FRIDAY HARBOR, TOWN OF — public works contracts
202 public works projects and 381 intents to pay prevailing wages name FRIDAY HARBOR, TOWN OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: Town.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 24 | 34 | 43 | 24 | 35 | 21 | 19 | 23 | 17 | 7 |
Latest contracts (143)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 10, 2026 | Water Supply Pipe and Valves Replacement at Lawson Pond 3039 | RICHARD LAWSON CONST INC | $80,129 |
| Aug 25, 2026 | Town of Friday Harbor PMs LBs Q08092026-413 | Legacy Telecommunications, LLC | $21,775 |
| Jul 17, 2026 | Parking Lot Fence Replacement 2026 RES 3035 07/16/2026 | DISCOUNT FENCE | $14,641 |
| Feb 27, 2026 | Sidewalk Grinding Improvement Project Resolution No. 3005 | N W DEVELOPMENT & UNDERGR LLC | $60,507 |
| Jan 2, 2026 | 2025 Annual Maintenance Inv.54401-2025 annual maint. | T M G SERVICES INC | $4,258 |
| Dec 9, 2025 | Town of Friday Harbor Waste Management 3000 | WEST MECHANICAL INC | $27,255 |
| Sep 8, 2025 | WWTP gen Swap Q081225-479 | Legacy Telecommunications, LLC | $1,414 |
| Sep 2, 2025 | City of Friday Harbor WWTP Repair Q081125-478 | Legacy Telecommunications, LLC | $5,382 |
| Jul 28, 2025 | Town of Friday Harbor PMs LBs Q072125-451 | Legacy Telecommunications, LLC | $21,775 |
| Jul 10, 2025 | Friday Harbor Wastewater Treatment Plant Owners Contract # Res. 2958 | BOSS CONSTRUCTION INC | $10,319,354 |
| May 19, 2025 | Sewer Plant N. Roof 58464Z-2 | LOBERG ROOFING.COM INC | $155,818 |
| May 8, 2025 | Sunken Park Maintance G&O No. 25-445 | RICHARD LAWSON CONST INC | $49,407 |
| May 8, 2025 | Town Firehall Rooftop Heat Pump Replacement 2945 | SAN JUAN HEATING LLC | $27,304 |
| Apr 24, 2025 | Sand Shelter G&O#23532 | MIKE CARLSON ENTERPRISES INC | $93,933 |
| Feb 12, 2025 | Annual Service 2024 Annual Service 2024 | T M G SERVICES INC | $3,425 |
| Jan 30, 2025 | Finance Office 2024-FINOFF-Carpet | FLOORING CONNECTIONS INTL INC | $7,335 |
| Dec 27, 2024 | Wastewater Treatment Department 58464R | LOBERG ROOFING.COM.INC | $2,050 |
| Nov 27, 2024 | City of Friday Harbor TS Q112724-545 | Legacy Telecommunications, LLC | $374 |
| Nov 20, 2024 | Sunshine Alley Restroom 2895 | ISLAND HOME FINISHES LLC | — |
| Oct 29, 2024 | Sunshine Alley Bathroom Repair Project 2887 and 2891 | TOP NOTCH PLUMBING SRVICS LLC | $60,112 |
| Sep 30, 2024 | Wastewater Treatment Plant HVAC 2885 | WEST MECHANICAL INC | $57,289 |
| Sep 7, 2024 | 245 Spring Street 235279961 | BARRON HEATING & A/C INC | $1,791 |
| Sep 6, 2024 | Water Main -Mullis to Argyle 001 | SPEER TAPS INC | $21,006 |
| Aug 26, 2024 | Water Treatment Plant Repair Q082624-382 | Legacy Telecommunications, LLC | $748 |
| Aug 19, 2024 | Town of Friday Harbor PMs LBs Q081924-360 | Legacy Telecommunications, LLC | $23,952 |
| Jul 11, 2024 | WTP Roof Repair 57085Z | LOBERG ROOFING.COM.INC | $21,523 |
| Jul 2, 2024 | Margerite Place Improvements C44.21.10 | MIKE CARLSON ENTERPRISES INC | $2,241,864 |
| Jun 11, 2024 | San Juan Transfer Station Shop 57088 | LOBERG ROOFING.COM.INC | $6,305 |
| Feb 14, 2024 | Town Hall Roof Repair Small Works Contract | LOBERG ROOFING.COM.INC | $54,398 |
| Jan 10, 2024 | PM ON OSEC SYSTEM 51081 | T M G SERVICES INC | $3,219 |
| Dec 18, 2023 | PUMP REPAIR OF VOGELSANG VX139 TBD | BECKWITH & KUFFEL INC | — |
| Aug 8, 2023 | Malcom St Sewer Replacement 2023 | RICHARD LAWSON CONST INC | $22,173 |
| Jun 30, 2023 | Vaughan Self Primer replacements S/N 61062 A & B 4202891 | PUMPTECH LLC | $30,450 |
| Jun 26, 2023 | Nash Street Improvement (Spruce St to Market St) C44.19.09 | MIKE CARLSON ENTERPRISES INC | $876,757 |
| Apr 26, 2023 | Town of Friday Harbor Generator Preventative Maintenance. Q041823-179 | Legacy Telecommunications, LLC | $28,408 |
| Mar 24, 2023 | TOWN OF FRIDAY HARBOR AC 01 TOWN OF FRIDAY HARBOR AC 01 | SECURITY SOLUTIONS NORTHWEST | $4,169 |
| Mar 22, 2023 | Spring St Emergency Sewer Repair S.42.23.04 | MIKE CARLSON ENTERPRISES INC | — |
| Mar 2, 2023 | service-annual maint 23 serviceannual2023 | T M G SERVICES INC | $5,040 |
| Dec 30, 2022 | repair goulds smvt pump tbd | BECKWITH & KUFFEL INC | — |
| Oct 14, 2022 | 2022 Pavement Repairs G&O#22548.02 | RICHARD LAWSON CONST INC | $58,925 |
| Oct 14, 2022 | 2022 Curb, Gutter & Sidewalk Repairs 22548.02 | GULL WING CONSTRUCTION LLC | $10,850 |
| Aug 23, 2022 | McDonald Street Improvements 22548.01 | RICHARD LAWSON CONST INC | $249,696 |
| Aug 18, 2022 | UW Lab - block heater N/A | PACIFIC POWER GROUP LLC | — |
| Aug 18, 2022 | WWTP 350kw - overspeed alarm N/A | PACIFIC POWER GROUP LLC | — |
| Apr 4, 2022 | First Street Overlay Project TIB NO. 6-W-831(008)-1 | KONNERUP CONSTRUCTION INC | $607,210 |
| Dec 21, 2021 | 2021 STORM DRAIN REPAIRS 2699 | MEM ENTERPRISES LLC | $119,077 |
| Nov 23, 2021 | MARGUERITE Fiber Optic (2021) | KONNERUP CONSTRUCTION INC | $34,720 |
| Oct 18, 2021 | Installation of Sidewalk Improvements at 105 Spring St S.44.21.07 | GULL WING CONSTRUCTION LLC | $18,445 |
| Oct 4, 2021 | Harrison Street Sewer Main Replacement Project 2021 | KONNERUP CONSTRUCTION INC | $237,500 |
| Sep 20, 2021 | Sewer Outfall Replacement | REDSIDE CONSTRUCTION LLC | $2,872,266 |
| Sep 15, 2021 | Pocket Park - First St & Court St S.44.1908 | GULL WING CONSTRUCTION LLC | $129,186 |
| Aug 25, 2021 | Road Maintenance-Trout Lake Watershed | MIKE CARLSON ENTERPRISES INC | — |
| Jul 19, 2021 | Spring Street & Second Pedestrian Access Improvements S.44.21.04 | MIKE CARLSON ENTERPRISES INC | $18,490 |
| May 19, 2021 | Argyle & Foxhall Sidewalks Argyle & Foxhall Sidewalks | GULL WING CONSTRUCTION LLC | $3,798 |
| Mar 30, 2021 | Spring Street Sewer and Storm Drain Replacement, 1st Street to 2nd Street C.44.21.02 | MIKE CARLSON ENTERPRISES INC | $448,365 |
| Mar 2, 2021 | MULLIS STREET IMPROVEMENTS 6-W-831(007)-1 | KONNERUP CONSTRUCTION INC | $759,199 |
| Feb 26, 2021 | West Street Sidewalk Replacement S.44.21.01 | GULL WING CONSTRUCTION LLC | $35,642 |
| Dec 25, 2020 | WTP Backup Generator & ATS Installation 2592 | JL Electric LLC | $48,237 |
| Dec 17, 2020 | TOFH SJ Valley-Strawberry Ln | MIKE CARLSON ENTERPRISES INC | — |
| Nov 10, 2020 | Elsworth Sewer Replacement and Rhone Street Sewer Relocation Project C.42.20.07 | MIKE CARLSON ENTERPRISES INC | $212,536 |
| Oct 27, 2020 | WWTP Sealcoat & Striping WWTP Sealcoat & Striping | SAN JUAN STRIPING LLC | $15,100 |
| Oct 27, 2020 | Generator Call out/Repair - Ferry Landing Call Out | PACIFIC POWER GROUP LLC | $3,622 |
| Oct 9, 2020 | AUG -2 Pump Station Upgrade SQ-15 | JL Electric LLC | $72,893 |
| Oct 7, 2020 | Manhole Concrete Collar & Sidewalk Repair S.41.20.10 | GULL WING CONSTRUCTION LLC | $4,540 |
| Oct 2, 2020 | Generator Maintenance and Loadbank Service N/A | PACIFIC POWER GROUP LLC | $12,931 |
| Aug 31, 2020 | Town Hall | WASHINGTON ALARM INC | $1,890 |
| Aug 31, 2020 | Wastewater Treatment Plant, 375 Tucker Fire | WASHINGTON ALARM INC | $627 |
| Aug 31, 2020 | Wastewater Treatment Plant 375 Sec | WASHINGTON ALARM INC | $2,490 |
| Aug 31, 2020 | Wastewater Treatment Plant 530 Security | WASHINGTON ALARM INC | $3,503 |
| Jul 17, 2020 | 2020 AC Pavement Repairs 2020 AC Repairs | RICHARD LAWSON CONST INC | $119,265 |
| Jul 8, 2020 | Trout Lake Spillway Restoration 281000030 | MEM ENTERPRISES LLC | — |
| Jul 8, 2020 | Port of Friday Harbor Curb and Gutter S.44.20.03 | GULL WING CONSTRUCTION LLC | $20,344 |
| Apr 16, 2020 | 2020 Pavement Repair-Second Street Second | RICHARD LAWSON CONST INC | $125,552 |
| Apr 1, 2020 | SBR Basin Cleanout 4202695 | BAI ENVIRONMENTAL SERVICES | — |
| Mar 9, 2020 | QuikValve- 1st Street 4102421 | SPEER TAPS INC | $6,985 |
| Oct 28, 2019 | Construct Improvements at Wastewate Treatment Plant S.42.19.13 | MIKE CARLSON ENTERPRISES INC | $42,183 |
| Sep 26, 2019 | Marguerite Place Pavement repairs 2493 | RICHARD LAWSON CONST INC | $37,632 |
| Aug 13, 2019 | TUCKER AVE - DRIVEWAY S.44.19.07 | MEM ENTERPRISES LLC | — |
| Aug 1, 2019 | SPRING ST - SIDEWALK REPAIR S44.19.06 | MEM ENTERPRISES LLC | — |
| Jul 10, 2019 | Nash, Caines, and Price Street Project C.44.19.02 | MIKE CARLSON ENTERPRISES INC | $761,863 |
| Jul 10, 2019 | Whale Museum Street Patch 10005 | MIKE CARLSON ENTERPRISES INC | — |
| Jun 27, 2019 | QuikValve Improvement/Spring & Lampard 001 | SPEER TAPS INC | $6,985 |
| May 30, 2019 | Sewer Repair Argyle at Caines ESR-1901 | MIKE CARLSON ENTERPRISES INC | — |
| May 13, 2019 | Biofilter Media Removal | BAYSIDE SERVICES | — |
| Mar 13, 2019 | Linder St Storm Drian Linder | RICHARD LAWSON CONST INC | $65,701 |
| Mar 13, 2019 | Transfer station RLC-511 | RICHARD LAWSON CONST INC | $1,649 |
| Feb 23, 2019 | Water 327 Zone Booster Station Improvements 2016-083 | Equity Builders LLC | $610,704 |
| Feb 7, 2019 | ARGYLE AVENUE SIDEWALK WIDENING R2449 | M.E.M. ENTERPRISES, LLC | $110,891 |
| Jan 17, 2019 | Emergency Repair AUG II Pumpstation | MIKE CARLSON ENTERPRISES INC | — |
| Nov 29, 2018 | Town of Friday Harbor WWTP Headworks Res. 2414 | MCCLURE & SONS INC | $2,625,639 |
| Sep 25, 2018 | Spring Street Handicap Ramps | MIKE CARLSON ENTERPRISES INC | $71,191 |
| Jun 12, 2018 | Web St, A St and Nichols St Improvements | MIKE CARLSON ENTERPRISES INC | $1,380,359 |
| May 9, 2018 | Painted Roundabout | KAMPS PAINTING COMPANY INC | $39,405 |
| May 9, 2018 | Painted Roundabout | KAMPS PAINTING COMPANY INC | $39,405 |
| Jan 30, 2018 | Install 3 manholes on Franck St at Linder, Geneste and C st S.44.17.09 | MIKE CARLSON ENTERPRISES INC | $24,000 |
| Jan 9, 2018 | Tucker Avenue Reconstruction Phase 2 TA-5829 | STRIDER CONSTRUCTION CO INC | $2,828,894 |
| Jan 8, 2018 | University Way Emergency Sewer Replacement #C.42.18.01 | MIKE CARLSON ENTERPRISES INC | $109,000 |
| Jan 5, 2018 | WWTP Effluent Filter | TIGER CONSTRUCTION LTD | $144,364 |
| Oct 5, 2017 | Manholes, catch basin & valve boxes | RICHARD LAWSON CONST INC | $20,280 |
| Jul 11, 2017 | Waterline Replacement Project Phase 2 | MIKE CARLSON ENTERPRISES INC | $1,045,981 |
| Jun 21, 2017 | Jensen Alley Speed humps | RICHARD LAWSON CONST INC | $7,500 |
| Jun 21, 2017 | 2017 Pothole Repairs | RICHARD LAWSON CONST INC | $71,707 |
| Jun 16, 2017 | (title withheld) | MIKE CARLSON ENTERPRISES INC | $10,323 |
| May 26, 2017 | Park Street & Reed Street Sidewalk Improvements | ARISTON PACIFIC INC | $143,520 |
| May 23, 2017 | Price Street Repair | RICHARD LAWSON CONST INC | $17,695 |
| May 23, 2017 | UW Pumping Station #1 and #2 | EQUITY BUILDERS LLC | $675,250 |
| May 17, 2017 | Front Street CIPP Project | FLOW TECHNOLOGIES INC | $26,500 |
| Apr 3, 2017 | Sewer Main & Water Main Replacemetn Project | ARISTON PACIFIC INC | $440,989 |
| Mar 27, 2017 | LED Streetlight Retrofit | NORTHWEST EDISON INC | $47,199 |
| Feb 27, 2017 | Spring Street Pocket Park S.44.15.09 | MIKE CARLSON ENTERPRISES INC | $192,050 |
| Sep 12, 2016 | (title withheld) | MIKE CARLSON ENTERPRISES INC | $112,428 |
| May 26, 2016 | Waterline Replacement | INTERWEST CONSTRUCTION INC | $3,881,353 |
| Apr 15, 2016 | Tucker Avenue Improvements C44.15.03 | MIKE CARLSON ENTERPRISES INC | $1,119,075 |
| Apr 14, 2016 | Trout Lake Dam-Concrete Restoration Project | EQUITY BUILDERS LLC | $48,194 |
| Feb 3, 2016 | Spring Street Water, Sewer and Storm Drain Replacement Project | MIKE CARLSON ENTERPRISES INC | $468,067 |
| Dec 11, 2015 | Drop Inlet & handicap ramps | RICHARD LAWSON CONST INC | $20,620 |
| Sep 15, 2015 | Marguerite Place Sidewalk and Pavement Restoration Project C.44.15.04 | MIKE CARLSON ENTERPRISES INC | $302,763 |
| Jul 24, 2015 | Sewer Pump Station #2 Rebuild 2014-099 | EQUITY BUILDERS LLC | $552,666 |
| Jun 4, 2015 | Small Paving patches various locations | RICHARD LAWSON CONST INC | $125,104 |
| Feb 9, 2015 | Marguerite Water Line Replacement | MIKE CARLSON ENTERPRISES INC | $96,365 |
| Nov 14, 2014 | Emergency Digester Repairs | STELLAR J CORPORATION | $59,058 |
| May 27, 2014 | Blair Ave Improvements 6-W-831(002)-1 | MIKE CARLSON ENTERPRISES INC | $1,435,492 |
| May 19, 2014 | Sunken Park CIPP Project 2027 | MICHELS CORP | $52,150 |
| Apr 8, 2014 | New Walkways at WWTP S.42.14.06 | MIKE CARLSON ENTERPRISES INC | $23,458 |
| Apr 8, 2014 | Blair Ave Sewer Main Replacement Project | MIKE CARLSON ENTERPRISES INC | $72,654 |
| Apr 1, 2014 | Warbass Way Tree Trimming | EAGER BEAVER TREE SERVICE INC | $3,243 |
| Feb 21, 2014 | Spring street ramps res 2010 | ATLANTIS CONSTRUCTION INC | $10,938 |
| Feb 12, 2014 | Town Water Plant - Ductless Heat Pumps S.41.14.04 | JIM'S HEATING | $10,135 |
| Jan 30, 2014 | Spring Street Front st. to First st. Water and Sewer C.41.13.01 | RICHARD LAWSON CONST INC | $225,000 |
| Dec 16, 2013 | Mullis street sidewalk Market-Airport | RICHARD LAWSON CONST INC | $37,972 |
| Sep 19, 2013 | Warbass & Hillcrest Gutters 1961 & 1962 | ATLANTIS CONSTRUCTION INC | $7,329 |
| Aug 29, 2013 | Web Street Overlay | RICHARD LAWSON CONST INC | $11,625 |
| Aug 19, 2013 | Spring St. & Marguerite St. Corner | RICHARD LAWSON CONST INC | $8,720 |
| Aug 12, 2013 | Sunken Park Basketball Court Repairs | RICHARD LAWSON CONST INC | $17,125 |
| Jul 18, 2013 | stair tread replacement between grange and legion resolution 1954 | ROBERT ROBERTSON CONST LLC | $5,797 |
| May 30, 2013 | stair tread replacement between grange and legion resolution 1954 | ROBERT ROBERTSON CONST LLC | $5,797 |
| Apr 22, 2013 | Tucker Ave Asphalt Replacement 2013-01 | RICHARD LAWSON CONST INC | $53,720 |
| Oct 25, 2012 | Spring Street Water Main Replacement Project | RICHARD LAWSON CONST INC | $85,700 |
| Oct 10, 2012 | Town Shop Fence Project | MCBRIDE FENCE INC | $29,194 |
| Sep 25, 2012 | Spring St. Water Break Patch 5000924 | RICHARD LAWSON CONST INC | — |
| Sep 30, 2011 | Spruce Street Storm Drainage Improvements N/A | RICHARD LAWSON CONST INC | $338,997 |
| Apr 14, 2011 | Odor Control Improvement Project 1837 | MIKE CARLSON ENTERPRISES INC | $579,262 |
| Feb 23, 2011 | Sewer Replacement Project Phase II | STRIDER CONSTRUCTION CO INC | $214,190 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.