LAKEWOOD WATER DISTRICT — public works contracts
377 public works projects and 768 intents to pay prevailing wages name LAKEWOOD WATER DISTRICT as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: City.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 27 | 37 | 117 | 69 | 70 | 64 | 42 | 49 | 78 | 68 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 14, 2026 | Lakewood E-2 and G-3 Motor Balance 26281 | PUMPTECH LLC | $1,919 |
| Sep 10, 2026 | Well O-2R | MTN VIEW PUMPS/FILTRATION INC | $6,231 |
| Aug 20, 2026 | Lake Ave Pump House 9607 | PREFERRED ROOF SERVICES INC | $7,724 |
| Aug 7, 2026 | Lakewood G-3 Motor balance Verbal | PUMPTECH LLC | $1,919 |
| Jul 31, 2026 | Repair Tillicuma A-3 VFD 26179 4326496 | TAURUS POWER AND CONTROLS | $3,985 |
| Jun 26, 2026 | WESTERN STATE TANK SITE - REPLACE BATTERY CABLE AND OIL PRESSURE SENDER PO 26217 | PACIFIC POWER GROUP LLC | $2,604 |
| Jun 25, 2026 | Lake Avenue K-3 Well Equipping Project 877 | Pacific Civil & Infrstrctr Inc | $1,875,086 |
| Jun 8, 2026 | Lakewood WBPS #1 Balancing Verbal | PUMPTECH LLC | $1,916 |
| Jun 4, 2026 | 187583 Lakewood Water District 187583 Lakewood Water District | GUARDIAN SECURITY SYSTEMS INC | $1,140 |
| Jun 4, 2026 | NYANZA TANK SITE - Fuel Gauge and Fuel Sender Replacement PO#: 26202 | PACIFIC POWER GROUP LLC | $3,024 |
| May 29, 2026 | Hipkins Temporary Test Pump | MTN VIEW PUMPS/FILTRATION INC | $5,163 |
| May 22, 2026 | Hemlock Hill - Replace Battery Charger PO 26192 | PACIFIC POWER GROUP LLC | $3,651 |
| May 5, 2026 | Well S-1 Airburst & Airlift 2026051 | JKA WELL DRILLING & PUMPS | $34,836 |
| May 1, 2026 | TROUBLESHOOT FUEL SYSTEMS AT MULTIPLE SITES CALLOUT | PACIFIC POWER GROUP LLC | — |
| Apr 29, 2026 | Lakewood - VFDs 20260049 | BAINBRIDGE ISLAND ELECTRIC | — |
| Apr 24, 2026 | 0876 G-4 Well Test Pump 0876 | MTN VIEW PUMPS/FILTRATION INC | $7,297 |
| Apr 21, 2026 | WESTERN STATE TANK SITE - 6 YR. CSS, REPLACE OIL PRESSURE GAUGE PO 26141 | PACIFIC POWER GROUP LLC | $4,872 |
| Apr 15, 2026 | Lakewood Hg Motor Decom 2026 26004 | PUMPTECH LLC | $215,828 |
| Apr 7, 2026 | Lakewood Water Hipkins Well Work 50902 | JKA WELL DRILLING & PUMPS | $108,175 |
| Apr 6, 2026 | Lakewood G-1 Pump Pull and Repair 26104 | PUMPTECH LLC | $35,986 |
| Mar 26, 2026 | PORT 2 - AUX FAULT - CALLOUT PORT 2 - AUX FAULT - CALLOUT | PACIFIC POWER GROUP LLC | — |
| Mar 25, 2026 | 187584 Gravlley Lake 187584 Gravlley Lake | GUARDIAN SECURITY SYSTEMS INC | $1,000 |
| Mar 24, 2026 | 88th and Pine St. Wells PFAS Treatment 0867 | CECCANTI INC | $6,112,411 |
| Mar 18, 2026 | Clark-Lakewood Water 07,92261 | STATE ROOFING INC | $10,460 |
| Mar 17, 2026 | HEMLOCK HILL - REPLACE BLOCK HEATER PO 26102 | PACIFIC POWER GROUP LLC | $2,315 |
| Mar 13, 2026 | Wadsworth Watermain Extension PO26094 | HCON INCORPORATED | — |
| Mar 13, 2026 | Lakewood S-1 26079 | PUMPTECH LLC | $42,229 |
| Mar 3, 2026 | 14500 Grant Ave SW Pump House 25D2096 | ROOFSMART | $9,832 |
| Feb 23, 2026 | Lakewood Scotts G-1 Troubleshoot - Sanding 26060 | PUMPTECH LLC | $10,019 |
| Feb 9, 2026 | N-3 Air Release Valve 26003 | PUMPTECH LLC | $3,028 |
| Feb 7, 2026 | 8017 Washington Blvd 25D2095 | ROOFSMART | $32,000 |
| Jan 27, 2026 | Dead Plant Removal LWD-010726 | ALS AMERICAN LNDSCP SERV LLC | $5,203 |
| Jan 27, 2026 | 2026 Annual Generator Services 26021 | PACIFIC POWER GROUP LLC | $33,364 |
| Jan 16, 2026 | Tree Removal PO 25196 | WRIGHT'S LOGGING/TREE SRVC INC | $10,460 |
| Jan 12, 2026 | Lakewood ATS 20260006 | BAINBRIDGE ISLAND ELECTRIC | — |
| Jan 5, 2026 | Well J-3 Brush & Airbursting 80617140 | JKA WELL DRILLING & PUMPS | $39,807 |
| Jan 5, 2026 | G-1 Well Rehabilitation in Lakewood 50061 | JKA WELL DRILLING & PUMPS | $100,677 |
| Dec 18, 2025 | Flooring Replacement 7851 | David's Showcase Floors Inc | $59,200 |
| Dec 18, 2025 | Lakewood P-2 motor Balance 25178 | PUMPTECH LLC | $1,916 |
| Dec 1, 2025 | Lakewood N-3 NRR Replacement and Test 25152 | PUMPTECH LLC | $12,304 |
| Nov 25, 2025 | 181122 Lakewood water 181122 Lakewood | GUARDIAN SECURITY SYSTEMS INC | $595 |
| Oct 22, 2025 | Lakewood J-3 Motor Replacement and Pump Repair 25114 | PUMPTECH LLC | $75,391 |
| Oct 16, 2025 | P-2 Column Extension 25044 | PUMPTECH LLC | $21,910 |
| Oct 13, 2025 | Lakewood N-3 2nd Motor Repair 25085 | PUMPTECH LLC | $16,867 |
| Oct 9, 2025 | Dead Tree Removal PO# 25104 | ALS AMERICAN LNDSCP SERV LLC | $6,468 |
| Oct 8, 2025 | Elevated Water Tanks Vent Replacment 25095 | T BAILEY LLC | $107,348 |
| Oct 7, 2025 | Lakewood J-3 Pump Pull and Inspect Signed Quote | PUMPTECH LLC | $12,755 |
| Oct 2, 2025 | Lakewood Water Tree Removal PO25091 | WRIGHT'S LOGGING/TREE SRVC INC | $2,532 |
| Oct 1, 2025 | 179941 Lakewood Water District View Road 179941 | GUARDIAN SECURITY SYSTEMS INC | $640 |
| Sep 30, 2025 | Annual Landscape Services 25-010 | ALS AMERICAN LNDSCP SERV LLC | $87,582 |
| Sep 4, 2025 | Well 0-2R Project Job # 0854 | SCHNEIDER EQUIPMENT INC | $2,226,839 |
| Aug 29, 2025 | 177687 Lakewood Water District 177687 | GUARDIAN SECURITY SYSTEMS INC | $4,133 |
| Aug 26, 2025 | N-3 Motor Repair 25037 | PUMPTECH LLC | $10,759 |
| Aug 20, 2025 | (title withheld) Warranty work | PACIFIC POWER GROUP LLC | — |
| Aug 14, 2025 | Country Place PFAS Treatment Project 253-588-4423 | CECCANTI INC | $4,188,052 |
| Aug 8, 2025 | E-3 Motor Repair & Balance LWD-17282 | PUMPTECH LLC | $18,067 |
| Aug 8, 2025 | BRIDGEPORT-6YR CSS, BLOCK HEATER REPLACEMENT PO#25043 | PACIFIC POWER GROUP LLC | $4,240 |
| Jul 28, 2025 | Lakewood Hg Motor Decommission LWD-17247 | PUMPTECH LLC | $98,948 |
| Jul 28, 2025 | Emergency Callout N-3 Motor Fail Emergency Call Out | PUMPTECH LLC | — |
| Jul 11, 2025 | G-4 Well Project 892 | HOLT SERVICES INC | $959,984 |
| Jun 30, 2025 | F-2 and E-3 Motor Balance 25016 | PUMPTECH LLC | $2,455 |
| Jun 20, 2025 | Lakewood Well 2 20250084 | BAINBRIDGE ISLAND ELECTRIC | — |
| Jun 5, 2025 | Lakewood Water Back Fence 25011 | ALL AROUND FENCE COMPANY | — |
| May 29, 2025 | Tillicum Tank Job 912 99729 | REALFINE PAINTING LLC | $21,603 |
| May 29, 2025 | 104TH & BRIDGEPORT WELL - ALARM 104TH & BRIDGEPORT WELL - ALARM | PACIFIC POWER GROUP LLC | — |
| May 20, 2025 | 88th & Pine 17149 | PUMPTECH LLC | $8,739 |
| May 19, 2025 | Fence Replacement 25005 | SECOMA FENCE INC | $22,541 |
| Apr 25, 2025 | Bridgeport Way VFD 20250057 | BAINBRIDGE ISLAND ELECTRIC | — |
| Apr 23, 2025 | R-2 Well Equipment and Site Improvements 850 | CECCANTI INC | $439,519 |
| Apr 15, 2025 | YARD/PORTABLE 2 - 6YR CSS AND BATTERY REPLACEMENT LWD-16259 | PACIFIC POWER GROUP LLC | $8,205 |
| Apr 7, 2025 | 169838 - Hemlock - Troubleshoot Security Camera 169838 | GUARDIAN SECURITY SYSTEMS INC | $595 |
| Apr 7, 2025 | 169837 - Wholesale Booster Pump #1 169837 | GUARDIAN SECURITY SYSTEMS INC | $595 |
| Apr 3, 2025 | Bi-annual maintenance 16176 | PREFERRED ROOF SERVICES INC | $6,000 |
| Mar 21, 2025 | 172184 - Lakewood Water Dist Security Camera Service 172184 | GUARDIAN SECURITY SYSTEMS INC | $540 |
| Mar 19, 2025 | 169839 - Gravelly Lake Service Eagle Eye System 169839 | GUARDIAN SECURITY SYSTEMS INC | $595 |
| Feb 20, 2025 | On Call Asphalt/Concrete 2025 | ASPHALT PATCH SYSTEMS | — |
| Feb 19, 2025 | 168349 - Angle Lane Card Reader s not reading cards 168349 | GUARDIAN SECURITY SYSTEMS INC | $3,306 |
| Feb 11, 2025 | Deepwood Q-1 Motor Repair 17220 | PUMPTECH LLC | $24,560 |
| Jan 30, 2025 | surge protection 20250020 | BAINBRIDGE ISLAND ELECTRIC | — |
| Jan 24, 2025 | Yard/Office - Remove and Replace Block Heater LWD-17208 | PACIFIC POWER GROUP LLC | $1,636 |
| Jan 24, 2025 | S Tacoma Way: 80th - 88th Water Main Replacement 893 | HCON INCORPORATED | $1,155,484 |
| Jan 24, 2025 | Lakewood Water District - Annual Generator Full Service 16499 | PACIFIC POWER GROUP LLC | $20,528 |
| Jan 7, 2025 | 100Th St Vault SVC-5000 | EVERGREEN CONCRETE CUTTING INC | — |
| Dec 27, 2024 | (title withheld) 181025 | CRESSY DOOR CO INC | — |
| Nov 21, 2024 | Hemlock Well Piping Modifications LWD-17163 | PUMPTECH LLC | $3,532 |
| Nov 13, 2024 | Well Rehabilitation PO 17158 | JKA WELL DRILLING & PUMPS | $37,940 |
| Oct 31, 2024 | Steilacoom Well P-2 Line Shaft Turbine and Install LWD-16098 | PUMPTECH LLC | $197,885 |
| Oct 29, 2024 | Steilacoom Tank 20240156 | BAINBRIDGE ISLAND ELECTRIC | — |
| Oct 29, 2024 | Misc repairs 2024 | ASPHALT PATCH SYSTEMS | — |
| Oct 21, 2024 | Scott Well MCC 20240151 | BAINBRIDGE ISLAND ELECTRIC | $45,779 |
| Sep 24, 2024 | 162944 - Lakewood Water District Door Pad Swap 162944 | GUARDIAN SECURITY SYSTEMS INC | $105 |
| Sep 23, 2024 | WBPS 2 Motor Balence Signed Quote | PUMPTECH LLC | $2,110 |
| Sep 6, 2024 | Asphalt & Concrete Repairs CRM 5616 | AA ASPHALTING LLC | $13,776 |
| Aug 30, 2024 | Roof Maintenance PO#16176 | PREFERRED ROOF SERVICES INC | $2,395 |
| Aug 27, 2024 | Lakewood Water Exhaust Fan ST#154669 | CAPITAL HEATING & COOLING | $16,004 |
| Aug 7, 2024 | Well K3 869 | HOLT SERVICES INC | $731,588 |
| Jul 15, 2024 | Tree Limbing Inv 2616 | WRIGHT'S LOGGING/TREE SRVC INC | $991 |
| Jul 12, 2024 | 104th and Bridgeport 14' H Motor Decom 16312 | PUMPTECH LLC | $20,500 |
| Jun 13, 2024 | Well E-3 Vertical Turbine 16284 | PUMPTECH LLC | $21,752 |
| May 10, 2024 | Lakewood Water District Conference Room 8670 | LEGACY GROUP INC | $4,607 |
| Apr 27, 2024 | (title withheld) LWD-16123 | FENCE SPECIALISTS LLC | $2,835 |
| Mar 27, 2024 | SW Annex Updates LWD-06687 | BLUE CORE POWER LLC | $148,000 |
| Mar 14, 2024 | Scott Well Fence LWD-16265 | ALL AROUND FENCE COMPANY | — |
| Mar 7, 2024 | Lakewood Water District New Monument LWD-06692 | Yesco LLC | $16,031 |
| Feb 27, 2024 | Tillicum - Confidence Test Policy | PACIFIC POWER GROUP LLC | $1,125 |
| Feb 23, 2024 | LaYard Portable #2 - CSS and Battery replacement 16259 | PACIFIC POWER GROUP LLC | $3,726 |
| Feb 22, 2024 | Lobby LVP TI 6810 | David's Showcase Floors Inc | $7,388 |
| Feb 21, 2024 | 88th and Pine - Remove & Replace E-stop 16254 | PACIFIC POWER GROUP LLC | $1,834 |
| Feb 20, 2024 | Yard Office - CSS & Battery 16253 | PACIFIC POWER GROUP LLC | $3,303 |
| Feb 7, 2024 | Lakewood Water District- Yard -Callout- TS Low Coolant Alarm callout | PACIFIC POWER GROUP LLC | $1,318 |
| Feb 7, 2024 | Nyanza Well Decommission 06693 Job # 871 | HOLT SERVICES INC | $40,500 |
| Feb 5, 2024 | Yard -well- R& R Block Heater/ CSS/ Battery 16118 | PACIFIC POWER GROUP LLC | $3,553 |
| Feb 1, 2024 | LWD Historical Wall 1943-2023 | SHINE ON SIGNS AND GRAPHICS | $12,885 |
| Jan 26, 2024 | Well D2 Yard Well Motor Balancing LWD-16182 | PUMPTECH LLC | $1,150 |
| Jan 22, 2024 | 868 ARDMORE-WHITMAN INTERSECTION WATER MAIN RELOCATION 868 | PAPE & SONS CONSTRUCTION, INC | $145,287 |
| Jan 15, 2024 | Lakewood Booster Station 1 Pump Repair Wholesale 16083 | PUMPTECH LLC | $13,188 |
| Jan 4, 2024 | K2 Motor Repair Signed Quote | PUMPTECH LLC | $17,015 |
| Dec 22, 2023 | Replace Failed Blower Motor 2248 | CODE MECHANICAL INC | $4,518 |
| Dec 18, 2023 | K-2 Removal and Inspection LWD-16084 | PUMPTECH LLC | $10,930 |
| Nov 17, 2023 | (title withheld) LWD-06690 | NORTHWEST ABATEMENT SRVCS INC | $6,501 |
| Nov 15, 2023 | R-2 New Pump & Motor LWD-169361 | PUMPTECH LLC | $193,875 |
| Nov 9, 2023 | Lakewood Water District - 2023 PM 17044 | PACIFIC POWER GROUP LLC | $18,790 |
| Oct 18, 2023 | SW Annex LWD-06687 | ABLE GENERAL CONTRACTING | $148,831 |
| Sep 25, 2023 | Wholesale Booster 4x Motor Balance Signed Quote | PUMPTECH LLC | $2,280 |
| Sep 19, 2023 | Lakewood Water District LWD-15996 | PUMPTECH LLC | $18,710 |
| Sep 15, 2023 | Tree Removal Inv# 2490 | WRIGHT'S LOGGING/TREE SRVC INC | $2,532 |
| Aug 28, 2023 | Electric Gate Repair JOB#105402 | ROBBLEE'S TOTAL SECURITY INC | $933 |
| Aug 15, 2023 | Lakewood Water District N-1 Well - BJ Sub Pump and Install, Signed Quote | PUMPTECH LLC | $7,593 |
| Aug 11, 2023 | R2 Well Casing Extension 15920 | PUMPTECH LLC | $2,890 |
| Jul 12, 2023 | Lakewood Water District -Hemlock-repl rib board 17007 | PACIFIC POWER GROUP LLC | $1,510 |
| Jun 21, 2023 | (title withheld) PO# 15934 | PREFERRED TRAFFIC CONTROL LLC | — |
| Jun 1, 2023 | (title withheld) LWD-15903 | PUMPTECH LLC | $2,115 |
| May 24, 2023 | Ardmore City Franchise Pot Holes 5152023 | HCON SERVICES LLC | — |
| May 23, 2023 | View Road Well N-3 Vertical Line Shaft Pump LWD-16784 | PUMPTECH LLC | $146,875 |
| May 11, 2023 | Lakewood Water District - PM's LWD-16902 | PACIFIC POWER GROUP LLC | $17,037 |
| May 10, 2023 | Wholesale Booster Motor Repair 050923 | PUMPTECH LLC | $16,815 |
| Apr 26, 2023 | 104th and Butte Main Break Project 0857 | HCON SERVICES LLC | — |
| Apr 20, 2023 | Lakewood F-2 Vertical Line Shaft Pump LWD-16964 | PUMPTECH LLC | $163,500 |
| Apr 10, 2023 | 104th and Butte Water Break | ASPHALT PATCH SYSTEMS | — |
| Apr 5, 2023 | Lakewood Water District -Hemlock Hill 17741 | PACIFIC POWER GROUP LLC | $1 |
| Mar 29, 2023 | Front Street and 96th Water Main Replacement 0781 | HCON INCORPORATED | $1,274,350 |
| Jan 25, 2023 | Well E-2 Troubleshoot Signed Quote | PUMPTECH LLC | $630 |
| Jan 24, 2023 | Lakewood 88th & Pine Balancing Signed Quote | PUMPTECH LLC | $2,955 |
| Dec 16, 2022 | (title withheld) LWD-16747 | ABLE GENERAL CONTRACTING | $9,592 |
| Dec 15, 2022 | Restroom Remodel LWD-16663 | ABLE GENERAL CONTRACTING | $29,082 |
| Dec 15, 2022 | Lakewood Column Pipe Breakdown and transfer LWD-16850 | PUMPTECH LLC | — |
| Nov 4, 2022 | Steel Building Gutter Install 0806 | BLYTON GUTTER COMPANY | $4,838 |
| Oct 12, 2022 | Scotts G-1 Well Pump Replacement LWD-15165 | PUMPTECH LLC | — |
| Sep 30, 2022 | Abitibi Well Evaluation 829 | HOLT SERVICES INC | $293,700 |
| Sep 27, 2022 | Lake Steilacoom Dr. Main Replacement 0799 | HCON INCORPORATED | $976,833 |
| Sep 26, 2022 | 843 - NAOMILAWN, NEWGROVE & HIGHLAND WATER MAIN JOB #719 0719 | PAPE & SONS CONSTRUCTION, INC | $1,111,111 |
| Aug 30, 2022 | Wholesale Transmission Main Extension 777 | CECCANTI INC | $842,132 |
| Aug 29, 2022 | Water Line Break- Farwest Dr/112th/Military 2022 | ASPHALT PATCH SYSTEMS | — |
| Aug 4, 2022 | Yard Gutter Replacement 263 | BLYTON GUTTER COMPANY | $7,213 |
| Jul 22, 2022 | N-3 Pull Signed Quote | PUMPTECH LLC | — |
| Jul 1, 2022 | Wholesale Booster Station Pump Change Out Signed Quote | PUMPTECH LLC | — |
| May 25, 2022 | 112th St SW Water Main Replacement 800 | HCON INCORPORATED | $424,320 |
| Apr 25, 2022 | Lakewood Water District Steel Building 806 | BERSCHAUER CONSTRUCTION INC | $334,782 |
| Apr 15, 2022 | 39th Avenue SW Phase 4 Halcyon Rehabilitation 804 | CECCANTI INC | $245,367 |
| Apr 12, 2022 | Angle Lane S-2 LWD-16579 | PUMPTECH LLC | $146,500 |
| Apr 7, 2022 | Generator Repair Service - 88th & Pine - Cooling Sys, Battery 17741 | PACIFIC POWER GROUP LLC | $4,060 |
| Apr 7, 2022 | Generator Repair Service - Nyanza Tank - Cooling System 17741 | PACIFIC POWER GROUP LLC | $3,470 |
| Apr 7, 2022 | Generator Repair Service - Tillicum - Cooling System 17741 | PACIFIC POWER GROUP LLC | $3,450 |
| Apr 5, 2022 | Steilacoom P-1R LWD-15839 | PUMPTECH LLC | $9,488 |
| Apr 4, 2022 | Steilacoom Booster Pmp and Motor Signed Quote | PUMPTECH LLC | $59,215 |
| Mar 31, 2022 | 833 GENERATOR, ELECTRICAL, AND SEISMIC IMPROVEMENTS 783 | PAPE & SONS CONSTRUCTION, INC | $1,361,635 |
| Mar 30, 2022 | N-1 Replacement Pump & Motor LWD-16555 | PUMPTECH LLC | $114,450 |
| Mar 29, 2022 | 88th and Pine Booster Pump 2 LWD-17724 | PUMPTECH LLC | $14,385 |
| Mar 1, 2022 | Angle Lane S-1 LWD-17714 | PUMPTECH LLC | $149,366 |
| Feb 23, 2022 | Generator Repair Service - 88th & Pine - Muffler 17853 | PACIFIC POWER GROUP LLC | $3,884 |
| Feb 23, 2022 | Generator Service -Tillicum - Confidence Test 17728 | PACIFIC POWER GROUP LLC | $512 |
| Feb 23, 2022 | Generator Call out Service - Yard Well - Low coolant temp 17727 | PACIFIC POWER GROUP LLC | $627 |
| Jan 27, 2022 | #10050 Angle Ln SW Tree RM PO17706 | WRIGHT'S LOGGING/TREE SRVC INC | $4,180 |
| Jan 27, 2022 | #6400 Tree Removal PO17705 | WRIGHT'S LOGGING/TREE SRVC INC | $2,750 |
| Jan 12, 2022 | R-2 Well Project 803 | HOLT SERVICES INC | $449,640 |
| Jan 3, 2022 | Lakewood Water District - Office & Conference Room Q 16891 | LEGACY GROUP INC | $7,923 |
| Dec 29, 2021 | Roof Repair - Main Bldg | PREFERRED ROOF SERVICES INC | $7,535 |
| Nov 23, 2021 | Reservoir Seismic Retrofits for Steilacoom Boulevard 788 | T BAILEY INC | $2,815,696 |
| Nov 9, 2021 | Wholesale Transmission Spanaway Connection #777 777 | CECCANTI INC | $68,932 |
| Nov 2, 2021 | Generator Preventative Maintenance Service 17798 | PACIFIC POWER GROUP LLC | $12,757 |
| Oct 18, 2021 | 11900 GRAVELLY LAKE DR 11900 GRAVELLY LAKE DR | CRESSY DOOR CO INC | $273 |
| Aug 16, 2021 | Tillicum Well A-3 Motor Repair signed quote | PUMPTECH INC | $9,090 |
| Jul 22, 2021 | Scott Well Site Treatment 758 | CECCANTI INC | $5,432,145 |
| Jun 22, 2021 | 39th Avenue Water Main Replacement Project Ph. 2 & 3 780 | MILES RESOURCES LLC | $2,108,869 |
| Jun 22, 2021 | Repair Washington E-3 Pump Motor LWD-17776 | PUMPTECH INC | $12,575 |
| May 28, 2021 | Well O-3 signed quote | PUMPTECH INC | $219,669 |
| May 27, 2021 | HVAC Room Abatement LWD-15573 | F S & G S SERVICES INC | $4,318 |
| May 26, 2021 | Lakewood Well O-3 signed quote | PUMPTECH INC | $8,820 |
| May 18, 2021 | Generator Repair Service - Yard Well, Nyanza sites 15184 | PACIFIC POWER GROUP LLC | $3,708 |
| Apr 20, 2021 | Trees Removed LWD-15668 | MILLERS TREE SERVICE | $23,079 |
| Mar 30, 2021 | Office Wall LWD-15674 | ABLE GENERAL CONTRACTING | $8,973 |
| Mar 23, 2021 | Generator Repair Service - Oakbrook, Hemlock Hill 15238 | PACIFIC POWER GROUP LLC | $14,309 |
| Mar 11, 2021 | Generator Repair Service - Tillicum, Nyanza, Western St. 15236 | PACIFIC POWER GROUP LLC | $2,423 |
| Mar 11, 2021 | Generator Repair Service - Yard/Office Cooling System 15185 | PACIFIC POWER GROUP LLC | $2,429 |
| Mar 3, 2021 | 39th Ave Watermain Rplc Ph 2 PCI 181 | Pacific Civil & Infrstrctr Inc | $191,880 |
| Feb 16, 2021 | Oakbrook Well #O-2 LWD-15191 | PUMPTECH INC | $98,004 |
| Feb 16, 2021 | Well #F-2 Submersible Pump Option LWD-15164 | PUMPTECH INC | $91,905 |
| Feb 15, 2021 | Lakewood Scotts G-3 Well LWD-15612 | PUMPTECH INC | $90,250 |
| Feb 15, 2021 | Scotts G-1 Well Pump Replacement LWD-15165 | PUMPTECH INC | $90,036 |
| Feb 11, 2021 | Generator Preventative Maintenance Service 15627 | PACIFIC POWER GROUP LLC | $12,158 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.