EDMONDS, CITY OF — public works contracts
713 public works projects and 1,668 intents to pay prevailing wages name EDMONDS, CITY OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: City.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 61 | 73 | 99 | 116 | 93 | 125 | 142 | 118 | 82 | 99 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 29, 2026 | Public Works Gutter Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $75,476 |
| Sep 28, 2026 | Public Works Fire Alarm Panel/ Device Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $94,489 |
| Sep 28, 2026 | Waste Water Treatment Plant office building flooring replacement N/A | WOODRIDGE CONSTRUCTION LLC | $34,447 |
| Sep 4, 2026 | (title withheld) 200860322 | EVERON LLC | $495 |
| Sep 2, 2026 | REPAIR FAIRBANKS B5424 SN: K3T1-061170-3 TBD | BECKWITH & KUFFEL INC | — |
| Aug 31, 2026 | GOOD HOPE POND DREDGING ie26sm01 | GRANITE CONSTRUCTION COMPANY | $110,000 |
| Aug 21, 2026 | Wade James Theater Roof Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $100,503 |
| Aug 21, 2026 | Tank Water & Sediment Removal Service and Post Service Lab Test for 1 Tank PO 259 | FUELCARE INC | $3,714 |
| Aug 17, 2026 | Yost Pool Exterior Lighting JOC-COE-Saybr-002 | SAYBR CONTRACTORS INC | $65,038 |
| Aug 17, 2026 | Public Counter and Office ADA Improvements JOC-COE-Saybr-002 | SAYBR CONTRACTORS INC | $153,197 |
| Aug 17, 2026 | Municiple Court ADA Restroom Addition JOC-COE-Saybr-002 | SAYBR CONTRACTORS INC | $104,130 |
| Aug 13, 2026 | CITY OF EDMONDS - COLUMBARIUM CEMENT REPAIR 4153715/641-0004/9932247 | WEATHERPROOFING TECH INC | $10,846 |
| Aug 12, 2026 | 7th Ave N Pedestrian Improvements Project IE25ST07 | P&A CIVIL LLC | $277,085 |
| Aug 5, 2026 | HP #1201 Replacement HP #1201 Replacement | D K SYSTEMS INC | $20,189 |
| Aug 5, 2026 | (title withheld) 200858016 | EVERON LLC | $991 |
| Jul 31, 2026 | 2026 CIPP REHABILITATION PROJECT 2026 | IRON HORSE LLC | $437,061 |
| Jul 28, 2026 | (title withheld) 301457845 | EVERON LLC | $984 |
| Jul 28, 2026 | Cemetery Columbarium WA-025D-300079 | CHINOOK BLDG ENVELOPE SERV | $115,670 |
| Jul 24, 2026 | Hickman Park Court Surfacing Option 1A 117669-01-02 | GAMETIME | $28,893 |
| Jul 21, 2026 | SR-104 @ 236th ST SW Traffic Signal IE25ST05 | SERVICE ELECTRIC CO INC | $22,500 |
| Jul 20, 2026 | (title withheld) 301449475 | EVERON LLC | $779 |
| Jun 25, 2026 | (title withheld) 892308055 | EVERON LLC | $4,247 |
| Jun 23, 2026 | Olympic View Drive Pavement Preservation IE25ST06 | NORTHWEST ASPHALT INC | $1,145,767 |
| Jun 22, 2026 | Small Works Contract - 2026 Spot Repair CE25SW01 | FLOW TECHNOLOGIES INC | $73,808 |
| Jun 12, 2026 | CH01 4B4 CF Motor & Blade Repl 26-13487293 | TRANE | $5,513 |
| Jun 8, 2026 | CLARIFIER ARM REPAIR #159 | GENERAL MECHANICAL INC | $32,103 |
| Jun 3, 2026 | Emergency Hauling #200 | SERIES SEVEN INC | $212,177 |
| May 20, 2026 | City Hall Roof Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $180,966 |
| May 19, 2026 | Service Agreement SEA01060 SEA01060 Service Agreement | TRANE | $18,190 |
| May 18, 2026 | BIO AIR FAN REPAIR #173 26.0255 | GENERAL MECHANICAL INC | $10,295 |
| May 15, 2026 | Lift repair #4179 | HYDRAULIC SOLUTIONS LLC | $1,272 |
| May 11, 2026 | Mathay Ballinger Park 1783 | DTG ENTERPRISES INC | $5,850 |
| May 8, 2026 | Frances Anderson Center - Edmonds 1783 | DTG ENTERPRISES INC | $4,709 |
| May 7, 2026 | 70-125 Ton Air-Cooled Chiller is not coming on 26-13407472 | TRANE | — |
| Apr 29, 2026 | 20719 86th Pl W Property Demolition CE26SM01 | RECLAIM LAND MANAGEMENT LLC | $38,454 |
| Apr 28, 2026 | Fleet Insulation Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $66,022 |
| Apr 28, 2026 | Plaza Room Blinds Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $22,642 |
| Apr 28, 2026 | Wade James Theater Gutter and Downspout Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $18,462 |
| Apr 28, 2026 | Plaza Room Plumbing Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $19,461 |
| Apr 24, 2026 | Plaza Room Entry Door Replacement (4sets) JOC-COE -Saybr-002 | SAYBR CONTRACTORS INC | $89,732 |
| Apr 24, 2026 | 301276317 Wastewater treatment plant 892284082 | EVERON LLC | $4,041 |
| Apr 24, 2026 | 301277843 Public Safety Building 892284072 | EVERON LLC | $2,700 |
| Apr 24, 2026 | Edmonds City Park 1783 | DTG ENTERPRISES INC | $3,971 |
| Apr 24, 2026 | Marina Beach Park 1783 | DTG ENTERPRISES INC | $2,084 |
| Apr 24, 2026 | (title withheld) 301310396 | EVERON LLC | $779 |
| Apr 23, 2026 | BIOAIR BLOWER REPAIR #143 | GENERAL MECHANICAL INC | $11,613 |
| Apr 23, 2026 | 301275662 City of Edmonds Library 892284060 | EVERON LLC | $1,172 |
| Apr 15, 2026 | (title withheld) 200849568 | EVERON LLC | $55 |
| Apr 15, 2026 | Library Plaza Room Audio System JOC #JC25 | SAYBR CONTRACTORS INC | $58,809 |
| Apr 2, 2026 | Chain Link Fence Kyle Harris | TOWN & COUNTRY FENCE INC | $4,605 |
| Mar 27, 2026 | (title withheld) 4151820 | NORTHWEST PLAYGROUND EQUIP INC | $135,061 |
| Mar 18, 2026 | Frances Anderson Center Side Sewer JOC-COE-Saybr-002 | SAYBR CONTRACTORS INC | $136,065 |
| Feb 17, 2026 | EQUIPMENT MAINTENANCE PO#111 26.0134 | GENERAL MECHANICAL INC | $17,048 |
| Feb 16, 2026 | Public Safety Building Gutter and Downspout Replacement N/A | WOODRIDGE CONSTRUCTION LLC | $39,076 |
| Feb 6, 2026 | Vactor - Waste water Treatment Plant 12817 | WHIRLWIND SERVICES INC | $8,248 |
| Feb 4, 2026 | 2024 URP - Monument Replacement E24GA/CE24SW01 | SHORELINE CONST CO | $6,593 |
| Jan 27, 2026 | Library Plaza Room Roof Replacement JOC-COE-Saybr-002 | SAYBR CONTRACTORS INC | $156,055 |
| Jan 27, 2026 | Fish Hatchery Roof Replacement JOC-COE-Saybr-002 | SAYBR CONTRACTORS INC | $60,252 |
| Jan 26, 2026 | YOST POOL SHOWER TILE REPLACEMENT N/A | GREAT FLOORS | $14,999 |
| Jan 13, 2026 | Air dryer install 3650944-00 | NORTHWEST PUMP/EQUIP CO | $14,363 |
| Dec 23, 2025 | 2025 Spot Repair E24GA/c622 | FLOW TECHNOLOGIES INC | $75,500 |
| Dec 19, 2025 | ANCHOR POINT 44 | GENERAL MECHANICAL INC | $10,166 |
| Dec 18, 2025 | City of Edmonds Bowdoin 2025 WA99336BC | PRECISION CONCRETE CUTTING INC | $7,051 |
| Dec 11, 2025 | Yost Pool - Qtrly HVAC MTC Yost Pool - Qtrly HVAC MTC | D K SYSTEMS INC | $3,536 |
| Dec 10, 2025 | (title withheld) Joseph | SME SOLUTIONS LLC | — |
| Dec 9, 2025 | 2025 Combined CIPP Rehab Project EL4GA/c622 and E24FA/c620 | IRON HORSE LLC | $936,879 |
| Dec 9, 2025 | (title withheld) PO 1444 | GENERAL MECHANICAL INC | $11,050 |
| Nov 21, 2025 | 7317 Lake Ballinger Way House Demolition E23MA/c581 | WELWEST CONSTRUCTION INC | $96,687 |
| Nov 6, 2025 | Entry Door Francis Anderson Center 261 | D K BOOS GLASS INC | $9,348 |
| Oct 28, 2025 | T/C Crane is buzzing loudly - LBC 58542 | WASHINGTON CRANE & HOIST LLC | $960 |
| Oct 22, 2025 | City of Edmonds - HVAC SERVICE City of Edmonds - HVAC SERVICE | D K SYSTEMS INC | $10,000 |
| Sep 23, 2025 | Electrical Services Installation & Inspection 09-2025-Boyer Electric Co. Inc. | BOYER ELECTRIC COMPANY INC | $102,451 |
| Sep 15, 2025 | Pedestrian Improvements & 88th Avenue West Overlay E24CE/i092 | KAMINS CONSTRUCTION INC | $1,043,868 |
| Aug 27, 2025 | CITY OF EDMONDS LS#4 WO-415214 | CUMMINS INC | $1,419 |
| Aug 19, 2025 | CITY OF EDMONDS BANNERS OS-147042 | TUBE ART DISPLAYS INC | $41,265 |
| Jul 31, 2025 | City of Edmonds WA25535BC | PRECISION CONCRETE CUTTING INC | $6,253 |
| Jun 24, 2025 | Mee Property Fence C618 | ECONOMY FENCE CENTER | $18,665 |
| Jun 20, 2025 | WAS PIPING FLOW INSTALLATION 01-2025-GENERAL MECHANICAL,INC. | GENERAL MECHANICAL INC | $12,313 |
| Jun 10, 2025 | Phase 15 Waterline Replacement E24JA/c621 | SHORELINE CONST CO | $2,226,053 |
| Jun 4, 2025 | 2025 Overlay Program E25CA/i093 | NORTHWEST ASPHALT INC | $1,040,515 |
| May 19, 2025 | (title withheld) 1415 | C H MURPHY/CLARK ULLMAN INC | — |
| May 14, 2025 | Blend Tank Cleaning 05-2025-Whirlwind | WHIRLWIND SERVICES INC | $15,050 |
| May 12, 2025 | 2025 Pedestrian Safety Improvements (Main & 5th Ave) E25AB/i099 | SERVICE ELECTRIC CO INC | $19,500 |
| Apr 24, 2025 | Replace Utility Pole BRT WSDOT 2025-0401A | INTRACOMMUNICATION NTWK SYS IN | $24,135 |
| Apr 23, 2025 | City Hall Stairway Hand Rail JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $74,871 |
| Apr 16, 2025 | PF Computer Shows Incorrect Level | MASCOTT EQUIPMENT CO INC | $869 |
| Apr 10, 2025 | Vactor - Waste water Treatment Plant Wastewater Treatment Plant | WHIRLWIND SERVICES INC | $7,400 |
| Mar 27, 2025 | Tank Water & Sediment Removal Service for 1 tank. PO 1398 | FUELCARE INC | $4,453 |
| Mar 11, 2025 | Public Library - HVAC MTC Public Library - HVAC MTC | D K SYSTEMS INC | $1,547 |
| Mar 9, 2025 | City Hall HVAC Svc/Mtc City Hall HVAC Svc/Mtc | D K SYSTEMS INC | $13,812 |
| Feb 13, 2025 | remove gd hydrovane rental compressor 1334 | BECKWITH & KUFFEL INC | — |
| Feb 5, 2025 | 282557058 - City of Edmonds - Public Safety Bldg 891913325 | ADT COMMERCIAL LLC | $269 |
| Jan 29, 2025 | Anderson Center - Boiler - Repairs Anderson Center - Boiler - Repairs | D K SYSTEMS INC | $6,374 |
| Jan 17, 2025 | City of Edmonds WWTP-Year 2 423.000.76.535.80.41.00 | SMITH FIRE SYSTEMS INC | $6,000 |
| Jan 2, 2025 | WWTP Janitorial Services WWTP Janitorial Services | SOUND CLEANING RESOURCES INC | $45,714 |
| Dec 23, 2024 | Anderson Center 24-651 | G S F INCORPORATED | $3,667 |
| Dec 20, 2024 | 7317 LAKE BALLINGER WA 7317 | TOWN & COUNTRY FENCE INC | $8,215 |
| Dec 16, 2024 | Frances Anderson Center Exterior Door Replacements JOC #JC22 | SAYBR CONTRACTORS INC | $149,672 |
| Dec 11, 2024 | Yost Swimming Pool Locker Rooms 6 | ALBA PAINTING & COATINGS | $18,652 |
| Dec 9, 2024 | City of Edmonds - Server Room A/C Unit City of Edmonds - Server Room A/C Unit | D K SYSTEMS INC | $17,868 |
| Dec 5, 2024 | 77802-1 - City of Edmondsw Annual Fire Alarm Inspection 77802-1 | GUARDIAN SECURITY SYSTEMS INC | $1,003 |
| Nov 21, 2024 | install gd hydrovane rental compressor 1334 | BECKWITH & KUFFEL INC | — |
| Nov 13, 2024 | (title withheld) Rear Bay Door | CRESSY DOOR CO INC | — |
| Nov 5, 2024 | City of Edmonds Public Safety Complex Trunk 2 TUX Upgrade Contract | A T S AUTOMATION INC | $40,106 |
| Nov 5, 2024 | City of Edmonds Global Controller Upgrades Small Works Contract | A T S AUTOMATION INC | $59,850 |
| Oct 25, 2024 | City of Edmonds WA55895BC | PRECISION CONCRETE CUTTING INC | $9,307 |
| Oct 21, 2024 | Edmonds Shortliners 24-655 | FLOW TECHNOLOGIES INC | $18,100 |
| Oct 8, 2024 | AERATION BASIN #1 BAFFLE WALL REPAIR 04-2024-GENERAL | GENERAL MECHANICAL INC | $15,028 |
| Oct 2, 2024 | Electrical Repairs & Installation 01-2024-AP | ADVANCED POWER LLC | — |
| Oct 1, 2024 | Split rail build 187 | FOXTROT FENCING | $3,025 |
| Sep 26, 2024 | Main Street Overlay E23CF/i078 | C A CAREY CORPORATION | $1,416,113 |
| Sep 19, 2024 | (title withheld) Spring on door | CRESSY DOOR CO INC | $1,391 |
| Sep 19, 2024 | (title withheld) Safety edge on door | CRESSY DOOR CO INC | $2,150 |
| Sep 17, 2024 | REPLACEMENT OF FAF 651 002-2024-GENERAL | GENERAL MECHANICAL INC | $49,946 |
| Aug 29, 2024 | (title withheld) Install new operator, PM door | CRESSY DOOR CO INC | — |
| Aug 13, 2024 | (title withheld) Install bump stops | CRESSY DOOR CO INC | $1,152 |
| Aug 9, 2024 | Mathay Ballinger Park Improvements Project c597.re | ACCORD CONTRACTORS LLC | $249,054 |
| Jul 29, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $116 |
| Jul 24, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $922 |
| Jul 24, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $922 |
| Jul 24, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $922 |
| Jul 24, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $805 |
| Jul 24, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $805 |
| Jul 24, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $1,389 |
| Jul 24, 2024 | (title withheld) Preventative Maintenance | CRESSY DOOR CO INC | $494 |
| Jul 19, 2024 | EDMONDS 24 OVERLAY E24CA | GRANITE CONSTRUCTION COMPANY | $1,510,650 |
| Jul 18, 2024 | WAS421 Pump Replacement 003-2024-General | GENERAL MECHANICAL INC | $66,300 |
| Jun 21, 2024 | SCREW PRESS SCREEN REPLACEMENT 001-2024-GENERAL | GENERAL MECHANICAL INC | $33,122 |
| Jun 21, 2024 | SCREW PRESS 603 SCREEN REPLACEMENT 002-2024-GENERAL | GENERAL MECHANICAL INC | $28,000 |
| Jun 12, 2024 | Museum Concrete Sealing JOC-COE-Centennial-001 | CENTENNIAL CONTRACTORS ENT INC | $18,421 |
| Jun 7, 2024 | 2024 Utility Replacement Project E23JA/c579, E23GC/c601, E22FA/c567 & E23GA/c580 | SHORELINE CONST CO | $4,873,112 |
| May 30, 2024 | City of Edmonds WWTP 423.000.76.535.80.41.00 | SMITH FIRE SYSTEMS INC | $6,000 |
| May 28, 2024 | CTX Restroom Foundation c597.re | ACCORD CONTRACTORS LLC | $40,525 |
| May 24, 2024 | Public Works Yard Gate Replacement # C628.fm | ALL CITY FENCE CO | $97,980 |
| Apr 29, 2024 | Waste pick up | NRC ENVIRONMENTAL SERVICES INC | — |
| Apr 25, 2024 | On call Unit Priced Tree Trimming/Removal WTEoc | WASHINGTON TREE EXPERTS LLC | $50,000 |
| Apr 12, 2024 | Yost Simming Pool 5 | ALBA PAINTING & COATINGS | $24,300 |
| Mar 26, 2024 | Edmonds Fire #16 23090029 | SPECIALTY DOOR SERVICE INC | $800 |
| Mar 21, 2024 | Johnson Property Fence and Gate Installation # F125 | FOXTROT FENCING | $17,775 |
| Mar 11, 2024 | Bottle Filler Installation Bottle Filler Installation | TIETON CONSTRUCTION LLC | $24,684 |
| Mar 4, 2024 | 2024 HVAC Service 2024 HVAC Service | D K SYSTEMS INC | $500,000 |
| Mar 1, 2024 | Homeless Camp Clean Up | NRC ENVIRONMENTAL SERVICES INC | — |
| Feb 27, 2024 | Civic park Playground Fence Retrofit C556 | Bozco Construction LLC | $17,017 |
| Feb 1, 2024 | Pine Street Park Bleachers 125.000.64.576.80.48.00 | VIBETECH SPECIALTIES LLC | $19,025 |
| Jan 31, 2024 | Sewer & Water Treatment Plant 23172057 | SPECIALTY DOOR SERVICE INC | $1,912 |
| Jan 30, 2024 | Edmonds Fire #17 23245450 | SPECIALTY DOOR SERVICE INC | $265 |
| Dec 19, 2023 | (title withheld) 3433791-00 | NORTHWEST PUMP/EQUIP CO | $6,409 |
| Dec 18, 2023 | field repair on gd hydrovane compressor 1037 | BECKWITH & KUFFEL INC | — |
| Dec 18, 2023 | 2023 Guardrail Installation E23AD/i080 | PETERSEN BROTHERS INC | $3,357 |
| Dec 15, 2023 | City of Edmonds Fiber & Conduit 717677 | Veca Electric & Tech LLC | $6,409 |
| Dec 14, 2023 | Community Transit 23-738 | WASHINGTON TREE EXPERTS LLC | $2,800 |
| Dec 7, 2023 | 5th and Main Oak Trees Pruning N/A | WASHINGTON TREE EXPERTS LLC | $40,000 |
| Dec 1, 2023 | Frances Anderson Center Transom Window Replacement C613.FM | DISTINCTIVE WINDOWS INC | $148,610 |
| Nov 30, 2023 | Public Safety Pedestrian Bldg - Police Clerk Entry Door JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $42,270 |
| Nov 22, 2023 | FAC Gym Floor Refinish JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $67,601 |
| Oct 23, 2023 | Meadowdale Preschool 3615 | BOYER ELECTRIC COMPANY INC | $14,870 |
| Oct 23, 2023 | Public Safety Pedestrian Barrier - Court ADA Access JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $29,202 |
| Oct 23, 2023 | City of Edmonds EV charger 3599 | BOYER ELECTRIC COMPANY INC | $24,011 |
| Oct 23, 2023 | Public Safety Pedestrian Barrier- Public Safety Building ADA Doors JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $47,203 |
| Oct 23, 2023 | Mathay-Ballinger Park 3616 | BOYER ELECTRIC COMPANY INC | $12,928 |
| Oct 20, 2023 | COE Public Safety Lobby East Entrance JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $25,036 |
| Oct 20, 2023 | Edmonds Fire #17 22657640 | SPECIALTY DOOR SERVICE INC | $1,581 |
| Oct 17, 2023 | BARBED WIRE INSTALLATION N/A | ALL ABOUT FENCE LLC | $8,785 |
| Oct 4, 2023 | Public Safety Pedestrian Barrier Fence(Electrical) C598.FM | BOYER ELECTRIC COMPANY INC | $62,300 |
| Sep 11, 2023 | Outdoor Shower and Wash Installation Bracketts | K-A GENERAL CONST CONTR LLC | $22,098 |
| Sep 7, 2023 | Parks Restroom Locks JC23-16F | FORMA CONSTRUCTION COMPANY | $74,200 |
| Sep 6, 2023 | Edmonds Wastewater 20230829 -07s266 | MORGAN MECHANICAL INC | $24,834 |
| Sep 6, 2023 | Johnson Property (c578.re) | SKYCORP LTD | $115,694 |
| Sep 5, 2023 | 23 EDMONDS OVERLAY E23CA/I074 | GRANITE CONSTRUCTION COMPANY | $759,599 |
| Aug 29, 2023 | Seaview Park 2706 | BOYER ELECTRIC COMPANY INC | $37,746 |
| Aug 15, 2023 | City of Edmonds Library Remodel 23-651-LIB | A T S AUTOMATION INC | $19,524 |
| Aug 2, 2023 | Main Street Blowoff E22JA | SHORELINE CONST CO | $6,567 |
| Jul 28, 2023 | Fire Station 17 Apparatus Bay Drywall JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $98,270 |
| Jul 28, 2023 | City Park Bldg. Asphalt Overlay and Re-Stripe JOC-COE-Saybr-001 | SAYBR CONTRACTORS INC | $169,175 |
| Jul 28, 2023 | Edmonds Library 4 | ALBA PAINTING & COATINGS | $13,300 |
| Jul 24, 2023 | Edmonds Creek CCTV WO-28370 | INNOVAC | $3,680 |
| Jul 19, 2023 | Haynes Wharf Park 22655 | TOWN & COUNTRY FENCE INC | $1,287 |
| Jul 18, 2023 | Edmonds Memorial Cemetery Gate Repair Edmonds Memorial Cemetery Gate Repair | TRANSBLUE LLC | $13,812 |
| Jun 29, 2023 | MCC Panel for NPW System Repair/Replace 20230614-079319 | ADVANCED POWER LLC | $34,798 |
| Jun 14, 2023 | Frances Anderson Center Transom Window & Entry Door Replacement JOC-COE-Centennial-001 | CENTENNIAL CONTRACTORS ENT INC | $14,053 |
| Jun 7, 2023 | Citywide Bicycle Improvement and Elm Way Walkway projects E0DC/i505 | LASER UNDRGRND & ERTHWRKS INC | $2,675,267 |
| Jun 7, 2023 | WO501405950_City of Edmonds City Hall-Fire System problems | ADT COMMERCIAL LLC | $932 |
| Jun 2, 2023 | (title withheld) Carl Rugg | SME SOLUTIONS LLC | — |
| May 26, 2023 | Primary Clarifier #1 Internal Steel Structure Replacement 20230509170642531 | SENTRY EQUIPMENT CORP | $374,182 |
| May 18, 2023 | Library Building Window and Frame Replacement JC-23-03F | FORMA CONSTRUCTION COMPANY | $24,999 |
| May 5, 2023 | 2023 Utility Replacement Project E22JA/c565 E6GB/c488 E22GA/c566 | SHORELINE CONST CO | $2,638,970 |
| May 5, 2023 | Johnson Property Refuse Removal C578.RE | PACIFIC NW BIO WA LLC | $24,787 |
| Apr 20, 2023 | City Hall Interior Painting 3 | ALBA PAINTING & COATINGS | $95,079 |
| Apr 7, 2023 | Neighborhood City Office Lobby JC22-04F | FORMA CONSTRUCTION COMPANY | $76,240 |
| Apr 6, 2023 | Non-Pot Valve Replacement & MLSS CV402 Inspection JC23-01F | FORMA CONSTRUCTION COMPANY | $36,910 |
| Mar 21, 2023 | Wastewater Treatment Plant Vault Cleaning 1003 | INNOVAC | $16,985 |
| Mar 8, 2023 | JC23-02F City of Edmonds � Library Flood Exterior Insulation JC23-02F | FORMA CONSTRUCTION COMPANY | $49,660 |
| Feb 23, 2023 | Highway 99 Revitalization & Gateway Project � Stage 2 (Gateway Sign Installations) E20CE/i055 | TUBE ART DISPLAYS INC | $64,724 |
| Feb 16, 2023 | Olympic View Drive Pipe Abandonment project E23FA | SHORELINE CONST CO | $33,026 |
| Feb 14, 2023 | Edmonds Tree Trimming n/a | WASHINGTON TREE EXPERTS LLC | $3,859 |
| Feb 6, 2023 | Emonds Public Works Building 01 | ALBA PAINTING & COATINGS | $73,446 |
| Feb 6, 2023 | Edmonds Public Works Building 01 | ALBA PAINTING & COATINGS | $85,578 |
| Jan 4, 2023 | Signal Repair N/A | WEST COAST SIGNAL INC | $75,045 |
| Nov 22, 2022 | Francis Anderson Center 09 | ALBA PRO PAINTING LLC | $49,847 |
| Nov 18, 2022 | Waste Disposal 09231 | NRC ENVIRONMENTAL SERVICES INC | — |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.