2,857 public works projects and 5,588 intents to pay prevailing wages name EVERETT, CITY OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: City, 1st Class.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 314 | 318 | 307 | 365 | 328 | 336 | 394 | 551 | 495 | 406 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 28, 2026 | Police South Precinct Fire Alarm System Replacement PW 26079 | FIRE PROTECTION INC | $102,730 |
| Sep 28, 2026 | Fire Station #4 Fire Sprinkler Deficiency Corrections PW 26075 | FIRE PROTECTION INC | $12,146 |
| Sep 21, 2026 | WPCF Admin Auto Door Opener Replacement PW 26081 | PACIFIC GLASS INC | $25,323 |
| Sep 16, 2026 | Everett Police South Precinct HVAC & Controls Improvements 24-1121 | HI MARK CONSTRUCTION INC | $411,297 |
| Sep 10, 2026 | Everett Transit Operations Base Signage PW 26076 | SPECIAL T STRIPING/SIGN CO INC | $12,081 |
| Sep 8, 2026 | Grand Avenue Bridge PW 26059 | TK ELEVATOR CORPORATION | $41,647 |
| Sep 8, 2026 | Exterior Wraps 8722 | WICKED WRAPS LLC | $5,717 |
| Aug 27, 2026 | IPT Demolition 2024-082 | FORMA CONSTRUCTION COMPANY | $51,097 |
| Aug 27, 2026 | Crane W/Operator and Rigger at Baywood Stormwater Project Site PW 23092 | FORD CRANE INC | — |
| Aug 26, 2026 | Installation of HVAC for Ammunition Cargo Container PW 26073 | D K SYSTEMS INC | $9,326 |
| Aug 25, 2026 | Port Gardner Storage Facility UP 3815-01 | INTERWEST CONSTRUCTION INC | $11,637,311 |
| Aug 20, 2026 | WPCF TFI Bar Screen Pipe Repair UT3851-1-4 | AWARD CONSTRUCTION INC | $651,762 |
| Aug 20, 2026 | Central Business District Bus Shelters 2024-082 | FORMA CONSTRUCTION COMPANY | $348,387 |
| Aug 19, 2026 | Window Cleaning Services - Year 5 2022-093 | GHB Windows Inc | $78,000 |
| Aug 18, 2026 | PV200 Install FS2 | MASCOTT EQUIPMENT CO INC | $6,709 |
| Aug 17, 2026 | %CITY OF EVERETT PUBLIC WORKS WO-46269 | CUMMINS INC | $649 |
| Aug 17, 2026 | Everett Performing Arts Center Sign Replacement 2026-052 | BERRY SIGN SYSTEMS | $64,074 |
| Aug 17, 2026 | Animal Shelter Kennel Door Repairs PW 26037 | PACIFIC GLASS INC | $65,326 |
| Aug 12, 2026 | Hazardous Tree Removal - Various City Locations PW 26063 | CHAMPION TREE CARE LLC | $19,550 |
| Aug 9, 2026 | Rotary Park Float Replacement 2026-020 | NEPTUNE GENERAL CONTRACTORS | $70,149 |
| Aug 6, 2026 | Animal Shelter Pod Window Replacement PW 26028 | PACIFIC GLASS INC | $39,520 |
| Aug 5, 2026 | WFP Roof Repairs 2024-082 | FORMA CONSTRUCTION COMPANY | $105,637 |
| Aug 4, 2026 | Tree Trimming and Removal (Year 3) 2023-103 (3) | Mike's Affordable Tree Ser LLC | $65,000 |
| Aug 4, 2026 | Edgewater Park Renovation WO 221926 | DIVERSE EARTH WORKS, INC. | $2,772,096 |
| Jul 31, 2026 | Low Voltage Fire Alarm System Install at Fire Station #2 PW 26049 | FIRE PROTECTION INC | $7,749 |
| Jul 31, 2026 | City of Everett PO #PW26053 | FIRE PROTECTION INC | $69,741 |
| Jul 30, 2026 | City of Everett PO #PW 26002 | FIRE PROTECTION INC | $38,745 |
| Jul 27, 2026 | Service Center #1 Traffic Office Carpet Replacement PW 26058 | GREAT FLOORS | $4,576 |
| Jul 27, 2026 | WPCF Flooring PW 26057 | GREAT FLOORS | $5,986 |
| Jul 22, 2026 | PGSF Banner and Install PW 26030 | STUDIO 3 SIGNS | $7,363 |
| Jul 20, 2026 | Lombard Property Abatement 2024-082 | FORMA CONSTRUCTION COMPANY | $23,490 |
| Jul 20, 2026 | EVERETT CITY OF INV0030424 | DAVIS DOOR SERVICE INC | $3,539 |
| Jul 20, 2026 | 2026 WPCF Biosolids Removal & Disposal UT-3752-30 | AMERICAN PROCESS GROUP LLC | $4,539,125 |
| Jul 16, 2026 | WPCF Lab and Trailer Abatement | WRECKING BALL DEMOLITION LLC | $7,548 |
| Jul 6, 2026 | 2026 Citywide Pavement Markings 2026-048 | SPECIALIZED PAVEMENT MRKG LLC | $288,166 |
| Jun 12, 2026 | Everett Station 2nd Floor Carpeting Replacement PW 26050 | GREAT FLOORS | $7,198 |
| Jun 12, 2026 | Rotary Park Outhouse Septic Pumping N/A | SERIES SEVEN INC | $1,083 |
| Jun 8, 2026 | COE - Everett Animal Services PO # PW 26033 | FIRE PROTECTION INC | $9,402 |
| Jun 2, 2026 | Sewer Pipe Relining - On Call 2026-019 | SARKINEN PLUMBING INC | $150,000 |
| Jun 2, 2026 | Everpark Bar Code Scanner Installation JC26372 | BURTON CONSTRUCTION INC | $49,675 |
| May 28, 2026 | Abatement Services - Year 1 2026-044 (1) | Layland Construction LLC | $150,000 |
| May 27, 2026 | Landscaping and Irrigation Repairs 2023-005 (4) | TOTAL LANDSCAPE CORPORATION | $50,000 |
| May 21, 2026 | 2026 Pavement Maintenance Overlay WO3860 | LAKESIDE INDUSTRIES INC | $2,953,771 |
| May 12, 2026 | PORT GARDNER STORAGE FACILITY WEST MARINE VIEW DRIVE STORM AND COMBINED SEWER, PACKAGE 2, UP 3815-02 WO# UP-3815-02 | KLB CONSTRUCTION LLC | $43,694,571 |
| May 12, 2026 | Everett Minor Home Repair CFDA #14.218 | SENIOR SERVICES/SNOHOMISH CNTY | $172,374 |
| May 10, 2026 | SCALDING WATER IN RESTROOMS 260312-0002 | MACDONALD-MILLER FAC SOLNS LLC | $14,435 |
| May 6, 2026 | City of Everett Main Library HVAC Replacement and Controls Project 2612 | APEX MECHANICAL LLC | $2,079,308 |
| May 6, 2026 | Everett Animal Shelter 206-550-5811 | DUCTVAC NORTHWEST LLC | $769 |
| Apr 29, 2026 | STAINLESS STEEL COUNTERTOPS OM 26053 | LSM HEATING PLUMBING ELEC INC | $7,218 |
| Apr 29, 2026 | Performing Art Center WO-26-1430 | PACIFIC GLASS INC | $11,708 |
| Apr 27, 2026 | Police Firing Range Renovations 2026-012 | Casa Bella LLC | $62,231 |
| Apr 23, 2026 | Greely Street Water Quality Retro. UP 3817 | NEPTUNE GENERAL CONTRACTORS | $475,187 |
| Apr 20, 2026 | Everett Station HVAC and Controls Improvements 24-3201 | APEX MECHANICAL LLC | $1,938,636 |
| Apr 20, 2026 | Fall Protection Inspection for TSG PW 26034 | GRAVITEC SYSTEMS INC | $5,767 |
| Apr 13, 2026 | Everett Municipal Building TI 22-101 | EVERON LLC | $145,219 |
| Apr 9, 2026 | 1st Floor Bathroom Remodel JC26369 | FORMA CONSTRUCTION COMPANY | $125,677 |
| Apr 8, 2026 | Lowell Riverfront Trail Improvements Project WO# 409725 | O M A CONSTRUCTION INC | $1,035,258 |
| Apr 7, 2026 | Year 3 - Overhead Door and Automatic Gate Repairs 2023-004 (3) | PRECISION DOOR SERVICE | $300,000 |
| Apr 2, 2026 | COE - Forrest Park Swim Center PO #PW 26026 | FIRE PROTECTION INC | $8,888 |
| Apr 1, 2026 | City of Everett - Main Library PO #PW24098 | FIRE PROTECTION INC | $6,237 |
| Apr 1, 2026 | Everett Animal Shelter PO #PW 24072 | FIRE PROTECTION INC | $5,684 |
| Mar 26, 2026 | Everett Animal Shelter - Fire Sprinker Repairs 2023-040 | FIRE PROTECTION INC | $112,724 |
| Mar 26, 2026 | Fire Alarm Wireless Communicator Combo Panel Installation PW 26014 | FIRE PROTECTION INC | $77,490 |
| Mar 26, 2026 | Light Pole Base Installation at 5041 Colby Ave PW 26022 | SERVICE ELECTRIC CO INC | $8,771 |
| Mar 17, 2026 | Thornton A. Sullivan Park Renovation 2025-062 | East Slope Earthworks LLC | $147,046 |
| Mar 16, 2026 | Rental Crane W/Operator to Lift and Replace BW Pump #1 PW 26023 | FORD CRANE INC | $5,468 |
| Mar 16, 2026 | Downtown Streetscape Planting Renovations 2025-082 | FORMA CONSTRUCTION COMPANY | $175,020 |
| Mar 9, 2026 | Everett Station Suites 310, 313, 325, and 330 Carpet Replacement PW 26019 | GREAT FLOORS | $22,959 |
| Mar 5, 2026 | Legion Memorial Golf Pro Shop Flooring PW 26018 | GREAT FLOORS | $664,536 |
| Mar 3, 2026 | Digital Display For College & Mall Station JC26366 | FORMA CONSTRUCTION COMPANY | $155,352 |
| Mar 3, 2026 | Main Library Flooded Carpet Replacement PW 26017 | GREAT FLOORS | $10,292 |
| Feb 26, 2026 | Evergreen Way & 52nd S. SE Corner Junction Box Relocation 2025-082 | FORMA CONSTRUCTION COMPANY | $53,064 |
| Feb 26, 2026 | Everett Performing Arts Center Wet Sealing PW 25098 | PACIFIC GLASS INC | $16,793 |
| Feb 25, 2026 | Lions Park Lighting 2024-082 | FORMA CONSTRUCTION COMPANY | $138,528 |
| Feb 25, 2026 | Cleaning and Debris Removal From Service Center's Automated Carwash PW 26009 | SOUND CRAWLS LLC | $6,862 |
| Feb 23, 2026 | On Call Commercial Diving Services - Year 2 2024-131 (2) | ASSOCIATED UNDERWATER SVCS INC | $160,000 |
| Feb 23, 2026 | Impound Lot Burglar Alarm System Install PW 25085 | FIRE PROTECTION INC | $6,270 |
| Feb 23, 2026 | LENORA REGIONAL STORMWATER FACILITY UP3792 | KLB CONSTRUCTION LLC | $5,905,728 |
| Feb 19, 2026 | FIRE STATION #5 STAINLESS COUNTERTOP WITH SINK OM 25391 | LSM HEATING PLUMBING ELEC INC | $3,796 |
| Feb 16, 2026 | GRAND AVE BRIDGE PO# 24078// inv 6000764724 PO# 24078// inv 6000764724 | TK ELEVATOR CORPORATION | $10,245 |
| Feb 13, 2026 | EMB 4th Floor Doors 2025-082 | FORMA CONSTRUCTION COMPANY | $86,120 |
| Feb 12, 2026 | Everett Municipal Building 5th Floor Flooring Replacement PW 26012 | GREAT FLOORS | $6,371 |
| Feb 12, 2026 | Service Center #5 Office Flooring Replacement PW 26011 | GREAT FLOORS | $6,371 |
| Feb 2, 2026 | Everett 36th Street CSO Storage Improvements UP 3765-2 | INTERWEST CONSTRUCTION INC | $20,955,622 |
| Feb 2, 2026 | Water Main Replacement Y UP3814 | INTERWEST CONSTRUCTION INC | $2,020,202 |
| Jan 27, 2026 | PV-200 Installation | MASCOTT EQUIPMENT CO INC | $6,472 |
| Jan 23, 2026 | Wiggums Hollow Playground Repair PW 26007 | LANDSCAPE STRUCTURES INC | $476,169 |
| Jan 23, 2026 | RRFB Pedestrian Safety Project 3807 | EARTHWORK SOLUTIONS LLC | $715,109 |
| Jan 20, 2026 | Walter E. Hall Community Connections Pathway 2024-082 | FORMA CONSTRUCTION COMPANY | $451,237 |
| Jan 13, 2026 | 2026 Landscape Maintenance Services 2022-074 (4) | TOTAL LANDSCAPE CORPORATION | $293,999 |
| Jan 13, 2026 | City of Everett-Multiple Site EWF 117162-01-01 | GREAT WESTRN INSTLLATNS INC | $20,463 |
| Jan 9, 2026 | Garfield Park Playground Option 4A 116369-01-05 | GREAT WESTRN INSTLLATNS INC | $851,255 |
| Jan 9, 2026 | Everett Municipal Court - Judges Exit Door 2023-148 | EVERON LLC | $34,974 |
| Jan 7, 2026 | Fire Alarm Permits & Wireless Communicators PO #PW 25086 | FIRE PROTECTION INC | $15,922 |
| Jan 6, 2026 | Legion Golf Course Brush Pile Grinding PW 26001 | SPRINGBROOK NURSERY/TRCKNG INC | $8,242 |
| Dec 29, 2025 | Generator Maintenance and Repair Services 2021-102 | GENERATOR SERVICES NW LLC | $36,000 |
| Dec 24, 2025 | Everett Station � 4th Floor Improvements 2024-082 | FORMA CONSTRUCTION COMPANY | $99,436 |
| Dec 22, 2025 | Loins Skate Park DOT 2024-082 | FORMA CONSTRUCTION COMPANY | $334,949 |
| Dec 15, 2025 | Port Gardner Storage Facility 665 | ABSHER CONSTRUCTION CO | $105,306,778 |
| Dec 12, 2025 | Everett Animal Shelter 000 | DUCTVAC NORTHWEST LLC | $1,044 |
| Dec 3, 2025 | Everett Station Lobby Restroom Grout Cleaning & Tile Patching PW 25089 | GREAT FLOORS | $8,479 |
| Dec 2, 2025 | Public Works Physical Reservoir Project 37278/170404 | CDW GOVERNMENT LLC | $212,177 |
| Dec 2, 2025 | Cedar Hall & Recreation Building Demo 2024-082 | FORMA CONSTRUCTION COMPANY | $206,643 |
| Nov 25, 2025 | City Of Everett PO #PW 25080 | FIRE PROTECTION INC | $61,992 |
| Nov 24, 2025 | College Station Cabinet Charger Project 2024-082 | FORMA CONSTRUCTION COMPANY | $358,056 |
| Nov 20, 2025 | Lift Station 24 Harmonic Filter Replacement JC25362 | BURTON CONSTRUCTION INC | $60,256 |
| Nov 14, 2025 | HVAC Maintenance - Year 5 2021-010 (5) | D K SYSTEMS INC | $240,000 |
| Nov 14, 2025 | Year 4 - Unit Priced HVAC Service and Repairs 2022-047 (4) | D K SYSTEMS INC | $250,000 |
| Nov 13, 2025 | Bezos Academy I-25-2917 | PACIFIC GLASS INC | $2,624 |
| Nov 13, 2025 | EVERETT STATION STE 417 SIGNED PROPOSAL | GREAT FLOORS | $48,521 |
| Nov 12, 2025 | Everett Station Suite 314 Carpeting PW 25087 | GREAT FLOORS | $5,804 |
| Nov 7, 2025 | 2025-2026 Fencing Repairs 2023-127 (3) | ECONOMY FENCE CENTER | $50,000 |
| Nov 7, 2025 | Treating Roots in Sewer Lines at 9 City Sites PW 25066 | DUKE'S ROOT CONTROL INC | $9,891 |
| Nov 7, 2025 | 2024-2025 Fencing Repairs 2023-127 (2) | ECONOMY FENCE CENTER | $66,736 |
| Nov 6, 2025 | EMB Downtown Restroom Fencing PW 25061 | ECONOMY FENCE CENTER | $7,041 |
| Nov 3, 2025 | Operations Depot Tenant Improvements 2024-082 | FORMA CONSTRUCTION COMPANY | $322,898 |
| Oct 29, 2025 | %CITY OF EVERETT WA WATER TREATMENT FACILITY WO-416590 | CUMMINS INC | $0 |
| Oct 17, 2025 | 2025 Backflow Testing Parks #2020-046 | BACKFLOWS NORTHWEST INC | $5,385 |
| Oct 17, 2025 | Municipal Court Camera Installation PW 25042 | CDW GOVERNMENT LLC | $322,521 |
| Oct 16, 2025 | WFP West Clearwell Baffle Repair JC25353 | BURTON CONSTRUCTION INC | $68,893 |
| Oct 16, 2025 | Equity Shelters Project 2024-082 | FORMA CONSTRUCTION COMPANY | $332,984 |
| Oct 16, 2025 | Madison PUD Liquidated Damage Correction 2024-082 | FORMA CONSTRUCTION COMPANY | $36,652 |
| Oct 14, 2025 | Parks restrooms Access Control 2024-082 | FORMA CONSTRUCTION COMPANY | $331,499 |
| Oct 9, 2025 | Police HQ 70688 | TK ELEVATOR CORPORATION | $78,000 |
| Oct 7, 2025 | Village Theater Fire Panel Replacement PW 25076 | FIRE PROTECTION INC | $9,882 |
| Oct 3, 2025 | City of Everett / Year III CB 23164 | FIRE PROTECTION INC | $108,048 |
| Oct 1, 2025 | Forest Park Pickleball Project 09262025 | DIVERSE EARTH WORKS, INC. | $868,210 |
| Oct 1, 2025 | Vehicle Lift Repair Services - Year 1 2025-060 (1) | EQUIPMENT SALES CO INC | $75,000 |
| Sep 30, 2025 | Window Cleaning Services - Year 4 2022-093 (4) | GHB Windows Inc | $63,000 |
| Sep 15, 2025 | North Broadway Bus Shelter Wire Mesh 2024-084 | FORMA CONSTRUCTION COMPANY | $181,611 |
| Sep 15, 2025 | Parking Lot Striping - Year 2 2024-052 (2) | HUIZENGA ENTERPRISES LLC | $148,000 |
| Sep 15, 2025 | Encampment Cleanup near Pigeon Creek PW 25071 | Layland Construction LLC | $8,892 |
| Sep 12, 2025 | VIBRATION TESTING, MOTOR & IMPELLER PUMP BALANCING 2025-009 | BALANCE DYNAMICS INC. | $4,774 |
| Sep 12, 2025 | Power Pole Install at VOA Pallet Shelter Site PW 25072 | SERVICE ELECTRIC CO INC | $5,495 |
| Sep 10, 2025 | Door Operator Repairs at Main Library Parking Garage and Police Headquarters PW 25063 | PACIFIC GLASS INC | $47,555 |
| Sep 8, 2025 | Crane Rental with Operator and Rigger for Vault Lid Lift at WFP PW 25065 | FORD CRANE INC | $5,474 |
| Sep 3, 2025 | Site Offline, MVD | MASCOTT EQUIPMENT CO INC | $1,639 |
| Sep 3, 2025 | Blank Screen, Station 5 | MASCOTT EQUIPMENT CO INC | $728 |
| Sep 2, 2025 | Everett Municipal Building Downtown Restroom Fencing Installation PW 25061 | ECONOMY FENCE CENTER | $7,041 |
| Aug 26, 2025 | Flow Meter Repairs - Year 1 2025-048 | ADS LLC | — |
| Aug 25, 2025 | City f Everett Generator Maintenance 25014 | GENERATOR SERVICES NW LLC | $38,906 |
| Aug 19, 2025 | Fire Station 1 Leaking Dispenser | MASCOTT EQUIPMENT CO INC | $1,317 |
| Aug 14, 2025 | Police - South Precinct PO #25055 | FIRE PROTECTION INC | $10,987 |
| Aug 12, 2025 | Year 2 Overhead Door and Automatic Gate Repairs 2023-004 (2) | PRECISION DOOR SERVICE | $100,000 |
| Aug 12, 2025 | Service Center Door 3 Office Flooring Installation PW 25057 | GREAT FLOORS | $6,806 |
| Aug 11, 2025 | Fuel Infrastructure Upgrade and Refurbishment-Water Filtration Plant JOC2022 | FORMA CONSTRUCTION COMPANY | $144,893 |
| Aug 11, 2025 | Fuel Infrastructure Upgrade and Refurbishment-Water Filtration Plant JOC2022 | FORMA CONSTRUCTION COMPANY | $120,777 |
| Aug 8, 2025 | Reservoir 1 Tank 2 Roof Replacement 2024-084 | FORMA CONSTRUCTION COMPANY | $415,487 |
| Jul 28, 2025 | Carbon Monoxide & Nitrous Dioxide Detection Systems Install & Replacement PW 25054 | HAWK EQUIPMENT SERVICES INC | $7,333 |
| Jul 28, 2025 | Balance Testing for pumps at WFP. PW 25044 | BALANCE DYNAMICS INC. | $7,161 |
| Jul 25, 2025 | 2025 Federal Overlay, Broadway - California St to 18th St COE PW WO# 3841 | Central Paving LLC | $1,336,574 |
| Jul 23, 2025 | Guardrail Repairs - Year 2 #2 | PETERSEN BROTHERS INC | — |
| Jul 18, 2025 | GRAND AVE BRIDGE 1326979 | TK ELEVATOR CORPORATION | $10,245 |
| Jul 17, 2025 | Year 3 - Graffiti Removal Services 2023-061 (3) | ACTION PRESSURE WASHING LLC | $15,000 |
| Jul 16, 2025 | Service Center 3 Gable Reroof 2025-035, | WASHINGTON ROOFING SOLUTNS LLC | $65,390 |
| Jul 15, 2025 | 2025 FED OVERLAY MUKILTEO NHPP-2776(011) | GRANITE CONSTRUCTION COMPANY | $1,211,580 |
| Jul 11, 2025 | Crane Pump/Motor Off of/Onto Truck at WFP PW 25048 | FORD CRANE INC | $5,468 |
| Jul 8, 2025 | Everett Station Suite 315 Carpeting PW 25045 | GREAT FLOORS | $10,923 |
| Jul 8, 2025 | Crane Rental for Evergreen Pump Station Generator Move PW 25046 | FORD CRANE INC | $5,682 |
| Jun 30, 2025 | Year 3 - Unit Priced HVAC Service and Repairs 2022-047 (3) | D K SYSTEMS INC | $200,000 |
| Jun 24, 2025 | (title withheld) 2024-082 | FORMA CONSTRUCTION COMPANY | $15,885 |
| Jun 19, 2025 | WPCF Stage 3 Operations Building Window Replacement PW 25034 | PACIFIC GLASS INC | $13,491 |
| Jun 13, 2025 | Window Cleaning Services - Year 3 2022-093 (3) | GHB Windows Inc | $60,000 |
| Jun 4, 2025 | 4913 Delaware Ave PW 25039 | SEWER DETECTIVES | $11,535 |
| Jun 4, 2025 | Forest Park Entry Driveway Repave Project 2025-029 | FIDALGO PAVING & CONST LLC | $34,069 |
| Jun 3, 2025 | Later Phase Eclipse Mill Park Project n/a | STRIDER CONSTRUCTION CO INC | $3,634,393 |
| May 30, 2025 | Vibration analysis on pumps PW 25031 | BALANCE DYNAMICS INC. | $3,110 |
| May 30, 2025 | Fire Station Duct Cleaning PW 25037 | AIRGANIC LLC | $7,105 |
| May 30, 2025 | 2025 EVERETT OVERLAYS 3830 | GRANITE CONSTRUCTION COMPANY | $1,327,734 |
| May 29, 2025 | Tree Trimming and Removal (Year 2) 2023-103 (2) | Mike's Affordable Tree Ser LLC | $65,000 |
| May 23, 2025 | EMERGENCY REPAIR - TRANSMISSION LINE BREAK | IMCO GENERAL CONSTRUCTION INC | $27,160 |
| May 20, 2025 | WFP Crane Services for Generator PW 25032 | FORD CRANE INC | $2,518 |
| May 16, 2025 | LED Retrofit for full Marquee PW 25011 | FASTSIGNS | $6,286 |
| May 15, 2025 | 4097 Delaware Avenue PW 25035 | SEWER DETECTIVES | $4,995 |
| May 15, 2025 | Beverly Lake Sewer Replacement and Lift Station 47 UP 3529 | FABER CONSTRUCTION CORP | $2,485,194 |
| May 14, 2025 | Landscaping and Irrigation Repairs 2023-005 (3) | TOTAL LANDSCAPE CORPORATION | $50,000 |
| May 9, 2025 | Drew Nielsen Park Playground Replacement PW 25028 | LANDSCAPE STRUCTURES INC | $341,538 |
| May 9, 2025 | Transit Shop Floor Replacement and Recovering 2024-082 | FORMA CONSTRUCTION COMPANY | $37,724 |
| May 9, 2025 | Lowell Park Playground Replacement PW 25029 | LANDSCAPE STRUCTURES INC | $574,960 |
| May 9, 2025 | Smith Island Advance Mitigation Year 7 Monitoring n/a | GEOENGINEERS INC | $78,000 |
| May 7, 2025 | EVERETT MALL BUS PLATFORM MALLSTN/24462 | COLACURCIO BROS INC | $1,992,716 |
| May 6, 2025 | MRW Breakroom Modifications RFP-22-015DW | FORMA CONSTRUCTION COMPANY | $47,705 |
| May 1, 2025 | Repair of Transit Bus Lift, MVD058 2024-082 | FORMA CONSTRUCTION COMPANY | $52,922 |
| Apr 29, 2025 | (title withheld) B24MC530004 | BAYSIDE SUPPLY CO LLC | $88,975 |
| Apr 28, 2025 | Irrigations Repairs 2025 PO NO UP24003 | TOTAL LANDSCAPE CORPORATION | $3,053 |
| Apr 24, 2025 | Everett Parks Restroom Renovations Project PRK2024-23007 | VANDER VEEN CONSTRUCTION INC | $850,000 |
| Apr 22, 2025 | Everett Transit charger installation Public Works JOC2022 | FORMA CONSTRUCTION COMPANY | $485,635 |
| Apr 18, 2025 | JC-24-29-F JCP Piping and Pump RFP-22-015DW | FORMA CONSTRUCTION COMPANY | $400,578 |
| Apr 15, 2025 | Crane Rental at WFP to Pull BWP Pump PW 25021 | FORD CRANE INC | $7,031 |
| Apr 4, 2025 | Spada Conference Room Upgrade PW 25023 | AVIDEX INDUSTRIES LLC | — |
| Apr 2, 2025 | JC25343_Streetlight Knockdown Replacement JOC2022 | FORMA CONSTRUCTION COMPANY | $71,395 |
| Mar 31, 2025 | Fencing Removal and Replacement - 3900 Block 2025-023 | FRN DRYWALL CORP | $16,625 |
| Mar 18, 2025 | Simme Seat Installation at Transit Stops JOC2022 | FORMA CONSTRUCTION COMPANY | $339,613 |
| Mar 13, 2025 | EPAC Clean and Seal PW 25017 | BELLEVUE COATING SYSTEMS INC | $9,891 |
| Mar 11, 2025 | WFP Potable Water Pump Station Physical Security Improvements JOC2022 | FORMA CONSTRUCTION COMPANY | $67,476 |
| Mar 5, 2025 | Sewer liner install at 7514 Evergreen Way PW25014 | SEWER DETECTIVES | $4,994 |
| Feb 25, 2025 | WPCF Operational Security Improvements JC25342 | BURTON CONSTRUCTION INC | $19,481 |
| Feb 24, 2025 | Everett Municipal Bldg floor 4 CB24286 | BUSINESS INTERIORS NW INC | $463,412 |
| Feb 21, 2025 | Records Building Refrigeration System 56830 | FORMA CONSTRUCTION COMPANY | $80,246 |
| Feb 21, 2025 | Courthouse 5th Floor AV Closet JC-25-0399-F | FORMA CONSTRUCTION COMPANY | $93,533 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.