QUILLAYUTE VALLEY SCHOOL DISTRICT #402 — public works contracts
411 public works projects and 549 intents to pay prevailing wages name QUILLAYUTE VALLEY SCHOOL DISTRICT #402 as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: School District.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 18 | 7 | 29 | 28 | 44 | 61 | 55 | 45 | 46 | 30 |
Latest contracts (185)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 11, 2026 | Plugged Kitchen Sink 49102 | ANGELES PLUMBING LLC | $761 |
| Sep 2, 2026 | start-up the VFD Signed Quote | Johnson Controls Bldg Sol LLC | $9,785 |
| Aug 19, 2026 | Refinishing Gym floors 2026 0175 | NORTHERN HARDWOOD CO INC | $18,119 |
| Aug 6, 2026 | Forks High School Athletic Fields | INTERWEST CONSTRUCTION INC | $4,788,283 |
| Aug 3, 2026 | Quillayute Valley SD, Forks HS, Kitchen Vinyl Repair/ 15199 Coming | CHARLES H BERESFORD CO INC | $2,583 |
| Aug 3, 2026 | QUILLAYUTE VALLEY SCHOOL DISTRICT PH I FP251 IAQ GRANT E739 | APOLLO SOLUTIONS GROUP | $11,342 |
| Jul 29, 2026 | Leak Repair Under Slab 48652 | ANGELES PLUMBING LLC | $3,460 |
| Jun 29, 2026 | Quillayute Valley SD, Forks HS, Commons Entry/ 15180 Coming | CHARLES H BERESFORD CO INC | $18,875 |
| Jun 29, 2026 | Quillayute Valley SD, Forks HS, Gym Entry Logo/ 15179 Coming | CHARLES H BERESFORD CO INC | $26,663 |
| Jun 18, 2026 | Trane Heat Pump Repair (Rm 104) 96840 | MAYDA & SONS MECHANICAL | $6,957 |
| May 15, 2026 | Provide (2) ACH580-PDR-017A-2 / (2) ACH580-PDR-031A-2 VFD Provide (2) ACH580-PDR-017A-2 / (2) ACH580-PDR-031A-2 VFD | Johnson Controls Bldg Sol LLC | $29,614 |
| May 5, 2026 | Leak under slab 47980 | ANGELES PLUMBING LLC | $1,814 |
| Mar 27, 2026 | FMS Annex HVAC Compressor Replacement 97073 | MAYDA & SON MECHANICAL | $9,711 |
| Jan 22, 2026 | Provide Two ACH580-PDR-017A-2 Two ACH580-PDR-031A-2 VFD Provide Two ACH580-PDR-017A-2 Two ACH580-PDR-031A-2 VFD | JOHNSON CONTROLS INC | $28,585 |
| Nov 26, 2025 | 2850 FES GYM LIGHTS 61665 | OLYMPIC ELECTRIC CO INC | $5,293 |
| Oct 31, 2025 | QUILLAYUTE VALLEY SCHOOL DISTRICT NO. 402 WO-416819 | CUMMINS INC | $9,411 |
| Oct 22, 2025 | 2850 FES Gym Lights #2 61731 | OLYMPIC ELECTRIC CO INC | $6,780 |
| Sep 19, 2025 | Security System Upgrade 103680 | HI TECH SECURITY INC | $6,337 |
| Sep 17, 2025 | FES BUS GATE 61672 | OLYMPIC ELECTRIC CO INC | $10,448 |
| Aug 26, 2025 | 2897 FHS CATCH BASIN 1307 | OLYMPIC ELECTRIC CO INC | $5,476 |
| Aug 14, 2025 | Refinish gym floors | NORTHERN HARDWOOD CO INC | $18,119 |
| Aug 12, 2025 | 2897 FHS Catch Basins 1307 | OLYMPIC ELECTRIC CO INC | $5,476 |
| Jun 4, 2025 | Replace the NAE at the elementary school Replace the NAE at the elementary school | JOHNSON CONTROLS INC | $28,364 |
| May 28, 2025 | Quillayute Valley SD, Forks ES, Kitchen/ 15005 Coming | CHARLES H BERESFORD CO INC | $27,258 |
| Mar 28, 2025 | FES RTU Replacement, Room 107 i92984 | MAYDA & SON MECHANICAL | $19,502 |
| Mar 18, 2025 | QVSD FORKS MS AC CAMS 01 QVSD FORKS MS AC CAMS 01 | SECURITY SOLUTIONS NW LLC | $10,035 |
| Feb 21, 2025 | unit giving rinse sensor error Forks Elementary School | HOBART | $2,325 |
| Feb 20, 2025 | FES Trane RTU Repair #2 i92783 | MAYDA & SON MECHANICAL | $5,375 |
| Feb 13, 2025 | FHS Gymnasium Equipment 116623 | BARCLAY DEAN ARCHTL PRDTS LLC | $6,350 |
| Dec 16, 2024 | Quillayute Valley School Transit Center 2067 | SERVPRO OF CLALLAM & JEFF CO | $3,692 |
| Aug 22, 2024 | QUILLAYUTE VALLEY SCHOOL DISTRICT 80047, 80049, 80050, 80051, 80052 | KNIGHT FIRE PROTECTION INC | $4,659 |
| Jul 9, 2024 | Refinish FHS Aux and FMS Gym floors 1102300262 | NORTHERN HARDWOOD CO INC | $10,011 |
| Jun 26, 2024 | Striping 47498 | RAINBOW SWEEPERS INC | $975 |
| Jun 13, 2024 | Quillayute Valley School District - Stadium Patch | LAKESIDE INDUSTRIES INC | $2,200 |
| May 8, 2024 | Quillayute Schools EMC 1102300-261 | HANSON SIGN CO INC | $45,989 |
| May 6, 2024 | Forks High School District Office 24-1483 | STRIPE RITE INC | $28,833 |
| May 6, 2024 | Forks Middle School 24-14884 | STRIPE RITE INC | $4,466 |
| May 6, 2024 | Forks School Transportation Building 24-1482 | STRIPE RITE INC | $13,358 |
| Apr 8, 2024 | Quillayute Valley SD, Forks ES/ 14787 Coming | CHARLES H BERESFORD CO INC | $87,127 |
| Mar 14, 2024 | Resurface Spartan Gymnasium Floor 0189 | NORTHERN HARDWOOD CO INC | $64,997 |
| Nov 20, 2023 | FHS Washer & Dryer Parts & Repair 4685 | WASHINGTON AUTOMATED LLC | $4,731 |
| Oct 20, 2023 | Spartan Stadium Restroom Addition 22-1637 | Hoch Construction | $1,063,876 |
| Oct 4, 2023 | Stadium Sound System Upgrade 1102300042 | DIMENSIONAL COMMUNICATIONS INC | $3,659 |
| Sep 29, 2023 | QUILLAYUTE VALLEY SCHOOL DISTRICT 77729, 77724, 77725, 77726, 77727, 77728 | KNIGHT FIRE PROTECTION INC | $5,345 |
| Sep 6, 2023 | THEATER LIGHTING RETROFIT HIGH SCHOOL THEATER LIGHTING | OLYMPIC ELECTRIC CO INC | $153,696 |
| Aug 29, 2023 | Restripe Parking Lot 3190 | STRIPE RITE INC | $2,500 |
| Jul 24, 2023 | Quillayute Valley SD, Alternative School, Portable/ 14638 Coming | CHARLES H BERESFORD CO INC | $6,069 |
| Apr 17, 2023 | High School Grandstand 69175 | HI TECH SECURITY INC | $3,671 |
| Jan 13, 2023 | Forks Elem School Gym SS 1102100303 | DIMENSIONAL COMMUNICATIONS INC | $9,619 |
| Nov 14, 2022 | 22-09857 Quillayute Valley SD SPI-QVSD-FY22-Dark Fiber Switching-Equipment 2002200002 | Ednetics Inc | $2,764 |
| Sep 27, 2022 | Quillatyte Valley Grandstand 2020104 | ALLPLAY SYSTEMS LLC | $1,319,388 |
| Sep 15, 2022 | 22-09684 Quillayute Valley SD 2022 E-Rate Switches 2002200001 | Ednetics Inc | $302,987 |
| Aug 30, 2022 | QUILLAYUTE VALLEY SCHOOL DISTRICT 75261, 75260, 75259, 75258, 75257 | KNIGHT FIRE PROTECTION INC | $4,572 |
| Jul 13, 2022 | School Asphalt Repairs 0422111 | LAKESIDE INDUSTRIES INC | $57,350 |
| Jun 13, 2022 | Spartan Stadium Grandstand Replacement 21149 | INTERWEST CONSTRUCTION INC | $1,128,552 |
| Jun 7, 2022 | Forks High School Partial Roof Replacement 21148 | Hoch Construction | $423,518 |
| Feb 11, 2022 | Classroom ALS/Mic system 65869 | DIMENSIONAL COMMUNICATIONS INC | $6,475 |
| Feb 8, 2022 | Grandstand demolition Grand Stand | K D & S ENVIRONMENTAL INC | $35,741 |
| Dec 10, 2021 | boiler maintenance 1102100117 | INDUSTRIAL BOILER SERVICE INC | $5,426 |
| Aug 31, 2021 | Quillayute Valley SD, Forks ES, Gym & Commons / 14223 Coming | CHARLES H BERESFORD CO INC | $111,537 |
| Jul 6, 2021 | Quillayute Valley SD, Forks HS, Band Rm / 14183 Coming | CHARLES H BERESFORD CO INC | $5,649 |
| Jun 21, 2021 | Quillayute Valley SD, Forks Hs, Concessions / 14154 Coming | CHARLES H BERESFORD CO INC | $5,248 |
| Jun 21, 2021 | Quillayute SD, Forks HS, Science Room 204/ 14155 Coming | CHARLES H BERESFORD CO INC | $12,008 |
| Jun 21, 2021 | Quillayute SD, Forks HS, Art Rm 203/ 14156 Coming | CHARLES H BERESFORD CO INC | $11,334 |
| Jun 4, 2021 | Transportation Center Pavement Repair - Quillayute Valley | LAKESIDE INDUSTRIES INC | $10,750 |
| Jun 3, 2021 | High School ReRoof 41421-2 | WESTERN WASHINGTON CONST LTD | $56,745 |
| May 17, 2021 | Forks Elementary Parking Lot and Drive Aisles | LAKESIDE INDUSTRIES INC | $252,449 |
| Nov 30, 2020 | Cleaning 38 Catch Basins 1102000072 | R J SERVICES INC | $10,308 |
| Aug 27, 2020 | Maintenance Coats on gym floors 1101900190 | WESTERN HARDWOOD INC | $9,656 |
| Jul 23, 2020 | Forks Elementary School Playground - Quillayute Valley School District #402 | LAKESIDE INDUSTRIES INC | $94,950 |
| Jun 24, 2020 | Bryan Boiler Repair | INDUSTRIAL BOILER SERVICE INC | $21,577 |
| May 27, 2020 | Boiler Repair FHS Boiler Repair | OLYMPIC ELECTRIC CO INC | $1,293 |
| Apr 27, 2020 | Forks Elementary Playground 1101900135 | ALLPLAY SYSTEMS LLC | $212,900 |
| Apr 14, 2020 | Forks High School Intrusion 1101900034 | JOHNSON CONTROLS FIRE PRTTN LP | $3,100 |
| Mar 27, 2020 | Forks Elementary School Heat Pump 1101900119 | JIM'S REFRIGERATION | $2,809 |
| Mar 2, 2020 | Quillayute Valley SD, Forks ES, Gym & Commons / 13730 Coming | CHARLES H BERESFORD CO INC | $105,477 |
| Feb 12, 2020 | Middle school cooler Middle School | JIM'S REFRIGERATION | $678 |
| Oct 23, 2019 | Forks HS Bracing | KNIGHT FIRE PROTECTION INC | $3,572 |
| Oct 16, 2019 | Gym floor coatings 1101800189 | WESTERN HARDWOOD INC | $5,968 |
| Oct 14, 2019 | Forks High School Window Replacement 1669 | LARSON GLASS CO INC | $8,491 |
| Sep 17, 2019 | Sewer and water for mobile home unknown | Angeles Plumbing | — |
| Sep 17, 2019 | QUILLAYUTE VALLEY SCHOOL DISTRICT PORTABLES PO 1101800201 | COSCO FIRE PROTECTION INC | $14,475 |
| Aug 21, 2019 | Forks High School 2019 | TODD ROBINSON PAINTING INC | $9,735 |
| Jul 27, 2019 | Alternative School Foundation Fill 447276 | D & H ENTERPRISES | $8,788 |
| Jul 3, 2019 | Forks High School AC UPG 610655001 | JOHNSON CONTROLS FIRE PRTTN LP | $7,877 |
| May 28, 2019 | Alternative School 19-5616 | K D & S ENVIRONMENTAL INC | $39,999 |
| May 9, 2019 | Quillayute Valley SD, Forks ES, Pod A,B & C coming | CHARLES H BERESFORD CO INC | $120,938 |
| May 9, 2019 | Quillayute SD-Forks Alt. School 4117734 | WILLIAMS SCOTSMAN INC | $210,321 |
| Apr 19, 2019 | Forks HS PVI WTR HTR Repairs 1101800131 | COMBUSTION & CONTROL | $4,536 |
| Apr 18, 2019 | Forks HS PVI WTR HTR Clean and Tune 1101800124 | COMBUSTION & CONTROL | $6,215 |
| Mar 25, 2019 | Forks High School 1101800111 | DIMENSIONAL COMMUNICATIONS INC | $9,597 |
| Mar 25, 2019 | Forks High School 1101800112 | DIMENSIONAL COMMUNICATIONS INC | $23,860 |
| Mar 14, 2019 | Forks HS Track Repair 1101800096 | BEYNON SPORTS SURFACES INC | $1,899 |
| Mar 14, 2019 | FORKS HIGH SCHOOL 302987 BILL HENDERSON | NOR-PAC SEATING COMPANY INC | $2,902 |
| Mar 12, 2019 | FORKS HIGH SCHOOL 302983 BILL HENDERSON | NOR-PAC SEATING COMPANY INC | — |
| Feb 7, 2019 | Forks Middle School 106 | Jim's Refrigeration Inc. | $3,896 |
| Aug 30, 2018 | Ceiling Wire for ceiling clouds and lights Ceiling Wire | OLYMPIC ELECTRIC CO INC | $8,569 |
| Aug 28, 2018 | Gym Floor Coating None | WESTERN HARDWOOD INC | $10,633 |
| Jun 4, 2018 | Forks Elementary School | DIMENSIONAL COMMUNICATIONS INC | $23,826 |
| Apr 24, 2018 | Quillayute Valley School District No. 402 Backup Generator | NORTHEAST ELECTRIC LLC | $312,000 |
| Dec 19, 2017 | Forks High School | DIMENSIONAL COMMUNICATIONS INC | $3,445 |
| Oct 27, 2017 | Forks High School Water Leak | Angeles Plumbing | — |
| Oct 9, 2017 | FORKS HIGH SCHOOL | CONVERGINT TECHNOLOGIES LLC | $2,768 |
| Sep 19, 2017 | Forks Elementary School | LAKESIDE INDUSTRIES INC | $4,900 |
| Aug 8, 2017 | Forks School Recoating 5355 | BRANDSEN HARDWOOD FLOORS INC | $8,310 |
| Jul 24, 2017 | 17-03225 Quillayute Valley SD - Camera Additions 47065 | EDNETICS INC | $10,107 |
| Jun 30, 2017 | New drinking fountains | Angeles Plumbing | — |
| Jun 29, 2017 | Forks High School | TODD ROBINSON PAINTING INC | $5,408 |
| Jun 26, 2017 | Forks High School 17-2455 | STRIPE RITE INC | $19,179 |
| May 25, 2017 | Elementary School Room 308 Heat Pump 360-374-6262 | JIM'S REFRIGERATION | $3,076 |
| Apr 27, 2017 | Forks High School | MESSERSMITH MANUFACTURING INC | $2,635 |
| Mar 31, 2017 | Repaired leak on copper circ line | Angeles Plumbing | $5,298 |
| Sep 8, 2016 | Library Compressor Replacement | JIM'S REFRIGERATION | $3,867 |
| Aug 8, 2016 | Transportation Department | RAINBOW SWEEPERS INC | $23,101 |
| Jul 27, 2016 | Forks HS Track 2001500003 | FIELDTURF USA INC | $90,572 |
| Jun 29, 2016 | QVSD Transportation Entry / 12486 | CHARLES H BERESFORD CO INC | $1,028 |
| Jun 29, 2016 | Forks HS, Gym Entry & Locker Rooms / 12485 | CHARLES H BERESFORD CO INC | $3,704 |
| Jun 17, 2016 | Install Scoreboard | D & H ENTERPRISES | $8,268 |
| Jun 2, 2016 | Forks High School 2001500001 | FIELDTURF USA INC | $1,286,732 |
| May 11, 2016 | Elderberry Elementary School Repairs | Angeles Plumbing | $3,281 |
| May 10, 2016 | Forks Recoating | BRANDSEN HARDWOOD FLOORS INC | $4,715 |
| May 10, 2016 | Forks HS Aux Gym Resand | BRANDSEN HARDWOOD FLOORS INC | $20,457 |
| Feb 10, 2016 | Forks High School Field Design 2001500000 | FIELDTURF USA INC | $38,666 |
| Nov 10, 2015 | Alternative School emergency abatement None | K D & S ENVIRONMENTAL INC | $1,695 |
| Sep 29, 2015 | Elementry School & Bus Loop Asphalt Repair 1101400253 | JERRY LEPPELL INVESTMENTS | $14,324 |
| Aug 10, 2015 | Kelvinator Freezer | JIM'S REFRIGERATION | $4,553 |
| Jul 28, 2015 | Forks High School Gym 22439-G | GIFFORD INDUSTRIES INC | $8,547 |
| Jul 20, 2015 | QVSD Transportation Entry / 12012 | CHARLES H BERESFORD CO INC | $1,028 |
| Jul 20, 2015 | Forks HS, Boys & Girls Restrooms / 12013 | CHARLES H BERESFORD CO INC | $3,098 |
| Nov 3, 2014 | District Office, Restroom / 11605 | CHARLES H BERESFORD CO INC | $488 |
| Sep 23, 2014 | Elem School Library Compressor | JIM'S REFRIGERATION | $2,650 |
| Sep 18, 2014 | WA14-0240C QVSD - WA14-0240C QVSD - Forks Campus IPVS Phs 1 + Phs 2 WA14-0240C | EDNETICS INC | $165,210 |
| Aug 25, 2014 | Playground Fence | S J B CONSTRUCTION INC | $6,287 |
| Aug 25, 2014 | Forks High School | DIMENSIONAL COMMUNICATIONS INC | $19,980 |
| Aug 25, 2014 | Drop Off Zone Fence | S J B CONSTRUCTION INC | $5,843 |
| Aug 21, 2014 | High School/District Office Re-Stripe | RAINBOW SWEEPERS INC | — |
| Aug 20, 2014 | Replace 4' Butterfly Vlave | J H KELLY LLC | — |
| Aug 13, 2014 | Forks Intermediate School computer lab | ANDERSON ELECTRIC | $21,030 |
| Jul 25, 2014 | Gutter Work 072514-03 | WESTERN WASHINGTON CONST LTD | $3,729 |
| Jul 8, 2014 | 01086 Forks 1101300212 | (individual contractor) | $61,386 |
| Jul 2, 2014 | ILC Re-roof Project 360-640-9726 | JOHN LUPO CONSTRUCTION INC | $48,244 |
| Jun 18, 2014 | A ST AND SPARTAN AVE | LAKESIDE INDUSTRIES INC | $23,568 |
| Jun 9, 2014 | Forks Middle School 200130000 | NORTHWEST PLAYGROUND EQUIP INC | $121,536 |
| Jun 5, 2014 | Screen & Recoat main Gym floors | GIFFORD INDUSTRIES INC | $5,883 |
| Mar 27, 2014 | Forks Elementary School 3606409726 | DIMENSIONAL COMMUNICATIONS INC | $2,764 |
| Jan 9, 2014 | Forks High School 1101300022 | BARCLAY DEAN ARCHTL PRDTS LLC | $6,075 |
| Jan 6, 2014 | Auxiliary Gym Heater Repair | ANGELES HEATING INC | $5,913 |
| Nov 26, 2013 | Elementary School 37971 | HI TECH SECURITY INC | $6,569 |
| Nov 7, 2013 | asphalt repair on bus route 1101200274 | JERRY LEPPELL INVESTMENTS | $5,393 |
| Oct 29, 2013 | Forks High School 1101300022 | BARCLAY DEAN ARCHTL PRDTS LLC | $6,075 |
| Aug 23, 2013 | Heat pumps at Elementry school | ANDERSON ELECTRIC | — |
| Aug 23, 2013 | heat pumps elementry school | ANDERSON ELECTRIC | — |
| Jul 12, 2013 | Heat Pump Installation - Forks Elementary School 1422 | ANGELES HEATING INC | $38,059 |
| Jul 5, 2013 | Screen & Recoat Gym Floors | GIFFORD INDUSTRIES INC | $4,448 |
| May 31, 2013 | Aux Gym Wallway Post Project 2001200005 | ANGELES HEATING INC | $6,314 |
| May 22, 2013 | Heat Pump Installation - Forks Elementary School 1422 | ANGELES HEATING INC | $28,130 |
| Apr 24, 2013 | Forks High School Covered Walkway | HENSON COMPANY INC, THE | $31,600 |
| Apr 12, 2013 | Auxiliary Gym Re-roof | WESTERN WASHINGTON CONST LTD | $167,153 |
| Feb 4, 2013 | Boiler Repair 2802 | INDUSTRIAL BOILER SERVICE INC | $5,828 |
| Oct 5, 2012 | A/C for Computer Room | JIM'S REFRIGERATION | $4,131 |
| Sep 12, 2012 | Forks High School Stadium Access Ramp & Stairs N/A | Hoch Construction | $15,672 |
| Aug 28, 2012 | Forks ES and MS Controls Upgrades | JOHNSON CONTROLS INC | $79,530 |
| Jul 26, 2012 | Forks HS, Game Lines / 10513 | CHARLES H BERESFORD CO INC | $3,285 |
| Jul 12, 2012 | Forks Middle School Gym Siding Replacement N/a | Hoch Construction | $41,582 |
| Jul 2, 2012 | Forks Elem School Walk-In Freezer 1111100013 | JIM'S REFRIGERATION | $25,937 |
| Jul 2, 2012 | Field work @ Forks HS 1101100178 | JERRY LEPPELL INVESTMENTS | — |
| Jun 28, 2012 | Screen and Re-coat Gym Floors 3603746262 | GIFFORD INDUSTRIES INC | $5,150 |
| Jun 22, 2012 | Asphalt Replacement at Forks Transporation Center | LAKESIDE INDUSTRIES INC | $135,561 |
| May 10, 2012 | Forks HS - 21281 1071100060 | (individual contractor) | $39,023 |
| May 4, 2012 | replace gym lights 2012 | OLYMPIC ELECTRIC CO INC | $10,900 |
| Mar 11, 2012 | Auxiliary walkway gym canopy 0 | MOODY CONSTRUCTION | $32,711 |
| Dec 29, 2011 | Forks HS, Entry / 10219 | CHAS H BERESFORD COMPANY | $1,202 |
| Nov 29, 2011 | Forks MS & ES - 49392 1061000042 | (individual contractor) | $36,871 |
| Nov 29, 2011 | Forks HS - 49347-2 1061000038 | (individual contractor) | $18,436 |
| Nov 21, 2011 | Forks HS, Auxiliary Gym / 10177 | CHAS H BERESFORD COMPANY | $18,244 |
| Sep 6, 2011 | Forks HS / 10002K 2001000014 | CHAS H BERESFORD COMPANY | $7,976 |
| Aug 11, 2011 | Forks HS, Science Rm #10039 | CHAS H BERESFORD COMPANY | $7,462 |
| Aug 11, 2011 | Forks HS, Rms A105, A131a, A131b #10040 | CHAS H BERESFORD COMPANY | $5,272 |
| Jul 28, 2011 | Forks HS Cabling PRJ-04448 | EDNETICS INC | $131,534 |
| Jul 27, 2011 | Forks HS, Weight Room / 10002K | CHAS H BERESFORD COMPANY | $13,500 |
| Jun 27, 2011 | QVSD Gym Floor Maintenance | TRADITIONAL HRDWD FLOORS INC | — |
| Jun 23, 2011 | Forks HS - 49347 2001000007 | (individual contractor) | $55,307 |
| Jun 12, 2011 | Intercom/Clock Replacement 67581 | DIMENSIONAL COMMUNICATIONS INC | $30,874 |
| Jun 9, 2011 | Forks Elementary School Re-Roof | ROOF TOPPERS INC | $144,481 |
| May 24, 2011 | Forks HS, New Addition / 9861K | CHAS H BERESFORD COMPANY | $146,810 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.