LOTT Clean Water Alliance — public works contracts
877 public works projects and 1,717 intents to pay prevailing wages name LOTT Clean Water Alliance as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: Water/Sewer District.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 91 | 82 | 84 | 88 | 112 | 67 | 90 | 70 | 116 | 71 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 18, 2026 | LOTT Substation & Switchgear Replacement 561-04-08 | B E S ELECTRICAL SERVICES LLC | $979,000 |
| Sep 18, 2026 | Underground Utility Search of Monitoring Well Locations PO-1703 | Ground Penetrating Radar Systems, Inc | — |
| Sep 14, 2026 | LOTT Asphalt Failure Investigation | PROSPECT CONSTRUCTION INC | $35,000 |
| Sep 11, 2026 | North Outfall Marine Drive Hot Spot Test 1704 | CASCADE DRLG/LP A LTD PTSHP/DE | $8,595 |
| Sep 4, 2026 | Traffic Control for Pump Test Activities on Marine Drive PO-1706 | K & D SERVICES INC | — |
| Aug 14, 2026 | LOTT HVAC Mini Split wiring 1674 | BETSCHART ELECTRIC CO INC | $18,769 |
| Aug 5, 2026 | New Office Wall- Budd Inlet Treatment Plant 1696 | SCOTT WALL CONSTRUCTION INC | $16,880 |
| Jul 31, 2026 | LOTT-Hydraulic System Removal 582-06-08 | PROSPECT CONSTRUCTION INC | $54,710 |
| Jul 30, 2026 | LOTT-Repair Of Non Potable Water Line 582-07-08 | PROSPECT CONSTRUCTION INC | $150,000 |
| Jul 21, 2026 | PW21089 - Panel Upgrade 222265 - 1607 | N C POWER SYSTEMS CO | $31,086 |
| Jun 24, 2026 | (title withheld) 1687 | D K BOOS GLASS INC | $1,611 |
| May 8, 2026 | Cork Flooring Maintenance PO 1665 | PTL HARDWOOD FLOORS LLC | $6,500 |
| May 7, 2026 | Gate Modification PO 1649 | ALWAYS SAFE & LOCK INC | $2,083 |
| May 5, 2026 | LOTT Water HP 3-12 2nd Floor PO#1669 | TRS MECHANICAL INC | $21,507 |
| May 5, 2026 | LOTT Water HP L-14 Breakroom PO#1670 | TRS MECHANICAL INC | $25,354 |
| Apr 30, 2026 | LOTT-Feature Drain Valve Replacement 565-05-08 | PROSPECT CONSTRUCTION INC | $15,000 |
| Apr 24, 2026 | Reconfigure office 172 PO 1647 | BUSINESS INTERIORS NW INC | $19,974 |
| Apr 17, 2026 | (title withheld) Nick Townsend | SME SOLUTIONS LLC | — |
| Apr 17, 2026 | (title withheld) Nick Townsend | SME SOLUTIONS LLC | — |
| Apr 9, 2026 | SPIRAL HEAT EXCHANGER REPAIR 1657 | C H MURPHY/CLARK ULLMAN INC | — |
| Mar 31, 2026 | Overhead Crane Repairs 25-034-WTR-001 | CRANETECH INC | — |
| Mar 27, 2026 | LOTT Water Server Room PO#1652 | TRS MECHANICAL INC | $35,199 |
| Mar 19, 2026 | 1401-Overhead Crane Repairs 1401 | CRANETECH INC | $3,020 |
| Mar 16, 2026 | Underground Utility Search for North Pipeline Alignment PO-1640 | Ground Penetrating Radar Systems, Inc | $2,600 |
| Mar 6, 2026 | LOTT North Outfall Realignment Project � Profile Borings 1636 | SAFETY SIGNS INC | — |
| Mar 5, 2026 | Marine Drive DPT Borings 1639 | CASCADE DRLG/LP A LTD PTSHP/DE | $9,990 |
| Mar 2, 2026 | Underground Utility Search � North Pipeline Alignment 1 PO-1564 | Ground Penetrating Radar Systems, Inc | — |
| Feb 27, 2026 | (title withheld) 1635 | BETSCHART ELECTRIC CO INC | $5,490 |
| Feb 19, 2026 | Lott Clean Water Alliance - Install Wireless Gateway 344335661 | KONE INC | $1,945 |
| Feb 11, 2026 | PMA-EG02-058 WO-419170 | CUMMINS INC | $1,455 |
| Feb 5, 2026 | (title withheld) C137108 | SME SOLUTIONS LLC | — |
| Jan 29, 2026 | LOTT CLEAN WATER- TS INTERMITTENT RUN WSC 06225 - PO 1627 | PACIFIC POWER GROUP LLC | $4,660 |
| Jan 27, 2026 | LOTT Janitorial, Windows, Bathrooms 26-001 | JAN-PRO DEV OF PUGET SOUND | $150,000 |
| Jan 26, 2026 | DCS Fire Suppression System 582-03-08 | SCOTT WALL CONSTRUCTION INC | $233,350 |
| Jan 23, 2026 | Budd Inlet Trmtmt Plant (BITP) 1475 | AUTOMATED EQUIPMENT CO INC | $1,252 |
| Jan 6, 2026 | Replace and test Bad Fiber 1619 | INTRACOMMUNICATION NTWK SYS IN | $8,859 |
| Dec 30, 2025 | Martin Way chain link fence repairs 64964 | SOUTHGATE FENCING INC | $3,181 |
| Dec 16, 2025 | Capitol Lake Pump Station Wet Well Coatings 456-03-08 | ROGNLINS INC | $1,314,306 |
| Dec 5, 2025 | LOTT Alliance Upgrade Equipment 1595 | DAY WIRELESS SYSTEMS | $6,555 |
| Nov 25, 2025 | Security Camera Upgrade 410-15-08 | BEAR COMMUNICATIONS INC | $109,770 |
| Nov 25, 2025 | Cogen Exhaust Blankets 1611 | D & G MECH INSULATION INC | $3,080 |
| Nov 20, 2025 | TROUBLESHOOT ERRATIC RPM, INTERMITTENT 1613 | PACIFIC POWER GROUP LLC | $1,742 |
| Nov 18, 2025 | Lott - Nanobubble Pilot Trailer Temp Line BI2401 | PROPEL CONSTRUCTION COMPANY | $114,379 |
| Nov 7, 2025 | 9724 - Remote Site Vehicle Gates 410-17-08 | BEAR COMMUNICATIONS INC | $159,969 |
| Nov 6, 2025 | Power and Network Connections For 2nd Floot Workroom NV23-16259 | BEAR COMMUNICATIONS INC | $8,764 |
| Nov 6, 2025 | 8828 - LOTT Clean Water Access Controll 410-16-08 | BEAR COMMUNICATIONS INC | $141,094 |
| Nov 5, 2025 | Q: 13468 VAVMCC-A4 Control Board & TStat 1597 | TRS MECHANICAL INC | $2,273 |
| Oct 28, 2025 | Replace shades 959 | BLIND DEPOT INC SHN A BND, THE | $2,973 |
| Oct 21, 2025 | Vactor Truck Services for North Pipeline Pump Test Activities PO-1558 | UNITED RENTALS (NO AMRCA) INC | $14,660 |
| Oct 16, 2025 | (title withheld) PO#1601 | TRS MECHANICAL INC | $19,928 |
| Oct 15, 2025 | LOTT RTU ACU20-610 PO#1591 | TRS MECHANICAL INC | $30,507 |
| Oct 14, 2025 | LOTT Water HP1-12 PO#1590 | TRS MECHANICAL INC | $22,748 |
| Oct 8, 2025 | East Primary Building to Temporary Buildings 1599 | INTRACOMMUNICATION NTWK SYS IN | $6,464 |
| Sep 10, 2025 | Bollard Removal PO-1577 JOB#MS2403 | EVERGREEN CONCRETE CUTTING INC | — |
| Sep 10, 2025 | Descale 3� cast iron pipe 1587 | Olympic Plumbing Technolgy LLC | $2,757 |
| Sep 5, 2025 | Martin Way Compressor Upgrades PO 1574 | PROPEL CONSTRUCTION COMPANY | $42,942 |
| Sep 4, 2025 | Martin Way Reclaimed Water Plant Drain Sump Improvements 577-03-08 | ROGNLINS INC | $255,601 |
| Sep 3, 2025 | Replace HP-1-16 PO# 1584 | TRS MECHANICAL INC | $23,031 |
| Aug 5, 2025 | Office 104 countertops Po# 1560 | PRECISION DESIGN CONCEPTS | $3,510 |
| Aug 1, 2025 | Elkay Water Bottle Filler Station PO # 1567 | SCOTT WALL CONSTRUCTION INC | $31,208 |
| Jul 28, 2025 | LOTT Clean Water Alliance 1555 | CASCADE DRLG/LP A LTD PTSHP/DE | $9,590 |
| Jul 28, 2025 | Diagnostic + Repair Q: 13233 CHILLER Low Pressure Transducer 1410 | TRS MECHANICAL INC | $1,689 |
| Jul 24, 2025 | 9724 - Remote Site Vehicle Gates 410-17-08 | STONE SECURITY LLC | $159,969 |
| Jul 23, 2025 | LOTT - Bypass Piping CV2500 | PROPEL CONSTRUCTION COMPANY | $19,406 |
| Jul 17, 2025 | (title withheld) 5584 | BLIND DEPOT INC SHN A BND, THE | $11,326 |
| Jul 2, 2025 | Grit Drain Pipe Lining PO 1550 CV2500 | PROPEL CONSTRUCTION COMPANY | $88,866 |
| Jul 2, 2025 | Traffic Control Services for Crane Operation PO�1556 | K & D SERVICES INC | — |
| Jun 27, 2025 | LOTT Water Solids RTU PO#1563 | TRS MECHANICAL INC | $30,114 |
| Jun 27, 2025 | LOTT Water Source HP PO#1559 | TRS MECHANICAL INC | $17,977 |
| Jun 27, 2025 | LOTT Water Network Service Office PO#1562 | TRS MECHANICAL INC | $23,857 |
| Jun 17, 2025 | Toilet Replacement PO1554 | Olympic Plumbing Technolgy LLC | $27,813 |
| Jun 9, 2025 | Martin Way Pump Station Safety & Exit Loops PO 1475 | AUTOMATED EQUIPMENT CO INC | $6,348 |
| May 28, 2025 | Asphalt Improvement AM2405 | PROPEL CONSTRUCTION COMPANY | $145,790 |
| May 22, 2025 | (title withheld) 1529 | BUSINESS INTERIORS NW INC | $40,493 |
| May 16, 2025 | Power and Network Connections For 2nd Floor Workroom NV23-16259 | STONE SECURITY LLC | $8,764 |
| May 5, 2025 | BITP Gate 4 & Gate 7 Repair PO-1475 | AUTOMATED EQUIPMENT CO INC | $2,889 |
| May 5, 2025 | MWPS Gate Operator Replacment PO-1475 | AUTOMATED EQUIPMENT CO INC | $13,980 |
| Apr 28, 2025 | (title withheld) 1517 | SME SOLUTIONS LLC | — |
| Apr 18, 2025 | Q: 12754 NetworkServiceOffice RTU Compre C135397 | TRS MECHANICAL INC | $5,344 |
| Apr 8, 2025 | Enclosure system 1526 | TACOMA TENT & AWNING CO INC | $11,408 |
| Mar 28, 2025 | LOTT Clean Water Access Control 8828 410-16-08 | STONE SECURITY LLC | $141,094 |
| Mar 28, 2025 | Regional Services Center 1509 | D K BOOS GLASS INC | $2,993 |
| Mar 28, 2025 | Core drilling for temporary sludge loadout line PO-1171 | EVERGREEN CONCRETE CUTTING INC | — |
| Mar 25, 2025 | Pipe insulation installation, Lott Treatment Plant PO-1511 | HUDSON BAY INSULATION CO INC | $1,515 |
| Mar 21, 2025 | Sealing Conduits PO 1149 | WCCL SYSTEMS LLC | $1,500 |
| Mar 21, 2025 | LOTT Water New Ductwork PO#1514 | TRS MECHANICAL INC | $9,689 |
| Mar 14, 2025 | Budd Inlet Reclaimed Water Plant Cross Connection Control Upgrades 582-01-08 | PROPEL CONSTRUCTION COMPANY | $171,000 |
| Mar 14, 2025 | Ring & Cover replacement, Planter Island Curb install P.O. 1493 | PROPEL CONSTRUCTION COMPANY | $21,448 |
| Mar 7, 2025 | Lott Olympia Bathrooms 25-001 | L&S HOLDINGS NW LLC | $8,670 |
| Mar 4, 2025 | start up UV system Sutton Brown | AQUATIC SPECIALTY SERVICES INC | $1,603 |
| Feb 17, 2025 | MWRWP Gate Repairs PO-1475 | AUTOMATED EQUIPMENT CO INC | $1,403 |
| Feb 14, 2025 | (title withheld) Po# 1502 | PRECISION DESIGN CONCEPTS | $3,358 |
| Feb 14, 2025 | LOTT BNR Pipe Modifications 418-40-08 | PROSPECT CONSTRUCTION INC | $230,382 |
| Feb 13, 2025 | Coating of MH222 and MH26 Project #CV0703 - PO #1489 | OLSON BROTHERS PRO-VAC LLC | $45,349 |
| Feb 12, 2025 | Bud Inlet TP Pipe Insulation 1488 | D & G MECH INSULATION INC | $13,233 |
| Feb 6, 2025 | LOTT Clean Water roof repair C30986-91884 | STATE ROOFING INC | $2,346 |
| Jan 20, 2025 | BITP Roof Repairs; PO 1490 AM0806 | WRIGHT ROOFING | $128,540 |
| Jan 10, 2025 | New Cantilever 1487 | QUALITY FENCE BUILDERS INC | $21,350 |
| Dec 31, 2024 | 2025 Janitorial and Window Cleaning Services 25-001 | L&S HOLDINGS NW LLC | $129,911 |
| Dec 14, 2024 | Roofing System Service, Maintenance, Repair, & Improvement PO #1426 | WRIGHT ROOFING | $314 |
| Dec 11, 2024 | Hawks Prairie fence repair 63723 | SOUTHGATE FENCING INC | $883 |
| Dec 9, 2024 | HydroEx and Install Casings for Monitoring Wells PO #1459 | OLSON BROTHERS PRO-VAC LLC | $29,728 |
| Dec 6, 2024 | Budd Inlet Treatment Plant 1458 | CASCADE DRLG/LP A LTD PTSHP/DE | $24,510 |
| Nov 22, 2024 | LOTT Digester Phase 2 565-05-08 | PROSPECT CONSTRUCTION INC | $34,315,986 |
| Nov 10, 2024 | CONCRETE REPLACE & INSTALL PO 1452 | PROPEL CONSTRUCTION COMPANY | $43,765 |
| Oct 25, 2024 | Flow Monitoring Services 435-37-10 | SFE Global Inc | — |
| Oct 11, 2024 | Q: 12256 ACU-3-1 TXV and Filter Drier Re 106345 | TRS MECHANICAL INC | $2,979 |
| Oct 11, 2024 | Q: 12268 Chiller Hot Gas Bypass Valve Re C134509 | TRS MECHANICAL INC | $4,983 |
| Oct 3, 2024 | Reclaimed Water fence repairs 63060 | SOUTHGATE FENCING INC | $2,013 |
| Sep 24, 2024 | Security Camera Upgrade 410-15-08 | STONE SECURITY LLC | $109,770 |
| Jul 30, 2024 | Centrate Building Improvements 1409 | WESTERN STATES FIRE PRTCTN CO | $36,695 |
| Jul 18, 2024 | Budd Inlet Treatment Plant 1446 | Security Gate and Access LLC | $13,750 |
| Jun 26, 2024 | Intermediate Pump Station Roof Replacement 572-04-08 | WRIGHT ROOFING | $222,807 |
| May 4, 2024 | Exhaust fan loosing power 104788 | TRS MECHANICAL INC | $495 |
| May 4, 2024 | Two Hastings Supply Fans having issues 1410 | TRS MECHANICAL INC | $2,063 |
| May 4, 2024 | Q: 11512 MAU-711 Actuator Replacement PO-1410 | TRS MECHANICAL INC | $1,960 |
| May 1, 2024 | LOTT CLEAN WATER DRIVE REPLACEMENT 42068126 | KONE INC | $25,582 |
| Apr 26, 2024 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | $825 |
| Apr 26, 2024 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | $825 |
| Apr 26, 2024 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | $825 |
| Apr 18, 2024 | Sports Court PO-1383 | SPECTRA CONTRACT FLOORING | $64,184 |
| Apr 15, 2024 | Trane Cooling Unit 37458 | OLYMPIA SHEET METAL INC | $2,532 |
| Apr 10, 2024 | Roofing System Service, Maintenance, Repair, & Improvement Work PO #1426 | WRIGHT ROOFING | — |
| Apr 10, 2024 | Gate 6 Glass Replacement 1412 | D K BOOS GLASS INC | $2,344 |
| Mar 4, 2024 | HP Replacement PO#1405 | TRS MECHANICAL INC | $18,592 |
| Feb 29, 2024 | Bud Inlet Treatment Plant 1404 | SECOMA FENCE INC | $20,789 |
| Feb 19, 2024 | Budd Inlet Treatment Plant 1363 | AUSTIN MAC INC | $38,356 |
| Jan 8, 2024 | Martin Way Reclaimed Water Plant 1384 | ABBEY CAPITOL FLOORS & INTERRS | $5,253 |
| Jan 4, 2024 | 2024 Janitorial and Window Cleaning Services 24-001 | L&S HOLDINGS NW LLC | $121,845 |
| Jan 4, 2024 | (title withheld) 1380 | SME SOLUTIONS LLC | — |
| Jan 4, 2024 | (title withheld) 1380 | SME SOLUTIONS LLC | — |
| Dec 15, 2023 | Water Detect 3365005-00 | NORTHWEST PUMP/EQUIP CO | $13,933 |
| Dec 15, 2023 | Mechanical Insulation for Class A Water Pipe PO-1360 | HUDSON BAY INSULATION CO INC | $1,730 |
| Dec 1, 2023 | 3 holes cut in chain link fence 112923-3 | SOUTHGATE FENCING INC | $986 |
| Nov 27, 2023 | Install vision window in door 1374 | D K BOOS GLASS INC | $1,106 |
| Nov 13, 2023 | Centrate Building Rehab BI1601 | ROGNLINS INC | $8,765,475 |
| Nov 10, 2023 | Lott Small Works project PO # 1182 | PROPEL CONSTRUCTION COMPANY | $14,100 |
| Nov 6, 2023 | (title withheld) 646449-00 | SME SOLUTIONS LLC | $8,590 |
| Oct 19, 2023 | Main Entrance HVAC Repairs PO-1248 | OLYMPIA SHEET METAL INC | $4,856 |
| Oct 12, 2023 | Rolling Steel Repair 457831 | HUNG RIGHT DOORS LLC | $616 |
| Oct 10, 2023 | (title withheld) 1362 | D K BOOS GLASS INC | $7,211 |
| Sep 26, 2023 | Budd Inlet Reclaimed Water Plant Piping Replacement AM2300 | ROGNLINS INC | $337,808 |
| Sep 18, 2023 | Razor Wire on Courtyard Fence PO 1348 | CONSTRUCT INCORPORATED | $8,212 |
| Sep 8, 2023 | (title withheld) 1330 | SME SOLUTIONS LLC | $3,900 |
| Sep 6, 2023 | (title withheld) 1330 | SME SOLUTIONS LLC | $3,900 |
| Aug 29, 2023 | Office 107 glass panel replace 1349 | D K BOOS GLASS INC | $2,798 |
| Aug 28, 2023 | Carrier Unit Repairs C132448 | OLYMPIA SHEET METAL INC | $4,768 |
| Aug 14, 2023 | DAFT Collection Equipment PO 1232A and 1340A | AUSTIN MAC INC | $117,479 |
| Aug 4, 2023 | Opener- Logic Board replacement 456903 | HUNG RIGHT DOORS LLC | $1,334 |
| Aug 4, 2023 | Glass partition removal | D K BOOS GLASS INC | $1,319 |
| Jul 31, 2023 | REPAIR SLUDGE HEAT EXCHANGER #3 1345 | C H MURPHY/CLARK ULLMAN INC | — |
| Jul 31, 2023 | HEAT EXCHANGER REPAIR 1319 | C H MURPHY/CLARK ULLMAN INC | — |
| Jul 26, 2023 | Deschutes Valley Property fence repair 61792 | SOUTHGATE FENCING INC | $1,046 |
| Jul 19, 2023 | Fall Protection Improvements MS2100 | ROGNLINS INC | $172,405 |
| Jul 17, 2023 | Offices 101 & 301 PO# 1325 | PRECISION DESIGN CONCEPTS | $10,830 |
| Jul 6, 2023 | (title withheld) 66447 | OLYMPIA SHEET METAL INC | $4,249 |
| Jun 15, 2023 | Cooling Unit Repair 1248 | OLYMPIA SHEET METAL INC | $3,920 |
| May 11, 2023 | Martin Way Reclaimed Water Plant 1314 | INTRACOMMUNICATION NTWK SYS IN | $13,704 |
| May 10, 2023 | LOTT ThermalCare Chiller Repair PO 991 | CAPITAL HEATING & COOLING | $1,891 |
| May 1, 2023 | Fence repairs on west side 61713 | SOUTHGATE FENCING INC | $1,035 |
| Apr 24, 2023 | General Construction SUpport PO-1171 | EVERGREEN CONCRETE CUTTING INC | — |
| Apr 21, 2023 | (title withheld) EG30-100 | TACOMA DIESEL & EQUIPMENT INC | — |
| Apr 18, 2023 | Power roller shade PO 959 | BLIND DEPOT INC SHN A BND, THE | $2,946 |
| Apr 17, 2023 | Lott Curb Repair #1182 | PROPEL CONSTRUCTION COMPANY | $8,261 |
| Apr 14, 2023 | gate repair 61179 | SOUTHGATE FENCING INC | $670 |
| Apr 6, 2023 | Budd Inlet Treatment Plant 1273 | CASCADE DRLG/LP A LTD PTSHP/DE | $4,680 |
| Apr 3, 2023 | PROJECT CV1803 PIPELINE REHABILITATION PHASE 2 560-03-08 | ALLIED PLUMBING & PUMPS LLC | $684,550 |
| Mar 17, 2023 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | — |
| Mar 17, 2023 | (title withheld) 1279 | SME SOLUTIONS LLC | — |
| Mar 16, 2023 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | — |
| Mar 16, 2023 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | — |
| Mar 16, 2023 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | — |
| Mar 16, 2023 | (title withheld) Julie Dufresne | SME SOLUTIONS LLC | — |
| Feb 23, 2023 | Repairs to west headworks door 1298 | D K BOOS GLASS INC | $980 |
| Feb 15, 2023 | Open PO for carpentry work Po# 546 | PRECISION DESIGN CONCEPTS | $5,000 |
| Feb 14, 2023 | Fence repairs at Reclaimed Water 61281 | SOUTHGATE FENCING INC | $3,065 |
| Feb 10, 2023 | Budd Inlet Reclaimed Water Plant Chlorine Basin Valve Replacement MS0601, 438-99-00 | PROSPECT CONSTRUCTION INC | $93,670 |
| Feb 6, 2023 | LOTT Exterior Gates 6&7 1244 | LONG PAINTING CO | $29,236 |
| Feb 6, 2023 | LOTT Dewatering Well Support Project LOTT PO #1228 | PROSPECT CONSTRUCTION INC | — |
| Feb 2, 2023 | Leak Repair 1149 | WCCL SYSTEMS LLC | — |
| Jan 26, 2023 | (title withheld) 15964 | BLIND DEPOT INC SHN A BND, THE | $733 |
| Jan 25, 2023 | 2023 Janitorial and Window Cleaning Services 23-001 | L&S HOLDINGS NW LLC | $125,000 |
| Jan 23, 2023 | Compressor Service PO-685 | ROGERS MACHINERY CO INC | $1,041 |
| Jan 18, 2023 | BITP Sludge Thickener Improvements 526-08-08 | PROSPECT CONSTRUCTION INC | $3,274,146 |
| Dec 21, 2022 | Heat Pump 1-19 C131244 | OLYMPIA SHEET METAL INC | $1,581 |
| Dec 20, 2022 | Curb install and coating Mechanical Room | WCCL SYSTEMS LLC | $2,079 |
| Dec 20, 2022 | NEUROS BLOWER NO. 4 CONTROLS UPGRADE 1070 | APGN INC | $32,570 |
| Dec 14, 2022 | Percival Creek 23-106 | ADVANCE ENVIRONMENTAL INC | $2,080 |
| Dec 8, 2022 | (title withheld) 959 | BLIND DEPOT INC SHN A BND, THE | $1,218 |
| Nov 16, 2022 | KR30 IQ Package 1271 | ROGERS MACHINERY CO INC | $3,882 |
| Nov 3, 2022 | Server Room Cooling 1248 | OLYMPIA SHEET METAL INC | $4,261 |
| Oct 21, 2022 | Compressor Replacement C130517 | OLYMPIA SHEET METAL INC | $3,359 |
| Oct 20, 2022 | uv service 1215 | AQUATIC SPECIALTY SERVICES INC | $3,893 |
| Oct 12, 2022 | (title withheld) AM0000 | TACOMA DIESEL & EQUIPMENT INC | — |
| Sep 23, 2022 | Lott Clean Water Alliance Monitoring 1214 | WESTERN STATES FIRE PRTCTN CO | $1,450 |
| Sep 12, 2022 | Quote 36532 1242 | HURLEY ENGRNG CO OF TACOMA | $5,459 |
| Sep 9, 2022 | Regional Services Center 1243 | ALWAYS SAFE & LOCK INC | $1,361 |
| Aug 25, 2022 | Franklin Gates Replacement MS2005 | CONSTRUCT INCORPORATED | $292,000 |
| Aug 23, 2022 | LOTT Exterior Gates 6&7 1244 | LONG PAINTING CO | $29,210 |
| Aug 18, 2022 | Repairs to Detroit 400KW Generator 1245 | TACOMA DIESEL & EQUIPMENT INC | $28,553 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.