COWLITZ COUNTY PUBLIC WORKS — public works contracts
767 public works projects and 1,400 intents to pay prevailing wages name COWLITZ COUNTY PUBLIC WORKS as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: County.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 55 | 55 | 38 | 76 | 73 | 74 | 103 | 89 | 95 | 108 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 24, 2026 | Public Works window cleaning, gutters, siding N/A: No contract required | PRATT ROOF & GUTTER CLEANING | $2,224 |
| Sep 8, 2026 | Pwer Pole Replacement- Headquarters Landfill 2026-0040-01 | RIVERLINE POWER LLC | $19,244 |
| Sep 3, 2026 | Fuel Dispenser Replacement - Castle Rock Shop 2026-0031-01 | ANDERSON ENVIRONMNTL CNTRG LLC | $28,779 |
| Sep 3, 2026 | Fuel Dispenser Replacement - Kalama Shop 2026-0032-01 | ANDERSON ENVIRONMNTL CNTRG LLC | $28,657 |
| Aug 31, 2026 | Lexington ADA Sidewalk Improvments 2026-0034-01 | N W CONST GENERAL CONTRNG INC | $31,349 |
| Aug 20, 2026 | COWLITZ TWLF FM CALIB 26 26-0608 | Columbia River Elect Maint INC | — |
| Aug 19, 2026 | (title withheld) 2025-0050-01 | ROTO ROOTER SEWER & DRAIN | $40,000 |
| Aug 19, 2026 | Powell Road Fish Removal 2054.46 | ECOLOGICAL LAND SERVICES INC | $5,400 |
| Aug 19, 2026 | Ryderwood Municipal Water Intake Fish Removal 2054.45 | ECOLOGICAL LAND SERVICES INC | $13,100 |
| Aug 19, 2026 | Museum wall 456 | ED SCHUMANN CSTM MNRY/TILE | $5,000 |
| Aug 17, 2026 | Headquarters LF Leachate Pond Repair 1781-001 | NORTHWEST LNG/GEOTXTL PRD INC | — |
| Aug 17, 2026 | Headquarters LF Cell 1 Liner Repair 1780-001 | NORTHWEST LNG/GEOTXTL PRD INC | — |
| Aug 14, 2026 | 2026 COUNTYWIDE PAVEMENT STRIPING PROJECT 2066-26 | CONSTRUCTION AHEAD INC | $938,166 |
| Aug 6, 2026 | CCPW-Studebaker Reservoir Booster TS 4526122PW | ADVANCED ELECTRICAL TECHNLGIES | $1,035 |
| Aug 4, 2026 | Burma Road Toutle Park Road Bypass Project 1859 | TAPANI INC | $1,329,018 |
| Jul 29, 2026 | Cowlitz Tower Road Bridge 1801 | QUIGG BROS INC | $2,683,985 |
| Jul 8, 2026 | Old 99 S Pin Creek Culvert Fish Removal 2054.44 | ECOLOGICAL LAND SERVICES INC | $4,308 |
| Jun 25, 2026 | Commercial Washer Install 107422 | WASHINGTON AUTOMATED LLC | $37,941 |
| Jun 8, 2026 | Leachate Flush & Valve Repair 2026-0027-01 | ADVANCED EXCAVATING SPCLTS LLC | $31,464 |
| May 21, 2026 | LEACHATE HAULING/REMOVAL - HQLF 2026-0014-01 | JAMMIE'S ENVIROMENTAL INC | — |
| May 5, 2026 | 2026 Countywide Pavement Overlay Project 2026 | LAKESIDE INDUSTRIES INC | $2,732,633 |
| May 5, 2026 | 2026 Camelot Large Onsite Septic System (LOSS) 2947 | N W CONST GENERAL CONTRNG INC | $799,520 |
| Apr 30, 2026 | 26-0265 Cowlitz Tennant TS Leechate P1 Fault 26-0265 | HAMER ELECTRIC INC | — |
| Apr 7, 2026 | Aggregate for Bituminous Surface Treatment - 2026 2026 | STERLING BREEN CRUSHING INC | $421,216 |
| Mar 10, 2026 | 2026 Headquarters Landfill Leachate Hauling 2026-01 | JANKE TRUCKING INC | — |
| Mar 10, 2026 | Leachate Line Emergency Repair 2026-001 | ADVANCED EXCAVATING SPCLTS LLC | — |
| Jan 28, 2026 | LEACHATE HAULING/REMOVAL - HQLF 2025-0073-01 | AUSTIN WIRKKALA TRUCKING LLC | — |
| Jan 20, 2026 | COWLITZ COUNTY PUBLIC WORKS 01082026 | TWIN CITY GLASS COMPANY INC | $792 |
| Jan 15, 2026 | CCPW - Headquarters Landfill Annual Maint 4526008A 2026 Annual | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jan 13, 2026 | Emergency Leachate Hauling/Removal 2025-0074-01 | JANKE TRUCKING INC | — |
| Jan 8, 2026 | Allender Road Bridge Replacement Project 1810 | WESTERN UNITED CIVIL GRP LLC | $1,647,545 |
| Dec 6, 2025 | Central Shop-Intrusion Monitoring Upgrades 2025-0054-01 | POINT MONITOR CORPORATION | $4,292 |
| Dec 6, 2025 | System Security Motor Pool Intrusion Upgrades 2025-0055-01 | POINT MONITOR CORPORATION | $4,119 |
| Dec 4, 2025 | CCPW-Toutle WWTP- Service Call 4425326PW | TAURUS POWER AND CONTROLS | — |
| Dec 2, 2025 | Drop Tube Replacement | MASCOTT EQUIPMENT CO INC | $765 |
| Oct 23, 2025 | HQ Landfill 2025 GCCS Expansion 8467 | GLACIER ENVIRONMENTAL SRVC INC | $1,490,176 |
| Oct 2, 2025 | Sweet Birch Drive Emergency Sewer Repair 902175 | ADVANCED EXCAVATING SPCLTS LLC | — |
| Sep 30, 2025 | CCPW-King Rd Pump station-service call 4425281PW | TAURUS POWER AND CONTROLS | — |
| Sep 15, 2025 | 25-0586 Cowlitz Tennant Rehab Electrical for Leechate Pumps 25-0586 | HAMER ELECTRIC INC | — |
| Sep 9, 2025 | Administration Building Parking Lot Replacement 2025-0045-01 | LAKESIDE INDUSTRIES INC | $205,958 |
| Sep 8, 2025 | Cowlitz County Headquarters LF Cell 9 Liner Repairs T25859 | NORTHWEST LNG/GEOTXTL PRD INC | — |
| Aug 27, 2025 | CCPW-Ryderwood WTP 4425253PW | TAURUS POWER AND CONTROLS | — |
| Aug 27, 2025 | CCPW-Woodbrook WWTP- Service Call 4425254PW | TAURUS POWER AND CONTROLS | — |
| Aug 20, 2025 | 25-0542 Cowlitz Tennant Landfill Conduit Repair 25-0542 | HAMER ELECTRIC INC | — |
| Aug 20, 2025 | 2025 COUNTYWIDE DELINEATORS PROJECT 1470 | CONSTRUCTION AHEAD INC | $159,886 |
| Aug 1, 2025 | 2025 Countywide Guardrail Project 1430 | DIRT & AGGREGATE INTERCHNG INC | $298,888 |
| Jul 29, 2025 | 2025 Countywide Pavement Striping Project 2066-25 | All Stripes LLC | $520,000 |
| Jul 10, 2025 | (title withheld) AS-12218 | ROTO ROOTER SEWER & DRAIN | $20,000 |
| Jul 7, 2025 | Sewer Lateral Repair - Mary Hill Dr. 2025-0046-01 | ADVANCED EXCAVATING SPCLTS LLC | $15,000 |
| Jun 20, 2025 | 2025 Countywide Pavement Overlay 2025 | LAKESIDE INDUSTRIES INC | $2,831,784 |
| Jun 16, 2025 | CCPW-North Kelso Flood Control-King Creek Mission RTU Install 4425178PW | TAURUS POWER AND CONTROLS | — |
| Jun 3, 2025 | Garlock Road Delameter Creek Fish Passage 1779 | WESTERN UNITED CIVIL GRP LLC | $2,349,120 |
| May 29, 2025 | ITALIAN CREEK RD CULVERT REPLACEMENT 1323; C.R.P NO 790 | DEWITT CONSTRUCTION INC | $434,355 |
| May 7, 2025 | CCPW-North Kelso Flood Control-King Creek ATS replacement 4425145PW | TAURUS POWER AND CONTROLS | $15,500 |
| May 7, 2025 | Cla-Val Rebuild 2025-0023-01 | CIMCO-GC SYSTEMS LLC | $14,709 |
| May 5, 2025 | 25-0211 Cowlitz Tennant Landfill 2025 Flow Calibration 25-0211 | HAMER ELECTRIC INC | — |
| May 2, 2025 | Aggregate for Bituminous Surface Treatment - 2025 2025 | STERLING BREEN CRUSHING INC | $431,524 |
| May 1, 2025 | CCPW-Ryderwood WTP 4425139PW | TAURUS POWER AND CONTROLS | — |
| May 1, 2025 | CCPW-Ryderwood WTP-Intrusion switch install 4425140PW | TAURUS POWER AND CONTROLS | — |
| Mar 25, 2025 | 25-0202 CCPW Fallert Bridge Wells- T/S Circuit Breaker Trip 25-0202 | HAMER ELECTRIC INC | — |
| Mar 21, 2025 | Toutle WWTP Improvements Project 9161 | TAPANI INC | $1,492,329 |
| Mar 19, 2025 | INSTALL NEW WASHER & DRYER PO100001331 | WASHINGTON AUTOMATED LLC | $21,263 |
| Mar 12, 2025 | 24-0793 Cowlitz Co Kelso 3rd Ave New Panel 24-0793 | HAMER ELECTRIC INC | — |
| Mar 5, 2025 | CCPW - Headquarters Landfill Annual Maintance 4425010PW | TAURUS POWER AND CONTROLS | — |
| Feb 25, 2025 | 25-0067 Cowlitz County Event Center 25-0067 | HAMER ELECTRIC INC | $120,166 |
| Feb 19, 2025 | CCPW-Tower Rd Pump station 4425067 | TAURUS POWER AND CONTROLS | — |
| Feb 3, 2025 | 25-0049 Cowlitz Tennant Landfill Add Flow to Raco AD 25-0049 | HAMER ELECTRIC INC | — |
| Jan 25, 2025 | 2024 Unit Price Guardrail Installation and Repair Project 360-577-3030 | COLUMBIA RIVER CONTRACTORS INC | $460,311 |
| Jan 10, 2025 | International Way Sewer Repair 9162 | ADVANCED EXCAVATING SPCLTS LLC | — |
| Dec 31, 2024 | CCPW - Troubleshoot King Road Lift Station pump #2 4524324PW | ADVANCED ELECTRICAL TECHNLGIES | — |
| Dec 24, 2024 | 24-0645 CCPW Diking District 15 Shed Power 24-0645 | HAMER ELECTRIC INC | $9,998 |
| Dec 16, 2024 | 24-0780 Cowlitz Co Kelso Pump Station Verify Function 24-0780 | HAMER ELECTRIC INC | — |
| Nov 15, 2024 | Silver Lake Flood Control Bracket Replacement SLFCD AES 24085 | ADVANCED EXCAVATING SPCLTS LLC | — |
| Sep 25, 2024 | Riverside Park Court Overlay 2024-0025-01 | LAKESIDE INDUSTRIES INC | $72,322 |
| Sep 24, 2024 | Cowlitz CO PU WS-03636 | UNITEC CORPORATION | — |
| Sep 6, 2024 | Annex Roof Replacement 2024-0024-01 | WEATHERGUARD INC | $191,235 |
| Sep 6, 2024 | Hall of Justice North Parking Lot 2024-0020-01 | LAKESIDE INDUSTRIES INC | $110,262 |
| Aug 7, 2024 | (title withheld) Small Project Agreement | RIVER CITY ENVIRONMENTAL INC | $33,080 |
| Aug 5, 2024 | 24-0504 Cowlitz Tennant Landfill TS Gas Flow 24-0504 | HAMER ELECTRIC INC | — |
| Jul 22, 2024 | Ryderwood Intake Maintenance 2054.38 | Ecological Land Services, Inc. | — |
| Jul 22, 2024 | (title withheld) AS-12218 | ROTO ROOTER SEWER & DRAIN | $18,000 |
| Jul 10, 2024 | Power washing H.H.R.S. old Maintenance building court yard FAC 16-2024 | DUNN MAINTENANCE | $5,136 |
| Jul 2, 2024 | 24-0441 Cowlitz Co Autoshop TS Oil Tank Pump OL 24-0441 | HAMER ELECTRIC INC | — |
| Jun 26, 2024 | CCPW - New pressure transducer at reservoir 4524174PW | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jun 24, 2024 | 2024 Countywide Pavement Overlay Project 2024 | LAKESIDE INDUSTRIES INC | $2,121,010 |
| Jun 17, 2024 | Cowlitz- Low Profile out repair WS-03473 | UNITEC CORPORATION | $2,333 |
| Jun 11, 2024 | Cowlitz County Shooting Range Est 8283 | DALE MCGHEE&SONS WELL DRL INC | $3,646 |
| Jun 3, 2024 | 24-0382 Cowltiz Co Autoshop TS Oil Tank 24-0382 | HAMER ELECTRIC INC | — |
| Apr 30, 2024 | T/S PLC at International Way Pump Station 4524121pw | ADVANCED ELECTRICAL TECHNLGIES | — |
| Apr 24, 2024 | Bond and Powell Road Fish Removal 2054.37 | ECOLOGICAL LAND SERVICES INC | — |
| Apr 18, 2024 | Service Hallway Project 23-PWP-EC04 | FINNERY CONSTRUCTION INC | $54,050 |
| Apr 11, 2024 | Potable Water Tank C&I Cowlitz County PW | INLAND POTABLE SERVICES INC | $11,382 |
| Apr 9, 2024 | Tree Removal Court House N/A | NEW DAY ARBORIST | $2,254 |
| Apr 9, 2024 | Tree Removal, Washington St. N/A | NEW DAY ARBORIST | $1,070 |
| Mar 27, 2024 | Delameter Creek Fish Removal 2054.36 | Ecological Land Services, Inc. | — |
| Feb 29, 2024 | 24-0111 Cowlitz Tennant Landfill TS Raco AD 24-0111 | HAMER ELECTRIC INC | — |
| Feb 23, 2024 | Landfill Link COWLZ-1000001221 | DAY WIRELESS SYSTEMS | $3,252 |
| Feb 8, 2024 | 24-0111 Cowlitz Tennant Landfill TS Raco AD 24-0111 | HAMER ELECTRIC INC | — |
| Jan 31, 2024 | Lexington Flood Control Dist. Ventura Pump Station 4524039 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jan 29, 2024 | Cowlitz County Public Works Motor Poole 2024-0003-01 | SMART RESTORE LLC | $81,631 |
| Jan 24, 2024 | CCPW Headquarters Landfill Annual Maintance 4524033 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jan 15, 2024 | Jet Main Leachate Line NA | JAMMIE'S ENVIROMENTAL INC | — |
| Jan 10, 2024 | McCorkle Creek Pump Station Gravity Gate Repair 2024-01-GGR | ADVANCED EXCAVATING SPCLTS LLC | $28,000 |
| Jan 4, 2024 | COW Blast road oil tank 7223489 | COWLITZ CLEAN SWEEP | $16,623 |
| Dec 26, 2023 | Tennant Way Landfill On-Call Electrical 23-0503 | HAMER ELECTRIC INC | — |
| Dec 21, 2023 | Install/Upgrade Curve Warning Signs 1107 | All Stripes LLC | $486,700 |
| Dec 14, 2023 | Cowlitz County Landfill N/A | OLSON BROTHERS PRO-VAC LLC | $7,661 |
| Dec 6, 2023 | (title withheld) 23-0799 | HAMER ELECTRIC INC | — |
| Nov 22, 2023 | Shop door knob Landfill Headquarters | KEYS PLUS INC | $338 |
| Nov 6, 2023 | Sparks Drive Bridge Sparks Drive Bridge | CHAMP'S TREE SERVICE | $9,163 |
| Oct 11, 2023 | SC Pump Station 4523295 | ADVANCED ELECTRICAL TECHNLGIES | $1,722 |
| Oct 9, 2023 | COWLITZ LANDFILL TS LEECHATE STOP FLOAT 23-0575 | HAMER ELECTRIC INC | — |
| Oct 4, 2023 | Cathlamet Road Slide Repair Project TA-7738 | MIDWAY UNDERGROUND LLC | $438,865 |
| Oct 4, 2023 | CDID 3 TAM1 REPLACE 2000A 22-0050 | HAMER ELECTRIC INC | $64,898 |
| Oct 3, 2023 | Oak tree removal N/A | NEW DAY ARBORIST | $2,090 |
| Oct 3, 2023 | Pruning on 1st Ave #2023-0041-01 | NEW DAY ARBORIST | $28,348 |
| Oct 2, 2023 | Old 99 South Fish Removal 2054.33 | Ecological Land Services, Inc. | $3,000 |
| Oct 2, 2023 | Lomor Creek Culvert 2054.32 | Ecological Land Services, Inc. | $4,100 |
| Sep 28, 2023 | Abernathy Creek Bridge 2 Painting Project 770 | MERICKA GROUP LLC | $147,944 |
| Sep 22, 2023 | CCPW-Tower Rd Phase Monitor 4523084 | ADVANCED ELECTRICAL TECHNLGIES | $1,138 |
| Sep 20, 2023 | Replacement-gate operator FAC 15-2023 | HARGROVE FENCE CO INC | $9,024 |
| Sep 1, 2023 | Cowlitz Co WS-02846 | UNITEC CORPORATION | — |
| Aug 29, 2023 | 2hr load bank test - Various location Equipment #'s - #001303, #00713, #1304, #00717, #1302, #00718, #01307 | PACIFIC POWER GROUP LLC | $10,535 |
| Aug 28, 2023 | 2023 Joint Agency Pavement Striping 2066-33 | SPECIALIZED PAVEMENT MRKG LLC | $889,732 |
| Aug 23, 2023 | Cowlitz County Landfill Pump Replacement 7386 | DALE MCGHEE&SONS WELL DRL INC | $8,355 |
| Aug 22, 2023 | Silver Lake Reinforcement 2023-02-SLD | ADVANCED EXCAVATING SPCLTS LLC | $16,170 |
| Aug 14, 2023 | LEACHATE POND CLEANING-HEADQUARTERS LANDFILL 2023-0042-01 | JAMMIE'S ENVIROMENTAL INC | $5,184 |
| Aug 9, 2023 | Camelot Reservoir Roof Replacement Project Project No. 2955 | SLATECO LLC | $308,718 |
| Jul 27, 2023 | Cowlitz County On-Call Electrical Services 2023-0026-01 / 4523248 | ADVANCED ELECTRICAL TECHNLGIES | $150,000 |
| Jul 25, 2023 | Diesel Pump Down Doug 072023 | MASCOTT EQUIPMENT CO INC | $1,375 |
| Jul 20, 2023 | 2023 CLA-VAL Maintenance 2023 CLA-VAL Maintenance | CIMCO-GC SYSTEMS LLC | $8,516 |
| Jul 17, 2023 | Pump 2 Replacement 4523203 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jun 13, 2023 | 2023 Joint Agency Pavement Overlay 2023 | LAKESIDE INDUSTRIES INC | $2,031,318 |
| Jun 12, 2023 | Cowlitz Landfill TS LFG Foot Valve 23-0309 | HAMER ELECTRIC INC | — |
| May 30, 2023 | Cowlitz County Vaults R119422 | ROTO ROOTER SEWER & DRAIN | $3,185 |
| May 18, 2023 | Cowlitz Co Public Works WS-02835 | UNITEC CORPORATION | — |
| May 11, 2023 | CCPW-Gassman Rd & Westside HWY lighting Service call 4523100 | ADVANCED ELECTRICAL TECHNLGIES | — |
| May 10, 2023 | HEADQUARTERS LANDFILL SHO HEAT STACK REMOVAL 2023-0021-01 | WEATHERGUARD INC | $3,500 |
| May 9, 2023 | (title withheld) AS-12218 | ROTO ROOTER SEWER & DRAIN | $18,000 |
| Apr 25, 2023 | Compliance Testing Doug 112022 | MASCOTT EQUIPMENT CO INC | $743 |
| Apr 21, 2023 | Testing Doug 012023 | MASCOTT EQUIPMENT CO INC | $743 |
| Mar 28, 2023 | Cowlitz WS-02709 | UNITEC CORPORATION | — |
| Mar 26, 2023 | CCPW - T/S Toutle Reservoir pressure Transmitter 4523073 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Mar 23, 2023 | CCPW - Headquarters Landfill Annual Maintance 4523061 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Mar 7, 2023 | (title withheld) F4523 | INDUSTRIAL ELECTRIC MACHINERY | $3,543 |
| Mar 6, 2023 | (title withheld) F4517 | INDUSTRIAL ELECTRIC MACHINERY | $3,543 |
| Feb 28, 2023 | COWLITZ LANDFILL REPLACE 8' AUTOMATIC FOOT VALVE 22-0747 | HAMER ELECTRIC INC | $18,498 |
| Feb 23, 2023 | Cowlitz Landfill TS Leechate Pumps 23-0122 | HAMER ELECTRIC INC | — |
| Feb 23, 2023 | CCPW -Leachate Pump station generator block Heater Outside outlet 4523029 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jan 27, 2023 | (title withheld) 2223096 | SME SOLUTIONS LLC | $2,816 |
| Jan 24, 2023 | (title withheld) 4522379 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jan 24, 2023 | (title withheld) 2223097 | SME SOLUTIONS LLC | $2,816 |
| Jan 18, 2023 | Spruce Creek Tree Work 2023-0007-01 | BRINEY'S TREE SERVICE | $1,725 |
| Jan 5, 2023 | Cowlitz Indan Tribal Housing WWTP-Service Call 4522380 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Jan 5, 2023 | CCPW - T/S Phase monitor relay 4522381 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Dec 22, 2022 | Cowlitz Landfill T/S Flare Temp controls 22-0857 | HAMER ELECTRIC INC | — |
| Dec 21, 2022 | Hydroblast Road Oil Tank 7322184 | COWLITZ CLEAN SWEEP | — |
| Dec 15, 2022 | CCPW-CR Fuel Station Repair 4522252 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Dec 1, 2022 | Lot Cleaning NA | JAMMIE'S ENVIROMENTAL INC | — |
| Nov 22, 2022 | Landfill Sump/Vault Cleaning NA | JAMMIE'S ENVIROMENTAL INC | — |
| Nov 21, 2022 | Primrose Tree Removal 2022-0028-01 | CROSSCUT TREE WORKS LLC | $7,243 |
| Nov 15, 2022 | Ostrander Tree Work 2022-0055-01 | BRINEY'S TREE SERVICE | $1,725 |
| Nov 15, 2022 | Westside Hwy Tree Work 2022-0054-01 | BRINEY'S TREE SERVICE | $2,372 |
| Nov 9, 2022 | CCPW-Gassman Rd & Westside HWY lighting Service call 4522324 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Nov 3, 2022 | N Goble Creek tress | BRINEY'S TREE SERVICE | $2,695 |
| Oct 26, 2022 | COWLITZ LANDFILL T/S HI FLARE TEMP 22-0710 | HAMER ELECTRIC INC | — |
| Oct 26, 2022 | Cowlitz County Landfill J#22464 | Entek Corporation | $1,550 |
| Oct 10, 2022 | Cowlitz Equipment Install | PUREGREEN EQUIPMENT SRVCS LLC | $90,665 |
| Sep 27, 2022 | Lines/Leaks x 2 ATG | MASCOTT EQUIPMENT CO INC | $2,457 |
| Sep 22, 2022 | Sparks Pump Station Repair Pump S/N: 97WP0029 | TRIANGLE PUMP & EQUIPMENT INC | $25,100 |
| Sep 15, 2022 | CCPW - Troubleshoot King Road Lift Station pump #2 4522286 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Sep 9, 2022 | Cowlitz County Public Works | OVERHEAD DOOR CO OF S W WA | $411 |
| Sep 8, 2022 | (title withheld) DYAWNE 7 20 2022 | MASCOTT EQUIPMENT CO INC | $2,000 |
| Aug 25, 2022 | T/S PLC power loss 4522265 | ADVANCED ELECTRICAL TECHNLGIES | — |
| Aug 11, 2022 | Replace Spill Buckets & Drop Tube Duane 6/10 | MASCOTT EQUIPMENT CO INC | $7,278 |
| Aug 11, 2022 | (title withheld) Duane 6/10/2022 Kalama | MASCOTT EQUIPMENT CO INC | $7,119 |
| Aug 7, 2022 | Binding door 82079 | OVERHEAD DOOR CO/PRTL VAN INC | $359 |
| Aug 1, 2022 | Lexington Flood Control FI4793 | INDUSTRIAL ELECTRIC MACHINERY | $3,795 |
| Aug 1, 2022 | (title withheld) F4114 | INDUSTRIAL ELECTRIC MACHINERY | $3,805 |
| Jun 24, 2022 | Riverside Park Resurface COWLZ-1000000756 | PACIFIC SPORTS TURF INC | $78,097 |
| Jun 16, 2022 | (title withheld) Duane Ahrens | SME SOLUTIONS LLC | $850 |
| Jun 16, 2022 | (title withheld) Duane | SME SOLUTIONS LLC | $800 |
| Jun 7, 2022 | 2022 Countywide Pavement Overlay 2022 | LAKESIDE INDUSTRIES INC | $1,144,628 |
| May 23, 2022 | PROBE ISSUES DWAYNE SERVICE | MASCOTT EQUIPMENT CO INC | $3,700 |
| May 19, 2022 | Riverside Park Soccer Field Fencing 2021-0031-01 | EXPRESS IRON WORKS INC | $42,616 |
| May 11, 2022 | CCPW - T/S Loss of Power Alarm at Toutle WWTP 4522125 | ADVANCED ELECTRICAL TECHNLGIES | — |
| May 11, 2022 | CCPW Headquaters Landfill - Leachate Pump station service call 4522147 | ADVANCED ELECTRICAL TECHNLGIES | — |
| May 9, 2022 | Tennant Way Landfill Lift Station 9322125 | COWLITZ CLEAN SWEEP | — |
| May 5, 2022 | Field Fence Delameter Rd 03022022 | HARGROVE FENCE CO INC | $4,679 |
| Apr 29, 2022 | 2021 Unit Price Guardrail Installation & Repair Project 2216 | COLUMBIA RIVER CONTRACTORS INC | $349,561 |
| Apr 26, 2022 | Powell Road Fish Removal 0000-07ELS | Ecological Land Services, Inc. | $8,900 |
| Apr 14, 2022 | COWLITZ PUBLIC WORKS SHOPS 120120-123121 | ABM ONSITE SERVICES-WEST | $5,200 |
| Apr 14, 2022 | Landfill 717172 | RIVER CITY ENVIRONMENTAL INC | $94,533 |
| Apr 14, 2022 | COWLITZ PUBLIC WORKS-SHOPS 01/01/2022-05/31/2022 | ABM ONSITE SERVICES-WEST | $2,000 |
| Apr 13, 2022 | 65 Alpha Dr Transformer Spill 9322107 | COWLITZ CLEAN SWEEP | — |
| Apr 7, 2022 | CCPW Longview Shop TS Breaker Panel 22-0238 | HAMER ELECTRIC INC | — |
| Mar 30, 2022 | 126 Rollingwood Lateral Repair 126 Rollingwood Lateral | ADVANCED EXCAVATING SPCLTS LLC | — |
| Mar 23, 2022 | Toutle waste water treatment plant Sludge removal | ROTO ROOTER SEWER & DRAIN | $18,000 |
| Mar 8, 2022 | Replace Operator, Judges gate 02152022 | HARGROVE FENCE CO INC | $8,072 |
| Feb 11, 2022 | Vacuum Leachate & Pump 083 003 788 | WEST COAST MARINE CLEANING | $44,205 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.