# QUINCY-COLUMBIA BASIN IRRIGATION DIS — public works contracts and contractors (Washington prevailing wage intents)

> 151 public works projects of QUINCY-COLUMBIA BASIN IRRIGATION DIS: the latest contracts, the prime contractors and the amounts declared on prevailing wage intents.

## QUINCY-COLUMBIA BASIN IRRIGATION DIS — public works contracts

151 public works projects and 254 intents to pay prevailing wages name QUINCY-COLUMBIA BASIN IRRIGATION DIS as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: [Diking/Drainage/Irrigation District](/agency-type/diking-drainage-irrigation-district.md).

Bidding, hiring a subcontractor or checking a competitor? A [dated public works report ($19)](/report.md) on one contractor — or [an agency's awards, every month](/pro.md).

### Intents filed, by year

| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 12 | 20 | 14 | 12 | 9 | 25 | 13 | 22 | 17 | 17 |

### Latest contracts (124)

| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| May 27, 2026 | District Residences Siding Abatement 1 | [Asbestos Central LLC](/search.md) | $21,114 |
| Mar 13, 2026 | Quincy Pumping Plant PO 50567 | [FULCRUM ELECTRIC LLC](/search.md) | $46,381 |
| Jan 20, 2026 | QCBID Main Canal MPOLY 10-24-25 | [COLUMBIA IND COATINGS LLC](/search.md) | $200,980 |
| Nov 25, 2025 | West Canal Concrete Panel 2026 Replacement Project PANELS 10-22-25 | [TOMMER CONSTRUCTION COMPANY](/search.md) | $314,687 |
| Nov 18, 2025 | Main Canal 2026 Concrete Panel Replacement MC 10-22-25 | [BELSAAS & SMITH CONST INC](/search.md) | $482,291 |
| Sep 30, 2025 | Furnish & Install New Mainline Power Conductor Bar System on 5 Ton Crane 46554 | [CRANETECH INC](/search.md) | $11,916 |
| Jun 24, 2025 | UNL Turbine Down | [MASCOTT EQUIPMENT CO INC](/search.md) | $6,239 |
| Apr 10, 2025 | Frenchman Springs Pumping Plant Electrical Systems Upgrade ELEC 05-24-24 | [FULCRUM ELECTRIC LLC](/search.md) | $852,847 |
| Feb 6, 2025 | West Canal Concrete Panel 2025 Replacement Project PANELS 10-29-24 | [TOMMER CONSTRUCTION COMPANY](/search.md) | $295,645 |
| Jan 24, 2025 | West Canal Concrete Lining Project Sta. 3828+18 to Sta. 3859+18 WC02 12-18-24 | [HALME CONSTRUCTION INC](/search.md) | $1,044,340 |
| Jan 23, 2025 | West Canal Concrete Lining Project - Sta. 3326+47 to Sta. 3368+91 WC01 12-18-24 | [HALME CONSTRUCTION INC](/search.md) | $991,230 |
| Jan 14, 2025 | 2025 Main Canal Polyurea Application Project, QCBID MPOLY 10-30-24 | [MATHESON PAINTING](/search.md) | $195,556 |
| Jan 14, 2025 | 2025 West Canal Polyurea Application Project, QCBID POLY 10-30-24 | [MATHESON PAINTING](/search.md) | $208,593 |
| Dec 30, 2024 | West Canal Rehabilitation Ephrata - Part A XM WC 11-26-24 | [HALME CONSTRUCTION INC](/search.md) | $2,213,710 |
| Nov 19, 2024 | Main Canal Concrete Panel Replacement MC 10-29-24 | [HALME CONSTRUCTION INC](/search.md) | $401,937 |
| Oct 2, 2024 | Evergreen Pumping Plant Electrical Systems Upgrades ELEC 05-25-23 | [FULCRUM ELECTRIC LLC](/search.md) | $818,476 |
| Aug 23, 2024 | Main Canal Polyurea 2024 Application Project POLY 12-14-23 | [MATHESON PAINTING](/search.md) | $212,685 |
| Aug 7, 2024 | Soap Lake I-Well MOP10607 | [LAD IRRIGATION CO INC](/search.md) | — |
| Jul 8, 2024 | Babcock Domestic Well MOP11200 | [LAD IRRIGATION CO INC](/search.md) | — |
| Feb 27, 2024 | West Canal Polyurea Application 2024 Poly 11-28-23 | [COLUMBIA IND COATINGS LLC](/search.md) | $200,200 |
| Jan 22, 2024 | W61F Lateral Concrete Lining Project W61F 12-28-23 | [HALME CONSTRUCTION INC](/search.md) | $664,018 |
| Jan 19, 2024 | 2024 Main Canal Concrete Panel Replacement MC 11-21-23 | [BELSAAS & SMITH CONST INC](/search.md) | $236,600 |
| Dec 30, 2023 | 2024 West Canal Panel Replacements PANELS 11-28-23 | [HALME CONSTRUCTION INC](/search.md) | $225,200 |
| May 18, 2023 | (title withheld) MOP10389 | [LAD IRRIGATION CO INC](/search.md) | — |
| May 18, 2023 | (title withheld) MOP10251 | [LAD IRRIGATION CO INC](/search.md) | — |
| May 18, 2023 | D86.1 Drain Well 5094138776 | [LAD IRRIGATION CO INC](/search.md) | — |
| Feb 7, 2023 | Main Canal Polyurea 2023 Application Project Poly 11-30-22 | [COLUMBIA IND COATINGS LLC](/search.md) | $360,360 |
| Feb 7, 2023 | West Canal Polyurea Application 2023 Project Poly 11-30-22 | [COLUMBIA IND COATINGS LLC](/search.md) | $240,240 |
| Jan 20, 2023 | West Canal 22-23 Concrete Lining CONC 12-22-22 | [HALME CONSTRUCTION INC](/search.md) | $759,334 |
| Jan 20, 2023 | West Canal Concrete Panel 2023 Replacement Project Panels 11-01-22 | [BELSAAS & SMITH CONST INC](/search.md) | $219,300 |
| Oct 22, 2022 | (title withheld) MOP10196 | [LAD IRRIGATION CO INC](/search.md) | — |
| Aug 4, 2022 | Frenchman Hills Pumping Plant ELEC 05-20-21 | [BURKE ELECTRIC LLC](/search.md) | $465,126 |
| Jul 19, 2022 | West Canal Polyurea Application 2022 Project Poly 12-01-21 | [REED ENVIRONMENTAL LLC](/search.md) | $235,000 |
| Jun 23, 2022 | MODERNIZING 10-TON TRAVELING CRANE EVERGREEN PUMPING PLANT CRANE 05-31-22 | [K & N ELECTRIC MOTORS INC](/search.md) | $290,347 |
| May 23, 2022 | Road E House Basement Sheetrock 1024 | [O C D CONSTRUCTION LLC](/search.md) | $2,462 |
| Mar 24, 2022 | (title withheld) ML-22-0209 | [JUST RIGHT CLEANING/CONST INC](/search.md) | — |
| Mar 21, 2022 | W61 Feeder Repair | [TOMMER CONSTRUCTION COMPANY](/search.md) | — |
| Jan 20, 2022 | 2022 West Canal Concrete Panel Replacement Panels 11-30-21 | [BELSAAS & SMITH CONST INC](/search.md) | $191,420 |
| Jan 19, 2022 | 2022 Main Canal Concrete Panel Replacement MC 11-30-21 | [BELSAAS & SMITH CONST INC](/search.md) | $207,400 |
| Nov 11, 2021 | Pump N. MOP09730 | [LAD IRRIGATION CO INC](/search.md) | — |
| Oct 20, 2021 | West Canal Concrete Lining CONC 09-30-21 | [HALME CONSTRUCTION INC](/search.md) | $579,200 |
| Oct 20, 2021 | W61F Lateral Concrete Lining Project W61F 09-30-21 | [HALME CONSTRUCTION INC](/search.md) | $764,586 |
| Mar 25, 2021 | (title withheld) POLY 11/20/19 | [COLUMBIA IND COATINGS LLC](/search.md) | $245,520 |
| Dec 22, 2020 | West Canal 2021 Concrete Panel Replacement Panels 11-19-20 | [BELSAAS & SMITH CONST INC](/search.md) | $107,820 |
| Aug 6, 2020 | MODERNIZING 15-TON TRAVELING CRANE CRANE 06-25-20 | [K & N ELECTRIC MOTORS INC](/search.md) | $159,163 |
| Feb 19, 2020 | W36 CHECK & W35.9 DIVERSION GATES RE-COATING PROJECT W36 12-19-19 | [INDUSTRIAL COATNGS UNLMTD LLC](/search.md) | $141,900 |
| Jan 24, 2020 | 2020 Main Canal Concrete Panel Replacement Project MC 11-21-19 | [BELSAAS & SMITH CONST INC](/search.md) | $126,900 |
| Jan 2, 2020 | 2020 West Canal Concrete Panel Replacement Project PANELS 11-21-19 | [TOMMER CONSTRUCTION COMPANY](/search.md) | $99,000 |
| Dec 31, 2019 | W61F Lateral Concrete Lining Project W61F 11-19-19 | [HALME CONSTRUCTION INC](/search.md) | $787,389 |
| Oct 10, 2019 | AWA TEST 58 MOTORS 41904 | [K & N ELECTRIC MOTORS INC](/search.md) | $8,972 |
| Oct 10, 2019 | AWA MOTOR TESTING 41907 | [K & N ELECTRIC MOTORS INC](/search.md) | $680 |
| Aug 19, 2019 | (title withheld) BLAST 08-07-18 | [SUPERIOR BLASTING/DRILLING INC](/search.md) | $41,500 |
| May 13, 2019 | Lake Lenore Pumping Plants #1 and # 2 Electrical System Upgrades, Grant County ,Washington TRAN 04-23-2019 | [COLVICO INC](/search.md) | $262,682 |
| Mar 6, 2019 | Frenchman Hills Tunnel and Wasteway Gates Re-coating W61 12-20-18 | [COLUMBIA IND COATINGS LLC](/search.md) | $145,100 |
| Feb 12, 2019 | Quincy Pumping Plant Electrical System Upgrades TRAN 01-29-19 | [Northeast Electric LLC](/search.md) | $636,610 |
| Feb 11, 2019 | Trail Lake Section Main Canal Concrete Panel Replacement Project TL 01-31-19 | [Tommer Construction Co. Inc.](/search.md) | $141,775 |
| Feb 5, 2019 | Lateral Pipe Installation QCBID-W26A17 | [Tommer Construction Co. Inc.](/search.md) | $13,623 |
| Dec 26, 2018 | 2019 Polyurea Application Project | [COLUMBIA IND COATINGS LLC](/search.md) | $337,920 |
| Dec 19, 2018 | West Canal Concrete Panel Replacement Panels 11-29-18 | [HALME CONSTRUCTION INC](/search.md) | $177,750 |
| Dec 19, 2018 | W39.9 Lateral Sta 116+01 Bridge Replacement Bridge 09-25-18 | [HALME CONSTRUCTION INC](/search.md) | $78,100 |
| Dec 19, 2018 | Main Canal Concrete Panel Replacement MC 11-29-18 | [HALME CONSTRUCTION INC](/search.md) | $289,062 |
| Dec 19, 2018 | W53.1D & W53.1E Laterals Concrete Lining W53.1D&E 11-20-18 | [HALME CONSTRUCTION INC](/search.md) | $852,862 |
| Sep 17, 2018 | Downstairs Server Room | [QUINCY HEATING & A/C LLC](/search.md) | $5,719 |
| Jul 25, 2018 | Winchester Camp Tree Work QCBID | [BASIN TREE SVC & PEST CTRL INC](/search.md) | $5,098 |
| Jul 2, 2018 | Install 5 ton fan coil on basecan in the new shop 40162 - 06-05146 | [BASIN REFRIGERATION & HTG INC](/search.md) | $6,142 |
| Feb 26, 2018 | (title withheld) 39765 | [WESCO OVERHEAD DOOR CO](/search.md) | $9,727 |
| Jan 25, 2018 | 2018 Polyurea Application Project POLY 11-21-17 | [COLUMBIA IND COATINGS LLC](/search.md) | $341,440 |
| Jan 25, 2018 | Quincy-Columbia Basin Irrigation District W26 Check Re-Coating Project W26 12-19-17 | [COLUMBIA IND COATINGS LLC](/search.md) | $153,800 |
| Jan 16, 2018 | W53.1E Lateral Concrete Lining Project W53.1E 11-02-17 | [HALME CONSTRUCTION INC](/search.md) | $574,914 |
| Jan 16, 2018 | 2018 Main Canal Concrete Panel Replacement MC 11-28-17 | [HALME CONSTRUCTION INC](/search.md) | $465,000 |
| Jan 16, 2018 | 2018 West Canal Concrete Panel Replacement PANELS 11-28-17 | [HALME CONSTRUCTION INC](/search.md) | $182,700 |
| Jan 16, 2018 | W61 Lateral Concrete Lining Project W61 11-02-17 | [HALME CONSTRUCTION INC](/search.md) | $231,224 |
| Oct 28, 2017 | Quincy Pumping Plant 7,8, and 9 Replacement Motor Controls QPP 02-23-17 | [EQUITY BUILDERS LLC](/search.md) | $285,935 |
| Aug 2, 2017 | Quincy Shop Overhead Crane 3678-A | [KONECRANES, INC](/search.md) | $38,144 |
| Apr 12, 2017 | Evergreen Pumping Plant - Transformer Replacement TRAN 03-23-17 | [COLVICO INC](/search.md) | $293,488 |
| Mar 7, 2017 | Quincy Irrigation Dist Mitigation | [JUST RIGHT CLEANING/CONST INC](/search.md) | $11,873 |
| Jan 31, 2017 | 2017 Polyurea Application Project | [COLUMBIA IND COATINGS LLC](/search.md) | $460,460 |
| Jan 10, 2017 | W20 Check and Turnout Recoating Project W20 12-15-16 | [E C I SERVICES](/search.md) | $158,500 |
| Jan 6, 2017 | 2017 Main Cnal Concrete Panel Replacement Project MC 11-29-16 | [WEST COMPANY INC](/search.md) | $464,500 |
| Dec 28, 2016 | Quincy Columbia Basin Irrigation Dist | [JUST RIGHT CLEANING/CONST INC](/search.md) | $9,464 |
| Nov 21, 2016 | W53.1E & W61 Lateral Concrete Lining Project W53.1E/W61 | [HALME CONSTRUCTION INC](/search.md) | $907,357 |
| Mar 23, 2016 | Transformer Replacement - Sand Hollow Pumping Plant TRAN 10-22-15 | [KVA ELECTRIC INC](/search.md) | $266,065 |
| Mar 1, 2016 | 2016 Polyurea Apllication Projects, Grant County POLY 12-17-15 | [MATHESON PAINTING](/search.md) | $321,108 |
| Feb 4, 2016 | Quincy Columbia Basin Irr Dist Re-Roof n/a | [MASON ROOFING & CONST INC](/search.md) | $19,479 |
| Jan 26, 2016 | 2016 Main Canal Concrete Panel Replacement Project MC 11-24-15 | [WEST COMPANY INC](/search.md) | $297,000 |
| Dec 17, 2015 | QCBID 2016 West Canal Concrete Replacement Project PANELS 11-24-15 | [ROTSCHY INC](/search.md) | $361,332 |
| Dec 7, 2015 | (title withheld) WIN 11-19-15 | [E C I SERVICES](/search.md) | $40,000 |
| Oct 26, 2015 | Replacement Glass O&M 3570A | [COMMUNITY GLASS COMPANY INC](/search.md) | $2,633 |
| Oct 23, 2015 | QCBID W53.1D Lateral Concrete Lining Project W53.1D 09-24-15 | [HALME CONSTRUCTION INC](/search.md) | $701,324 |
| Sep 22, 2015 | New Offices floorcovering | [GRANT'S NEW & RENEW INC](/search.md) | $10,519 |
| Jun 23, 2015 | West Canal Low Pressure Grouting Station 850+00 WC 02-24-15 | [HAYWARD BAKER INC](/search.md) | $103,961 |
| Jun 22, 2015 | New storefront 3542A | [COMMUNITY GLASS COMPANY INC](/search.md) | $17,264 |
| Mar 31, 2015 | RB4C SR 26 Culvert RB4C SR 26 Culvert | [MATHESON PAINTING](/search.md) | $44,455 |
| Feb 12, 2015 | Trail Lake Section Main Concrete Panel Replacement TL 01-29-15 | [WEST COMPANY INC](/search.md) | $104,400 |
| Feb 10, 2015 | 2015 Polyurea Application Projects poly 12-18-14 | [MATHESON PAINTING](/search.md) | $404,142 |
| Jan 20, 2015 | Quincy Shop Doors | [WESCO OVERHEAD DOOR CO](/search.md) | $10,930 |
| Dec 19, 2014 | 2015 Shotcrete Canal Lining Project none | [CLEARWATER CONST & MGMT LLC](/search.md) | $472,436 |
| Dec 16, 2014 | MAJOR PUMPING PLANT 2014-2014 MOTOR 11-25-14 | [Eastside Electric Motors LLC](/search.md) | $37,078 |
| Dec 8, 2014 | 2015 West Canal Concrete Panel Replacement Project PANELS 11-20-14 | [TOMMER CONSTRUCTION COMPANY](/search.md) | $162,890 |
| Nov 12, 2014 | DW231 Wasteway Bridge Replacement Project Bridge 10-30-14 | [TOMMER CONSTRUCTION COMPANY](/search.md) | $75,333 |
| Oct 17, 2014 | 2015 Main Canal Concrete Panel Replacement | [HALME CONSTRUCTION INC](/search.md) | $310,500 |
| Sep 8, 2014 | Martin Road Bridge Demo N/A | [TOMMER CONSTRUCTION COMPANY](/search.md) | $10,000 |
| Jun 6, 2014 | 2014 shotcrete lining projects shot 11-21-13 | [ROCK SUPREMACY LLC](/search.md) | $448,200 |
| Feb 3, 2014 | Quincy Auxiliary Pumping Plant Discharge Manifold Lining Project QPP 10-29-13 | [COLUMBIA PUMPING & CONST INC](/search.md) | $123,301 |
| Jan 22, 2014 | Main Canal Concrete Panel Replacement MC 11-22-13 | [C & S CONSTRUCTION](/search.md) | $204,000 |
| Dec 23, 2013 | 2014 West Canal Concrete Panel Replacement Project PANELS 11-22-13 | [TOMMER CONSTRUCTION COMPANY](/search.md) | $149,890 |
| Nov 19, 2013 | Quincy Pumpin Plant Roof Refurbishment QPP-ROOF 10-24-13 | [J U CONTRACTING CO](/search.md) | $19,400 |
| Nov 12, 2013 | 2014 Polyurea Application Projects POLY 10-31-13 | [MATHESON PAINTING](/search.md) | $124,362 |
| Apr 8, 2013 | Hilltop Pit Rock Crushing & Stockpiling CR 03-28-13 | [SEUBERT EXCAVATORS INC](/search.md) | $176,092 |
| Feb 6, 2013 | 2013 MAIN CANAL CONCRETE PANEL REPLACEMENT PROJECT MC 11-16-12 | [BELSAAS & SMITH CONST INC](/search.md) | $45,750 |
| Feb 1, 2013 | 2013 Shotcrete Canal Lining Projects SHOT 12-18-12 | [JOHNSON WESTERN GUNITE CO](/search.md) | $458,568 |
| Jan 31, 2013 | 2013 Polyurea Application Projects 12-18-12 | [MATHESON PAINTING](/search.md) | $97,242 |
| Jan 9, 2013 | West Canal Concret Panel Replacement Panel 11-16-12 | [TOMMER CONSTRUCTION COMPANY](/search.md) | $148,590 |
| Dec 6, 2012 | W40 Check Re-Coating Project W40000 11-15-12 | [E C I SERVICES](/search.md) | $39,082 |
| Nov 26, 2012 | 2012 Shotcrete Canal Lining Projects SHOT 11-17-11 | [JOHNSON WESTERN GUNITE CO](/search.md) | $415,005 |
| Jul 24, 2012 | Polyurea Application W3F Sta 65+85.51 24' and 30' Concrete Pipe W3F 02-18-11 | [MATHESON PAINTING](/search.md) | $18,164 |
| Feb 2, 2012 | Babcock Pumping Plant Discharge Manifold Lining Project | [COLUMBIA PUMPING & CONST INC](/search.md) | $248,790 |
| Jan 16, 2012 | 2012 Main Canal Concrete Panel Replacement MC 11-17-11 | [HALME BUILDERS INC](/search.md) | $43,500 |
| Jan 10, 2012 | 2012 Polyurea Application Project Poly-12-15-11 | [MATHESON PAINTING](/search.md) | $94,866 |
| Jan 6, 2012 | 2012 West Canal Replacement, QCBID | [ROTSCHY INC](/search.md) | $125,250 |
| Oct 31, 2011 | WEST CANAL EMBANKMENT STABILITY IMPROVEMENTS NEAR OASIS PARK - PHASE II WC 09-15-11 | [TAPANI UNDERGROUND INC](/search.md) | $1,995,620 |
| Jul 28, 2011 | George Office | [QUINCY HEATING & A/C INC](/search.md) | $7,612 |
| Apr 12, 2011 | 2011 Main Canal Concrete Panel Replcacement MC11-16-10 | [HALME BUILDERS INC](/search.md) | $42,500 |
| Mar 31, 2011 | MOTOR PUMPING PLANT 2010-2011 MOTOR OVERHAUL MOTOR 09-30-10 | [H&N ELECTRIC](/search.md) | $240,000 |

Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.

### Contractors that filed intents on its projects

| Contractor | Intents on this agency's projects |
|---|---|
| [AAA Concrete Inc](/search.md) | 4 |
| [AAA Readymix, Inc. II](/search.md) | 24 |
| [BELSAAS & SMITH CONST INC](/search.md) | 9 |
| [COLUMBIA IND COATINGS LLC](/search.md) | 10 |
| [COLUMBIA PUMPING & CONST INC](/search.md) | 2 |
| [E C I SERVICES](/search.md) | 4 |
| [FULCRUM ELECTRIC LLC](/search.md) | 3 |
| [HALME BUILDERS INC](/search.md) | 4 |
| [HALME CONSTRUCTION INC](/search.md) | 22 |
| [INLAND ASPHALT CO](/search.md) | 5 |
| [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | 2 |
| [INTERSTATE SAWING/DRILLING LLC](/search.md) | 5 |
| [J U CONTRACTING CO](/search.md) | 3 |
| [JOHNSON WESTERN GUNITE CO](/search.md) | 2 |
| [JUST RIGHT CLEANING/CONST INC](/search.md) | 3 |
| [K & N ELECTRIC MOTORS INC](/search.md) | 4 |
| [LAD IRRIGATION CO INC](/search.md) | 7 |
| [MATHESON PAINTING](/search.md) | 13 |
| [POPPOFF INC](/search.md) | 7 |
| [Ralph's Concrete Pumping](/search.md) | 27 |
| [TOMMER CONSTRUCTION COMPANY](/search.md) | 12 |
| [WASHINGTON GREEN HYDROSDNG INC](/search.md) | 11 |
| [WESCO OVERHEAD DOOR CO](/search.md) | 2 |
| [WEST COMPANY INC](/search.md) | 3 |
| [WITHROW CONSTRUCTION INC](/search.md) | 3 |

Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.

**Do you run a construction company with
20 or more people on site?**

AI labs pay businesses to record first-person video of everyday hands-on
work — filmed by their own crews with a smartphone on a wearable mount, with consent and under contract.

**See the program and apply →** 
 Referral link to micro1: this site may be paid a fee if your business is accepted. Not affiliated with the
Washington State Department of Labor & Industries.

---

Página: https://wa-public-works-records.pages.dev/agency/quincy-columbia-basin-irrigation-dis/
Fonte: https://data.wa.gov/d/t9je-9qwa
Recolha: 2026-10-01