JEFFERSON COUNTY PUBLIC WORKS — public works contracts
427 public works projects and 786 intents to pay prevailing wages name JEFFERSON COUNTY PUBLIC WORKS as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: County.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 48 | 44 | 30 | 44 | 28 | 83 | 46 | 104 | 49 | 20 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Aug 19, 2026 | Welding at transfer station 153 | D WELD SHOP | $3,465 |
| Aug 12, 2026 | Grizzly Island Demo work PW PO #151 | D WELD SHOP | $6,712 |
| Jun 30, 2026 | Grizzly removal PW PO #144 | Olympic Concrete Cutting | $7,525 |
| May 28, 2026 | Gibbs Lake Shop 2612 | NW GUTTER PROS | $1,456 |
| Mar 11, 2026 | (title withheld) #112 | SHOLD EXCAVATING INC | — |
| Mar 6, 2026 | PROPERTY 20 GRINDER PUMP CONNECTION PO #107 | SHOLD EXCAVATING INC | — |
| Feb 26, 2026 | Oil City Rd MP0.5 Tree Removal RW-2026-001 | OLYMPIC RESOURCES | $38,250 |
| Feb 13, 2026 | JC Library Backfill Hole 99 | SHOLD EXCAVATING INC | — |
| Feb 9, 2026 | Ness Corner Utilites #98 | SHOLD EXCAVATING INC | — |
| Jan 22, 2026 | (title withheld) 93 | D WELD SHOP | $6,956 |
| Jan 13, 2026 | HJ Carroll Park - Striping 15590 | AGATE ASPHALT & EXCAVATION | $5,687 |
| Jan 8, 2026 | Transmission Line Mowing DG3218 | D & L POLES INC | $11,050 |
| Dec 2, 2025 | Hadlock Sewer Emergency Repair PO #87 | SHOLD EXCAVATING INC | — |
| Nov 7, 2025 | SOLID WASTE TRANSFER STATION 10.17.25 | SHOLD EXCAVATING INC | — |
| Oct 2, 2025 | 81228-1 - Port Hadlock UGA Water Reclamation - Cell Communicator Install 81228-1 | GUARDIAN SECURITY SYSTEMS INC | $1,335 |
| Sep 17, 2025 | Alarm - Connect Sewer 71 | SHOLD EXCAVATING INC | — |
| Sep 8, 2025 | Quilcene County Parks | SWIFT PLUMBING & HEATING INC | $1,850 |
| Aug 13, 2025 | ANNUAL INSPECTION EES 09.09.25 | SHOLD EXCAVATING INC | — |
| Aug 13, 2025 | SEPTIC INSPECTION EES 09.09.25 | SHOLD EXCAVATING INC | — |
| Aug 11, 2025 | UGA WASTEWATER DIVISION 53520/594350/49,40516936 | SHOLD EXCAVATING INC | $3,822 |
| Aug 4, 2025 | CHECK ALARM COUNTY SHOP | SHOLD EXCAVATING INC | — |
| Jul 30, 2025 | Gibbs Lake Rd 57 | VIKING FENCE CO | $5,903 |
| Apr 24, 2025 | Jump Playground Fence 501603 | RAINBOW SWEEPERS INC | $8,073 |
| Apr 9, 2025 | court house basketball court 3605311744 | RJC PAINTING & HNDYMN SERV LLC | $6,003 |
| Feb 11, 2025 | Jefferson Co. Reno 22 | PACIFIC SPORTS TURF INC | $20,750 |
| Dec 5, 2024 | Courthouse Basketball Court 17521200 | AGATE ASPHALT & EXCAVATION | $17,145 |
| Dec 5, 2024 | Irondale Park Court 17521200 | AGATE ASPHALT & EXCAVATION | $18,200 |
| Dec 3, 2024 | Jefferson County 5 year PM plan SA3080 | MICHELLI MEASUREMENT GROUP INC | $3,300 |
| Oct 14, 2024 | Paradise Bay Road 503608 | IDGAF INCORPORATED | — |
| Oct 3, 2024 | Phase 4 - Stage 1 On-site Grinder Pump Installation 405-2127-0 | STRIDER CONSTRUCTION CO INC | $2,589,589 |
| Aug 13, 2024 | SLR8000 VHF Repeater Installation N/A | DAY WIRELESS SYSTEMS | $17,135 |
| Jul 25, 2024 | JC QUILCENE SHOP 295316 HWY 101 | SHOLD EXCAVATING INC | — |
| Jun 25, 2024 | Skim Pump 49473509 | GOOD MAN INC | $392 |
| May 7, 2024 | Jefferson Co. Reno 23123 | PACIFIC SPORTS TURF INC | $18,984 |
| Apr 12, 2024 | Temp power for construction trailer at waste water facility 23187 | Frederickson Electric | $20,164 |
| Apr 8, 2024 | Ph. 3 Low Pressure Sewer Collection System for Pt. Hadlock UGA County Project #405-2114-0 Commerce Pro. # 22-96515-026 ECY Agree. No. WQC_2024_JCoPWE-00034 | SETON CONSTRUCTION INC | $4,997,707 |
| Mar 25, 2024 | Naylors Creek at West Valley Road & Gibbs Lake Road 18020592 | NORDLAND CONST NW INC | $1,696,325 |
| Mar 15, 2024 | Flagging for Potholing PO #23142 | SETON CONSTRUCTION INC | — |
| Mar 12, 2024 | JCPW Wastewater 23183 | PACIFIC MOBILE STRUCTURES INC | $4,577 |
| Feb 28, 2024 | SOLID WASTE LOCATE STORM WATER SYSTEM CAMERA LOCATE | SHOLD EXCAVATING INC | — |
| Feb 20, 2024 | Center Road 2R Overlay MP 10.34 to MP 14.58 1802096 | LAKESIDE INDUSTRIES INC | $1,112,584 |
| Feb 8, 2024 | CEDAR ST CEDAR ST | SHOLD EXCAVATING INC | — |
| Jan 19, 2024 | Phase 2 - Membrane Bioreactor Wastewater Treatment Plant for Port Hadlock UGA 405-2114-0 | INTERWEST CONSTRUCTION INC | $10,020,835 |
| Dec 7, 2023 | T/S BAD BATTERY & WONT SET I-34249 | DOUBLE D ELECTRICAL INC | $354 |
| Dec 7, 2023 | T/S TANK HEATER FOR HYDRAULIC SYSTEM I-34003 | DOUBLE D ELECTRICAL INC | $841 |
| Dec 7, 2023 | REPAIR PANEL AT SCALE I-33954 | DOUBLE D ELECTRICAL INC | $389 |
| Dec 4, 2023 | (title withheld) Collums | SHOLD EXCAVATING INC | — |
| Nov 14, 2023 | Upper Oak Bay Campground 17520650 | HENDEN ELECTRIC INC | $78,687 |
| Oct 4, 2023 | Cedar Ave Crosswalks 12332 | AGATE ASPHALT & EXCAVATION | $5,250 |
| Sep 13, 2023 | PORT HADLOCK POT HOLES POT HOLING | SHOLD EXCAVATING INC | — |
| Aug 30, 2023 | Quilcene Fiber Hut 12283 | VIKING FENCE CO | $21,894 |
| Aug 24, 2023 | Jump Park River Rock Entrance 23-61 | Van Ness Construction | $4,255 |
| Aug 22, 2023 | HJ Carroll Park 23155 | AGATE ASPHALT & EXCAVATION | $4,105 |
| Jul 14, 2023 | 72 megs way DG01049 | D & L POLES INC | $2,427 |
| Jun 6, 2023 | Jefferson Co. Reno 23123 | PACIFIC SPORTS TURF INC | $18,984 |
| May 24, 2023 | Snow Creek Road MP 0.84 18020310 | BRUCH & BRUCH CONSTRUCTION INC | $1,092,394 |
| May 18, 2023 | Jefferson County Public Works - Jail & EOC 29324220 | Performance Systems Intgn LLC | $3,738 |
| May 15, 2023 | 2215-T & M - Shine Culvert Crossing 2215- T&M | SETON CONSTRUCTION INC | $1,653 |
| May 11, 2023 | 2023 Jefferson County Road Striping 18020490 | SPECIALIZED PAVEMENT MRKG LLC | $516,320 |
| Mar 10, 2023 | 306144 HWY 101 RISERS 03.10.23 | SHOLD EXCAVATING INC | — |
| Mar 2, 2023 | 980 OLD GARDINER FOLLOW UP 980 OLD GARDINER FOLLOW UP | SHOLD EXCAVATING INC | — |
| Feb 11, 2023 | (title withheld) | D & L POLES INC | $2,379 |
| Feb 9, 2023 | Animal Shelter Septic Repairs 112 Critter Lane | SHOLD EXCAVATING INC | — |
| Jan 24, 2023 | Larry Scott Trail Larry Scott Trail | SETON CONSTRUCTION INC | — |
| Nov 15, 2022 | Jefferson Co PUD Remove Zoning DG02095 | AIR SYSTEMS ENGINEERING INC | $6,367 |
| Nov 9, 2022 | JETT & CAMERA SITE MAP | SHOLD EXCAVATING INC | — |
| Sep 27, 2022 | 2022 Hadlock Sewer Design 2022 Hadlock Sewer Design | SHOLD EXCAVATING INC | — |
| Sep 9, 2022 | HJ Carrol Park Patching 23086 | LAKESIDE INDUSTRIES INC | $9,950 |
| Aug 17, 2022 | Jefferson County Solid Waste 2022-068 | AGATE ASPHALT & EXCAVATION | $21,993 |
| Aug 12, 2022 | Ductles heat for hadlock shop | DOUBLE D ELECTRICAL INC | $16,985 |
| Aug 2, 2022 | 232 FERN WAY HJ CARROLL 07.12.22 | SHOLD EXCAVATING INC | — |
| Jul 1, 2022 | 232 Fern Way Check System | SHOLD EXCAVATING INC | — |
| May 25, 2022 | 8X10 shed wiring I-28246 | DOUBLE D ELECTRICAL INC | $1,276 |
| May 12, 2022 | January 2022 Storm 2931 | HERMANN BROS LOGGING/CONST INC | $24,140 |
| May 10, 2022 | (title withheld) HJ Carroll Park | SHOLD EXCAVATING INC | $8,564 |
| May 10, 2022 | Jefferson County Universal Movement Playground (JUMP) 17520650 | INTERWEST CONSTRUCTION INC | $756,385 |
| Apr 27, 2022 | JUMP Jefferson Universal Installation 104247-03-02 | GAMETIME | $61,144 |
| Apr 12, 2022 | Paradise Bay Median Paradise Bay | DOUBLE D ELECTRICAL INC | $973 |
| Mar 14, 2022 | THORNDYKE ROAD CULVERT REPLACEMENT 18020580 | NORDLAND CONST NW INC | $1,749,021 |
| Mar 11, 2022 | Jefferson Co. DT 23034 | PACIFIC SPORTS TURF INC | $16,152 |
| Mar 11, 2022 | HJ Carroll Restroom Repair 1629 | Hope Roofing | $6,371 |
| Feb 28, 2022 | Paradise Bay Median Paradise Bay | DOUBLE D ELECTRICAL INC | — |
| Feb 22, 2022 | Point Hudson | D & L POLES INC | $4,369 |
| Feb 10, 2022 | SEPTIC INSPECTIONS 325 COUNTY LANDFILL RD | SHOLD EXCAVATING INC | — |
| Jan 24, 2022 | Jefferson Co SS-03320 | UNITEC CORPORATION | — |
| Dec 20, 2021 | SR 116 & Cedar Avenue Pedestrian/Bike Improvements 637109 | INTERWEST CONSTRUCTION INC | $573,724 |
| Dec 16, 2021 | Oil City Road - Ruby Creek Washout 2165 | BRUCH & BRUCH CONSTRUCTION INC | $154,000 |
| Jul 21, 2021 | Decommissioning of Three water wells 18020790 | OASIS WELL DRILLING INC | $19,865 |
| Jun 24, 2021 | PW SW Equipment Building Slab N/a | Sound Concrete Solutions Inc | — |
| Jun 14, 2021 | Lopeman Parcel Fencing LP2021 | MC EXCAVATING LLC | $26,938 |
| May 25, 2021 | (title withheld) Sono Tubes - Multiple | SHOLD EXCAVATING INC | — |
| May 19, 2021 | Jefferson Co. DT/TD N/A | PACIFIC SPORTS TURF INC | $14,026 |
| May 17, 2021 | CENTER ROAD 04.22.21 MUD | SHOLD EXCAVATING INC | — |
| May 17, 2021 | CONCRETE FOR BASE OF SIGNS 04.07.21 | SHOLD EXCAVATING INC | — |
| Apr 20, 2021 | Olympic Discovery Trail #1 & #2 2601 | VIKING FENCE CO | $4,469 |
| Apr 20, 2021 | 371 Chimacum Rd 2597 | VIKING FENCE CO | $2,834 |
| Apr 9, 2021 | Jefferson County Humane Society EST# 1125 | MOVING EARTH LLC | $5,995 |
| Apr 6, 2021 | (title withheld) Michelle Ham | SME SOLUTIONS LLC | — |
| Mar 31, 2021 | CHIMACUM RD INT SLAB TICKET 14651 | SHOLD EXCAVATING INC | — |
| Mar 16, 2021 | Dabob Emergency Repair Dabob Emergency Repair | SETON CONSTRUCTION INC | $24,598 |
| Feb 16, 2021 | Paradise Bay Rd MP 4.2 Slide Repair 18020830 | BRUCH & BRUCH CONSTRUCTION INC | $10,607 |
| Feb 12, 2021 | 981 GIBBS LAKE 59054 | SHOLD EXCAVATING INC | — |
| Feb 4, 2021 | WIRING FOR AUTO SHUT OFF FOR PUMP I-14759 | DOUBLE D ELECTRICAL INC | $11,352 |
| Nov 4, 2020 | Jefferson County - Memorial Field Gutter Cleaning 40312748 | JOHNNY TSUNAMI LLC | $2,130 |
| Oct 13, 2020 | EES @ 371 CHIMACUM RD EES | SHOLD EXCAVATING INC | — |
| Oct 8, 2020 | WIRING FOR VEHICLE LIFT I-14605 | DOUBLE D ELECTRICAL INC | $2,206 |
| Jul 28, 2020 | QUILCENE GENERATOR 10KW I-13812 | DOUBLE D ELECTRICAL INC | $6,184 |
| Jul 28, 2020 | CHIMACUM ROAD BANNER POLE REPLACEMENT I-13941 | DOUBLE D ELECTRICAL INC | $3,052 |
| Jul 28, 2020 | REPAIR STREETLIGHT I-12854 | DOUBLE D ELECTRICAL INC | — |
| May 21, 2020 | OAKBAY COUNT PARK SIDEWALK SLAB 15001 | SHOLD EXCAVATING INC | $791 |
| Apr 8, 2020 | CENTER ROAD RESURFACE AND RESTORE 18020500 | NORDLAND CONST NW INC | $498,514 |
| Feb 25, 2020 | Jefferson Co. DT/TD 22919 | PACIFIC SPORTS TURF INC | $12,523 |
| Feb 10, 2020 | Fairgrounds 2 buildings 1843-1844 | Hope Roofing | $49,001 |
| Feb 5, 2020 | UPPER HOH RD MP 8.02 EMERGENCY REPAIR 18020381 | SETON CONSTRUCTION INC | $102,000 |
| Jan 21, 2020 | Oak Bay Campground Electrical Project 17520650 | HENDEN ELECTRIC INC | $34,444 |
| Jan 2, 2020 | PIPE AND WIRE FOR GENERATOR I-12190 | DOUBLE D ELECTRICAL INC | $9,627 |
| Nov 15, 2019 | UPPER HOH RD MP 8.01 EMERGENCY REPAIR 18020381 | SETON CONSTRUCTION INC | $286,270 |
| Sep 27, 2019 | TRANSFER STATION SITE IMPROVEMENTS 4012043 | NORDLAND CONST NW INC | $237,620 |
| Sep 17, 2019 | Silent Lake 9235 | D & L POLES INC | $2,414 |
| Sep 5, 2019 | Sidewalk Extension 4595 | SHOLD EXCAVATING INC | $11,380 |
| Aug 9, 2019 | JEFFCO SEWER AND LANDFILL I-11557 | DOUBLE D ELECTRICAL INC | $11,170 |
| Jul 30, 2019 | Castle Hill Parking Lot Castle Hill Parking Lot | VIKING FENCE CO | $8,284 |
| Jul 25, 2019 | Transfer Station Septic and Water 40120422 | WHITWORTH EXCAVATING INC | $95,547 |
| Jul 25, 2019 | Valve Installation Hickory and Moose | L & J ENTERPRISES | $3,049 |
| Jul 25, 2019 | Puget Loop and Walkter Under Ground Electrical Fault Afterhours Emergency Puget Loop | L & J ENTERPRISES | $3,450 |
| Jul 10, 2019 | Reroute 2 Fiber Optic Conduit 9904 | L & J ENTERPRISES | $9,789 |
| Jul 3, 2019 | 2019.55 KCDA Jefferson County 4118489 / 22866 | MODERN BUILDING SYSTEMS INC | $125,950 |
| Jun 12, 2019 | Shine Boat Launch Repair 22865 | SHOLD EXCAVATING INC | $6,344 |
| May 30, 2019 | TEMP MOVE OF ATTENDANT SHACK I-11095 | DOUBLE D ELECTRICAL INC | $4,982 |
| Apr 3, 2019 | PAVEMENT MARKING ON JEFFERSON CO ROADS CY2019-2021 18020490 | APPLY-A-LINE LLC | $402,330 |
| Mar 25, 2019 | South Discovery Road Pavement Preservation Project 18019760 | LAKESIDE INDUSTRIES INC | $461,322 |
| Mar 5, 2019 | PT CC Playground 17520360 | VIKING FENCE CO | $34,533 |
| Dec 18, 2018 | PT Fencing 130118900 | VIKING FENCE CO | $5,559 |
| Oct 30, 2018 | Irondale Comm. Park 22816 | VIKING FENCE CO | $4,583 |
| Sep 28, 2018 | UPPER HOH RD MP 8 EMERGENCY REPAIR 18020380 | DIRT & AGGREGATE INTERCHNG INC | $28,999 |
| Sep 11, 2018 | Upper Hoh Road Emergency Repairs 18020380 | LAKESIDE INDUSTRIES INC | $26,960 |
| Jul 17, 2018 | JC Memorial Field 4111783 | MUSCO SPORTS LIGHTING LLC | $273,000 |
| Jun 29, 2018 | Parking Lot Castle Hill Lighting Project | SHOLD EXCAVATING INC | — |
| Jun 19, 2018 | Repair sign shop roof | OLYMPIC STEEL LLC | $327 |
| Jun 1, 2018 | Jefferson Co. Parks DT/TD 22760 | PACIFIC SPORTS TURF INC | $9,283 |
| May 22, 2018 | PAVEMENT MARKING ON JEFFERSON CO ROADS FOR CY 2018 18020490 | APPLY-A-LINE LLC | $306,824 |
| May 3, 2018 | SALMON CREEK BRIDGE 18019341 | NORDLAND CONST NW INC | $942,367 |
| May 2, 2018 | GRIZZY CRANE INSTALLATION P-5287 | DOUBLE D ELECTRICAL INC | $14,780 |
| Apr 27, 2018 | Dosewallips Road MP 1.67 Permanent Repair 18019960 | HANSON EXCAVATION LLC | $131,667 |
| Apr 25, 2018 | Quilcene Campground Picnic Shelter | Hope Roofing | $12,635 |
| Mar 28, 2018 | SOLID WASTE DISPOSAL FACILITY 2014-2019 | UNITEC CORPORATION | $1,657 |
| Mar 14, 2018 | REPLACE TRAFFIC SIGNAL I-7970 | DOUBLE D ELECTRICAL INC | $3,297 |
| Mar 5, 2018 | Pavement Markings & Striping 1805422026 | Affordable Asphalt Company | $191,756 |
| Feb 1, 2018 | Install Interior Doors | Rubio & Co | $5,090 |
| Dec 14, 2017 | Jefferson County Courthouse Window | G LITTLE INC | $2,093 |
| Nov 29, 2017 | Upper Hoh Rd MP 8 ER | SETON CONSTRUCTION INC | $150,000 |
| Oct 10, 2017 | LIGHTING UPGRADE P-2290 | DOUBLE D ELECTRICAL INC | $2,810 |
| Sep 26, 2017 | (title withheld) N/A | PACIFIC ENVIRONMENTAL SRVCS CO | $756 |
| Sep 21, 2017 | Port Townsend Landfill Asphalt Repair 22710 | NORTHERN ASPHALT LLC | $9,881 |
| Aug 24, 2017 | Quilcene Solid Waste Drop Box Site-Improvements 401 594 1984 | COULTAS GENERAL CONTRACTING | $180,630 |
| Jun 15, 2017 | Rick Tollefson Memorial Trail, Phase I CR1815 | SHOLD EXCAVATING INC | $557,319 |
| Jun 14, 2017 | Center Road Overlay Phase 5 18019270 | LAKESIDE INDUSTRIES INC | $681,103 |
| May 11, 2017 | Griffith Rd Guardrial Replacement | PETERSEN BROTHERS INC | $17,670 |
| May 11, 2017 | Undi Rd Bypass Guardrail Project | PETERSEN BROTHERS INC | $35,558 |
| May 4, 2017 | Undie Road Mp 1.1 Culvert Removal 360-385-9234 | SEALEVEL BULKHEAD BUILDERS INC | $10,486 |
| May 3, 2017 | Teal Lake Road Overlay 18020270 | LAKESIDE INDUSTRIES INC | $163,322 |
| Mar 28, 2017 | JEFFERSON COUNTY COURTHOUSE VERBALTOM WALKER | COLE INDUSTRIAL INC | — |
| Mar 28, 2017 | Olympic Discovery Trail 12-1250C | INTERWEST CONSTRUCTION INC | $987,654 |
| Mar 9, 2017 | REPAIR BROKEN BASE ON GRAPPLE N/A | PACIFIC ENVIRONMENTAL SRVCS CO | — |
| Mar 1, 2017 | EMERGENCY REPAIR OVERHEAD CABLES I-6505 | DOUBLE D ELECTRICAL INC | — |
| Jan 25, 2017 | Undie Road Bypass | INTERWEST CONSTRUCTION INC | $78,025 |
| Dec 27, 2016 | Tree removal None Provided | DARREL EMEL'S TREE SERVICE INC | $4,224 |
| Dec 21, 2016 | TRANSFER STATION LIGHTS PROJECT PO# 22635 | DOUBLE D ELECTRICAL INC | $6,241 |
| Nov 11, 2016 | EAST QUILCENE ROAD MP .40 TO MP .55 PAVING XO2011 | LAKESIDE INDUSTRIES INC | $80,102 |
| Oct 18, 2016 | (title withheld) PO 22523 | PETERSEN BROTHERS INC | $5,691 |
| Oct 3, 2016 | REPAIR CRACKS ON THE GRISLY GARBAGE EQUIPMENT N/A | PACIFIC ENVIRONMENTAL SRVCS CO | — |
| Oct 3, 2016 | Oil City Rd | LAKESIDE INDUSTRIES INC | $12,000 |
| Sep 29, 2016 | Repair Park Office Roof N/A | OLYMPIC STEEL LLC | $1,100 |
| Aug 5, 2016 | Undie Road Emergency Relocation | INTERWEST CONSTRUCTION INC | $905,310 |
| Aug 1, 2016 | QUILCENE SHOP IMPROVEMENTS: ENCLOSED EQUIPMENT SHED 180 543 1979 | JENNINGS HEINS & ASSOC INC | $32,264 |
| Jul 28, 2016 | Oak Bay Road - Grinding | SETON CONSTRUCTION INC | $3,112 |
| Jul 19, 2016 | Quilcene Community Park Sport Court Project | PACIFIC ACE LLC | $13,729 |
| Jun 30, 2016 | Transfer Station and MRW | MATTILA PAINTING INC | $296,210 |
| Jun 16, 2016 | Fleet Services Division Hadlock Shop P.O. No. 1208 | Hoch Construction | $11,113 |
| May 24, 2016 | Upper Hoh Road MP 6.949 Culvert Replacment CR18962 | JORDAN EXCAVATING INC | $791,447 |
| Apr 11, 2016 | Center Road MP 6.9 Emergency Repair N/A | JORDAN EXCAVATING INC | — |
| Apr 4, 2016 | Enviromental Center Project | WCE General Contractors LLC | $55,143 |
| Mar 29, 2016 | Pavement Marking On Jefferson County Rdwys for 2016 180 542 1994 | STRIPE RITE INC | $229,885 |
| Mar 14, 2016 | Upper Hoh Rd MP 9.8 ER | SETON CONSTRUCTION INC | $104,119 |
| Mar 10, 2016 | Oil City Rd MP 8.9 ER | SETON CONSTRUCTION INC | $96,250 |
| Feb 8, 2016 | Undie Road MP 1.1 Emergency Repair XO1990 | BRUCH & BRUCH CONSTRUCTION INC | — |
| Nov 23, 2015 | Oil City Rad MP 8.8 Road Washout | SETON CONSTRUCTION INC | $125,000 |
| Nov 17, 2015 | SIGN SHOP ELECTRICAL 1124 | DOUBLE D ELECTRICAL INC | $2,834 |
| Aug 8, 2015 | Dowan Crk Rd Realignment CR17993 | BRUCH & BRUCH CONSTRUCTION INC | $338,467 |
| Jul 1, 2015 | UPPER HOH ROAD MP 3.9 PAVING REPAIR XO1957 | LAKESIDE INDUSTRIES INC | $32,970 |
| May 29, 2015 | Upper Hoh Road Culvert Replacement 360-385-92010 | ROGNLINS INC | $515,000 |
| May 26, 2015 | JC Jail Fire Alarm Replacement Project 301 594 1901 | NORTH SHORE ELECTRIC INC | $134,615 |
| May 5, 2015 | Hell Roaring Creek Bridge Repair None | Combined Construction Inc | $12,600 |
| Apr 16, 2015 | PARADISE BAY ROAD, PHASE 2 CR1873 | LAKESIDE INDUSTRIES INC | $971,324 |
| Mar 23, 2015 | QUILCENE TRANSFER STATION 2014 | DOUBLE D ELECTRICAL INC | $6,818 |
| Mar 4, 2015 | Pavement Marking On Jefferson Cty Rdwys. for calendar yrs 2014 & 2015 | STRIPE RITE INC | $270,507 |
| Feb 26, 2015 | Recycling Improvement Project N/A | GRANT STEEL BLDG SYSTEMS INC | $5,666 |
| Feb 18, 2015 | FLEET SERVICES GARGE DOOR OPENERS 932 | DOUBLE D ELECTRICAL INC | $4,426 |
| Feb 17, 2015 | Jefferson County Courthouse Window Rehabilitation Project 360-385-9380 | G LITTLE INC | $98,410 |
| Feb 13, 2015 | Oil City Road MP 8.8 ER | SETON CONSTRUCTION INC | $108,445 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.