OTHELLO, CITY OF — public works contracts
237 public works projects and 443 intents to pay prevailing wages name OTHELLO, CITY OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: City.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 39 | 11 | 37 | 34 | 31 | 28 | 36 | 21 | 15 | 19 |
Latest contracts (167)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 25, 2026 | CITY HALL WO-95941 | CUMMINS INC | $1,652 |
| Sep 10, 2026 | Crack Seal 2026 25-01 | B C V INC | $35,875 |
| Sep 10, 2026 | 26-11623 City of Othello Server & Configuration Signed quote #94336 | Ednetics Inc | $19,666 |
| Sep 10, 2026 | Well No. 5 Motor Pull WO 54167 | SCHNEIDER EQUIPMENT INC | — |
| Aug 18, 2026 | KIWANIS PARK TRAILS na | GRANITE CONSTRUCTION COMPANY | $248,032 |
| Jun 18, 2026 | Concrete upgrades 26-09 | DUG EXCAVATION LLC | $7,480 |
| Apr 15, 2026 | Emergency sewer repair - Royal Street 26-10 | DUG EXCAVATION LLC | $230,000 |
| Apr 8, 2026 | ADAMS COUNTY FIRE DIST 5 WO-95316 | CUMMINS INC | $2,529 |
| Mar 12, 2026 | 26-11205 City of Othello City Hall ACS Addition NTP Q91728 | Ednetics Inc | $34,080 |
| Feb 12, 2026 | Othello Rodeo 304533 Ken Dockins | NOR-PAC SEATING COMPANY INC | $271,623 |
| Feb 11, 2026 | City Well #7 Rehabilitation Project 25-07 | SCHNEIDER EQUIPMENT INC | $62,107 |
| Jan 28, 2026 | Well 3R Motor Noise 53554 | SCHNEIDER EQUIPMENT INC | $47,814 |
| Dec 2, 2025 | Hotsy Lateral Sewer 1124-2025 | ALLIED PLUMBING & PUMPS LLC | $9,950 |
| Oct 8, 2025 | Well Tent and Park Rec Slacks Custom Landscapes LLC | SLACK'S CUSTOM LANDSCAPES LLC | $3,571 |
| Sep 30, 2025 | City of Othello Reroof 5093463973 | EMINENT ROOFING INC | $21,512 |
| Sep 3, 2025 | 2025 Sidewalk Repair 25-06 | DUG EXCAVATION LLC | $17,853 |
| Jun 17, 2025 | Birch Street Fire Incident - Emergency Response 5094886997 | GRAYMAR ENVIRONMENTAL SERV LLC | $30,000 |
| May 22, 2025 | Birch Street Fire Incident - Emergency Response 5094886997 | GRAYMAR ENVIRONMENTAL SERV INC | $30,000 |
| May 19, 2025 | Well #4 Emergency Repair Well 4 2025 | LAYNE OF WASHINGTON INC | — |
| Apr 21, 2025 | City of Othello Paving N/A | CENTRAL WASHINGTON ASPHALT INC | $36,901 |
| Jan 29, 2025 | Main St decorative lighting project 24-22 | FARMERS ELECTRIC II LLC | $300,699 |
| Aug 12, 2024 | 24-01584 City of Othello Lions Park IPVS signed quote #79538 | Ednetics Inc | $13,463 |
| Aug 1, 2024 | 24-01559 City of Othello Fiber Optic Cable Addition Notice to Proceed (signed proposal) | Ednetics Inc | $8,487 |
| Jun 24, 2024 | Seal Coat Project - 2024 #24-06 | TOMMER CONSTRUCTION COMPANY | $600,000 |
| Jun 3, 2024 | Sidewalk Replacement 21-09-A | EXCO LLC | $9,812 |
| May 21, 2024 | Playground sidewalk repair 21-09-A | DUG EXCAVATION LLC | — |
| May 10, 2024 | 2024 Asphalt Repair Project #24-09 - #24-17 | CENTRAL WASHINGTON ASPHALT INC | $45,000 |
| May 2, 2024 | Lions Park Sidewalk Repair 21-9A | DUG EXCAVATION LLC | — |
| Mar 22, 2024 | Fuel Containment 349-2024 | DUG EXCAVATION LLC | — |
| Mar 15, 2024 | Crack Seal Project - 2024 24-05 | B C V INC | $75,600 |
| Feb 9, 2024 | CCTV Project 6/28/22 10:44 | R F I COMM & SECURITY SYS | $121,291 |
| Jan 10, 2024 | Kiwanis Park Splash Pad CB-1212023-00004101 | NORTHWEST PLAYGROUND EQUIP INC | $839,449 |
| Nov 22, 2023 | Well #3 MOP10596 | LAD IRRIGATION CO INC | — |
| Oct 25, 2023 | Asphalt Repair Project 23-15 | CENTRAL WASHINGTON ASPHALT INC | $59,500 |
| Oct 10, 2023 | LIONS PARK PLAYGROUND PROJECT #21-09a | PAVEMENT MAINTENANCE OF WA LLC | $289,935 |
| Aug 15, 2023 | Fog Seal/ Sealcoat Fog Seal | QUALITY PAVING INC | $8,656 |
| Aug 4, 2023 | install new probe sam harris | AQUATIC SPECIALTY SERVICES INC | $1,444 |
| Jul 5, 2023 | Lions Park Basketball Court Project 21-09B | DUG EXCAVATION LLC | $600,420 |
| Jun 7, 2023 | Sod Removal Project 23-01 | NORTHWEST TURF SOLUTIONS INC | $8,210 |
| May 19, 2023 | Well 10 Pump Pull OOP08911 | LAD IRRIGATION CO INC | — |
| May 19, 2023 | Lions Park Connectivity Trail Project TA-7228 | C & E TRENCHING LLC | $336,350 |
| May 11, 2023 | Asphalt Patches and Repairs Patches | QUALITY PAVING INC | $15,000 |
| May 3, 2023 | CITY HALL DUCTLESS REVAMP CITY HALL | BASIN REFRIGERATION & HTG INC | $20,836 |
| Apr 6, 2023 | Seal Coat Project - 2023 23-11 | SIERRA SANTA FE CORP | $695,777 |
| Feb 16, 2023 | Sewer Lining Project - 2022 22-02 | PLANNED & ENGINEERED CONST INC | $838,637 |
| Jan 11, 2023 | Well 5 VFD Fault 9753 | SCHNEIDER EQUIPMENT INC | — |
| Dec 28, 2022 | OFFICE SYSTEM OFFICE SYSTEM | BASIN REFRIGERATION & HTG INC | $10,946 |
| Nov 28, 2022 | Scooteney and 14th Safety Improvements TA-7235 | ESF DEVELOPMENT LLC | $222,222 |
| Oct 31, 2022 | Well 5 VFD Fault 9753 | SCHNEIDER EQUIPMENT INC | — |
| Oct 26, 2022 | Motor Pull & Set OOP08762 | LAD IRRIGATION CO INC | — |
| Oct 3, 2022 | City Hall Remodel Project 22-04 | CARPET CARROUSL OF OTHELLO INC | $62,627 |
| Sep 13, 2022 | Asphalt Repair Project 2022 0906 | EAST SIDE ASPHALT INC | $71,931 |
| Aug 31, 2022 | WATER SCADA PROJECT 2022 22-06 | TAYLOR ELECTRIC & CONTROLS LLC | $306,001 |
| Jul 21, 2022 | Asphalt Patches and Repairs Asphalt Patches and Repairs | QUALITY PAVING INC | $14,607 |
| Jul 19, 2022 | Avigilon Install 06/28/22 10:44 | R F I COMM & SECURITY SYS | $264,096 |
| Jul 11, 2022 | PUBLIC WORKS HVAC RPLMNT 7/22 HVAC RPLMNT JULY 2022 | BASIN REFRIGERATION & HTG INC | $10,946 |
| Jun 29, 2022 | City of Othello Railroad Crossing Project 20-15 | Industrial Const of WA LLC | $535,379 |
| Jun 2, 2022 | Booker Road Project 22-04 | HILMES CONSTRUCTION INC | $17,400 |
| Mar 9, 2022 | Crack Seal Project 2022 22-01 | QUALITY PAVING INC | $139,000 |
| Dec 9, 2021 | Ash Street Safety Improvements Project 20-07 | ESF DEVELOPMENT LLC | $654,324 |
| Dec 7, 2021 | 10th Street Alley 2021-12-06 | DUG EXCAVATION LLC | — |
| Dec 6, 2021 | Well 9 Lowering Pump Project 21-13 | LAYNE OF WASHINGTON INC | $39,493 |
| Nov 18, 2021 | 15th St Curb 2021-11-18 | DUG EXCAVATION LLC | — |
| Nov 16, 2021 | Sewer Lining Project - 2021 21-01 | PLANNED & ENGINEERED CONST INC | $893,602 |
| Nov 8, 2021 | Adams County Sheriff Sub Station Adams County Sheriff Sub Station | JOHNSON CONTROLS FIRE PRTTN LP | $368 |
| Nov 1, 2021 | Vegetation Management OTH*06252021 | OUTBACK SPRAYING LLC | — |
| Oct 14, 2021 | Recycle Center 10-8-2021 | DUG EXCAVATION LLC | — |
| Sep 29, 2021 | City Hall Generator OO012234 | LAD IRRIGATION CO INC | — |
| Sep 22, 2021 | City Hall Bldg Compressor change out S10699 | BASIN REFRIGERATION & HTG INC | $23,456 |
| Aug 31, 2021 | Wastewater Treatment Chlorination/Declorination Project 21-01 | POW CONTRACTING | $532,074 |
| Aug 23, 2021 | Hydrant #1 & #2 Repair 7-2021 | DUG EXCAVATION LLC | $9,305 |
| Jun 8, 2021 | Seal Coat Project - 2021 #21-06 | TOMMER CONSTRUCTION COMPANY | $471,000 |
| Apr 15, 2021 | Broadway & Fir Fence Project 21-06 | SLACK'S CUSTOM LANDSCAPES | $13,854 |
| Apr 6, 2021 | OPD Carpet 2021 | CARPET CARROUSL OF OTHELLO INC | $20,052 |
| Mar 12, 2021 | Main Street Safety Project Rebid TA-6769 | ESF DEVELOPMENT LLC | $629,080 |
| Nov 20, 2020 | City of Othello Cabling #00918 | EVERGREEN TECHNOLOGIES INC | $7,769 |
| Nov 9, 2020 | Water Main Replacement Project 20-16 | GRAY EXCAVATION | $206,321 |
| Oct 14, 2020 | HMA Patching 20-17 | EAST SIDE ASPHALT INC | $26,000 |
| Oct 13, 2020 | Sewer Cleaning Project #20-05 | DR PIPELINE LLC | $204,714 |
| Aug 20, 2020 | City Fire Apparatus Shop Floor | Paint Smith Industrial LLC | $32,329 |
| Aug 7, 2020 | Well #10 Pump Station Project 20-14 | C & E TRENCHING LLC | $834,896 |
| Jun 25, 2020 | Cunningham Road Transmission Main 20-13 | C & E TRENCHING LLC | $208,014 |
| Apr 16, 2020 | Sagestone Irrigation Project 20-11 | PEGRAM CONSTRUCTION INC | $36,171 |
| Mar 31, 2020 | 3R Well VFD Smoked WO#9284 | SCHNEIDER EQUIPMENT INC | — |
| Mar 2, 2020 | Crack Seal Project-2020 #20-03 | QUALITY PAVING INC | $64,400 |
| Jan 21, 2020 | Lions Park Infield Renovation Project - 2020 20-02 | TOP CUT TREE TRM & RML SRV INC | $292,271 |
| Jan 7, 2020 | Sewer Smoke Test Project 20-01 | AMERICAN LEAK DETECTION | $22,809 |
| Dec 16, 2019 | Sidewalk repair patch 7th & Main St | DUG EXCAVATION LLC | $1,623 |
| Nov 6, 2019 | Concrete Pad and Conduit Project 19-06 | JOE'S EXCAVATION INC | $16,981 |
| Oct 7, 2019 | Broadway Planing Project 2019 19-05 | QUALITY PAVING INC | $165,000 |
| Oct 4, 2019 | City of Othello 9/9/19 8:37 | ONE DIVERSIFIED LLC | $1,967,942 |
| Oct 1, 2019 | OTHELLO CIY HALL OTHELLO CITY HALL CONTROLS UPGRADE | APOLLO MECHANICAL CONTRACTORS | $60,673 |
| Sep 24, 2019 | STANDPIPE #4 PROJECT- 2019 19-04 | T BAILEY INC | $2,652,975 |
| Sep 22, 2019 | Maintance Facility Fence 12586 | NORTH CENTRAL WASH FENCE LLC | $23,230 |
| Aug 15, 2019 | Library Re-Roof Coo-2019 | J R SWIGART CO INC | $42,468 |
| Aug 14, 2019 | Kiwanis Park ADA 2019-07 | DUG EXCAVATION LLC | $5,410 |
| Jul 18, 2019 | Lee Road Reconstruction 19-01 | GRANITE CONSTRUCTION COMPANY | $581,126 |
| Jul 17, 2019 | Police Department Dispatch Console System Replacement Police Department Dispatch Console System Replacement | SPECTRUM COMMUNICATIONS INC | $111,816 |
| Jul 3, 2019 | Well #10 Drilling Project 19-02 | YELLOW JACKET DRLLNG SRVCS LLC | $581,514 |
| May 15, 2019 | Crack Seal Project-2019 #19-01 | QUALITY PAVING INC | $115,000 |
| Apr 18, 2019 | Install Heater 2082019 | AQUATIC SPECIALTY SERVICES INC | $10,861 |
| Apr 15, 2019 | replace pool filter media & laterals 22 | AQUATIC SPECIALTY SERVICES INC | $15,707 |
| Dec 19, 2018 | 18-04520 City of Othello Network Upgrade WAOTHC-091418-1 | Ednetics Inc | $39,745 |
| Nov 7, 2018 | Well # 3 - Alterations 7665 | SCHNEIDER EQUIPMENT INC | $96,878 |
| Oct 26, 2018 | Well # 5 - Motor making bearing noise 8273 | SCHNEIDER EQUIPMENT INC | — |
| Aug 28, 2018 | 1st Street | DUG EXCAVATION LLC | — |
| Apr 13, 2018 | Replacement Well 3R 172-30-01 | SCHNEIDER EQUIPMENT INC | $970,960 |
| Dec 19, 2017 | Pine Street Sidewalk | DUG EXCAVATION LLC | $6,603 |
| Dec 18, 2017 | 12th Street Sidewalk | DUG EXCAVATION LLC | $7,429 |
| Dec 13, 2017 | 1305 Main Street | DUG EXCAVATION LLC | $5,179 |
| Nov 22, 2017 | OPD/ City Hall Parking Lot | DUG EXCAVATION LLC | $5,600 |
| Nov 22, 2017 | West City Hall Concrete | DUG EXCAVATION LLC | $6,600 |
| Oct 18, 2017 | SE Corner City Hall Dumpster Pad | DUG EXCAVATION LLC | $6,339 |
| Sep 11, 2017 | Well # 3 - Pull & Inspect pump | SCHNEIDER EQUIPMENT INC | — |
| Aug 23, 2017 | 14th Ave Meter | LAD IRRIGATION CO INC | — |
| Aug 23, 2017 | City Hall Curbing | QUALITY EDGE CURBING | $2,406 |
| Aug 16, 2017 | CITY OF OTHELLO CRACK SEAL 2017 | STRIPE RITE INC | $6,520 |
| Aug 12, 2017 | Tennis court Surfacing None | MID PAC CONSTRUCTION INC | $13,380 |
| Aug 10, 2017 | 1st Avenue Reconstruction Project 172-225 | ADC CONTRACTORS INC | $1,726,981 |
| Aug 8, 2017 | Pine & 2nd Street Repair | GRANITE CONSTRUCTION COMPANY | $204,079 |
| Jul 18, 2017 | Curb, gutter & driveway approaches | DUG EXCAVATION LLC | $52,871 |
| Jul 13, 2017 | Dan Dever Skate Park Memorial | TOP CUT TREE TRM & RML SRV INC | $6,086 |
| Jul 7, 2017 | Tennis Court Overlay | GRANITE CONSTRUCTION COMPANY | $21,640 |
| Sep 27, 2016 | Water Mitigation | SERVICEMASTER CLEANING & RESTO | — |
| Sep 19, 2016 | FIRE STATION GENERATOR | FARMERS ELECTRIC II LLC | $31,091 |
| May 20, 2016 | 14th Avenue Improvements 172-09 | CULBERT CONSTRUCTION INC | $1,740,126 |
| Apr 28, 2016 | Lions Park- New Restroom/Handicap Ramp | DUG EXCAVATION LLC | $9,585 |
| Apr 25, 2016 | (title withheld) 172-100-03 | WILLIAM EMFINGER CONST INC | $268,750 |
| Nov 10, 2015 | Alley approaches | DUG EXCAVATION LLC | — |
| Nov 6, 2015 | F&I New Pump Station Complete EJCDC C-520 | SCHNEIDER EQUIPMENT INC | $543,125 |
| Oct 23, 2015 | Lion's Park Restroom | ALLIED PLUMBING & PUMPS LLC | $4,410 |
| Oct 14, 2015 | Well 9 Pumping Equipment and Installation Project 1720702-W9ESP-03 | SCHNEIDER EQUIPMENT INC | $231,878 |
| Oct 7, 2015 | 1st Ave Improvements | AWARD CONSTRUCTION INC | $473,808 |
| Jul 27, 2015 | Adams County Fire District No 5 Unknow | PAINT SMITH CO | $44,750 |
| Jun 18, 2015 | Well # 9 Emergency temp pump | SCHNEIDER EQUIPMENT INC | — |
| May 7, 2015 | East Main Street 6' Force Sewer Main | PEGRAM CONSTRUCTION INC | $144,431 |
| Mar 19, 2015 | Pull & Inspect Well # 6 | SCHNEIDER EQUIPMENT INC | $57,199 |
| Feb 26, 2015 | Concrete Drive Water Extension 14074 | POW CONTRACTING | $108,858 |
| Feb 26, 2015 | 16' Waterline Transmission Main 12041.02 | PEGRAM CONSTRUCTION INC | $643,357 |
| Jan 23, 2015 | Waterline at OSD Bus Garage PO No. 1662 | APOLLO INC | — |
| Jan 23, 2015 | Othellow Transportation Facility Waterline Replacement NA | APOLLO INC | — |
| Dec 2, 2014 | Gutter Install- Building 111 N Broadway | CONTINUOUS GUTTER & ROOF. LLC | $5,600 |
| Nov 12, 2014 | Duct Cleaning | CLEAN AIR CONNECT/CLEAN CONN | $4,907 |
| Nov 3, 2014 | Pull pump Well # 3 - give report Well # 3 | SCHNEIDER EQUIPMENT INC | $21,702 |
| Sep 22, 2014 | East Main Street Overlay 14057 | CENTRAL WASHINGTON ASPHALT INC | $342,222 |
| Jun 23, 2014 | Drilling Well No. 9 G&O 12041 | SCHNEIDER EQUIPMENT INC | $417,796 |
| May 30, 2014 | Weed spraying valid through 12/01/2014 N/A | OUTBACK SPRAYING | $30,371 |
| Jan 2, 2014 | Pull motor & rebuild Well #5 | SCHNEIDER EQUIPMENT INC | — |
| Dec 2, 2013 | W MOON ST SEWER SYSTEM IMPROVEMENTS 11-64100-030 | PEGRAM CONSTRUCTION INC | $634,178 |
| Oct 16, 2013 | 2013 Crack Sealing Project CS2013 | B C V INC | $30,000 |
| Oct 9, 2013 | Pull pump at Well #8 Well #8 | SCHNEIDER EQUIPMENT INC | — |
| Jul 29, 2013 | Well #5 production is down Well #5 | SCHNEIDER EQUIPMENT INC | — |
| Mar 27, 2013 | 2012 STREET IMPROVEMENTS - REBID G&O # 12021.01 | CENTRAL WASHINGTON ASPHALT INC | $595,567 |
| Mar 22, 2013 | 2012 Infrastructure Improvements-Rebid 12021.02 | PEGRAM CONSTRUCTION INC | $121,941 |
| Mar 7, 2013 | Weed spraying valid through 12/1/2014 n/a | OUTBACK SPRAYING | $30,371 |
| Feb 4, 2013 | Council Chambers Sound System Upgrade | SOUND SOLUTIONS | $20,938 |
| Oct 18, 2012 | 2012 Crack Sealing Project CS2012 | B C V INC | $25,000 |
| Aug 8, 2012 | OUST DOOR BUILDING SIGNS ML 19680 | Signs Now of Moses Lake Inc. | $6,608 |
| Jul 31, 2012 | Well No. 6 Installation 2012-12004 | SCHNEIDER EQUIPMENT INC | — |
| Jul 13, 2012 | Public Works Shop Improvement | JOHNSON'S GLASS & DOORS LLC | $9,188 |
| Jul 13, 2012 | City Hall exterior painting n/a | AA PAINTING & SPECIALTIES LLC | $5,423 |
| May 2, 2012 | Public Works Shop Roof | J R SWIGART CO INC | $37,800 |
| Apr 17, 2012 | Othello Well # 5 motor repair PO # 1648 | SCHNEIDER EQUIPMENT INC | — |
| Oct 10, 2011 | Crack Seal Project 2010 CS10 | B C V INC | $25,000 |
| Sep 26, 2011 | City Hall | AA PAINTING & SPECIALTIES LLC | $13,208 |
| Sep 19, 2011 | Columbia Street Storm Sewer Improvements 10056 | CHRIS' EXCAVATION INC | $85,530 |
| Mar 25, 2011 | 2011 City Wide Weed Spraying | BASIN TREE SVC & PEST CTRL INC | $19,908 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.