CHELAN COUNTY PUBLIC UTILITY DISTRICT #1 — public works contracts
4,788 public works projects and 6,818 intents to pay prevailing wages name CHELAN COUNTY PUBLIC UTILITY DISTRICT #1 as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: Public Utility District.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 418 | 404 | 381 | 422 | 398 | 323 | 554 | 596 | 455 | 373 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 29, 2026 | Tree Trimming-1187 Walla Walla Ave 2026010905 | ARBOR CARE LWN & PST CNTRL INC | $3,278 |
| Sep 28, 2026 | Painting Chiwawa Facility 2026011210 | FRANCE & CO | $18,551 |
| Sep 28, 2026 | RAILING GLASS OLD STATION 1175193 PO 2026010552 | COMMUNITY GLASS CO INC | $1,715 |
| Sep 28, 2026 | Bridge Street Temp Elect Panel 2026011544 | BECKSTEAD ELECTRIC INC | $7,456 |
| Sep 24, 2026 | 5th Street Headquarters Cleanup 2026009972 | UPPER LEFT CONSTRUCTION | $4,210 |
| Sep 23, 2026 | (title withheld) 2026011465 | Holland Machine, Inc. | $1,018 |
| Sep 21, 2026 | Eyewash - Chelan Falls 2026010749 | PLUMBCO INC | $1,486 |
| Sep 21, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Sep 16, 2026 | MCC Door Repair 2026002922 | MIDLAND ELECTRIC INC | $1,496 |
| Sep 16, 2026 | 2026 Routine Preventative HVAC/Hatchery Facilities PO#2026005204 | MACDONALD-MILLER FAC SOLNS LLC | $12,526 |
| Sep 16, 2026 | Chelan Co PUD/HVAC Maintenance SA 16-156 | MACDONALD-MILLER FAC SOLNS LLC | $13,788 |
| Sep 15, 2026 | Fiber Optic Dock Crew 25-14382 | PARAMOUNT COMMUNICATIONS INC | $5,404,364 |
| Sep 14, 2026 | Fire - Chelan County PUD-Fire-Repair 2026005319 | MCKINSTRY CO LLC | $1,600 |
| Sep 14, 2026 | CU-2 COMPRESSOR DO-5315 2026008888 | MACDONALD-MILLER FAC SOLNS LLC | $7,941 |
| Sep 12, 2026 | Fire - Chelan County PUD Headquarters-INSP - Chelan County PUD - 2026 - Annual Fire Sprinkler Inspections (Multiple Site Locations) 2026008048 | MCKINSTRY CO LLC | $4,340 |
| Sep 10, 2026 | Chelan PUD Heat Exchanger Flush Out at HTEB 2026007915 | NORTH CASCADES HTG & A/C INC | $3,884 |
| Sep 9, 2026 | Test Well Installation Peshastin Water System 2026007938 | HOLT SERVICES INC | $41,626 |
| Sep 9, 2026 | HTTW Low Flow Entrance Antenna Replacement 25-14660 | ASSOCIATED UNDERWATER SVCS INC | $40,030 |
| Sep 9, 2026 | 359613 R1 PH1 Unit B-8 Stator Section Hauling PO 2026007765 Rev. #3 | TOMMER CONSTRUCTION COMPANY | $24,738 |
| Sep 9, 2026 | Bridge Street Substation Construction 25-14625 | MICHELS PACIFIC ENERGY INC | $3,865,261 |
| Sep 8, 2026 | Sandblast and Paint Tug Boat 2026008237 | MCCORMICK INDUSTRIAL ABATEMENT | $69,498 |
| Sep 8, 2026 | Washington State Dept of Fish & Wildlife - Mill Creek-Actuator box casing is running hot 11640-7292026 | MCKINSTRY CO LLC | $729 |
| Sep 8, 2026 | (title withheld) Christy Mayo | SME SOLUTIONS LLC | — |
| Sep 5, 2026 | Rocky Reach Powerhouse South Man-door Replacement PO 2026010544 | RIDGELINE CUSTOM BUILDERS LLC | $17,799 |
| Sep 4, 2026 | CRAC UNIT IS HIGH TEMPS 260722-0276 | MACDONALD-MILLER FAC SOLNS LLC | $872 |
| Sep 4, 2026 | (title withheld) 2026009896 | WELLS & WADE MECHANICAL | $1,926 |
| Sep 2, 2026 | New Hardware 46971 | KEYHOLE SECURITY INC | $1,374 |
| Sep 1, 2026 | (title withheld) 2026005414 | AVIDEX INDUSTRIES LLC | $18,799 |
| Sep 1, 2026 | Daroga Park Bank Stabilization 25-14659 | STRIDER CONSTRUCTION CO INC | $1,727,500 |
| Aug 31, 2026 | RIVERSIDE 9 FIBER PROJECT PO 2026007684 | LOCALTEL COMMUNICATIONS | $24,390 |
| Aug 28, 2026 | Dig and Backfill Conduit Ditch, Pershing St 2026009939 | SELLAND CONST INC | $1,500 |
| Aug 28, 2026 | Old Headquarter bldg. - Plywood Paint 2026010206 | CW PAINTING LLC | $10,237 |
| Aug 28, 2026 | Site Missing Transactions 85392 | CDASSE | — |
| Aug 27, 2026 | WQW Miscellaneous Work 2026005966 | WENATCHEE QUALITY WELDING | $11,686 |
| Aug 27, 2026 | Rock Island Powerhouse 2 Dirty Sump Pump P1B Installation 26-14942 | BRIVO CORP | $156,000 |
| Aug 26, 2026 | Install lever & new lock 46683 / 2026009097 | KEYHOLE SECURITY INC | $1,596 |
| Aug 26, 2026 | Eastbank Hatchery Bunkhouse Door Replacement PO 2026010329 | RIDGELINE CUSTOM BUILDERS LLC | $2,813 |
| Aug 26, 2026 | Hydro Generating Unit Mechanical Site Labor 26-14879 | BENDER CCP INC | $40,000,000 |
| Aug 24, 2026 | Unit Price Restoration and Maintenance 26-14902 | RISING SUN INDUSTRIES LLC | $850,000 |
| Aug 20, 2026 | CPUD - HQ Electrical Analysis - Consultation walk 2026009254 | STETNER ELECTRIC INC | — |
| Aug 19, 2026 | Conference Room ID Sign (24008.14) 2026007781 | RIXIR SYSTEMS LLC | $377 |
| Aug 19, 2026 | Backhoe Recovery 2026009752 | MOUNTAIN BARGE SERVICES LLC | $7,097 |
| Aug 18, 2026 | (title withheld) 2026004287 | WENATCHEE QUALITY WELDING | $703 |
| Aug 14, 2026 | New water fill valve for HTEB 2026009084 | PLUMBCO INC | $2,281 |
| Aug 14, 2026 | Olalia Pump Station 2026008934 | PRO CUT CONC CUTTING YAK INC | $1,572 |
| Aug 14, 2026 | Glycol leak repair 2026009250 | PLUMBCO INC | $838 |
| Aug 14, 2026 | Rock Island Wood Hauling 26-15187 | THE SOIL CENTER LLC | $100,000 |
| Aug 13, 2026 | Steel Structures for Bridge Street Substation 25-14546 | BLACKWATER INDUSTRIES | $268,010 |
| Aug 11, 2026 | Chelan WellField Well F-Inspection 2026009760 | IRRIGATION TECH & CONTROL INC | $35,880 |
| Aug 11, 2026 | (title withheld) Lorin | SME SOLUTIONS LLC | — |
| Aug 9, 2026 | Bathroom Door Lock Upgrades PO 2026009557 | RIDGELINE CUSTOM BUILDERS LLC | $4,253 |
| Aug 9, 2026 | Riverfront Park Water Wheel Repairs PO 2026009539 | RIDGELINE CUSTOM BUILDERS LLC | $6,894 |
| Aug 7, 2026 | RR Riverside Warehouse 2026009334 | BECKSTEAD ELECTRIC INC | $28,785 |
| Aug 6, 2026 | Shop work on gear assembly 2026008529 | MACHINISTS INC | $16,687 |
| Aug 4, 2026 | New chemical dist. system piping 2026005011 | PLUMBCO INC | $15,588 |
| Jul 31, 2026 | Spray Bar pipe replacement 2026007124 | PLUMBCO INC | $5,786 |
| Jul 31, 2026 | Replace PSI Control Valve PO #2026006753 | SALCIDO CONNECTION INC, THE | $1,635 |
| Jul 31, 2026 | Jett drain line - Dryden fish screen 2026005466 | PLUMBCO INC | $2,852 |
| Jul 31, 2026 | AAC Communication Sign 2026008674 | Zumar Industries | $1,583 |
| Jul 31, 2026 | Pressure Tank install 2026007448 | PLUMBCO INC | $3,161 |
| Jul 30, 2026 | Kirby Billingsley Hydro Park-Pump Repair 2026009282 | IRRIGATION TECH & CONTROL INC | $14,999 |
| Jul 29, 2026 | HTTW debris clean up 2026009219 | THIN AIR LOGGING | $5,837 |
| Jul 27, 2026 | Chelan PUD - Pump Motor Troubleshooting 2026002721 | CARRIER CORPORATION | $2,353 |
| Jul 27, 2026 | (title withheld) 26-0787-1 | SALCIDO CONNECTION INC, THE | $2,121 |
| Jul 27, 2026 | (title withheld) 25-14504 | WESTERN PACIFIC CRANE & EQUIPMENT LLC | $3,800 |
| Jul 27, 2026 | Rock Island Spillway Bay 25 Auto Hoist Relocation 26-15134 | KNIGHT CONST / SUPPLY INC | $137,000 |
| Jul 27, 2026 | (title withheld) Justin Clay | SME SOLUTIONS LLC | — |
| Jul 27, 2026 | (title withheld) 2026009195 | CASCADE POWDER COATING LLC | $11,758 |
| Jul 26, 2026 | Riverfront Park Shade Awning Install PO 2026007602 | RIDGELINE CUSTOM BUILDERS LLC | $5,679 |
| Jul 24, 2026 | Hydro Generation Mechanical Site Labor 21-30 | BENDER CCP INC | $35,000,000 |
| Jul 24, 2026 | Apple Loop Trail Extension 26-15014 | SMITH EXCAVATION | $2,117,729 |
| Jul 23, 2026 | Live Trap Box 2026005965 | WENATCHEE QUALITY WELDING | $4,644 |
| Jul 22, 2026 | Annual Fire Extinguisher Service WO# 05959451 | Performance Systems Intgn LLC | $4,300 |
| Jul 22, 2026 | Service Center gutter repairs PO 2026004615 | MASON ROOFING & CONST INC | $5,445 |
| Jul 22, 2026 | SC Bldg B downspout repair PO2026005440 | MASON ROOFING & CONST INC | $741 |
| Jul 21, 2026 | New Ice Machine 2026008835 | RIMBEY SOLUTIONS LLC | $18,000 |
| Jul 20, 2026 | Chelan PUD Acoustics Powerhouse 2026001664 | ONE WORKPLACE | $9,207 |
| Jul 20, 2026 | Chelan PUD Rocky Reach STEM 2026001672 | ONE WORKPLACE | $27,626 |
| Jul 17, 2026 | (title withheld) 2026004786 | MACDONALD-MILLER FAC SOLNS LLC | $1,526 |
| Jul 14, 2026 | Chelan Falls|Chelan Co. PUD NO. 1|Sod 2026008601 | RISING SUN INDUSTRIES LLC | $19,910 |
| Jul 14, 2026 | Old Mill Park Day Use Dock Replacement 26-14971 | MOUNTAIN BARGE SERVICES LLC | $1,170,795 |
| Jul 13, 2026 | RI PH2 U-5 Scaffold 2026008476 | BRANDSAFWAY SERVICES LLC | $7,476 |
| Jul 13, 2026 | Brush Removal HTLB 2026007911 | THIN AIR LOGGING | $4,980 |
| Jul 10, 2026 | Repair Broken Sprinkler Head 10014674 | INLAND FIRE PROTECTION INC | $690 |
| Jul 8, 2026 | Bavarian Substation and Transmission Line Construction 25-14596 | POTELCO INC | $4,575,962 |
| Jul 6, 2026 | (title withheld) 2026004786 | MACDONALD-MILLER FAC SOLNS LLC | $3,772 |
| Jul 2, 2026 | Chelan Falls Generator Move N/A | POW CONTRACTING | $3,631 |
| Jun 30, 2026 | HTCH Fish Waste Abatement Pond Clean-out 2026007912 | PIPKIN CONSTRUCTION | $6,339 |
| Jun 30, 2026 | Chelan Falls Lift Station & Force Main 25-14728 | HURST CONSTRUCTION LLC | $1,399,150 |
| Jun 29, 2026 | Squilchuck Substation 2026007404 | GRAYBEAL SIGNS | $699 |
| Jun 29, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Jun 29, 2026 | (title withheld) Justin Clay | SME SOLUTIONS LLC | — |
| Jun 29, 2026 | Hazard Tree Removal - Kirby Park 2026007614 | ARBOR CARE LWN & PST CNTRL INC | $10,675 |
| Jun 28, 2026 | CHELAN CO PUD SKYLIGHT REPAIRS PO #2026003851 | FLYNN BEC LP | $54,252 |
| Jun 26, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Jun 23, 2026 | Chelan PUD Custodial SErvice 24-13915 | ABM INDUSTRY GROUPS LLC | $349,000 |
| Jun 23, 2026 | ANNUAL INSPECTIONS 2026004976 | CRANETECH INC | $33,966 |
| Jun 21, 2026 | Beebe Park Rental Home Water Damage Repairs PO 2026007602 | RIDGELINE CUSTOM BUILDERS LLC | $5,084 |
| Jun 19, 2026 | Rock Island Dam Drop Gate Structure 24-13848 E | KUNEY-BRENNAN JOINT VENTURE | $17,556,467 |
| Jun 18, 2026 | Rock Island Dam PH1 South roof top HVAC PO #2026006761 | SALCIDO CONNECTION INC, THE | $636 |
| Jun 18, 2026 | Water Reservoir Safety Improvements Phase 3 25-14520 | 4 K CONTRACTORS INC | $292,395 |
| Jun 17, 2026 | Chelan County Public Utilitiy District #1 2026002247 | A M HARDWARE INC | $3,808 |
| Jun 17, 2026 | Xeriscape Chelan Hatchery Entrance 2026007231 | YARD WORKS LNDSCP & IRRIG INC | $23,122 |
| Jun 17, 2026 | Breaker foundation support 2026006668 | CASCADE POWDER COATING LLC | $6,105 |
| Jun 16, 2026 | Troubleshoot Rock Island Sound Curtains 2026007352 | HILDEBRAND CONSTRUCTION INC | $948 |
| Jun 16, 2026 | Chiwawa Weir System 2026006971 | BECKSTEAD ELECTRIC INC | $3,528 |
| Jun 15, 2026 | beebe bridge entrance 2026005162 | Zumar Industries | $960 |
| Jun 15, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Jun 14, 2026 | Rock Island Toolroom Shelving 25-14602 | RIDGELINE CUSTOM BUILDERS LLC | $346,663 |
| Jun 14, 2026 | Chelan Warehouse Door Replacement PO 2026006998 | RIDGELINE CUSTOM BUILDERS LLC | $9,218 |
| Jun 14, 2026 | Service Center Bollard Repair PO 2026007107 | RIDGELINE CUSTOM BUILDERS LLC | $3,362 |
| Jun 11, 2026 | Jetting out reuse lines 2026005467 | PLUMBCO INC | $1,979 |
| Jun 11, 2026 | Pump Install PO 2026006737 | FOGLE PUMP & SUPPLY INC | $3,664 |
| Jun 11, 2026 | Miscellaneous work- Tumwater dam 2026006107 | PLUMBCO INC | $3,718 |
| Jun 10, 2026 | Manson Bay Marina Breakwater Replacement 26-14974 | TRANSPAC MARINAS, LLC | $2,198,000 |
| Jun 10, 2026 | Pond Liner Replacement Project 25-14802 | HALME BUILDERS INC | $620,000 |
| Jun 8, 2026 | Chelan County PUD East Bank Fish Hatchery-Chiller diagnostics. 2026006613 | MCKINSTRY CO LLC | $3,131 |
| Jun 8, 2026 | Beebe Park Residence ADA Ramp Installation PO 2026006981 | RIDGELINE CUSTOM BUILDERS LLC | $8,965 |
| Jun 3, 2026 | rocky reach signs 2026006443 | Zumar Industries | $41,951 |
| Jun 2, 2026 | Conference Room ID Sign 2026006628 | RIXIR SYSTEMS LLC | $377 |
| Jun 2, 2026 | Compressor Service Call 3684454-00 | NORTHWEST PUMP/EQUIP CO | $237 |
| Jun 1, 2026 | Denil Pump replacement 2026003069 | IRRIGATION TECH & CONTROL INC | $36,350 |
| Jun 1, 2026 | Rebuild Pump 2026005711 | IRRIGATION TECH & CONTROL INC | $81,761 |
| May 29, 2026 | Chiwawa Weir Culvert Repair PO 2026006738 | RIDGELINE CUSTOM BUILDERS LLC | $3,339 |
| May 29, 2026 | Core drill pump house 2026005468 | PLUMBCO INC | $1,507 |
| May 29, 2026 | Video inspections 2026005964 | PLUMBCO INC | $900 |
| May 29, 2026 | Inspection Fire Exitnguisher 06015787 | Performance Systems Intgn LLC | $610 |
| May 28, 2026 | Smolt Trap 2026001606 | BECKSTEAD ELECTRIC INC | $3,010 |
| May 27, 2026 | Direct Labor & Materials Contract 26-15113 DLMC | Asbestos Central LLC | $1,750 |
| May 21, 2026 | Well #2 Dryden station 2026006351 | GRAY'S ELECTRIC INC | $15,013 |
| May 21, 2026 | Austin Avenue Water Main Replacement 26-14867 | SMITH EXCAVATION | $441,381 |
| May 20, 2026 | UNIT POWER SYSTEM LINEWORK SERVICES 26-14968 | OLYMPIC ELECTRIC CO INC | $3,511,572 |
| May 20, 2026 | Silver Bay Line Extension 2025014986 | MOUNTAIN BARGE SERVICES LLC | $27,000 |
| May 20, 2026 | 4 Safety Switch Supports 2026005555 | CASCADE POWDER COATING LLC | $3,438 |
| May 19, 2026 | Blue Canvas Prints 2026005137 | RIXIR SYSTEMS LLC | $17,487 |
| May 19, 2026 | Board Room Artwork Panels 2026005013 | RIXIR SYSTEMS LLC | $6,580 |
| May 18, 2026 | (title withheld) Jason Ridlon | SME SOLUTIONS LLC | — |
| May 18, 2026 | Chelan County PUD Fleet Services 05717270 | Performance Systems Intgn LLC | $724 |
| May 18, 2026 | (title withheld) 2026004889 | SME SOLUTIONS LLC | $19,788 |
| May 15, 2026 | Rock Island Dam Spring PM PO 2026004307 | SALCIDO CONNECTION INC, THE | — |
| May 15, 2026 | Beebe Park Rental Home Renovations PO 2026006257 | RIDGELINE CUSTOM BUILDERS LLC | $1,384 |
| May 15, 2026 | Ladder Gap Closure Installation 2026004136 | JASON SANDERSON CONST LLC | $1,000 |
| May 14, 2026 | Chelan County PUD 1510 | STETNER ELECTRIC INC | $4,522 |
| May 13, 2026 | Reservoir Leak Repair Chelan Ridge 2026005509 | BAKER SILO LLC | $7,650 |
| May 13, 2026 | Commercial Kitchen Exhaust Cleaning 2026006184 | APEX HOOD CLEANING INC | $1,041 |
| May 11, 2026 | Rocky Reach Park 2026005098 | GRAYBEAL SIGNS | $4,242 |
| May 8, 2026 | HVAC Unit Replacement Walla Walla Substation 2026005956 | NORTH CASCADES HTG & A/C INC | $21,655 |
| May 4, 2026 | Fish Hatchery 2026005363 | YARD WORKS LNDSCP & IRRIG INC | $6,400 |
| May 2, 2026 | Bavarian Substation Office Trailer Setup PO 2026005599 | RIDGELINE CUSTOM BUILDERS LLC | $2,932 |
| May 1, 2026 | Old Headquarters Building PO2026004888 | CW PAINTING LLC | $8,022 |
| May 1, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Apr 30, 2026 | Transformer hauling & instillation 2026002560 | MOUNTAIN BARGE SERVICES LLC | $986 |
| Apr 29, 2026 | (title withheld) 23-13350 | ALAMON, INC. | $450,000 |
| Apr 29, 2026 | Compressor Service Call 3682114-00 | NORTHWEST PUMP/EQUIP CO | $443 |
| Apr 28, 2026 | Chelan PUD Rocky Reach STEM 2026001672 | OPENSQUARE | $27,626 |
| Apr 28, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Apr 28, 2026 | Chelan PUD Acoustics Powerhouse 2026001664 | OPENSQUARE | $9,207 |
| Apr 28, 2026 | (title withheld) Jason | SME SOLUTIONS LLC | — |
| Apr 28, 2026 | (title withheld) Mark Sharp | SME SOLUTIONS LLC | — |
| Apr 26, 2026 | White River pit array site brush clearing 2026005287 | THIN AIR LOGGING | $5,600 |
| Apr 25, 2026 | breakroom lighting repair 2026002921 | READY ELECTRIC | $1,340 |
| Apr 23, 2026 | Dust Control 2026004784 | PROTAC INC | $17,406 |
| Apr 23, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Apr 22, 2026 | Chelan Hatchery- pipe replacement 2026003340 | PLUMBCO INC | $14,396 |
| Apr 22, 2026 | Manson substation irrigation line investigation 26-15042 | PATRIOT PLUMBING | $21,000 |
| Apr 22, 2026 | (title withheld) 25-14731 | Asbestos Central LLC | $19,226 |
| Apr 21, 2026 | Chelan Co PUD Bldg C Ductwork 2026004276 | NORTH CASCADES HTG & A/C INC | $4,242 |
| Apr 21, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | $18,049 |
| Apr 20, 2026 | Services/Independent Contractor Agreement 23-13387 23-13387 | CHELAN-DOUGLAS LAND TRUST | $260,000 |
| Apr 20, 2026 | Chelan Riverwalk Spider Box 2026-18 | BECKSTEAD ELECTRIC INC | $3,750 |
| Apr 15, 2026 | Chelan PUD Rock Island 2025015258 | FIRE SYSTEMS WEST INC | $1,512 |
| Apr 15, 2026 | Black Hose replacement 2025013006 | PLUMBCO INC | $916 |
| Apr 14, 2026 | (title withheld) 58411 | HERMANSON COMPANY LLC | $16,366 |
| Apr 14, 2026 | (title withheld) PO 2026004637 | RIDGELINE CUSTOM BUILDERS LLC | $32,180 |
| Apr 13, 2026 | Peshastin panel repairs 2026004782 | BEAVER VALLEY ELECTRICAL LLC | $3,389 |
| Apr 13, 2026 | (title withheld) Justin | SME SOLUTIONS LLC | — |
| Apr 11, 2026 | T.S. FREEZER DO-4990 2026003429 | MACDONALD-MILLER FAC SOLNS LLC | $695 |
| Apr 10, 2026 | HAWLEY STREET YARD 2026004616 | NORTH WEST HANDLING SYS INC | $5,127 |
| Apr 9, 2026 | Unit Price Asphalt & Concrete Services Year Two 24-13602 | MOE ASPHALT PATCHNG & SLCT LLC | $1,350,000 |
| Apr 7, 2026 | 2026 Fire Alarm Customer Support Program WA State DES Contract No. 27323, Proposal 251202CCP | CONVERGINT TECHNOLOGIES LLC | $74,334 |
| Apr 7, 2026 | Chelan Parks 2026004471 | APPLELAND SPRAY & TREE SRV INC | $794 |
| Apr 3, 2026 | (title withheld) 26-14829 | RIMBEY SOLUTIONS LLC | $60,000 |
| Apr 2, 2026 | (title withheld) 2025007144 | BECKSTEAD ELECTRIC INC | — |
| Apr 2, 2026 | South Shore Node 2026003946 | BECKSTEAD ELECTRIC INC | — |
| Apr 1, 2026 | lot power sweeping 2026003423 | WORLEY ENTERPRISES LLC | $43,961 |
| Mar 31, 2026 | Walla Walla Point Park - Ballfield Improvements 2026003246 | NORTHWEST TURF SOLUTIONS INC | $100,525 |
| Mar 31, 2026 | Conf Rm Furniture & Labor 2025012894 | OPENSQUARE | $32,800 |
| Mar 30, 2026 | 5000 US Highway 97A, Wenatchee PO 2026003517 | MASON ROOFING & CONST INC | $3,447 |
| Mar 27, 2026 | Beebe Park Fire Pit Replacement PO 2026004171 | RIDGELINE CUSTOM BUILDERS LLC | $13,420 |
| Mar 27, 2026 | Jump Off Substation Jobsite Trailer Move PO 2026004184 | RIDGELINE CUSTOM BUILDERS LLC | $1,089 |
| Mar 26, 2026 | Plumbing Vent Relocation - RR Parks Shop 2026003099 | PLUMB PERFECT | $2,981 |
| Mar 25, 2026 | Similkameen VFD 2026003694 | BECKSTEAD ELECTRIC INC | $105,506 |
| Mar 25, 2026 | Beebe Park Office Renovation PO 2026004047 | RIDGELINE CUSTOM BUILDERS LLC | $5,854 |
| Mar 25, 2026 | Walla Walla Park Bridge Repair PO 2026004086 | Ridgeline Custom Builders LLC | $80,501 |
| Mar 25, 2026 | Manson Breakwater Storm Repair 2026003995 | THE DOCK COMPANY LLC | $5,641 |
| Mar 23, 2026 | CHELAN CO PUD SERVICE CENTER BLDG A 2026003909 | NORTH WEST HANDLING SYS INC | $1,610 |
| Mar 23, 2026 | (title withheld) Carl Brandenburg | SME SOLUTIONS LLC | — |
| Mar 23, 2026 | (title withheld) 2026002629 | SME SOLUTIONS LLC | — |
| Mar 20, 2026 | Lever replacement 2026003542 | KEYHOLE SECURITY INC | $1,846 |
| Mar 20, 2026 | Replace Electric strike, adjust hinges 2026001931 | KEYHOLE SECURITY INC | $1,782 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.