ALDERWOOD WATER & SEWER DISTRICT — public works contracts
424 public works projects and 1,192 intents to pay prevailing wages name ALDERWOOD WATER & SEWER DISTRICT as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: Water/Sewer District.
Bidding, hiring a subcontractor or checking a competitor? A dated public works report ($19) on one contractor — or an agency's awards, every month.
Intents filed, by year
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 53 | 96 | 57 | 34 | 44 | 78 | 75 | 66 | 95 | 98 |
Latest contracts (200)
| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 3, 2026 | Easement Clearing BGEASE - 20 | Pacific Tree Management LLC | $7,283 |
| Aug 11, 2026 | 2026 Meter Testing 37311 | COLUMBIA BASIN WATER WORKS INC | — |
| Jul 16, 2026 | (title withheld) PO 37246 | GREAT FLOORS | $2,824 |
| Jul 9, 2026 | SHOP REPAIR SEEPEX 834059 BRIDGE BREAKER TBD | BECKWITH & KUFFEL INC | — |
| Jul 7, 2026 | 2026 Asphalt Patch Repairs J2507 | AA ASPHALTING LLC | $625,152 |
| Jul 6, 2026 | Green Chain Link Water Tank | TOWN & COUNTRY FENCE INC | $3,017 |
| Jun 30, 2026 | Window Cleaning BGEASE - 16 | Superior Services Window Cleaning, LLC | $7,750 |
| Jun 30, 2026 | REPAIR SEEPEX 834059 BRIDGE BREAKER TBD | BECKWITH & KUFFEL INC | — |
| Jun 4, 2026 | Lift Station 5 Easement Clearing - phase 2 BGEASE - 15 | PRO-CUT TREE SERVICE | $9,500 |
| May 1, 2026 | ADMIN STAIR LANDING SIGNED PROPOSAL | GREAT FLOORS | $1,242 |
| Apr 23, 2026 | Lift Station 5 Easement Clearing BGEASE - 12 | PRO-CUT TREE SERVICE | $18,000 |
| Apr 1, 2026 | 510-X1412-A Easement Clearing BGEASE - 09 | WESTSIDE TREE CARE INC | $6,906 |
| Mar 20, 2026 | PICNIC POINT WWTP- BATTERY, BELT, QUOTE WSC 06225 - PO36950 | PACIFIC POWER GROUP LLC | $7,852 |
| Mar 16, 2026 | Maintenance and Ops - CONFIDENCE TEST WSC 06225 - PO 36923 | PACIFIC POWER GROUP LLC | $1,300 |
| Mar 16, 2026 | REPLACE ADMIN CONTROLLER WSC 06225 - PO 36921 | PACIFIC POWER GROUP LLC | $13,056 |
| Mar 16, 2026 | REPLACE ATS CONTROLLER WSC 06225 - PO 36922 | PACIFIC POWER GROUP LLC | $8,076 |
| Mar 16, 2026 | Maintenance and Ops - CONFIDENCE TEST - RETEST AFTER REPAIR OF COOLING SYSTEM WSC 06225 - PO 36890 | PACIFIC POWER GROUP LLC | $1,350 |
| Mar 4, 2026 | Queensborough Sewer Rehabilitation S1915 | LASER UNDRGRND & ERTHWRKS INC | $3,064,923 |
| Feb 16, 2026 | ADMIN CONTROLLER DARK & NOT RESPONDING WSC 06225 | PACIFIC POWER GROUP LLC | — |
| Jan 27, 2026 | Trans Main 1& 2 Valve Replacements Ph.3 W2301C | NEPTUNE GENERAL CONTRACTORS | $718,500 |
| Jan 26, 2026 | (title withheld) 36801 | PACIFIC POWER GROUP LLC | $1,829 |
| Jan 4, 2026 | Easement Clearing 2025-06 | WESTSIDE TREE CARE INC | $18,000 |
| Dec 8, 2025 | PPWWTF Headworks Odor Scrubber Repair S2502 | PACIFIC COAST CARBON LLC | $70,168 |
| Nov 17, 2025 | PINIC POINT - 2HR LT, INSPECTION 36616 | PACIFIC POWER GROUP LLC | $24,954 |
| Nov 17, 2025 | CLEARVIEW P/S - 2HR LT, INSPECTION 36621 | PACIFIC POWER GROUP LLC | $27,720 |
| Nov 12, 2025 | M&O North Remodel J2208 | VALDEZ CONSTRUCTION INC | $4,931,620 |
| Nov 6, 2025 | Alderwood WD, WA 4455 Zone PRV 4 Vault W1102E | PUMPTECH LLC | $350,417 |
| Nov 5, 2025 | CLEANING PO #36135 | GREAT FLOORS | $300 |
| Oct 17, 2025 | 53365853 Picnic Point Wastewater NA | JOHNSON CONTROLS FIRE PRTTN LP | $1,643 |
| Aug 22, 2025 | Water Pressure Reduction Phase 2 W1102E | EARTHWORK SOLUTIONS LLC | $4,106,872 |
| Aug 12, 2025 | 2025 Asphalt Patch Repairs J2502 | AA ASPHALTING LLC | $829,202 |
| Jul 16, 2025 | 2025 SEWER RELINNING PROGRAM S2402 | IRON HORSE LLC | $6,568,703 |
| Jun 24, 2025 | W2507 36th Ave W Water Main Emergency Repair W2507 | COMPLETE EXCAVATING LLC | — |
| Jun 16, 2025 | NIKE RESERVOIRS 1 & 2 RECOATING PROJECT W2313 | F D THOMAS INC | $3,882,800 |
| Jun 15, 2025 | Exposed Sewer Pipe Repairs S1906C | S C I INFRASTRUCTURE LLC | $410,850 |
| Jun 10, 2025 | Asphalt Restoration OPP011 | AA ASPHALTING LLC | $9,152 |
| Jun 2, 2025 | 52918643 Picnic Point Wastewater NA | JOHNSON CONTROLS FIRE PRTTN LP | $1,500 |
| May 30, 2025 | Reservoirs 2 and 3 � Storm Drain and Ring Roads Replacement W2016 | MARSHBANK CONSTRUCTION INC | $1,358,800 |
| May 7, 2025 | Window Cleaning | Superior Services Window Cleaning, LLC | $8,500 |
| Apr 18, 2025 | CORRIDOR VCT PO 36031 | GREAT FLOORS | $26,390 |
| Apr 8, 2025 | AWWD M & O Build 70870826 | ACCO ENGINEERED SYSTEMS INC | $242,063 |
| Feb 13, 2025 | (title withheld) 35850 | PACIFIC POWER GROUP LLC | $1,962 |
| Jan 23, 2025 | Trans Main 1&2 Valve Replacement - Phase 2 W2301B | EARTHWORK SOLUTIONS LLC | $1,257,622 |
| Jan 7, 2025 | Lynwood - Alderwood HQ - IDS Signed Proposal | CONVERGINT TECHNOLOGIES LLC | $23,407 |
| Dec 30, 2024 | Roll up door enlargment 0000000 | DOOR DOCTOR SERVICES LLC | $19,890 |
| Dec 9, 2024 | J#300229071 - Alderwod Water District 300229071 | ADT COMMERCIAL LLC | $1,028 |
| Sep 11, 2024 | City of Bothell 35th Ave SE Culvert Replacement Water Main Relocation W2311 | REDPOINT CONTRACTING | $339,335 |
| Jul 24, 2024 | Alderwood Water Dist. - DES Contract 08120 Props 340306 and 340697 | GREAT FLOORS | $1,990 |
| Jul 24, 2024 | WALK OFF MAT ALDERWOOD WATER DISTRICT QUOTE PROPS 340306 AND 340697 | GREAT FLOORS | $5,649 |
| Jul 17, 2024 | 52051270 Alderwood Water District NA | JOHNSON CONTROLS FIRE PRTTN LP | $1,390 |
| May 29, 2024 | 51954784 Picnic Point Wastewater NA | JOHNSON CONTROLS FIRE PRTTN LP | $1,794 |
| May 9, 2024 | 51880292 Alderwood Water District NA | JOHNSON CONTROLS FIRE PRTTN LP | $3,222 |
| Apr 24, 2024 | 2024-2025 Asphalt Patch Repairs AW25 | J B ASPHALT PAVING INC | $763,400 |
| Mar 18, 2024 | Nike Site and Lift Station 16 | WESTSIDE TREE CARE INC | $2,762 |
| Mar 15, 2024 | Reservoir and Lift Station Site Tree Work | WESTSIDE TREE CARE INC | $4,864 |
| Mar 8, 2024 | Annual Confidence Test PO 34831 | PACIFIC POWER GROUP LLC | $1,047 |
| Mar 7, 2024 | W2301 Trans Mains 1 & 2 Valve Replacement W2301 | R C N W | $733,185 |
| Nov 17, 2023 | Alderwood Water District Cleaning 214169 | GREAT FLOORS | $2,195 |
| Aug 22, 2023 | Kitchen VCT with Logo 201901 | GREAT FLOORS | $15,197 |
| Aug 10, 2023 | Exposed Sewer Pipe Repairs Site 1 S1906 | R C N W | $682,140 |
| Aug 8, 2023 | (title withheld) 34161 | Sparkle Wash of Puget Sound LL | $26,751 |
| Jul 10, 2023 | 2023 - 3 Year UPS Service Contract 40118218-20230109 | EATON CORPORATION | $17,212 |
| Jul 10, 2023 | 2023 - 3 Year UPS Service Contract 40118139-01052023 | EATON CORPORATION | $18,109 |
| Jun 26, 2023 | Reservoir Site Tree Work | WESTSIDE TREE CARE INC | $6,000 |
| Jun 6, 2023 | PPWWTF Headworks, Solids Handling & Aeration Improvements S2007C | MCCLURE & SONS INC | $10,226,163 |
| May 17, 2023 | Sewer Relining 2023 S2201 | IRON HORSE LLC | $5,563,959 |
| May 1, 2023 | Property Demolition J1805B | PELLCO CONSTRUCTION INC | $751,756 |
| Apr 5, 2023 | Alderwood Water CT's 2023 33447 | PACIFIC POWER GROUP LLC | $2,177 |
| Mar 21, 2023 | Sweeping Services N/A | allied sweeping llc | — |
| Mar 8, 2023 | Admin South Gate Repair 33668 | TRINITY GATE AND DOOR COMPANY | — |
| Mar 6, 2023 | AWWD Admin North Gate 33644 | TRINITY GATE AND DOOR COMPANY | $3,177 |
| Nov 23, 2022 | Admin Counter Upgrade J1904 | ANYTIME CONTRACTING/RMDL LLC | $350,095 |
| Oct 14, 2022 | High Tank Water Reservoir and Metal Roofs 33176 | Sparkle Wash of Puget Sound LL | $23,792 |
| Oct 6, 2022 | Lift Station Cleaning 33168 | BRAVO ENVIRONMENTAL NW INC | — |
| Oct 3, 2022 | Clearview P/S Load Test 31313 | PACIFIC POWER GROUP LLC | $22,889 |
| Sep 26, 2022 | Picnic Point Load Test 31317 | PACIFIC POWER GROUP LLC | $24,236 |
| Sep 20, 2022 | Lift Station No. 17 Force Main Replacement S2004B | R C N W | $1,053,425 |
| Aug 12, 2022 | Picnic Point Full Service 31675 | PACIFIC POWER GROUP LLC | $10,078 |
| Aug 11, 2022 | Lift Station #17 - Troubleshoot ATS PO# 31989 - WA State Contract #W40879 | PACIFIC POWER GROUP LLC | $1,000 |
| Aug 5, 2022 | (title withheld) | TRINITY GATE AND DOOR COMPANY | $2,249 |
| Aug 5, 2022 | Admin PMI 31662 | TRINITY GATE AND DOOR COMPANY | — |
| Jul 6, 2022 | M PMIO Buildings 31661 | TRINITY GATE AND DOOR COMPANY | — |
| May 13, 2022 | J2201- 2022-2023 Asphalt Patching and Iron Adjustments J2201 | A A ASPHALTING LLC | $771,000 |
| May 2, 2022 | Facility Tree Trimming 31518 | COMPLETE TREE CARE | $6,693 |
| Apr 29, 2022 | Mechanical Disp. not resetting Ryan 425-870-5752 | MASCOTT EQUIPMENT CO INC | $1,443 |
| Feb 23, 2022 | Transmission Mains 1 and 2 Air Valve Replacement W1609 | HARKNESS CONSTRUCTION LLC | $1,020,972 |
| Feb 22, 2022 | Barker Road Waterline Extension 2105 | TAYLOR'S EXCAVATORS INC | $440,000 |
| Feb 16, 2022 | MAINTENANCE BLDG FLOORING 01820 | GREAT FLOORS | $15,273 |
| Dec 20, 2021 | 184th PL SE Sewer Main Relocation S1909 | SHORELINE CONST CO | $1,303,067 |
| Nov 22, 2021 | 164th Street SW Transmission Main Connection W1810 | INTERWEST CONSTRUCTION INC | $11,256,384 |
| Oct 29, 2021 | Floor Strip & Wax 30715 | SLIPSAFE NORTHWEST | $5,725 |
| Oct 25, 2021 | Exposed Sewer Repairs - Site 5 S1906A | SHORELINE CONST CO | $253,683 |
| Oct 13, 2021 | Sewer Relining Program S1912 | IRON HORSE LLC | $3,016,184 |
| Sep 28, 2021 | 228th Street S.W. Lynnwood Alderwood Water & Wastewater District | NORTHSHORE PAVING INC | $25,000 |
| Sep 28, 2021 | 2021 Asphalt Pavement Repair J2007 | A A ASPHALTING LLC | $250,000 |
| Aug 27, 2021 | Lift Station Cleaning PO 30266 | BRAVO ENVIRONMENTAL NW INC | — |
| Jun 22, 2021 | (title withheld) W1401 | NESS CRANES | $12,867 |
| Jun 11, 2021 | Spray foam insulation 6609 | AT FOAM | $8,358 |
| May 20, 2021 | Gate Repair 04292021 | CITY WIDE FENCE CO INC | $1,987 |
| Apr 29, 2021 | (title withheld) | TAYLOR'S EXCAVATORS INC | — |
| Apr 19, 2021 | PPWWTF ODOR CONTROL REPAIR S2006 | PURE AIR FILTRATION LLC | $452,749 |
| Apr 7, 2021 | Picnic Point Treatment Plant Repairs 28130 | SNOHOMISH COUNTY ROOFING | $5,648 |
| Mar 19, 2021 | One Stop Auto 1125799 | GALLOWAY ENVIRONMENTAL INC | $12,901 |
| Mar 2, 2021 | Area clean up J2005-03 | AFFORDABLE ENVIRONMENTAL INC | $11,700 |
| Feb 17, 2021 | Alderwood Water & Sewer 425 787-0250 | KRAUSE LAMINATES | $2,088 |
| Feb 4, 2021 | Tanks Fuel Storage Area | TOWN & COUNTRY FENCE INC | $5,604 |
| Jan 28, 2021 | Sinder Bldg J2004 | GREAT FLOORS | $14,224 |
| Dec 9, 2020 | Alderwood water district air duct cleaning 27534 | DUCTVAC NORTHWEST LLC | $17,465 |
| Nov 18, 2020 | Load Bank PS98333 | N C POWER SYSTEMS CO | $2,689 |
| Oct 7, 2020 | canyon park tank site/lift station #6 425 478 8181 | Pacific Tree Management LLC | — |
| Oct 6, 2020 | Main Gate Circuit Board Replacement 27083 | TRINITY GATE & DOOR COMPANY | $3,135 |
| Aug 17, 2020 | Circuit Board Replacement 26741 | TRINITY GATE & DOOR COMPANY | $3,135 |
| Aug 13, 2020 | Alderwood Water & Sewer District 4513 | COLUMBIA SHEET METAL INC OF WA | $15,298 |
| Aug 13, 2020 | Repair Gas Boy 9100 Series Cory Stevens | MASCOTT EQUIPMENT CO INC | $603 |
| Aug 10, 2020 | 148th St S.W. Water Main Settlement Emergency Repair W2020 | NORTHSHORE PAVING INC | — |
| Aug 7, 2020 | Reservoir 1 Meter Vault Rehabilitation Project W1610 | Combined Construction Inc | $456,808 |
| Aug 7, 2020 | Gas Boy Repair Gas Boy Repair | MASCOTT EQUIPMENT CO INC | $603 |
| Jul 7, 2020 | Window Gasket Replacement 26040 | ASSOCIATED GLASS INC | $1,932 |
| Jun 12, 2020 | Preventive Maintenance Inspection Services: 26333 | TRINITY GATE & DOOR COMPANY | $1,354 |
| Mar 10, 2020 | Alderwood Admin Offices A46663 | GREAT FLOORS | $4,346 |
| Feb 25, 2020 | PPWWTF Fall Protection Improvements S1401B | K-A GENERAL CONST CONTR LLC | $136,232 |
| Feb 14, 2020 | Admin Door 25580 | CASCADE SAWING & DRILLING INC | — |
| Dec 31, 2019 | Cedar Trees J002 | PnD Logging & Tree Service | $3,575 |
| Nov 1, 2019 | Gate Safeties Time and materials | TRINITY GATE & DOOR COMPANY | $827 |
| Nov 1, 2019 | (title withheld) 23817 | Eagle Pipe & Mechanical LLC | $5,713 |
| Oct 30, 2019 | Hydroseed Nike reservoir site Purchase Order# 23758 | GRASS MASTER | $2,107 |
| Oct 17, 2019 | Canyon Park Reservoir Fence 23814 | CITY WIDE FENCE CO INC | $16,369 |
| Sep 6, 2019 | Tree Removal at Maintance Building 0001 | PnD Logging & Tree Service | $3,025 |
| Aug 6, 2019 | 2019 Water Main Repairs W1811 | B & B UTILITIES AND EXVTNG LLC | $334,475 |
| Jul 18, 2019 | Water Pressure Reduction Project - Phase 1 W1102D | KAR VEL CONSTRUCTION INC | $1,988,277 |
| Jul 5, 2019 | W1401 Reservoirs 2 & 3 Recoating Project W1401 | SAFFO CONTRACTORS INC | $5,748,750 |
| Jun 25, 2019 | Canyon Park Tank & Nike Tank Site 22106 | PnD Logging & Tree Service | $9,625 |
| Jun 25, 2019 | Beverly Park Road Side Sewer Replacement S1902 | WE DO DIRT LLC | $35,328 |
| Jun 21, 2019 | ADMIN BLDG GATE OPERATOR PUMP PACK REPLACEMENT PO 21817 | TRINITY GATE & DOOR COMPANY | $4,871 |
| Jun 17, 2019 | Generator and Electrical Improvements J1201 | AWARD CONSTRUCTION INC | $412,000 |
| May 29, 2019 | Manor Way and Richmond Road Water Main Relocation W1903 | B & B UTILITIES AND EXVTNG LLC | $321,547 |
| May 29, 2019 | AWWD Settlement Repair 19022 | NELSON & SONS CONST CO INC | — |
| May 13, 2019 | Lift Station 23 21856 | W B SPRAGUE CO INC | $1,963 |
| Mar 6, 2019 | Mukilteo Treatment Center Purchase Order | All Kleen | — |
| Mar 5, 2019 | Lift Station #6 Tree Removal 19040 | ASPLUNDH TREE EXPERT LLC | $3,133 |
| Jan 24, 2019 | CUT DOWN OF FIR CANYON PARK RESERVOIR | Best Tree Service NW, Inc | $565 |
| Nov 21, 2018 | 2018-M&O Security Modification 18412 | SKYLINE COMMUNICATIONS INC | $37,309 |
| Sep 13, 2018 | W1705 35th and 236th Water Main Relocation Project W1705 | B & B UTILITIES AND EXVTNG LLC | $110,200 |
| Sep 10, 2018 | 2018 SEWER RELINING PROGRAM | IRON HORSE LLC | $347,713 |
| Aug 27, 2018 | Admin Building Carpet 16895 | GREAT FLOORS | $2,388 |
| Jul 19, 2018 | (title withheld) None Given | TOWN & COUNTRY FENCE INC | $10,528 |
| Jun 22, 2018 | Olympus Meadows Trunk Sewer and W1002 196th Street SE Water Transmission Main Pr S1004 | FRANK COLUCCIO CONST CO | — |
| Jun 8, 2018 | Picnic Point WWTF Membrane Upgrades S1707 | PROSPECT CONSTRUCTION INC | $4,005,613 |
| May 30, 2018 | WATER QUALITY OFFICE PO 16572 16572 | GREAT FLOORS | $3,240 |
| Apr 11, 2018 | Polished concrete floors | THOMPSON FLOOR SERVICES INC | $10,000 |
| Apr 10, 2018 | North Bothell Sewer Main Repair S1804 | NORTHWEST CONSTRUCTION INC | — |
| Mar 21, 2018 | 128th Street and 4 Ave. Watermain Repalcement W1801 | GRANITE CONSTRUCTION COMPANY | $132,479 |
| Mar 20, 2018 | ALDERWOOD WATER DISTRICT 888669 | GREAT FLOORS | $1,815 |
| Feb 9, 2018 | Water District Garage Doors 15766 | DOOR DOCTOR SERVICES LLC | $711 |
| Jan 16, 2018 | D-1 Water Transmission Main Project W1102C | TAPANI INC | $6,315,561 |
| Oct 5, 2017 | 2017 Pavement Repair and Iron Adjustments S1704 | MCCANN TRUCKING & EXCAVATING | $212,372 |
| Aug 24, 2017 | S1210-Phase 2 Sewer & Water Replacement (Shelby rd/Hwy 99 to 52nd Ave W) S1210B | SHORELINE CONST CO | $7,576,646 |
| Aug 8, 2017 | Phase 1 Lift Station 23 S1210 | PACIFIC CREST CONSTRUCTION INC | $5,225,000 |
| Jul 3, 2017 | 2016 - 3 Year Eaton UPS Service Contract 22033-20160419 | EATON CORPORATION | — |
| Jun 12, 2017 | W1504 228th and Fitzgerald Water Main Relocation W1504 | B & B UTILITIES AND EXVTNG LLC | $361,563 |
| May 22, 2017 | S1705 180th St SE Sewer Lateral Repair N/A | BDZ CONSTRUCTION | — |
| Mar 29, 2017 | Harvest Road Sewer Replacement Project S1102 | FABER CONSTRUCTION CORP | $814,674 |
| Mar 21, 2017 | N.E. Sectional Door repair | DAVIS DOOR SERVICE INC | — |
| Feb 17, 2017 | Wireless Bridge Tree Removal 1848 | Taylors Snohomish Tree Ser LLC | $7,137 |
| Feb 6, 2017 | AWWD S1701 Sewer Lateral Repair S1701 | NELSON & SONS CONST CO INC | — |
| Jan 26, 2017 | PPWWTF air-Gap Pump Systems S1401D | GARY HARPER CONSTRUCTION INC | $310,075 |
| Nov 9, 2016 | Picnic Point Wastewater Treatment Facility Instrumentation & Control Modificatio S1502 | TECHNICAL SYSTEMS INC | $884,000 |
| Sep 6, 2016 | ASH / MAPLE WATERMAIN REPAIR W1606 | K L B CONSTRUCTION INC | — |
| Jul 13, 2016 | W1404 Elberta Road Water Main Replacement Project W1404 | B & B UTILITIES AND EXVTNG LLC | $657,070 |
| Jun 2, 2016 | fence repair off 156th St SW 12030 | ECONOMY FENCE CENTER | $1,407 |
| May 11, 2016 | CVPS Gate Project 11923 | CITY WIDE FENCE CO INC | $2,755 |
| Mar 30, 2016 | SODIUM HYPOCHLORITE SYSTEM UPGRADE RESERVOIR NO. 1 W1402 | HAWK MECHANICAL CONTRS INC | $294,000 |
| Jan 28, 2016 | Picnic Point Outfall S1401E-B | GLOBAL DIVING AND SALVAGE INC | $17,684 |
| Nov 30, 2015 | Administration Building Roof Replacement J1501 | K-A GENERAL CONST CONTR LLC | $49,928 |
| Nov 24, 2015 | Alderwood Floor Cleaning Alderwood Floors | MANAGEMENT SERVICES NW II LLC | $3,865 |
| Nov 17, 2015 | Olympus Meadows Trunk Sewer and W1002 196th Street SE Water Transmission Main Pr S1004 | FRANK COLUCCIO CONST CO | $7,165,174 |
| Nov 17, 2015 | S1505 2015 Pavement Repair S1505 | FIDALGO PAVING & CONST LLC | $165,509 |
| Oct 1, 2015 | Alderwood Water & Wastewater District Lunch Room N/A | MATTILA PAINTING INC | $2,181 |
| Sep 17, 2015 | Hazard Tree Removal Project W1401 | STORWICK FAMILY CONTRNG LLC | $67,342 |
| Aug 10, 2015 | access control upgraade WSCA 3047-WA PA 04814 | EDMONDS SECURITY & COMM INC | — |
| Aug 10, 2015 | M & O Gate Replacement/15-07-0107 J1502 | ALL CITY FENCE CO | $29,097 |
| Jul 28, 2015 | (title withheld) 4257434605 | All Kleen | $1,750 |
| Jul 9, 2015 | Reservoir Overflow Modifications Small Works Contract W1403 | D D J CONSTRUCTION WELDING INC | $9,964 |
| Apr 24, 2015 | 2015-2017 Pothole Services | BRAVO ENVIRONMENTAL NW INC | — |
| Mar 17, 2015 | ALDERWOOD WATER QUIET ROOM 639648 | GREAT FLOORS | $1,063 |
| Feb 11, 2015 | last door to east in parking garage | DAVIS DOOR SERVICE INC | — |
| Oct 17, 2014 | Canyon Park Tank ACV | MCCLURE & SONS INC | $329,876 |
| Jul 7, 2014 | ALDERWOOD WTR FINANCE DIRECTOR'S OFFICE 588338 | GREAT FLOORS | $1,253 |
| Jun 27, 2014 | Bridge 366 Water Main Replacement Project W1305 | EARTHWORK ENTERPRISES INC | $104,167 |
| Jun 11, 2014 | Swamp Creek Sewer Improvements S0601, S1013, S1209 | SHORELINE CONST CO | $2,382,755 |
| Jun 10, 2014 | Lift Station Upgrades S1015 | GARY HARPER CONSTRUCTION INC | $1,770,588 |
| Dec 10, 2013 | Picnic Point Road Sewer Replacement S1305 | TITAN EARTHWORK LLC | $3,201,731 |
| Dec 10, 2013 | 1-5/164th Martha Lake Gateway Sewer and Water Improvement S0702 | TITAN EARTHWORK LLC | $4,911,635 |
| Nov 13, 2013 | Brier Water Main Looping Project W1018 | B & B UTILITIES AND EXVTNG LLC | $378,366 |
| Jul 16, 2013 | Picnic Point WWTF Dryer Industrial Ductwork Replacement S0101J | DELTA TECHNOLOGY CORP | $208,120 |
| Jul 12, 2013 | Pipe and Manhole Materials Disposal S1004 | SHORELINE CONST CO | $23,324 |
| Jun 14, 2013 | Pump Station 2 and High Tank Booster Station Upgrade W1107 | PROSPECT CONSTRUCTION INC | $1,718,670 |
| May 23, 2013 | Clearview Pipeline Insertion Meter Project W1019E | D G BUCHANAN CONSTRUCTION INC | $82,856 |
| May 15, 2013 | Mountlake Terrace Water Supply Relocation Project W1017 | SHORELINE CONST CO | $240,996 |
| May 10, 2013 | Mountlake Terrace Water Supply Relocation Project W1017 | SHORELINE CONST CO | $240,996 |
Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.
Contractors that filed intents on its projects
Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.