
| Oct 15, 2018 | Orcas Landing Marine Facility Improvements | MIKE CARLSON ENTERPRISES INC | $252,701 |
| Aug 17, 2018 | Sheriff Shop Door Sheriff Shop Door | OVERHEAD DR CO OF BELLING INC | $4,959 |
| Mar 7, 2018 | Derelict Vessel Removal SJ17-004 / SJ16-003B | DOWN ISLAND TRADING CO | $4,650 |
| Nov 29, 2017 | 1395 Mt Baker Road 1395 Mt Baker Road | OVERHEAD DR CO OF BELLING INC | — |
| Sep 15, 2017 | 2017 Annual Planned Maintenance | OVERHEAD DR CO OF BELLING INC | — |
| Aug 4, 2017 | West Sound Stair Replacemnt None | NORTHWEST PRECAST LLC | $8,077 |
| Jul 31, 2017 | San Juan Valley Rd (#011701) and Mount Baker Rd (021703) Reclamation Project 011701 & 021703 | GROUND UP ROAD CONST INC | — |
| Jul 10, 2017 | Orcas Transfer Station Water System SW1702 | COLDSPRING PUMPS INC | $12,500 |
| Mar 29, 2017 | Oracas Village Park and Ride CRP 021404 | RAZZ CONSTRUCTION INC | $796,940 |
| Mar 2, 2017 | Orcas Reuse Facility Building Project SW1604 | H B HANSEN CONSTRUCTION INC | $385,917 |
| Dec 23, 2016 | courthouse HVAC replacement project unknown at this time | SAN JUAN HEATING LLC | $18,952 |
| Dec 22, 2016 | Griffin Bay Dock Maintenance Project | SAMISH BAY CONSTRUCTION INC | $8,646 |
| Nov 16, 2016 | SAN JUAN COUNTY SHERIFF OFFICES VIDEO SURVEILLANCE 16GR.006 | SECURITY SOLUTIONS NORTHWEST | $45,000 |
| Oct 27, 2016 | Lopez Farmers Market Stormwater Project 16ST.004 | Herrera Environmental Consultants, Inc. | — |
| Sep 27, 2016 | Cascade Creek Realignment Project CRP 021601 | ORCAS EXCAVATORS INC | $82,813 |
| Sep 19, 2016 | Deer Harbor Road Slump Project 16RD.026 | ORCAS EXCAVATORS INC | $240,495 |
| Sep 15, 2016 | Repair/Replace of Fire Alarm Control Panel | GUARDIAN SECURITY SYSTEMS INC | $2,919 |
| Aug 23, 2016 | Orcas Transfer Station Well 165W004 | COLDSPRING RESOURCE MGMNT INC. | $18,766 |
| Aug 16, 2016 | Eastsound storm Drain IMprovement St. 1602 | ORCAS ISLAND CONST CO INC | $4,300 |
| May 23, 2016 | Deer Harbor Bridge Replacement CRP 021201 | RAZZ CONSTRUCTION INC | $1,757,067 |
| Jan 11, 2016 | Mowing services in 2016 for san juan county 15gr.008 | OAK TREE PROPERTY CARE LLC | $19,000 |
| Jan 5, 2016 | Yard Services Orcas Island | Griffin's Yard Works | $7,500 |
| Dec 30, 2015 | Odlin Park Float and Pile Replacement 031001 | CARLSON CONSTRUCTION INC | $208,120 |
| Dec 23, 2015 | Buck Bay Bridge Embankment 15RD.031 | ORCAS EXCAVATORS INC | $6,150 |
| Oct 15, 2015 | UPS Project Quote No. 6780R1 | COMPUTER POWER & SERVICE INC | $34,261 |
| Oct 12, 2015 | Mt. Baker Road Mitigation Plant Establishment 1 3RD030 | KUCKLICK LANDSCAPE & DESIGN | — |
| Oct 8, 2015 | 2015 Eastsound Constructed Wetland Outlet Modifications 15RD.025 | ORCAS EXCAVATORS INC | $13,950 |
| Jul 6, 2015 | Auditors Office eHVAC | SAN JUAN HEATING LLC | $18,000 |
| Jun 25, 2015 | Eastsound Stormwater System Video | BRAVO ENVIRONMENTAL NW INC | — |
| Jun 18, 2015 | Eastsound Area Asphalt Repairs 15 RD.018 | ORCAS EXCAVATORS INC | $38,500 |
| Apr 30, 2015 | REPLACE HP-1 FOR JURY ROOM SAN JUAN COURT HOUSE SAN JUAN COUNTY COURTHOUSE | BARRON HEATING & A/C INC | $13,598 |
| Apr 23, 2015 | Deer Harbor Road Guardrail Installation CRP02133G | PAN-ARCTIC CONTRACTORS INC | $77,747 |
| Apr 23, 2015 | HVAC Unit for Rabbit Hutch - 15GR007 15GR007 | SAN JUAN HEATING LLC | $10,815 |
| Apr 16, 2015 | Orcas Hill Rock Removal 15RD011 | ORCAS EXCAVATORS INC | $12,410 |
| Apr 13, 2015 | Courthouse Elevator Room HVAC Unit Q363 | SAN JUAN HEATING LLC | $4,502 |
| Apr 13, 2015 | san juan mowing services N/a | OAK TREE PROPERTY CARE LLC | $19,000 |
| Apr 2, 2015 | Village Green Access 15RD010 | MIKE CARLSON ENTERPRISES INC | $33,000 |
| Feb 17, 2015 | 2015 CHIP SEAL PROJECT | ALBINA FUEL COMPANY | $600,000 |
| Nov 21, 2014 | SAN JUAN COUNTY COURTHOUSE MECHANICAL REPLACEMENT 14GR006 | BARRON HEATING & A/C INC | $41,450 |
| Oct 20, 2014 | Orcas Island Crash Repair | PAN-ARCTIC CONTRACTORS INC | $3,790 |
| Sep 29, 2014 | Mt. Baker Road Mitigation Plant Establishment 13RD030 | KUCKLICK LANDSCAPE & DESIGN | — |
| Sep 24, 2014 | Orcas Raod Shop Door | MT BAKER OVERHEAD GARAGE DR IN | $6,027 |
| Apr 29, 2014 | Eastsound Area Asphalt Repair | RICHARD LAWSON CONST INC | $22,393 |
| Apr 23, 2014 | Mount Baker Road Improvements 14RD017 | ORCAS EXCAVATORS INC | $8,300 |
| Apr 22, 2014 | Install PVC/Cat5 on Mullis Senior Center and Fairgrounds Bldg. 14AD.016 | FRIDAY HARBOR ELECTRIC | $2,811 |
| Mar 25, 2014 | Buck Bay Bridge Flooding Emergency Work 2014-03-19 | ORCAS EXCAVATORS INC | — |
| Jan 24, 2014 | CRP OSW131 Orcas Island Landfill | CASCADE DRLG/LP A LTD PTSHP/DE | $108,060 |
| Nov 19, 2013 | Deer Harbor Road Guardrail Installation 02133G | ORCAS EXCAVATORS INC | $7,500 |
| Sep 27, 2013 | Mt. Baker Road Mitigation Plant Establishment 13RD030 | KUCKLICK LANDSCAPE & DESIGN | $1,604 |
| Sep 5, 2013 | San Juan Mechanical Shop Overhead Doors | MT BAKER OVERHEAD GARAGE DR IN | $10,010 |
| Aug 6, 2013 | San Juan Island Guardrail Repair CRP542131 | COLUMBIA RIVER CONTRACTORS INC | $73,930 |
| Aug 6, 2013 | San Juan County Guardrail Safety Project CRP 041106, 041109 | COLUMBIA RIVER CONTRACTORS INC | $225,410 |
| Jun 12, 2013 | 2013 Roadway Striping | STRIPE RITE INC | $129,960 |
| Mar 5, 2013 | Mt. Baker Road Trail & Mt. Baker Road Improvements 13RD.004 | ORCAS EXCAVATORS INC | $1,017,461 |
| Mar 1, 2013 | 2013 CHIP SEAL PROJECT n/a | ALBINA FUEL COMPANY | — |
| Feb 20, 2013 | Mount Baker Road Ecology Green Well Decommissioning 020606 | HOLT SERVICES INC | $12,972 |
| Jan 4, 2013 | Lopez Island Guardrail Repair Lopez Is GR Repair | PETERSEN BROTHERS INC | $7,831 |
| Dec 19, 2012 | Lovers Lane Rockery & Pathway 052-01 | ORCAS EXCAVATORS INC | $20,892 |
| Dec 14, 2012 | Obstruction Pass Float and Pile Replacement 021001 | CARLSON CONSTRUCTION INC | $110,064 |
| Dec 10, 2012 | Orcas Maint Shop | ARROW INSULATION INC. | $16,500 |
| Nov 29, 2012 | Orcas Maint shop | ARROW INSULATION INC. | $16,500 |
| Oct 18, 2012 | A St To Main St-Stormwater Improvement-Phase 3A 12ST.003 | ORCAS EXCAVATORS INC | $23,606 |
| Aug 21, 2012 | Mt Baker Rd and Trail Improvement Projects-Wetland Mitigation 021202 | ISLAND EXCAVATING INC | $172,864 |
| Aug 10, 2012 | Crow Valley Road Washout Repair 12RD021 | ORCAS EXCAVATORS INC | $3,000 |
| Aug 6, 2012 | Annex Heat Pump Replacement | SAN JUAN HEATING LLC | $9,625 |
| Jul 26, 2012 | Plant Establishment and Monitoring ES EPA000 | MINDY KAYL CONSULTING | $19,000 |
| May 17, 2012 | 2012 Roadway Striping San Juan County n/a | ROAD RUNNER STRIPING INC | $108,882 |
| Mar 28, 2012 | 2012 CHIP SEAL PROJECT N/A | ALBINA FUEL COMPANY | — |
| Dec 12, 2011 | Roche Harbor Dock, Float, and Gangway Light Standard Project 2011-11RD004 | FRIDAY HARBOR ELECTRIC | $4,489 |
| Nov 21, 2011 | Roche Harbor Dock, Float and Gangway Light Standard 11RD004 | FRIDAY HARBOR ELECTRIC | $4,164 |
| Sep 1, 2011 | Eastsound Constructed Wetland EPA000 11RD.025 | ORCAS EXCAVATORS INC | $223,574 |
| Aug 4, 2011 | Outlook Inn Basin Cover Plantings ST0805 | Kayl Mindy A. | $4,301 |
| Jul 11, 2011 | Legislative Building roof 11RD019 | DUKE CONTRACTING SERVICES LLC | $30,710 |
| Jun 16, 2011 | SJC Fairgrounds Arena Fence 11PK.004 | LUM VOLVO & TRACTOR SERVICE | $9,724 |
| May 13, 2011 | 2011 Striping, San Juan County None | SPECIALIZED PAVEMENT MRKG INC | $104,246 |
| May 4, 2011 | Roche Harbor Dock, Float,and Gangway 011003 | CARLSON CONSTRUCTION INC | $191,820 |
| Mar 29, 2011 | 2011 CHIP SEAL PROJECT N/A | ALBINA FUEL COMPANY | — |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.