ENTERPRISE SERVICES, WASH STATE DEPT OF — public works contracts
12,470 public works projects and 46,303 intents to pay prevailing wages name ENTERPRISE SERVICES, WASH STATE DEPT OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: State Agency.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 2,549 | 2,081 | 2,508 | 2,374 | 2,770 | 2,685 | 3,347 | 3,741 | 3,968 | 2,968 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 28, 2026 | CLC - APH and Library Elev Modernizations 2026-235 G (1-1) | BANACK LLC | $550,900 |
| Sep 28, 2026 | Q: 13069 Chiller PLant Controls Upgrade M120524 | TRS MECHANICAL INC | $97,297 |
| Sep 28, 2026 | EvCC-Aviation Hangar Door J26-01, WO# 12, 2026-539 | CENTENNIAL CONTRACTORS ENT INC | $249,171 |
| Sep 28, 2026 | GHC - Main Campus Roadway Repairs J23-04, WO #126, 2027-052 | FORMA CONSTRUCTION COMPANY | $150,832 |
| Sep 25, 2026 | (title withheld) PENDING | COLE INDUSTRIAL INC | $2,000 |
| Sep 24, 2026 | Northpoint Kitsap (Worksource) 26-04-107 | DB GENERAL CONTRACTORS INC | $48,128 |
| Sep 24, 2026 | CPTC - Pedestrian Pathway J23-04, WO #124 2027-058 | FORMA CONSTRUCTION COMPANY | $60,259 |
| Sep 24, 2026 | CPTC Paint & Reseal Soffit Repair J23-04, WO #125, 2027-041 | FORMA CONSTRUCTION COMPANY | $64,425 |
| Sep 22, 2026 | Maple Park WS 2017 F042476 | C T S | $655 |
| Sep 22, 2026 | DES B&G LEG BLDG. EXTERIOR WALK OFF MATS M123679 | GREAT FLOORS | $1,513 |
| Sep 21, 2026 | Annual Commercial Kitchen Exhaust Hood Cleaning 09162026 | APEX HOOD CLEANING INC | $1,182 |
| Sep 18, 2026 | WLC - Fire Suppression Glycol Replacement J23-05, WO #113, 2026-880 | HILGER CONSTRUCTION INC | $18,185 |
| Sep 18, 2026 | WWCC - Fire Suppression Glycol Replacement J23-05, WO #114, 2026-880 | HILGER CONSTRUCTION INC | $49,036 |
| Sep 18, 2026 | PIE - Fire Alarm Panel Replacements 2026-594 G (1-1) | J A MORRIS CONSTRUCTION LLC | $1,594,500 |
| Sep 17, 2026 | (title withheld) 892357344 | EVERON LLC | $814 |
| Sep 15, 2026 | (title withheld) PNI WAPS 2026 | C T S | $3,021 |
| Sep 15, 2026 | WVC-Omak Classroom and Lighting J23-05, WO #112, 2027-036 | HILGER CONSTRUCTION INC | $154,477 |
| Sep 15, 2026 | WCCW Perimeter Road Paving 2025-337 G (1-1) | T STONE CONSTRUCTION LLC | $695,726 |
| Sep 14, 2026 | Office Addition 24-07-215 | STEPHENS & SONS CONST INC | $42,237 |
| Sep 14, 2026 | Annual Fire Pump Inspection Quote 59573 - Washington State DES Master Contract No. 27323 | COSCO FIRE PROTECTION INC | $721 |
| Sep 14, 2026 | Annual Fire Pump Inspection Quote 59540 - Washington State DES Master Contract No. 27323 | COSCO FIRE PROTECTION INC | $721 |
| Sep 14, 2026 | Washington State Patrol Moses Lake - EV Chargers J23-05, WO #111, 2026-289 | HILGER CONSTRUCTION INC | $4,858 |
| Sep 14, 2026 | J12061 - Natural Resource Building (P) M123514 - INV 24095 | WEST COAST MECH SLTNS LLC | $10,083 |
| Sep 11, 2026 | WA State DES On-Call Tree and Stump Contract K10619 | RON'S STUMP REMVL/TREE SER LLC | — |
| Sep 10, 2026 | SC Colville Work Center & ITC 2026-869 G (1-1) | TRANE | $46,666 |
| Sep 10, 2026 | SPCC - Main Building-East Wing Renovation - AHU Replacement 2025-087 J (3-4) | BOUTEN CONSTRUCTION COMPANY | $252,062 |
| Sep 10, 2026 | DCYF - Green Hill School Campus HVAC Improvements - Rebid 2025-085 H (1-2) | CONSTRUCT INCORPORATED | $6,010,000 |
| Sep 9, 2026 | Judge Office Mold 06419 | Layland Construction LLC | $5,981 |
| Sep 9, 2026 | YVC Raymond Hall, Tech. & Deccio HVAC Upgrades 2026-842 G (1-1) | A T S AUTOMATION INC | $1,662,481 |
| Sep 8, 2026 | MIL- YTC 951 Building Renovation 2023-278 G (1-1) | M SEVIGNY CONSTRUCTION INC | $892,325 |
| Sep 8, 2026 | Washington State Heath and Services Elevator Mold 06419 | Layland Construction LLC | $6,580 |
| Sep 8, 2026 | SCC Controls & NW Penthouse Coil 2026-719 G (1-1) | MCKINSTRY ESSENTION LLC | $2,600,551 |
| Sep 4, 2026 | LCC - Lift Station Parts Replacement J26-02, WO#26, 2027-021 | SAYBR CONTRACTORS INC | $76,850 |
| Sep 4, 2026 | SHC - 5000 Bldg. Domestic Water Line Replacement 2026-593 G (1-1) | DIAMOND PLUMBING & HEATING LLC | $168,777 |
| Sep 4, 2026 | DSHS OF YAKIMA 27323 / 2607-0912 | COSCO FIRE PROTECTION INC | — |
| Sep 4, 2026 | BC - Irrigation Loop Upgrade J23-04, WO #123, 2026-704 | FORMA CONSTRUCTION COMPANY | $80,433 |
| Sep 2, 2026 | YVC - Pedestrian Overpass Renovations 2026-194 G (1-1) | M SEVIGNY CONSTRUCTION INC | $644,700 |
| Sep 2, 2026 | SPS - Parking Lot F Painting J23-04, WO #122, 2027-031 | FORMA CONSTRUCTION COMPANY | $55,533 |
| Sep 2, 2026 | LCC - Access Controls 2026-575 G (1-1) | KOIVU ELECTRIC LLC | $125,367 |
| Sep 1, 2026 | WWCC - Elevator Control Replacement J26-03, WO 11, 2026-046 | BURTON CONSTRUCTION INC | $38,891 |
| Sep 1, 2026 | SVC-Replace Reader Boards at Whidbey Island Campus 2026-153 G (1-1) | SIGNS PLUS INC | $97,056 |
| Sep 1, 2026 | EDC-Olympic Hall-Food Pantry Reno REV1 J23-04, WO #121, 2026-026 | FORMA CONSTRUCTION COMPANY | $111,529 |
| Sep 1, 2026 | DCYF - Echo Glen Emergency Generator Project - REBID 2024-069 H (2-3) | Legacy Telecommunications, LLC | $1,183,460 |
| Aug 31, 2026 | Wenatchee Building 2 & 3 Roof Replacement C27-006 | HALME BUILDERS INC | $130,800 |
| Aug 29, 2026 | J11669 - 5 C's Child Care M123283 - INV 23861 | WEST COAST MECH SLTNS LLC | $18,865 |
| Aug 29, 2026 | (title withheld) M123443- INV 23862 | WEST COAST MECH SLTNS LLC | $803 |
| Aug 27, 2026 | GOVERNOR'S MANSION FRONT OFFICE & CLOAKE CLOSET M123484 | GREAT FLOORS | $3,442 |
| Aug 27, 2026 | J11766 - Powerhouse Bldg (E) M122421 | WEST COAST MECH SLTNS LLC | — |
| Aug 27, 2026 | TCC 2025-27 Biennium Roof Repairs 2026-113 G (2-1) | KRUEGER SHEET METAL CO | $1,167,363 |
| Aug 26, 2026 | DES B&G CAPITOL COURT 3RD FLOOR M123430 | GREAT FLOORS | $70,015 |
| Aug 26, 2026 | Meydenbauer Center - Phase 3 Upgrades - RTU Replacement 2022-705 I (5-1) | MACDONALD-MILLER FAC SOLNS LLC | $1,623,686 |
| Aug 26, 2026 | Clark County Court House - Controls & Valves 2025-269 G (1-1) | MACDONALD-MILLER FAC SOLNS LLC | $1,431,537 |
| Aug 25, 2026 | DES MCC EV Charger Transformer Pad Part 2 J26-02, WO #25, 2025-326 | SAYBR CONTRACTORS INC | $205,304 |
| Aug 25, 2026 | Olympic Correctional EV Chargers J26-02 WO #24, 2026-329 | SAYBR CONTRACTORS INC | $140,265 |
| Aug 25, 2026 | DES G&B OBII SERVICE LEVEL SUPPLY ENTRY M123145 | GREAT FLOORS | $6,522 |
| Aug 25, 2026 | J11814 - Natural Resources Building (C) M123166 | WEST COAST MECH SLTNS LLC | — |
| Aug 24, 2026 | (title withheld) 892293454 | EVERON LLC | $960 |
| Aug 21, 2026 | SHCC Foss Building RCx 2026-715 G (1-1) | A T S AUTOMATION INC | $32,916 |
| Aug 21, 2026 | SCC - BE, BPH Elevator Repairs J26-02 WO #21, 2026-786 | SAYBR CONTRACTORS INC | $95,014 |
| Aug 21, 2026 | YVC RCx Glenn Anthon & Deccio Center 2026-232 G (1-1) | A T S AUTOMATION INC | $113,391 |
| Aug 20, 2026 | SCC - Gas Leak Repairs J26-03, WO#10, 2026-568 | BURTON CONSTRUCTION INC | $156,014 |
| Aug 20, 2026 | Peninsula College Bldg J. HVAC Replacement, J23-04, WO #120, 2026-856 | FORMA CONSTRUCTION COMPANY | $100,511 |
| Aug 19, 2026 | RTC - Mechanical System Upgrades J26-02 WO #22, 2026-230 | SAYBR CONTRACTORS INC | $247,722 |
| Aug 19, 2026 | DCYF - Twin Rivers Lighting & Camera Upgrades J23-05, WO #110, 2027-024 | HILGER CONSTRUCTION INC | $106,959 |
| Aug 19, 2026 | GHC - Replace Heaters in 1800 Diesel Bldg. J26-02 WO #23, 2026-889 | SAYBR CONTRACTORS INC | $117,279 |
| Aug 19, 2026 | ADA Push Button Service Call 301556357 | EVERON LLC | $1,004 |
| Aug 19, 2026 | IT - Bus Canopy - Mini Mac 1- Electric Equipment Procurement | FORMA CONSTRUCTION COMPANY | $624,064 |
| Aug 19, 2026 | GRC Science Bldg. Lighting and Boilers Ph. 1 2026-725 G (1-1) | MCKINSTRY ESSENTION LLC | $960,150 |
| Aug 18, 2026 | WVC-Van Tassell Roofing Section Replacement J26-03, WO 7, 2026-858 | BURTON CONSTRUCTION INC | $159,978 |
| Aug 18, 2026 | DSHS - ESH - Reservoir Temperature Sensor J26-03, WO 8, 2026-426 | BURTON CONSTRUCTION INC | $30,980 |
| Aug 18, 2026 | Coast Controls & Automation, Inc. 2026-335 G (1-1) | Coast Controls & Atmtn Inc | $72,000 |
| Aug 18, 2026 | BBCC - Bldg. 1800 (ATEC) Remodel J26-03, WO 9, 2026-064 | BURTON CONSTRUCTION INC | $322,358 |
| Aug 17, 2026 | BC - Bellevue College Parking Garage Early Investigation J26-01, WO #9, 2025-728 | CENTENNIAL CONTRACTORS ENT INC | $130,320 |
| Aug 17, 2026 | EvCC Parks and Gray Wolf RCx 2026-527 G (1-1) | A T S AUTOMATION INC | $107,562 |
| Aug 17, 2026 | SHC - 2100 Building Roof Repairs 2026-588 G (1-1) | OLYMPIC ROOFING LLC | $292,000 |
| Aug 14, 2026 | gate repair 74328 | SOUTHGATE FENCING INC | $783 |
| Aug 14, 2026 | GHC - 3000 Building Improvements J26-02 WO #20, 2026-847 | SAYBR CONTRACTORS INC | $14,693 |
| Aug 13, 2026 | WCC - Multiple Mech. & Lighting Controls Repairs 2026-040 G (1-1) | APEX MECHANICAL LLC | $799,703 |
| Aug 13, 2026 | CI Headquarters EV Chargers J26-02 WO #19, 2026-328 | SAYBR CONTRACTORS INC | $70,495 |
| Aug 13, 2026 | DES DOC SCCC EV Chargers J26-02, WO #18, 2026-330 | SAYBR CONTRACTORS INC | $90,037 |
| Aug 13, 2026 | Tank Dialysis Cleaning Service and Post Service lab test for 1 40,000 gallon tank 1093993749-PW | FUELCARE INC | $27,658 |
| Aug 13, 2026 | EMERGENCY-WHS Emergency Boiler Replacement 2026-918 E (1-1) | ARIES MECHANICAL INC | $347,980 |
| Aug 12, 2026 | SSC- Potable Water Lines J26-02 WO #16, 2026-141 | SAYBR CONTRACTORS INC | $84,775 |
| Aug 12, 2026 | YVC - Parking Lots A & B Renovations & Repair 2026-740 G (1-1) | Central Paving LLC | $184,000 |
| Aug 11, 2026 | CLC - AMC Equipment Install J26-02 WO #17, 2027-026 | SAYBR CONTRACTORS INC | $172,663 |
| Aug 11, 2026 | Stanwood-Camano SD LED Upgrade 2026-895 G (1-1) | MCKINSTRY ESSENTION LLC | $587,362 |
| Aug 10, 2026 | James Dolliver Storage Room Lead Paint 06419 | Layland Construction LLC | $8,907 |
| Aug 10, 2026 | WSP-Marysville WSP EV Charging Stations J26-02 WO #12, 2026-299 | SAYBR CONTRACTORS INC | $438,540 |
| Aug 10, 2026 | (title withheld) J26-02, WO #15, 2024-313 | SAYBR CONTRACTORS INC | $450,936 |
| Aug 10, 2026 | SPSCC Elevator Modernization J26-02 WO #14, 2026-114 | SAYBR CONTRACTORS INC | $352,493 |
| Aug 10, 2026 | BATES - DC - Bldg. A Replace Two Failing HVAC Units 2026-089 G (1-1) | HOLADAY PARKS INC | $769,841 |
| Aug 7, 2026 | CBC - Potable Water Line Replacement 2026-173 G (2-1) | SIEFKEN & SONS CONST INC | $397,000 |
| Aug 7, 2026 | Clover Park TC Bld. 21 Retro-Commissioning 2026-896 G (1-1) | A T S AUTOMATION INC | $36,538 |
| Aug 7, 2026 | EMERGENCY-EDC- Mukilteo Hall Transformer Repairs 2027-022 E(1-1) | FORMA CONSTRUCTION COMPANY | $47,500 |
| Aug 7, 2026 | RCx, Window Glazing, Piping Insul., Ext. Ltg. Control 2026-772 G (1-1) | CUSTOM ENERGY CONSULTANTS | $433,971 |
| Aug 7, 2026 | GHC Riverview 2nd Fl. HVAC & Main Campus Energy Upgrades 2026-870 G (1-1) | A T S AUTOMATION INC | $674,857 |
| Aug 6, 2026 | PNI ACCESS CONTROL RELOCATION PM 2-10-26 | C T S | $48,962 |
| Aug 6, 2026 | SFCC - Spark Detection System J26-03, WO#6, 2018-063 | BURTON CONSTRUCTION INC | $31,470 |
| Aug 6, 2026 | DES - O'Brien - Leg. Bldg. Cleaning - REBID 2026-851 G (1-1) | PIONEER MASONRY RSTRTN CO INC | $759,602 |
| Aug 6, 2026 | SVC-Roberts Hall Reroof and Clerestory Repair 2026-115 G (1-1) | HYTECH ROOFING INC | $672,000 |
| Aug 5, 2026 | SVC-MV Campus-Asphalt Repair and Restriping 2026-122 G (1-1) | WESTERN REFINERY SERVICES INC | $122,821 |
| Aug 5, 2026 | SVC - Reeves Hall - Career Launch Grant Equipment 2026-520 G (1-1) | ELECTRIC WEST INC | $10,500 |
| Aug 5, 2026 | Clallam County Courthouse Boiler Upgrade 2026-532 G (1-1) | MILLIG LLC | $653,479 |
| Aug 5, 2026 | SCC - BE Brick Patio and Walk Repairs J26-01 WO#8, 2026-747 | CENTENNIAL CONTRACTORS ENT INC | $433,433 |
| Aug 4, 2026 | YVC - Hopf Union Building (HUB) Roof 2026-196 G (1-1) | LESLIE & CAMPBELL INC | $244,940 |
| Aug 4, 2026 | POWERHOUSE FIBER PROJECT K10267 | C T S | $6,864 |
| Aug 4, 2026 | OLC-Bldg.2 Water Intrusion Repair, 2026-548 J26-02 WO #13, 2026-548 | SAYBR CONTRACTORS INC | $61,859 |
| Aug 4, 2026 | TOJ CONSERVATORY FIBER PROJECT K10268 | C T S | $65,237 |
| Aug 4, 2026 | MIS Steilacoom Dock Repairs 2024-315 H (5-1) | QUIGG BROS INC | $68,736 |
| Aug 4, 2026 | PNI IDF RELOCATION PROJECT PO-CL-628 | C T S | $114,168 |
| Aug 4, 2026 | YVC - Student Residence Center (SRC) Roof 2026-261 G (1-1) | LESLIE & CAMPBELL INC | $176,524 |
| Aug 4, 2026 | WSDOT Hyak Maint. Facility Boiler Replacement 2026-775 G (1-1) | UNIVERSITY MECH CONTR INC | $432,059 |
| Aug 4, 2026 | DES - Fluorescent to LED Lighting Conversion 2026-200 G (1-1) | B E S ELECTRICAL SERVICES LLC | $1,538,000 |
| Aug 4, 2026 | EDC-Sewer and Storm Line Replacement 2026-166 G (1-1) | HARKNESS CONSTRUCTION LLC | $364,620 |
| Aug 3, 2026 | EVC - ADA Sidewalk Repairs 2026-567 G (1-1) | MOECO LLC | $72,293 |
| Aug 3, 2026 | ESH - Eastlake FSU Roofing Replacement 2026-410 G (1-1) | ADVANCED ROOFING | $533,946 |
| Aug 3, 2026 | YVS Cottage Fire Doors J26-03, WO 5, 2024-444 | BURTON CONSTRUCTION INC | $351,426 |
| Jul 31, 2026 | J10610 - Employment Security Dept. (C) INV 23487 | WEST COAST MECH SLTNS LLC | $6,185 |
| Jul 31, 2026 | SVC-Whidbey Campus Asphalt Repair and Restriping 2026-104 G (1-1) | LAKESIDE INDUSTRIES INC | $98,550 |
| Jul 31, 2026 | DSHS-Maple Lane Expansion - O/P/R/M 2023-425 H (2-2) | JONES & ROBERTS COMPANY | $7,298,000 |
| Jul 31, 2026 | MIS Fuel Distribution 2025-315 G (1-1) | PACIFIC ENVIRONMENTAL SRVCS CO | $816,920 |
| Jul 30, 2026 | CDHY-Clark Hall HVAC Optimization, 2025-275 J26-02 WO #10, 2025-275 | SAYBR CONTRACTORS INC | $125,499 |
| Jul 30, 2026 | (title withheld) 25030 | COLE INDUSTRIAL INC | $8,435 |
| Jul 30, 2026 | (title withheld) 25030 | COLE INDUSTRIAL INC | $11,380 |
| Jul 30, 2026 | SCC Epoxy Flooring Culinary Kitchen J26-02 WO #11, 2026-744 | SAYBR CONTRACTORS INC | $167,721 |
| Jul 30, 2026 | WCC - Multiple Classroom Upgrades 2026-029 G (1-1) | HI MARK CONSTRUCTION INC | $261,534 |
| Jul 30, 2026 | WSH-Multiple Bldgs Clean & Soiled Utility Imp 2024-441 G (1-1) | APEX MECHANICAL LLC | $686,000 |
| Jul 30, 2026 | DES - South Diagonal - Sidewalk & Storm Drain Repair -REBID 2026-184 G (1-1) | SASCON LLC | $595,650 |
| Jul 29, 2026 | WSD Solar Photovoltaic 2026-977 G (1-1) | A T S AUTOMATION INC | $437,802 |
| Jul 28, 2026 | CEC HVAC Upgrades 2026-288 G (1-1) | SUNSET AIR INC | $521,412 |
| Jul 28, 2026 | Men's Restroom - Security Building 06419 | Layland Construction LLC | — |
| Jul 28, 2026 | WCCW - Replace Roofs Bldgs C, H, B, G, U & W 2026-304 G (1-1) | SNYDER ROOFING OF WASH LLC | $2,642,810 |
| Jul 28, 2026 | Air compressor replacment | EVERGREEN COMPR AIR & VAC LLC | $11,922 |
| Jul 28, 2026 | SFCC - Building 6 Demolition and Site Restoration 2018-063 J (3-4) | M J TAKISAKI INC | $2,022,800 |
| Jul 28, 2026 | LCC - Renovation & Minor Improvements 2026-014 G (1-1) | CONSTRUCTION SRVS GROUP INC | $1,347,545 |
| Jul 27, 2026 | DES - Kelso Sink Hole Repair J26-01, WO #7, 2026-959 | CENTENNIAL CONTRACTORS ENT INC | $9,568 |
| Jul 27, 2026 | SVC - Old Main Sewer Line Replacement 2026-111 G (1-1) | TIGER CONSTRUCTION LTD | $200,000 |
| Jul 27, 2026 | H.S., M.S., E.S. Solar Array 2026-791 G (1-1) | APOLLO SOLUTIONS GROUP | $1,144,262 |
| Jul 27, 2026 | L&I - Transmission Electron Microscope Workspace 2026-009 G (1-1) | J A MORRIS CONSTRUCTION LLC | $269,500 |
| Jul 27, 2026 | SVC - Ford Hall Renovations 2026-226 G (1-1) | BCN CONSTRUCTION LLC | $533,010 |
| Jul 24, 2026 | WVC BLM Library Main Breaker Replacement J23-05, WO #109, 2026-914 | HILGER CONSTRUCTION INC | $49,077 |
| Jul 24, 2026 | RTC - Fire Suppression System Repairs J26-02 WO #9, 2026-225 | SAYBR CONTRACTORS INC | $36,650 |
| Jul 24, 2026 | SPCC - Main Building-East Wing Renovation - Core & Shell-Mini MACC02 2025-087 I (3-3) | BOUTEN CONSTRUCTION COMPANY | $5,310,401 |
| Jul 23, 2026 | WSDOT SWR HQ Electrical Upgrade 2024-102 G (1-1) | AMERESCO INC | $1,810,802 |
| Jul 23, 2026 | LV-Campus - Loading Dock Repairs 2026-402 G (1-1) | BURTON CONSTRUCTION INC | $427,351 |
| Jul 22, 2026 | WA St DES YR 3 Controls WA St DES YR 3 Controls | Johnson Controls Bldg Sol LLC | $5,446 |
| Jul 22, 2026 | CPTC - Multiple HVAC Repair/Replacements J23-04, WO #119, 2026-749 | FORMA CONSTRUCTION COMPANY | $313,739 |
| Jul 22, 2026 | J11112 - Capitol Court Building INV 23333 | WEST COAST MECH SLTNS LLC | — |
| Jul 22, 2026 | GHC Campus HVAC & Lighting 2026-505 G (1-1) | A T S AUTOMATION INC | $357,077 |
| Jul 21, 2026 | EMERGENCY-SCC-Repairs dust collect Units ventilati 2026-976 E (1-1) | MECHANICAL & CONTROL SRVCS INC | $54,071 |
| Jul 21, 2026 | J11109 - Campus Building (E) INV 23340 | WEST COAST MECH SLTNS LLC | $8,726 |
| Jul 20, 2026 | OHBH 2N & 3N Wards HCA Tenant Improvements 2025-410 G (1-1) | M J TAKISAKI INC | $508,852 |
| Jul 19, 2026 | SVC-Oak Hall-Replace VFD�s and Balancing Valves 2026-159 G (1-1) | CLEAR WATER MECHANICAL LLC | $245,800 |
| Jul 17, 2026 | WWCC - Security Upgrades 2026-087 G (1-1) | SECURITY SOLUTIONS NW LLC | $770,000 |
| Jul 16, 2026 | SVC EMCS & Submetering Upgrades 2026-871 G (1-1) | A T S AUTOMATION INC | $544,702 |
| Jul 16, 2026 | EVC - Existing Baker Hall Demolition & Restoration 2023-293 H (1-2) | CORNERSTONE GENERAL CONTRS INC | $1,317,826 |
| Jul 14, 2026 | Backflow Repair Quote 59015 - Washington State DES Master Contract No. 27323 | COSCO FIRE PROTECTION INC | $1,184 |
| Jul 14, 2026 | DOH-New LED Ltg. & Controls in PHL - Ph. II J23-04, WO #118, 2026-881 | FORMA CONSTRUCTION COMPANY | $333,172 |
| Jul 13, 2026 | PEC-Building T Floor Repairs J23-04, WO #117, 2024-727 | FORMA CONSTRUCTION COMPANY | $126,707 |
| Jul 13, 2026 | BC - B - Bldg. South Elevator 2026-244 G (1-1) | PRIMARIUS LLC | $542,278 |
| Jul 13, 2026 | BC - Replacement of 5 Water Source Heat Pumps 2026-523 G (1-1) | D/B SOLUTIONS LLC | $284,583 |
| Jul 13, 2026 | RS - Laundry Bldg Electrical Improvements - Phase 2 2024-461 H (1-2) | MILNE ELECTRIC INC | $478,700 |
| Jul 10, 2026 | DVA - Roosevelt Barracks Upgrades J26-02 WO #8, 2026-857 | SAYBR CONTRACTORS INC | $442,784 |
| Jul 10, 2026 | MIS Infrastructure Repairs and Upgrades 2024-315 G (7-1) | QUIGG BROS INC | $1,070,088 |
| Jul 10, 2026 | S-C SD PH-II Stevenson HS Lighting, Windows & HVAC 2026-560 G (1-1) | APOLLO SOLUTIONS GROUP | $3,501,678 |
| Jul 9, 2026 | CBC HAWK Sign Replacement-2 J26-03, WO 4, 2025-290 | BURTON CONSTRUCTION INC | $147,894 |
| Jul 9, 2026 | BTC-Site Infrastructure Repairs 2026-208 G (1-1) | COLACURCIO BROS INC | $198,300 |
| Jul 8, 2026 | SVC - Nelson Hall - Replace HVAC Equipment 2026-142 G (1-1) | K-A GENERAL CONST CONTR LLC | $381,148 |
| Jul 8, 2026 | McNeil Island SCC Plumbing - J26-02 WO #07, 2026-428 | SAYBR CONTRACTORS INC | $47,719 |
| Jul 8, 2026 | BTC-Building C HVAC Upgrades 2026-197 G (2-1) | SUMMIT CONSTRUCTION GROUP INC | $308,700 |
| Jul 8, 2026 | SVC-Hayes Hall Repair Exterior Cladding 2026-162 G (1-1) | SUMMIT CONSTRUCTION GROUP INC | $162,708 |
| Jul 7, 2026 | TCC Campus Chilled Water System Improvements 2025-780 G (1-1) | INTEGRITY ENERGY SERVICES CO | $101,674 |
| Jul 6, 2026 | KCMT - Bus Trolley SCADA System 2021-169 G (1-1) | MCKINSTRY ESSENTION LLC | $2,411,673 |
| Jul 6, 2026 | DCYF - EGCC Living Unit Roof Replacement 2026-134 G (1-1) | OLYMPIC ROOFING LLC | $714,000 |
| Jul 2, 2026 | BC - Botany Department Grow Chambers J26-01, WO #6, 2026-550 | CENTENNIAL CONTRACTORS ENT INC | $121,183 |
| Jul 2, 2026 | STATE OF WASHINGTON DOL 07012026 | TWIN CITY GLASS COMPANY INC | $297 |
| Jul 2, 2026 | HC - Campus Landscaping Improvements 2026-739 G (1-1) | SPECIALIZED LANDSCAPING INC | $396,303 |
| Jul 2, 2026 | EMERGENCY-SPSCC-Building 35 Compressor Replacement 2026-942 E (1-1) | ELITE MECHANICAL SERVICES LLC | $64,635 |
| Jul 2, 2026 | EMERGENCY-SPSCC-Building 22 JACE Controller Replacement 2026-950 E (1-1) | ELITE MECHANICAL SERVICES LLC | $82,711 |
| Jul 1, 2026 | EMERGENCY - MIS Underground Waterline Leak 2026-333 G (1-1) | ROGNLINS INC | $14,963 |
| Jul 1, 2026 | LCC - Controls J26-02 WO #6, 2026-227 | SAYBR CONTRACTORS INC | $117,850 |
| Jul 1, 2026 | HC - Campus Electrical Improvements 2026-737 G (1-1) | PDC Electric Co | $226,626 |
| Jun 30, 2026 | DCYF Kelso 6007 Access Control SA892259521 | EVERON LLC | $6,638 |
| Jun 30, 2026 | DES CAPITOL WAY PEDESTRIAN BRIDGE REPAIR 2026-195 G (1-1) | QUIGG BROS INC | $415,000 |
| Jun 30, 2026 | BC - E Building Duct Heater Replacement J26-01, WO #5, 2025-263 | CENTENNIAL CONTRACTORS ENT INC | $166,393 |
| Jun 30, 2026 | LCC - Grandstands 2025-580 G (3-1) | PACIFIC TECH CONSTRUCTION INC | $7,415,479 |
| Jun 30, 2026 | EVSD Solar Array Moxee & E.Valley E.S. 2026-855 G (1-1) | APOLLO SOLUTIONS GROUP | $700,563 |
| Jun 30, 2026 | RTC - Building I Bookstore Conversion - REBID 2025-551 H (1-2) | BFC CONSTRUCTION INC | $531,969 |
| Jun 30, 2026 | Tumwater SD Lighting Upgrade 2026-868 G (1-1) | MILLIG LLC | $1,401,861 |
| Jun 29, 2026 | EWH - Cafe Equipment & Infrastructure J26-03, WO 3, 2026-879 | BURTON CONSTRUCTION INC | $47,778 |
| Jun 29, 2026 | SVC � Pedestrian Pavers and Site Utility Replacement 2026-108 G (1-1) | J Ritter Dirt & Asphalt LLC | $125,235 |
| Jun 26, 2026 | Capital Court Building - Remove and replace failed 5 ton water source heat pump located in suite 250 (C) M123038 - J11355 | WEST COAST MECH SLTNS LLC | — |
| Jun 25, 2026 | DES - Kelso Bldg. Improvement Project 2025-544 G (1-1) | PACIFIC TECH CONSTRUCTION INC | $1,033,000 |
| Jun 25, 2026 | WSP - Vancouver Crime Lab Chiller Replacement 2026-215 G (1-1) | APEX MECHANICAL LLC | $423,621 |
| Jun 25, 2026 | LWIT - S. Parking Lot Paving & Striping J26-02 WO #5, 2026-916 | SAYBR CONTRACTORS INC | $460,675 |
| Jun 25, 2026 | TCC - Storm Sewer Improvements 2026-186 G (2-1) | SARKINEN PLUMBING INC | $306,912 |
| Jun 24, 2026 | PIE - EMERGENCY - Sewer Lift Station Failure 2026-908 E (1-1) | FLOHAWKS | $45,678 |
| Jun 24, 2026 | BC - C/D & B/L Building Bridges 2024-862 G (1-2) | M J TAKISAKI INC | $433,606 |
| Jun 24, 2026 | YVS Campus: Patient Activity Space Upgrades 2024-443 G (1-1) | BURTON CONSTRUCTION INC | $201,335 |
| Jun 23, 2026 | (title withheld) 66533 | VALLEY LOCK & KEY SERVICE LLC | $1,416 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.