Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 22 | 29 | 12 | 15 | 34 | 29 | 23 | 25 | 25 | 30 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 21, 2026 | (title withheld) Nate Cruz | SME SOLUTIONS LLC | — |
| Sep 21, 2026 | (title withheld) Nate Cruz | SME SOLUTIONS LLC | — |
| Sep 15, 2026 | HVAC/R MAINT/REPAIR 320262096 | DIVCO INCORPORATION | $13,241 |
| Sep 8, 2026 | Sinlahekin repair 20260388 | MCNALL CONSTRUCTION LLC | $49,942 |
| Sep 8, 2026 | Upper Main Lot - Striping SC26-068 | 24-7 PROPERTY MAINTENANCE LLC | $5,550 |
| Aug 12, 2026 | Tonasket Cable Plow NC 2026-22 | RANGE CONTRACTING LLC | $62,330 |
| Aug 11, 2026 | Sinlahekin Fire Infrastructure Cleanup NC 2026-21 | RUDNICK & SONS LLC | $50,000 |
| Jul 21, 2026 | Electrical Service Upgrade 07072026 | VASSAR ELECTRIC INC | $4,878 |
| Jul 21, 2026 | Okanogan 115 Substation Truck Shop Addition Building RS2026.17 1 | BLACK ROCK CONST & DEV LLC | $516,325 |
| Jul 17, 2026 | Eastside Park UG Replacement Omak 20260348 | RANGE CONTRACTING LLC | $23,470 |
| Jul 16, 2026 | Eastlake Underground Project 2 | ARCH EXCAVATION LLC | $24,705 |
| Jul 8, 2026 | (title withheld) NC 2026-12 | ALAMON, INC. | $275,000 |
| Jun 24, 2026 | PWB Conconully Fiber Project 20260237 | ZERO DB COMMUNICATIONS LLC | $720,111 |
| Jun 18, 2026 | 7th St Trailer Park Tonasket 20260206 | PROLINE CONCRETE CUTTING INC | $22,090 |
| Jun 16, 2026 | Pateros 115 line Watson Draw Fire | K & S EXCAVATION | — |
| Jun 15, 2026 | Waste Oil Heater Maintenance and Repair 22341 | AMB TOOLS | $1,825 |
| Jun 15, 2026 | Waste Oil Heater Maintenance and Repair 22341 | AMB TOOLS | $2,170 |
| Jun 2, 2026 | Vinmar Lane UG project 20260169 | SEYMOUR EXCAVATING LLC | $17,480 |
| Apr 28, 2026 | Truck Upper Roof Repair RS2026.14 | ZAGA ROOFING LLC | $76,400 |
| Apr 20, 2026 | Compressor Service 3673488-00 | NORTHWEST PUMP/EQUIP CO | $1,561 |
| Apr 20, 2026 | Compressor Conversion & Startup 3673490-00 | NORTHWEST PUMP/EQUIP CO | $1 |
| Mar 27, 2026 | Hillcrest Circle Dr. Underground Rebuild Project NC 2026-11 | CATES & ERB INC | $77,842 |
| Mar 23, 2026 | District-P19112 20250445 | K & S EXCAVATION | — |
| Mar 16, 2026 | Line Room/Make up room/Meter room Maintenance | PETE PETERSON PLUMBING INC | — |
| Mar 9, 2026 | fire alarm system | FFS | $5,000 |
| Mar 2, 2026 | Janitorial Services RS2026-05 | NIGHT OWL SERVICES LLC | $77,856 |
| Feb 24, 2026 | Utility Pole Access HWY 97 & HWY 153 HWY 97-153 Utility Pole | K & S EXCAVATION | — |
| Feb 23, 2026 | RCKC Trailer # 8 3422 | DON KRUSE ELECTRIC INC | $3,472 |
| Jan 5, 2026 | HVAC/R MAINT AND REPAIRS 20186001 | DIVCO INCORPORATION | $51,608 |
| Dec 24, 2025 | Electrical System Tree Trimming to December 31, 2026 NC 2026-01 | BASIN TREE SVC & PEST CTRL INC | $2,000,000 |
| Nov 10, 2025 | Whitestone Substation Project NC 2025-22 | MCNALL CONSTRUCTION LLC | $295,000 |
| Sep 9, 2025 | Garden Apartments Power Small Works | K & S EXCAVATION | — |
| Aug 25, 2025 | Sewer Leak Small Works | K & S EXCAVATION | — |
| Aug 20, 2025 | Omak Substation 06262025 | LEES & DUKE EXCAVATING LLC | $34,760 |
| Aug 15, 2025 | (title withheld) NC 2025-14 | ALAMON, INC. | $265,000 |
| Aug 14, 2025 | Brewster Plaza Underground Replacement Project NC 2025-16 | PROLINE CONCRETE CUTTING LLC | $147,525 |
| Aug 12, 2025 | 2024 Electrical System Tree Trimming NC 2024-11 | WRIGHT TREE SERVICE INC | — |
| Aug 4, 2025 | Transformer Access Small Works | K & S EXCAVATION | — |
| Jun 20, 2025 | Replace Underground Power Facilities at 1485 Old Hwy 97, Malott NA | CATES & ERB INC | $10,545 |
| May 28, 2025 | Oil Heater Preventative Maintance #2 21557 | AMB TOOLS | $1,760 |
| May 28, 2025 | Oil Heater Preventative Maintenance 21557 | AMB TOOLS | $1,937 |
| May 23, 2025 | PUD of Okanogan - Watson Switchyard and Whitesone Substation NC 2025-12 | GEOENGINEERS INC | $78,300 |
| Apr 24, 2025 | Truck Shop HVAC RTU's H0917241 | DON KRUSE ELECTRIC INC | $71,907 |
| Apr 10, 2025 | Log Cabin Trailer Park 122324 | LEES & DUKE EXCAVATING LLC | $6,447 |
| Apr 10, 2025 | (title withheld) 30325 | LEES & DUKE EXCAVATING LLC | — |
| Apr 8, 2025 | Tree Removal T25-030 | 24-7 PROPERTY MAINTENANCE LLC | $767 |
| Mar 19, 2025 | Okanogan 13.2 Substation Regulator Foundation None | CATES & ERB INC | $21,675 |
| Mar 18, 2025 | fire alarm system | FFS | $5,000 |
| Mar 8, 2025 | Janitorial Services 2025-05RS | NIGHT OWL SERVICES LLC | $77,856 |
| Feb 3, 2025 | 608 Golden Street 1696 | DON KRUSE ELECTRIC INC | $3,377 |
| Jan 16, 2025 | Electrical System Tree Trimming to December 31, 2025 NC 2025-04 | BASIN TREE SVC & PEST CTRL INC | $1,800,000 |
| Jan 7, 2025 | HVAC/R MAINT/REPAIR 20186001 | DIVCO INCORPORATION | $52,684 |
| Nov 6, 2024 | Eastlake Underground Project NA | CATES & ERB INC | $15,213 |
| Oct 2, 2024 | Tonasket PUD 46798 | DR GLASS WORKS LLC | $43,946 |
| Oct 2, 2024 | Oroville PUD 46828 | DR GLASS WORKS LLC | $34,363 |
| Sep 24, 2024 | Tonasket Substation MS2024-08 | TRANSFORMER TECHNOLOGIES LLC | $12,287 |
| Sep 23, 2024 | Okanogan Substation 1221 | DON KRUSE ELECTRIC INC | $300 |
| Sep 23, 2024 | Opher Grade 1220 | DON KRUSE ELECTRIC INC | $924 |
| Sep 23, 2024 | (title withheld) 383 | DON KRUSE ELECTRIC INC | $8,224 |
| Aug 20, 2024 | Tonasket DOT E0701241 | DON KRUSE ELECTRIC INC | $7,970 |
| Aug 5, 2024 | Ophir Building Misc. Concrete 23-106901 | LOCAL BOYS CONSTRUCTION LLC | $10,097 |
| Aug 1, 2024 | Tonasket Shop 509-486-2131 | PROLINE CONCRETE CUTTING LLC | — |
| Jun 6, 2024 | (title withheld) NC 2024-06 | ALAMON, INC. | $137,523 |
| May 1, 2024 | Tonasket Concrete Removal PO# 20240107 | CATES & ERB INC | $18,786 |
| Mar 27, 2024 | Tonasket PUD Door Replacement 46771 | DR GLASS WORKS LLC | $5,713 |
| Mar 26, 2024 | Okanogan PUD Safety Glass 45143 | DR GLASS WORKS LLC | $34,107 |
| Mar 25, 2024 | Brewster PUD Security Glass 45144 | DR GLASS WORKS LLC | $36,498 |
| Mar 18, 2024 | fire alarm system | FFS | $5,000 |
| Feb 20, 2024 | OK CO PUD OROVILLE WAREHOUSE 20509 | DOOR-TECH INC | $7,172 |
| Feb 1, 2024 | Electrical System Tree Trimming NC 2024-04 | ASPLUNDH TREE EXPERT LLC | — |
| Feb 1, 2024 | Electrical System Tree Trimming NC 2023-06 | ASPLUNDH TREE EXPERT LLC | — |
| Jan 22, 2024 | Janitorial Services RS2024-03 | NIGHT OWL SERVICES LLC | $77,856 |
| Jan 5, 2024 | HVAC/R MAINT/REPAIR 20186001 | DIVCO INCORPORATION | $50,890 |
| Nov 21, 2023 | Blue Mountain/ Fowler Trailer Courts Primary Power Conduit Installation 5094293310 | PROLINE CONCRETE CUTTING LLC | $50,000 |
| Aug 9, 2023 | Drilling & Blasting in Aeneas Valley for Power Poles N/A | CATES & ERB INC | — |
| Jun 29, 2023 | (title withheld) 2023-11 | ALAMON, INC. | $133,517 |
| Jun 27, 2023 | Brewster Sub Station 81437 | DON KRUSE ELECTRIC INC | $7,237 |
| Jun 11, 2023 | Log Cabin Trailer Park 05302023 | LEES & DUKE EXCAVATING LLC | $11,570 |
| Jun 7, 2023 | Riverside Drive Primary Power Riverside Drive | K & S EXCAVATION | — |
| Jun 2, 2023 | Tonasket Sub Station 81436 | DON KRUSE ELECTRIC INC | $7,139 |
| Jun 2, 2023 | (title withheld) 81396 | DON KRUSE ELECTRIC INC | $6,811 |
| May 23, 2023 | Deadend Foundations/Structures AA2023-10 | OLYMPIC ELECTRIC CO INC | $198,962 |
| May 3, 2023 | Plugged sewer & Urinals 26860 | MARK'S PLUMBING LLC | $1,383 |
| Apr 19, 2023 | OVERHEAD CONSTRUCTION SERVICES NC2023-09 | OLYMPIC ELECTRIC CO INC | $1,162,436 |
| Apr 12, 2023 | JANITORIAL SERVICES RS 2023-05RS | WDB JANITORIAL LLC | $77,856 |
| Apr 6, 2023 | Tonasket Substation Groundwork NC 2023-07 | CATES & ERB INC | $45,514 |
| Apr 5, 2023 | Old Armory CT Cans 80997 | DON KRUSE ELECTRIC INC | $1,997 |
| Mar 28, 2023 | Tonasket - Alarm Upgrade 20060 | ADVANCED PROTECTION SRVCS INC | $1,571 |
| Mar 28, 2023 | Brewster - Alarm Upgrade 20060 | ADVANCED PROTECTION SRVCS INC | $1,570 |
| Mar 28, 2023 | Oroville - Alarm Upgrade 20060 | ADVANCED PROTECTION SRVCS INC | $1,570 |
| Mar 28, 2023 | Okanogan HQ - Alarm Upgrade 20060 | ADVANCED PROTECTION SRVCS INC | $1,292 |
| Mar 13, 2023 | fire alarm system | FFS | $5,000 |
| Feb 23, 2023 | Minor Repairs | PETE PETERSON PLUMBING INC | — |
| Jan 13, 2023 | HVAC/R MAINT/REPAIRS 20186001 | DIVCO INCORPORATION | $50,890 |
| Jan 3, 2023 | Snow Removal Snow Removal | K & S EXCAVATION | — |
| Dec 6, 2022 | Heater Cleanout 19761 | A M B TOOLS & EQUIPMENT CO INC | $1,873 |
| Dec 6, 2022 | Heater Clean Out 19761 | A M B TOOLS & EQUIPMENT CO INC | $1,729 |
| Nov 28, 2022 | HVAC/R MAINT/REPAIRS 320222145 | DIVCO INCORPORATION | $137,974 |
| Nov 10, 2022 | Water Softener Water Softener | PETE PETERSON PLUMBING INC | — |
| Nov 9, 2022 | Mtn. View Trailer Park 10182022 | LEES & DUKE EXCAVATING LLC | $20,971 |
| Oct 3, 2022 | Pateros Ground Fault Repair Pateros Ground Fault Repair | K & S EXCAVATION | — |
| Sep 22, 2022 | North Area Distribution Line Rebuild NC 2022-17 | MICHELS PACIFIC ENERGY INC | $147,566 |
| Sep 21, 2022 | Water Softener Water Softener | PETE PETERSON PLUMBING INC | — |
| Sep 9, 2022 | POLE INSPECTION AND TESTING NC 2022-21 | ALAMON, INC. | $216,809 |
| Sep 8, 2022 | Tonasket Substation NC 2022-20 | RAWHIDE EXCAVATING INC | $349,796 |
| Aug 15, 2022 | North Pine Creek Road Construction 2022-18 | TOLLEFSON CONSTRUCTION INC | $66,275 |
| Aug 10, 2022 | Enloe Dam - Trash Racks JT2002-19 | COLUMBIA CRANE | $29,033 |
| Aug 4, 2022 | Enloe Dam jt2022-16 | ASSOCIATED UNDERWATER SVCS INC | $53,573 |
| Jul 8, 2022 | tonasket sub station 5094298286 | OVERLAND FENCE & CONST LLC | $62,000 |
| Jul 5, 2022 | Transformer Switch - Okanogan Substation NC2022-13 | COLUMBIA CRANE | $60,311 |
| Jun 14, 2022 | Testing, Treatment and Inspection of Wood Poles NC 2019-23 | OSMOSE UTILITIES SERVICES INC | $260,000 |
| Jun 8, 2022 | JANITORIAL SERVICES 407-14 | WDB JANITORIAL LLC | $71,625 |
| May 26, 2022 | Plugged sewer backup 25907 | MARK'S PLUMBING LLC | $1,861 |
| May 12, 2022 | Electrical System Tree Trimming NC 2022-07 | ASPLUNDH TREE EXPERT LLC | — |
| May 9, 2022 | fire alarm test and repair | FFS | $3,314 |
| Mar 3, 2022 | Distribution Line Build NC 2021-26 | MICHELS PACIFIC ENERGY INC | — |
| Feb 10, 2022 | (title withheld) 2021 | MCNALL CONSTRUCTION LLC | $12,466 |
| Jan 25, 2022 | OKANOGAN COUNTY PUD 320222008 | DIVCO INCORPORATION | $62,367 |
| Jan 12, 2022 | HVAC R/MAINTENANCE 20126058 | DIVCO INCORPORATION | $48,469 |
| Jan 12, 2022 | REPLACE FAILED LIEBERT 320212175 | DIVCO INCORPORATION | $107,268 |
| Dec 15, 2021 | Testing, Treatment, Inspection of Wood Poles NC 2020-10 | OSMOSE UTILITIES SERVICES INC | $208,376 |
| Dec 15, 2021 | Fireguard Treatment of Wood Poles NC 2021-31 | OSMOSE UTILITIES SERVICES INC | $33,879 |
| Oct 11, 2021 | Okanogan Twisp 115kV Transmission Line Rebuild NC 2021-30 | MICHELS PACIFIC ENERGY INC | — |
| Oct 7, 2021 | Replace evap coolers. 320212133 | DIVCO INCORPORATION | $23,870 |
| Sep 20, 2021 | Old Highway 97 Fiber Replacement 20210387 | B T O CONSTRUCTION | $34,990 |
| Sep 3, 2021 | Omak Substation, Transformer Move 20210142 | COLUMBIA CRANE | $11,723 |
| Aug 13, 2021 | Warren Ave Underground Power & Fiber Project NC 2021-25 | PROLINE CONCRETE CUTTING LLC | $142,618 |
| Aug 4, 2021 | Distribution Line Rebuild NC 2021-26 | MICHELS PACIFIC ENERGY INC | — |
| Jun 28, 2021 | Brewster-Okanogan Transmission Line Rebuild NC 2021-24 | MICHELS PACIFIC ENERGY INC | $3,991,874 |
| Jun 15, 2021 | Brewster-Okanogan Transmission Line Rebuild NC 2021-24 | MICHELS POWER INC | $3,991,874 |
| Jun 10, 2021 | Brewster-Okanogan Transmission Line Access Road Construction NC 2021-22 | RANGE CONTRACTING LLC | $156,041 |
| Jun 9, 2021 | Electrical System Tree Trimming NC2021-07 | ASPLUNDH TREE EXPERT LLC | — |
| May 4, 2021 | Aston Estates Underground Power and Domestic Water Main Improvement Project NC 2021-18 | B T O CONSTRUCTION | $390,051 |
| Apr 27, 2021 | Replace Lieberts 320212034 | DIVCO INCORPORATION | $106,330 |
| Apr 27, 2021 | Install ductless split. 320212033 | DIVCO INCORPORATION | $27,016 |
| Mar 29, 2021 | Noname St Underground Project 20200117 | B T O CONSTRUCTION | $20,837 |
| Mar 17, 2021 | Change Out Transformers at Oroville Substation NC2021-12 | COLUMBIA CRANE | $55,546 |
| Mar 16, 2021 | fire alarm system | FFS | $3,314 |
| Mar 4, 2021 | Fire Extinguisher Service N/A | OXARC INC | $12,000 |
| Jan 14, 2021 | HVAC R/Maintenance 20126058 | DIVCO INCORPORATION | $46,493 |
| Dec 15, 2020 | Janitorial Services 407-14 | WDB JANITORIAL LLC | $69,830 |
| Oct 11, 2020 | Cold Springs Fire Restoration NC 2020-13 | LEES & DUKE EXCAVATING LLC | $115,192 |
| Sep 15, 2020 | Emergency Transmission Repair NC 2020-11 | MICHELS CORP | — |
| Sep 14, 2020 | Cold Springs Fire Restoration NC2020-12 | PENNINGTON CONSTRUCTION LLC | $100,000 |
| Aug 24, 2020 | Aeneas Valley Distribution Replacement NC 2020-09 | MICHELS CORP | $212,004 |
| Aug 23, 2020 | Pan Vista Project 2019-11 | LEES & DUKE EXCAVATING LLC | $62,901 |
| Jul 28, 2020 | Truck Shop 509-422-3310 | PETE PETERSON PLUMBING INC | — |
| Jun 30, 2020 | Fire Alarm Testing/Repairs | FFS | $3,313 |
| Apr 8, 2020 | Janitorial Services 407-14 | WDB JANITORIAL LLC | $65,000 |
| Apr 8, 2020 | Janitorial Services 407-14 | WDB JANITORIAL LLC | $65,000 |
| Jan 28, 2020 | Electrical System Tree Trimming 2019-03 | ASPLUNDH TREE EXPERT LLC | — |
| Jan 24, 2020 | HVAC R/Maintenance 20126058 | DIVCO INCORPORATION | $44,804 |
| Jan 10, 2020 | Electrical System Tree Trimming NC2020-01 | ASPLUNDH TREE EXPERT LLC | — |
| Jun 5, 2019 | CRUMBACHER PHASE 2 NC 2019-24 | TOLLEFSON CONSTRUCTION INC | $99,434 |
| May 31, 2019 | NOXIOUS WEED CONTROL 2019 | LOOMIS AG SERVICE | $7,000 |
| May 28, 2019 | Elmwood Apartment Elmwood Apartments | LEES & DUKE EXCAVATING LLC | $10,807 |
| Apr 26, 2019 | Main office fence repair 4262019 | LEES & DUKE EXCAVATING LLC | — |
| Apr 11, 2019 | Sand Flat 5000 Underground Rebuild NC-2019-10 | B T O CONSTRUCTION | $56,870 |
| Apr 4, 2019 | Winthrop Tap-Twisp 115kV Transmission Line Rebuild Project NC 2019-17 | MICHELS CORP | $414,422 |
| Apr 2, 2019 | Winthrop Tap-Twisp 115kV Transmission Line Rebuild Project 438-19 | MICHELS CORP | $414,422 |
| Mar 31, 2019 | Sandflat Substation Sandflat Substation | LEES & DUKE EXCAVATING LLC | $17,667 |
| Mar 18, 2019 | Fire Alarm Testing/Repairs | FFS | $3,314 |
| Feb 4, 2019 | Openers for Storage Building 16910 | VALLEY LUMBER | $2,772 |
| Oct 18, 2018 | ENLOE DAM HYDROELECTRIC PROJECT 16418 | KUNEY, MAX J CO | $1,794,346 |
| Oct 15, 2018 | Ophir Substation | B T O CONSTRUCTION | $5,410 |
| Sep 13, 2018 | Crumbacher North Underground Rebuild NC 2018-28 | PENNINGTON CONSTRUCTION LLC | — |
| Aug 28, 2018 | Fire Alarm Testing & Inspection/Repairs | FFS | $3,314 |
| Aug 16, 2018 | Inspections Roy | ABC FIRE CONTROL INC | $215 |
| Aug 16, 2018 | Horseshoe Trailer Park 201825 | LEES & DUKE EXCAVATING LLC | $32,460 |
| Aug 7, 2018 | Sunrise Heights 18-166 | 24-7 PROPERTY MAINTENANCE LLC | — |
| Aug 7, 2018 | (title withheld) 18-173 | 24-7 PROPERTY MAINTENANCE LLC | $4,200 |
| Jul 13, 2018 | Oroville PUD Warehouse Roof 1 | MALLETT SHEET METAL/ROOFING | $25,968 |
| Jun 20, 2018 | Testing, Treatment and Inspection of Wood Poles No. NC2018-17 | OSMOSE UTILITIES SERVICES INC | $360,000 |
| Jun 14, 2018 | Kelli Lane Undergound Rebuild No. NC2018-19 | LLOYD LOGGING INC | $27,050 |
| Jun 14, 2018 | Similkameen Trail Repair RS2018-15 | CATES & ERB INC | $151,480 |
| Jun 6, 2018 | Okanogan 115 Equipment Shed Build NC 2018-16 | WELLS AFFORDABLE CONCRETE LLC | $130,000 |
| May 18, 2018 | Noxious Weed Control 2018 | LOOMIS AG SERVICE | $7,000 |
| Mar 26, 2018 | 2018 - UPS Capacitor Upgrades 22369-MOD20180131 | EATON CORPORATION | — |
| Mar 14, 2018 | INSTALL TRANSFORMER SHOP A/C 320182021 | DIVCO INCORPORATION | $19,004 |
| Mar 14, 2018 | REPLACE SPLIT AC 320182022 | DIVCO INCORPORATION | $14,770 |
| Mar 12, 2018 | 2018 Service N/A | OXARC INC | $4,000 |
| Feb 26, 2018 | Hale Ave. Electrical & Vault Installation 20180158 | CATES & ERB INC | $11,242 |
| Feb 22, 2018 | LED Street Lighting NC 2017-14 | MICHELS CORP | $158,930 |
| Jan 17, 2018 | Electrical System Tree Trimming NC 2018-03 | ASPLUNDH TREE EXPERT LLC | — |
| Jan 17, 2018 | HVAC MAINTENANCE 20126058, 57, 59, 60, 2016061 | DIVCO INCORPORATION | $44,655 |
| Dec 7, 2017 | District Janitorial Services RS2018-02 | WDB JANITORIAL LLC | $67,144 |
| Oct 31, 2017 | Emery Street NC 2017-17 | PARAMOUNT COMMUNICATIONS INC | $81,075 |
| Oct 31, 2017 | Grading PT Access Road | B T O CONSTRUCTION | $15,966 |
| Oct 23, 2017 | Inspections Roy | ABC FIRE CONTROL INC | $215 |
| Oct 16, 2017 | Move Transformer from Twisp Substation 15868 | COLUMBIA CRANE | $13,102 |
| Sep 20, 2017 | Pan Vista & Pioneer Garden Patches PO 1.21.954 | 24-7 PROPERTY MAINTENANCE LLC | — |
| Aug 22, 2017 | Fire System CAT816F | OXARC INC | $2,500 |
| Jun 7, 2017 | 2017 Full Battery Update 65638-FBR2017 | EATON CORPORATION | $9,018 |
| May 26, 2017 | Contract for Testing, Treatment and Inspection of Wood Poles in 2017 2017-10 | OSMOSE UTILITIES SERVICES INC | $245,000 |
| May 17, 2017 | 2015 - 3 Year Eaton UPS Service Contract 22369-20151010 | EATON CORPORATION | $31,890 |
| May 8, 2017 | Noxious Weed Control 2017 | TOMLINSON CRAIG H & KATHY | $8,000 |
| Apr 20, 2017 | Landscape Maintenance | 24-7 PROPERTY MAINTENANCE LLC | $8,889 |
| Apr 12, 2017 | Systems 15520 | ABC FIRE CONTROL INC | $215 |
| Mar 21, 2017 | Okanogan MS Underground Rebuild NC 2017-07 | LEES & DUKE EXCAVATING LLC | $36,290 |
| Mar 14, 2017 | 2017 FE Service Safety 1.21.583 | OXARC INC | — |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.