CHELAN COUNTY PUBLIC WORKS — public works contracts
413 public works projects and 862 intents to pay prevailing wages name CHELAN COUNTY PUBLIC WORKS as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: County.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 52 | 37 | 59 | 77 | 52 | 64 | 56 | 43 | 25 | 52 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 3, 2026 | Arizona Blvd Stormwater Improvements SD2029 | PIPKIN CONSTRUCTION | $222,835 |
| Aug 13, 2026 | System Down 84894 | CDASSE | — |
| Aug 5, 2026 | Annual Calibration of Plant Pressure Transmitter and Gauges 2025008436 | McCune's Instruments | $8,672 |
| Jul 16, 2026 | Beaver Hill Slide Emergency Reapairs TA-8456 | HURST CONSTRUCTION LLC | $789,788 |
| Jun 26, 2026 | Pump Error Codes 84549 | CDASSE | — |
| Jun 19, 2026 | Calibrate Meter 84340 | CDASSE | — |
| Jun 19, 2026 | Calibrate Meter 84351 | CDASSE | — |
| Jun 19, 2026 | Calibrate Meter 84341 | CDASSE | — |
| Jun 19, 2026 | Calibrate Meter 84350 | CDASSE | — |
| Jun 19, 2026 | Calibrate Meter 84339 | CDASSE | — |
| Jun 16, 2026 | Squilchuck Basin Stormwater Retrofit SD2030 | MASS X CONSTRUCTION LLC | $310,759 |
| May 13, 2026 | Chelan County - Law and Justice building CH Cond. Coil Cleaning 202600282 | APPLIED INDUSTRIAL SYSTEMS LLC | $1,920 |
| May 13, 2026 | Chelan County - Law and Justice CH Sys#1 Refrige Leak Repair Recharge 202600310 | APPLIED INDUSTRIAL SYSTEMS LLC | $9,295 |
| Apr 28, 2026 | Leavenworth Deicer Pump Q26033-2026 | APPLE CITY ELECTRIC LLC | $5,919 |
| Apr 24, 2026 | CAMERA SYSTEM ADDITION PO834 | LOCALTEL COMMUNICATIONS | — |
| Apr 22, 2026 | Preventative Maintenance of Equipment Don Hathaway | AMB TOOLS | $2,102 |
| Apr 8, 2026 | Network 83625 | CDASSE | — |
| Feb 23, 2026 | CRP 751 Countywide Barrier Terminals - 2025 - Rebid TA-7961 | FRANK GURNEY INC | $462,043 |
| Feb 19, 2026 | Totem Pole Road Phase 1 TA-7281 | LARIVIERE INC | $2,195,314 |
| Feb 6, 2026 | Dryden Transfer Station 193 | WENATCHEE QUALITY WELDING | $1,175 |
| Jan 27, 2026 | Fire Inspection 525348 | KEYHOLE SECURITY INC | $676 |
| Jan 15, 2026 | Site Controller 82631 | CDASSE | — |
| Dec 19, 2025 | Tank Monitor Setup 82382 | CDASSE | $419 |
| Dec 16, 2025 | Heater Blowing Cold Air N/A | SALCIDO CONNECTION INC, THE | — |
| Oct 28, 2025 | TRANSFER STATION-RELOCATE 100A SERVICE 30055-2025 | APPLE CITY ELECTRIC LLC | — |
| Oct 10, 2025 | LIGHTING REPAIR 29994 | APPLE CITY ELECTRIC LLC | — |
| Oct 9, 2025 | Repair of Sand Shed 2531 | WESTERN RANCH BUILDINGS LLC | $9,200 |
| Oct 1, 2025 | Chelan County Transfer Station PW-MOS2280442-o | PYE-BARKER FIRE & SAFETY LLC | $5,116 |
| Sep 26, 2025 | DRYDEN TRANSFER STATION METAL YARD PAVING PROJECT SW 834 | WAKEFIELD EXCAVATION LLC | $234,545 |
| Sep 24, 2025 | Stemilt Bridge #103 Channel Restoration CRP 730 CRP 730 | EXCAVATION WEST INC | $166,861 |
| Sep 16, 2025 | Chelan County Facilities - Maintenance Agreement 25280 | APPLIED INDUSTRIAL SYSTEMS LLC | $7,260 |
| Aug 25, 2025 | Drench Shower System Repair Kris Perry | AFTER HOURS PLUMBING & HTG INC | $1,257 |
| Aug 14, 2025 | Site Controller repair 80783 | CDASSE | — |
| Jul 2, 2025 | Annual Calibration of Plant Pressure Transmitter and Gauges 2025008436 | McCune's Instruments | $8,672 |
| Jun 17, 2025 | Replace heat detectors 524583 | KEYHOLE SECURITY INC | $10,682 |
| May 12, 2025 | School Street Wall Repair CRP762 CRP 762 | ADVANCED FNDTN SUPPORTS LLC | $81,818 |
| Apr 23, 2025 | East Bank Hatchery F1604-1310 | CORRECT EQUIPMENT INC | $418 |
| Feb 18, 2025 | DRYDEN TRFR STN RR NO HEAT N/A | SALCIDO CONNECTION INC, THE | — |
| Feb 18, 2025 | DRYDEN TRFR STN MINI SPLIT N/A | SALCIDO CONNECTION INC, THE | — |
| Jan 21, 2025 | NVR REPLACEMENT PO# 834 | LOCALTEL COMMUNICATIONS | — |
| Jan 16, 2025 | Floor Scanning Floor Scanning | INTERSTATE SAWING & DRILLING | — |
| Dec 31, 2024 | Fire system inspection 1026597 | KEYHOLE SECURITY INC | — |
| Dec 3, 2024 | Ch Co Sheriff County Shop Facility 10162024 | DOOR-TECH INC | $3,497 |
| Nov 14, 2024 | Lighting Retro Fit Q24205 2024 | APPLE CITY ELECTRIC LLC | $3,536 |
| Oct 3, 2024 | Interstitial sensor out alarm 76953 | COEUR D'ALENE SRVC STA EQP INC | — |
| Sep 18, 2024 | (title withheld) PO 24265 | GREAT FLOORS | $4,261 |
| Aug 22, 2024 | Law and Justice Bldg. Leak Test/Trim Charge AIS 2024-0251 | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Aug 13, 2024 | (title withheld) 75416 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 13, 2024 | (title withheld) 75420 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 13, 2024 | (title withheld) 75418 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 13, 2024 | (title withheld) 75522 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 13, 2024 | (title withheld) 75418 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jul 31, 2024 | Law and Justice Bldg. Chiller M/A AIS 2024-0243 | APPLIED INDUSTRIAL SYSTEMS LLC | $7,048 |
| Jul 25, 2024 | Rock Island Dam 2024007846 | McCune's Instruments | $8,688 |
| Jul 9, 2024 | Chelan County - law and Justice Center Emergency Call Approved by Bill | APPLIED INDUSTRIAL SYSTEMS LLC | — |
| Jun 12, 2024 | EASY ST DOOR #6 OPERATOR REPLACEMENT 5282024 | DOOR-TECH INC | $4,139 |
| May 21, 2024 | Time incorrect on site controller 75971 | COEUR D'ALENE SRVC STA EQP INC | — |
| May 13, 2024 | Truck shop break room Truck Shop break room | FRANCE & CO | — |
| May 1, 2024 | Bridge Deck and Joint Rehabilitation CRP 747 TA-7593 | N A DEGERSTROM INC | $2,057,740 |
| Apr 5, 2024 | Chelan County Roadside Spraying 2024 Spraying on County Roadsides | Woodland Resource Services Inc | — |
| Mar 13, 2024 | (title withheld) 75202 | COEUR D'ALENE SRVC STA EQP INC | — |
| Mar 12, 2024 | Dryden Transfer Station Push Pit floor repair SW 834 | SCI INDUSTRIAL SERVICES LLC | $237,269 |
| Feb 23, 2024 | (title withheld) 74777 | COEUR D'ALENE SRVC STA EQP INC | — |
| Feb 14, 2024 | Pump 2 diesel won't reset 74773 | COEUR D'ALENE SRVC STA EQP INC | — |
| Feb 7, 2024 | Diesel Down pump 2 74691 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jan 31, 2024 | HAY CANYON SERVICE REPLACEMENT HC28689 | APPLE CITY ELECTRIC LLC | $26,666 |
| Jan 30, 2024 | Fire System Inspection 1022597 | KEYHOLE SECURITY INC | — |
| Jan 29, 2024 | CASHMERE SHOP UPGRADE Q24009 | APPLE CITY ELECTRIC LLC | $8,401 |
| Dec 28, 2023 | (title withheld) 508350.271 | W/W PUMPING SERVICE INC | $20,000 |
| Oct 25, 2023 | Yaksum Canyon Road - Slide Repair CRP 749 | PIPKIN CONSTRUCTION | — |
| Oct 18, 2023 | Leavenworth Shop Fence Repairs | WENATCHEE FENCE INC | $3,479 |
| Oct 11, 2023 | Chelan County Courthouse HVAC 23259 | NORTH CASCADES HTG & AIR COND | $15,191 |
| Sep 20, 2023 | Harris Court Drainage Improvement Project SD 2025 | PIPKIN CONSTRUCTION | $155,150 |
| Sep 7, 2023 | MISCELLANEOUS ELECTRICAL 2023 | APPLE CITY ELECTRIC LLC | — |
| Aug 21, 2023 | Repair roof drain leak 23268 | ALLIED PLUMBING & PUMPS LLC | $2,268 |
| Aug 16, 2023 | LIGHTING RETROFIT 23069 | APPLE CITY ELECTRIC LLC | — |
| Aug 4, 2023 | 2023 Guardrail Repair Phase 1 CRP 741 | FRANK GURNEY INC | $100,000 |
| Jul 19, 2023 | No 2 Canyon Rd Imp TA 7375 | SELLAND CONST INC | $326,368 |
| Jul 10, 2023 | Chumstick Hwy Phase V Improvement Project CRP 735 | SMITH EXCAVATION | $1,496,616 |
| Jul 6, 2023 | Rock Island Dam N/A | McCune's Instruments | $8,640 |
| Jun 15, 2023 | LIGHTING RETROFIT 23069 | APPLE CITY ELECTRIC LLC | $23,119 |
| Jun 14, 2023 | SALT SHED POWER 23113 | APPLE CITY ELECTRIC LLC | $9,909 |
| Jun 13, 2023 | LIGHTING RETROFIT Q23059 | APPLE CITY ELECTRIC LLC | — |
| Jun 12, 2023 | Orchard Street Drainage Improvement Project CRP737 | SMITH EXCAVATION | $69,365 |
| May 26, 2023 | Singel Point Entry Walk Off JB23-176911 | GREAT FLOORS | $16,204 |
| May 26, 2023 | Two Jury Boxes JB23-181527 | GREAT FLOORS | $3,424 |
| May 26, 2023 | 1st Floor & 3rd Floor Carpet JB23-177486 | GREAT FLOORS | $31,540 |
| May 17, 2023 | Calibrate Meter - Easy Street in Wenatchee 71615 | COEUR D'ALENE SRVC STA EQP INC | — |
| May 17, 2023 | Calibrate Meter - Entiat River Road 71619 | COEUR D'ALENE SRVC STA EQP INC | — |
| May 17, 2023 | Calibrate Meter - Hwy 97 in Chelan 71616 | COEUR D'ALENE SRVC STA EQP INC | — |
| May 17, 2023 | Site Controller, Help with FSC 3000 system 71955 | COEUR D'ALENE SRVC STA EQP INC | — |
| May 17, 2023 | Calibrate Meter - County Shop Road in Leavenworth 71617 | COEUR D'ALENE SRVC STA EQP INC | — |
| May 17, 2023 | Calibrate Meter - Wescott Drive in Cashmere 71618 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 19, 2023 | Chelan County Facilities Maintenance - Elevator Upgrades 22791 | EVCO SOUND & ELECTRONICS INC | $14,545 |
| Apr 18, 2023 | Chelan County Facilities Maintenance-Vestibule Add PO225452 | EVCO SOUND & ELECTRONICS INC | $5,423 |
| Feb 17, 2023 | Fire System Inspection 21023 | KEYHOLE SECURITY INC | — |
| Feb 3, 2023 | K800 keypad not working. 70877 | COEUR D'ALENE SRVC STA EQP INC | — |
| Feb 3, 2023 | Programming new chip keys for K800 system 70873 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jan 18, 2023 | Tank Monitor - Alarms Multiple tank monitor alarms need checked out. 70733 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 23, 2022 | STREET LIGHT REPAIR Q22392 | APPLE CITY ELECTRIC LLC | $1,624 |
| Oct 20, 2022 | JUVINAL OFFICE JB22-143432 | GREAT FLOORS | $1,893 |
| Aug 29, 2022 | Dryden Transfer Station 22-137 | CANYON FENCE LLC | $18,562 |
| Aug 3, 2022 | Chelan County Public Works Gary | AFTER HOURS PLUMBING & HTG INC | $2,056 |
| Jul 19, 2022 | June Rain Event 2022-No. 1 Canyon Debris Basin Cleanout 2022-55 | SMITH EXCAVATION | — |
| Jul 19, 2022 | Rock Island Dam N/A | McCune's Instruments | $8,688 |
| Jun 21, 2022 | Tank Monitor - inoperable, battery issue 68393 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jun 10, 2022 | 2022 Guardrail Repair Phase 1, County Road Project No. 741 CRP 741 | FRANK GURNEY INC | $10,944 |
| Jun 3, 2022 | Calibrate Meter - Leavenworth 65510 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jun 3, 2022 | Calibrate Meter - Entiat 68227 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jun 3, 2022 | Calibrate meter - Wenatchee 65509 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jun 3, 2022 | Calibrate Meter - Chelan 68228 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jun 3, 2022 | Calibrate Meter - Cashmere 65511 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jun 2, 2022 | Sunnyslope yard Stormwater Retrofit Project SD2014 | PIPKIN CONSTRUCTION | $299,666 |
| May 17, 2022 | VIDEO COURT ROOM JB22-119419 | GREAT FLOORS | $5,663 |
| May 11, 2022 | Dryden Transfer Station WH Dryden Transfer Station WH | AFTER HOURS PLUMBING & HTG INC | $1,681 |
| Apr 28, 2022 | sites battery backup is continually beeping 67839 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 27, 2022 | Site cannot connect to their Entiat site via dial up 67745 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 26, 2022 | (title withheld) JB22-101038 | GREAT FLOORS | $12,415 |
| Mar 18, 2022 | COURTHOUSE LEVEL 5,4,3 JB21-037736 | GREAT FLOORS | $39,043 |
| Mar 18, 2022 | SHERRIFS OFFICE PO 21391 | GREAT FLOORS | $6,736 |
| Mar 16, 2022 | (title withheld) 210 Easy St | AFTER HOURS PLUMBING & HTG INC | $471 |
| Mar 3, 2022 | Brush Grinding at Multiple Sites SW0823 | Standard Pallet Co | $40,000 |
| Feb 18, 2022 | SS Office Warranty Compressor N/A | SALCIDO CONNECTION INC, THE | — |
| Feb 7, 2022 | Knowles Rd Phase2 Improvments CRP 725 | J & K EARTHWORKS LLC | $3,743,616 |
| Jan 31, 2022 | Fire System Inspection 1312022 | KEYHOLE SECURITY INC | — |
| Jan 18, 2022 | Rock removal 1/14/22 | SELLAND CONST INC | — |
| Jan 12, 2022 | Rocky Reach CM 24 Furniture 402897 | OPENSQUARE | — |
| Jan 5, 2022 | Police Dept - River Com Room HP Alarm N/A | SALCIDO CONNECTION INC, THE | — |
| Nov 17, 2021 | 210 East St 210 Easy St | AFTER HOURS PLUMBING & HTG INC | $518 |
| Nov 11, 2021 | Squilchuck Outfall Phase 2 SD2008 | OLIN EXCAVATION LLC | $188,820 |
| Nov 8, 2021 | (title withheld) 210 Easy St | AFTER HOURS PLUMBING & HTG INC | $249 |
| Nov 2, 2021 | 25-WA-211014 Chelan County Law & Justice Building 21411 | GARLAND/DBS INC | $343,911 |
| Oct 27, 2021 | BEAVER VALLEY SCHOOL FLASHING LIGHT 25893 | APPLE CITY ELECTRIC LLC | $2,320 |
| Sep 24, 2021 | Gas pump down 65115 | COEUR D'ALENE SRVC STA EQP INC | — |
| Sep 24, 2021 | Toilet Running Dryden Transfer Station | AFTER HOURS PLUMBING & HTG INC | $313 |
| Sep 24, 2021 | (title withheld) 65123 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 6, 2021 | Tank Monitor repair 64468 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 6, 2021 | Unlead pump repair 64698 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 4, 2021 | Convention Center Kitchen EF N/A | SALCIDO CONNECTION INC, THE | — |
| Jul 12, 2021 | Countywide Barrier Improvements-2021 CRP732 | M2 INDUSTRIAL INC | $262,220 |
| Jun 21, 2021 | Chelan Co Courthouse 1 | Asbestos Central LLC | — |
| Jun 17, 2021 | Chelan County Expo Center - Fire Alarm Panel Replacement 21234 | EVCO SOUND & ELECTRONICS INC | $7,599 |
| May 13, 2021 | Antoine Creek Culvert Replacement FCD506 | BATCHELOR EXCAVATION LLC | $232,470 |
| May 13, 2021 | Antoine Creek Culvert Replacement FCD506 | BATCHELOR EXCAVATION LLC | $214,654 |
| Apr 30, 2021 | Cashmere Canal 1871 | IGNACIO'S CONCRETE LLC | — |
| Apr 29, 2021 | Upgrade PV System 62192 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 29, 2021 | Upgrade PV System 62190 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 29, 2021 | Upgrade OPW PV System 62191 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 29, 2021 | Upgrade PV System 62194 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 29, 2021 | Upgrade PV System 62193 | COEUR D'ALENE SRVC STA EQP INC | — |
| Apr 22, 2021 | Repeater System Juvenile/Maint QO-9355 | DAY WIRELESS SYSTEMS | $10,640 |
| Apr 7, 2021 | Mission Creek Road Preservation CRP727 | SELLAND CONST INC | $1,330,000 |
| Apr 5, 2021 | Slide Ridge Culvert Replacement-Girder Fabrication, Flood Control Zone District No. 503 (FCD503) FCD503 | CONCRETE TECHNOLOGY CORP | $468,671 |
| Feb 17, 2021 | GFCI REPLACEMENT 28250 | APPLE CITY ELECTRIC LLC | $1,722 |
| Feb 15, 2021 | Fire System Inspection 02152021 | KEYHOLE SECURITY INC | — |
| Dec 28, 2020 | MISCELLANEOUS ELECTRICAL 24645 | APPLE CITY ELECTRIC LLC | $2,220 |
| Dec 9, 2020 | 316 Bldg. HVAC Controls 20389 | STANDARD PLG HTG CONTROLS CORP | $89,900 |
| Dec 8, 2020 | Chelan County Facility Maintenance karen.s.babst@co.chelan.wa.us | INLAND FIRE PROTECTION INC | $4,781 |
| Dec 7, 2020 | Guardrail Damage Repair | M2 INDUSTRIAL INC | $7,230 |
| Dec 3, 2020 | (title withheld) 61937 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 3, 2020 | Dispenser will not dispense 61964 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 3, 2020 | (title withheld) 61429 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 3, 2020 | (title withheld) 61428 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 3, 2020 | (title withheld) 61936 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 3, 2020 | (title withheld) 60288 | COEUR D'ALENE SRVC STA EQP INC | — |
| Nov 5, 2020 | MAINT. CREW OFFICE LEVEL 1 PO # 20453 | A Central LLC | $744 |
| Oct 17, 2020 | TW9 Maintenance 509-661-4441 | MIKE BACH DRILLING CO | — |
| Sep 22, 2020 | Traffic Safety Traffic Safety | HURST CONSTRUCTION LLC | $15,000 |
| Sep 18, 2020 | (title withheld) 60893 | COEUR D'ALENE SRVC STA EQP INC | — |
| Aug 26, 2020 | CAMERA REPAIR J19230545 | LOCALTEL COMMUNICATIONS | — |
| Aug 6, 2020 | Brush Grinding at Multiple sites SW834 | Standard Pallet Co | $30,000 |
| Jul 23, 2020 | Chelan County Fairgrounds Patching 20300 | MOE ASPHALT PATCHING & SEALCOA | $1,484 |
| Jul 10, 2020 | WINDOW ABATEMENT 327 OKANOGAN AVE. | A Central LLC | $653 |
| Jul 1, 2020 | Guardrail Repair 2020 Project CRP-734 | FRANK GURNEY INC | $142,292 |
| Jun 18, 2020 | Easy street 0 | DDP CONSTRUCTION LLC | $2,445 |
| May 22, 2020 | Convention Center System Replacements 0061185 | SALCIDO CONNECTION INC, THE | $153,760 |
| May 18, 2020 | Courthouse FS Bracing 20138 | PLUMBCO INC | — |
| May 18, 2020 | Fairgrounds & Expo FS Work 20145 | PLUMBCO INC | — |
| May 18, 2020 | Detox New Sprinkler 20137 | PLUMBCO INC | — |
| Mar 30, 2020 | Emergency Water Line Repair 20074 | PLUMBCO INC | — |
| Mar 19, 2020 | CRP 693- West Cashmere Bridge Replacement Project 693 | SB STRUCTURES LLC | $19,343,677 |
| Mar 10, 2020 | CHELAN CO DIST LIGHT RETROFIT PROJECTS 2020 | APPLE CITY ELECTRIC LLC | $8,447 |
| Mar 10, 2020 | CHELAN CO DIST LIGHT RETROFIT PROJECTS 2020 | APPLE CITY ELECTRIC LLC | $1,628 |
| Mar 4, 2020 | Probe sensor issues 58591 | COEUR D'ALENE SRVC STA EQP INC | — |
| Feb 19, 2020 | West Malaga Intersection Project, County Road Project No. 647 CRP 647 | SMITH EXCAVATION | $459,284 |
| Feb 12, 2020 | Slow flow diesel 58778 | COEUR D'ALENE SRVC STA EQP INC | — |
| Jan 17, 2020 | (title withheld) 58592 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 31, 2019 | Computer can't connect remotely 58559 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 31, 2019 | Sensor bad 58255 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 23, 2019 | golf course rd golf course rd | Jones Concrete, LLC | $4,750 |
| Dec 13, 2019 | Chelan Co Public Works Shop Easy St Shop | FRANCE & CO | $10,000 |
| Dec 10, 2019 | Annual Calibrations 58262 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 10, 2019 | Annual Calibrations 58260 | COEUR D'ALENE SRVC STA EQP INC | — |
| Dec 10, 2019 | Annual Calibrations 58261 | COEUR D'ALENE SRVC STA EQP INC | — |
| Nov 22, 2019 | Tank Monitor printer/Leak on dispenser 58123 | COEUR D'ALENE SRVC STA EQP INC | — |
| Nov 22, 2019 | Can't log in to Entiat site controller 57555 | COEUR D'ALENE SRVC STA EQP INC | — |
| Oct 18, 2019 | HVAC Preventative Maintenance n/a | SALCIDO CONNECTION INC, THE | — |
| Oct 11, 2019 | Modem not working 57207 | COEUR D'ALENE SRVC STA EQP INC | — |
| Sep 22, 2019 | Slide Ridge 2019 Restoration Project CRP 728 | BATCHELOR EXCAVATION LLC | $130,055 |
| Jul 18, 2019 | Petro-Vend Battery replace 56327 | COEUR D'ALENE SRVC STA EQP INC | — |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.