# NORTHSHORE UTILITY DISTRICT — public works contracts and contractors (Washington prevailing wage intents)

> 171 public works projects of NORTHSHORE UTILITY DISTRICT: the latest contracts, the prime contractors and the amounts declared on prevailing wage intents.

## NORTHSHORE UTILITY DISTRICT — public works contracts

171 public works projects and 602 intents to pay prevailing wages name NORTHSHORE UTILITY DISTRICT as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: [Public Utility District](/agency-type/public-utility-district.md).

Bidding, hiring a subcontractor or checking a competitor? A [dated public works report ($19)](/report.md) on one contractor — or [an agency's awards, every month](/pro.md).

### Intents filed, by year

| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 41 | 16 | 18 | 22 | 19 | 23 | 62 | 33 | 53 | 32 |

### Latest contracts (106)

| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Aug 11, 2026 | Building B Bay Door Replacement C2503 | [ALPHA DEVELOPERS LLC](/search.md) | $300,544 |
| Apr 15, 2026 | Fuel Sensor Error AP-14144 | [MASCOTT EQUIPMENT CO INC](/search.md) | $4,750 |
| Apr 8, 2026 | NORTHSHORE UTILITY DIS. WO-419813 | [CUMMINS INC](/search.md) | $2,345 |
| Mar 9, 2026 | 122-84 Watermain Replacement Project C2305 | [B & B UTILITIES AND EXVTNG LLC](/search.md) | $2,858,293 |
| Jan 7, 2026 | Small Diameter High Pressure Water Main Replacement Projectater Main C2101 | [KAR VEL CONSTRUCTION INC](/search.md) | $2,281,163 |
| Dec 16, 2025 | Norway Tank Cleaning 2025 AP-13468 | [CLEAN425 LLC](/search.md) | $5,914 |
| Dec 1, 2025 | Large Water Meter Testing 2025 Large Meter Testing | [Columbia Basin Water Works, Inc.](/search.md) | — |
| Oct 21, 2025 | 18817 73rd Ave SE - MMA Replacement None. | [SPECIALIZED PAVEMENT MRKG LLC](/search.md) | $8,254 |
| Aug 28, 2025 | Lakewood Villa Water and Sewer C0948 | [B & B UTILITIES AND EXVTNG LLC](/search.md) | $656,161 |
| Jun 5, 2025 | Northshore Utility District Power Upgrade AP-12179 | [MILNE ELECTRIC INC](/search.md) | $2,758 |
| Mar 5, 2025 | Ice Maker Cabinet - Operations Kitchenette 25-01 | [URBAN CABINET COMPANY INC](/search.md) | $6,419 |
| Jan 8, 2025 | Garage Door Torsion Spring 24-04 | [HESTON DOOR SERVICE INC](/search.md) | — |
| Jan 8, 2025 | Garage Window Repairs 24-03 | [HESTON DOOR SERVICE INC](/search.md) | — |
| Dec 30, 2024 | Building B Electrical Monitoring 24-2 | [NELSON ELECTRIC INC](/search.md) | $2,170 |
| Nov 11, 2024 | 119th ST SW Tree MT1590 | [KEMP WEST INC](/search.md) | $2,600 |
| Nov 7, 2024 | NUD Inglemoor 241192 | [Far West Technologies INC](/search.md) | — |
| Nov 1, 2024 | 451 Zone Control Valve Facility & Control Valve Vault C0928 | [INTERWEST CONSTRUCTION INC](/search.md) | $3,451,671 |
| Nov 1, 2024 | GRIND & OVERLAY 1 | [LAKERIDGE PAVING CO L L C](/search.md) | $116,101 |
| Oct 9, 2024 | C2307 HQ Backup Fiber C2307 | [PRIME ELECTRIC LLC](/search.md) | $25,741 |
| Aug 8, 2024 | (title withheld) 2024stripe1 | [ACCULINE](/search.md) | $3,130 |
| Jul 24, 2024 | Reservoir Exterior Cleaning Job#1643 | [PUGET POWER WASHING LLC](/search.md) | $9,515 |
| Jun 12, 2024 | Northshore Building A 16264 | [LEGACY GROUP INC](/search.md) | $99,710 |
| Dec 7, 2023 | Northshore - Building A Project Furnishings 14389 | [LEGACY GROUP INC](/search.md) | $488,884 |
| Nov 9, 2023 | Northshore Utility District - Bldg A 8359 | [LEGACY GROUP INC](/search.md) | $157,106 |
| Sep 15, 2023 | (title withheld) 230836 | [Far West Technologies INC](/search.md) | $56,871 |
| Aug 23, 2023 | Grind and Overlay 23075 | [FIDALGO PAVING & CONST LLC](/search.md) | $55,462 |
| Jun 27, 2023 | Water Main Replacement 120-84 | [BLUE MOUNTAIN CONST GROUP LLC](/search.md) | $457,455 |
| Jun 23, 2023 | Northshore Fire District # 51 185696 | [CRESSY DOOR CO INC](/search.md) | $963 |
| Jun 21, 2023 | Northshore Fire Dist. #51 185506 | [CRESSY DOOR CO INC](/search.md) | $802 |
| Jun 13, 2023 | NUD 130-66 watermain replacement, woodland Cove water service repl. 2023-02 | [KAR VEL CONSTRUCTION INC](/search.md) | $893,135 |
| May 24, 2023 | 14114 DRIVEWAY REPOUR 12345 | [DEPENDABLE CONTRACTING SVC LLC](/search.md) | $5,753 |
| May 1, 2023 | Northshore Utility District 2023-01 | [KLINGE & ASSOCIATES INC](/search.md) | $3,939,328 |
| Dec 24, 2022 | Sewer Repair Project 2022-02 | [WSB EXCAVATION & UTILITIES LLC](/search.md) | $724,561 |
| Dec 23, 2022 | Grinder Stations 1-4 Replacement Project 2022-01 | [DIRTWORKS NORTHWEST LLC](/search.md) | $703,666 |
| Dec 13, 2022 | 11802 DRIVEWAY R&R 1234 | [DEPENDABLE CONTRACTING SVC LLC](/search.md) | $8,609 |
| Feb 7, 2022 | Security System Upgrade | [Right! Systems, Inc.](/search.md) | $65,645 |
| Jan 13, 2022 | Private Water Service Line Project 2021-02 | [B & B UTILITIES AND EXVTNG LLC](/search.md) | $325,988 |
| Jan 4, 2022 | 165/81 Watermain Replacement Project 2021-04 | [LASER UNDRGRND & ERTHWRKS INC](/search.md) | $1,783,235 |
| Jun 3, 2021 | Totem Lake Blvd and 120th Ave NE Improvements 2021-01 | [SHORELINE CONST CO](/search.md) | $1,222,610 |
| Nov 19, 2020 | Lake Forest Park Reservoir & Booster Station Upgrades 2020-01 | [GARY HARPER CONSTRUCTION INC](/search.md) | $631,724 |
| Apr 23, 2020 | Electrical Outlets October 10, 2019 | [NELSON ELECTRIC INC](/search.md) | $19,205 |
| Feb 11, 2020 | Sewer CIPP Rehabilitation Project 2019-01 | [PLANNED & ENGINEERED CONST INC](/search.md) | $3,547,500 |
| Jan 23, 2020 | Bldg B Middle door 11408 | [DAVIS DOOR SERVICE INC](/search.md) | — |
| Jan 20, 2020 | Schedule A: NUD Totem Lake Emergency Wastewater Conveyance Plan Sewer Force Main Schedule B: City of Kirkland Comfort Inn Pond Storm water Bypass 2019-04 | [RAZZ CONSTRUCTION INC](/search.md) | $1,719,784 |
| Oct 10, 2019 | Norway Hill Reservoir Seal Welding & Recoating Project Warranty Work | [INDUSTRIAL COATNGS UNLMTD LLC](/search.md) | — |
| Oct 9, 2019 | Building B (16) Columns H11081 | [WALKER SPECIALTY CONST INC](/search.md) | $5,148 |
| Aug 20, 2019 | Northshore Utility District Building B Roof Replacement and Solar Energy USC-15-JLP-023 | [TRANE](/search.md) | $2,438,513 |
| May 28, 2019 | 21847 NUD-Kirkland Sidewalk Repair -- | [RAINIER ASPHALT SEALING LLC](/search.md) | $7,061 |
| Mar 12, 2019 | OHD with broken spring - | [DAVIS DOOR SERVICE INC](/search.md) | — |
| Nov 6, 2018 | Water Main Replacement Project Schedule B 2017-03 | [B & B UTILITIES AND EXVTNG LLC](/search.md) | $311,114 |
| Aug 29, 2018 | Slough 68 / City of Kenmore Bridge Sewer Bypass 2018-01 | [ACCORD CONTRACTORS LLC](/search.md) | $1,448,810 |
| Jun 14, 2018 | NUD Headquarters Energy Efficiency Recommissioning 2017-05 | [INTEGRITY ENERGY SERVICES CO](/search.md) | $23,685 |
| Feb 23, 2018 | 125/Holmes Point Drive Sewer Extension 2017-06, 125 | [NORTH HILL RESOURCES INC](/search.md) | $297,957 |
| Jan 12, 2018 | Cottonwood removal Norway Hill Cottonwoods | [NORTHWEST ARBORICULTURE LLC](/search.md) | $1,960 |
| Jun 16, 2017 | 2016 SEWER MAIN CIPP REHAB PROJECT 2016-04 | [PLANNED & ENGINEERED CONST INC](/search.md) | $1,209,975 |
| Jun 15, 2017 | Lift Stations No. 3 & 15 Rehab; Lift Station No. 19 Generator 2017-01 | [MCCLURE & SONS INC](/search.md) | $799,395 |
| May 18, 2017 | 126/72 Water main Replacement 2016-02 | [STEVE RUHNKE CONSTRUCTION INC](/search.md) | $107,539 |
| Apr 21, 2017 | Chick-fil-A & Totem Lake Retail Sewer Bypass 2017-04 | [TAPANI INC](/search.md) | $182,391 |
| Apr 11, 2017 | 2017 Water Main Replacement 2017-02 | [D & G BACKHOE INC](/search.md) | $1,666,030 |
| Mar 1, 2017 | Main front door and shop door H5759 | [DOOR PROS INC](/search.md) | $3,110 |
| Jan 26, 2017 | Village at Totem Lake D1513 | [ROBINSON CONSTRUCTION CO](/search.md) | $2,000,000 |
| Jan 5, 2017 | S.W. Shop door 5299 | [DAVIS DOOR SERVICE INC](/search.md) | $2,963 |
| Dec 9, 2016 | Norway Hill Reservoir Seal Welding & Recoating Project 2016-05 | [COATINGS UNLIMITED INC](/search.md) | $1,695,717 |
| Nov 8, 2016 | Lift Station No. 3 Force Main and Water Main Replacement 2016-06 | [SHORELINE CONST CO](/search.md) | $272,025 |
| Sep 13, 2016 | Northshore Root Control PO | [DUKE'S ROOT CONTROL INC](/search.md) | $2,981 |
| Aug 11, 2016 | Water Main Replacement at Kits Camera Kenmore | [NELSON & SONS CONST CO INC](/search.md) | $32,415 |
| Jul 8, 2016 | 120/89 Sewer Main Extension 2016-03 | [R L ALIA COMPANY](/search.md) | $782,104 |
| Jul 8, 2016 | 163/90 Water Main and Sewer Main Extensions 2016-01 | [R L ALIA COMPANY](/search.md) | $489,657 |
| Jun 7, 2016 | 5833 NE 198th Pl Overlay | [FIDALGO PAVING & CONST LLC](/search.md) | $11,826 |
| Mar 11, 2016 | Kingsgate Fence Replacement 2015-08 | [ECONOMY FENCE CENTER](/search.md) | $46,444 |
| Mar 2, 2016 | 2015 Water Main Replacement Projects 2015-02 | [EARTHWORK ENTERPRISES INC](/search.md) | $1,194,864 |
| Jan 12, 2016 | Headquarters Energy Efficiency Lighting Upgrades 2015-12 | [INTEGRITY ENERGY SERVICES CO](/search.md) | $43,000 |
| Aug 19, 2015 | Northshore Sewer Root Control H02189 | [DUKE'S ROOT CONTROL INC](/search.md) | — |
| Aug 17, 2015 | NUD Buildings A&B Recoating 2015-11 | [APPLIED RESTORATION INC](/search.md) | $268,877 |
| Aug 5, 2015 | Access Structures for the Inglemoor 24'' Transmission Main 2015-09 | [R L ALIA COMPANY](/search.md) | $76,304 |
| Aug 5, 2015 | 2015 Water Main Replacement 2015-05 | [R L ALIA COMPANY](/search.md) | $1,197,092 |
| Jun 26, 2015 | Mock-up painting of 2 color schemes and EIFS repair on the west end of buildingA | [APPLIED RESTORATION INC](/search.md) | $5,173 |
| Dec 10, 2014 | 2014 Water Main Replacement Projects 2014-01 | [B & B UTILITIES AND EXVTNG LLC](/search.md) | $694,612 |
| Oct 31, 2014 | 144/91 Sewer Trench Repair C1408 | [BUNO CONSTRUCTION LLC](/search.md) | $106,297 |
| Sep 22, 2014 | 2014 Mainline Sewer CIPP Rehab 2014-07 | [PLANNED & ENGINEERED CONST INC](/search.md) | $1,669,875 |
| Sep 5, 2014 | 130/116 Water Main Replacement Project 2014-08-27-A | [BUNO CONSTRUCTION LLC](/search.md) | $356,328 |
| Jul 9, 2014 | 2014 Sewer and Water Projects 2014-08 | [LASER UNDRGRND & ERTHWRKS INC](/search.md) | $726,177 |
| Jun 23, 2014 | NUD HQ & 124-68 Slurry Seal Project 2014-03 | [BLACKLINE INC](/search.md) | $66,815 |
| Jun 11, 2014 | SHOP DOOR AND PM & INSP. DOORS BLDGS B&C H01918 | [DAVIS DOOR SERVICE INC](/search.md) | — |
| May 7, 2014 | 155/81 Water Main Replacement Poject 2014-04 | [D & G BACKHOE INC](/search.md) | $484,585 |
| Jan 8, 2014 | Inglemoor � Reservoir 1 Improvements & Reservoir 2 Repairs C1316/C1318 | [T BAILEY INC](/search.md) | $1,526,190 |
| Oct 22, 2013 | 162/81 Road Repair and Water Main Replacement 2013-09 | [SHORELINE CONST CO](/search.md) | $275,174 |
| Jul 1, 2013 | 124/68 CIPP Sewer Project 2013-04 | [CORNERSTONE CONST/SEATTLE INC](/search.md) | $317,826 |
| Jun 20, 2013 | 133/88 Sewer Main Extension and Water Replacement 2013-06 | [SHORELINE CONST CO](/search.md) | $326,069 |
| Apr 8, 2013 | O.O. Denny Park 2013-03 | [MOSBRUCKER EXCAVATING, INC](/search.md) | $183,719 |
| Feb 27, 2013 | 2013 Water and Sewer Projects 2013-01 | [SHORELINE CONST CO](/search.md) | $863,548 |
| Dec 12, 2012 | OO Denny Park creek enhance& foot bridge 2012-07 | [N W LAND SERVICES LLC](/search.md) | $76,924 |
| Oct 23, 2012 | Inglemoor Reservoirs, Pump House & Secondary EOC Improvements Project 2012-02 | [KASSEL & ASSOCIATES INC](/search.md) | $4,250,991 |
| Aug 20, 2012 | ULID 1 Side Sewer Rehabilitation 2012-06 | [CORNERSTONE CONST/SEATTLE INC](/search.md) | — |
| Jul 20, 2012 | Headquarters Redevelopment Project 2012-01 | [C D K CONST SERVICES INC](/search.md) | $3,389,343 |
| May 29, 2012 | 181-61 Water Replacement 2012-05 | [KAR VEL CONSTRUCTION INC](/search.md) | $110,699 |
| May 29, 2012 | 2012 water and sewer project 2012-03 | [KAR VEL CONSTRUCTION INC](/search.md) | $505,420 |
| Feb 29, 2012 | 129/68 SEWER PROJECT 2011-10 | [B & B UTILITIES AND EXVTNG LLC](/search.md) | $32,865 |
| Oct 28, 2011 | 131/84 Sewer Extention 2011-09 | [MOSBRUCKER EXCAVATING, INC](/search.md) | $32,576 |
| Oct 24, 2011 | Juanita Drive Water Main Replacement 2011-04 | [TRENCHLESS CONST SERVICES LLC](/search.md) | $270,350 |
| Oct 17, 2011 | prev maint on several doors F9789 | [DAVIS DOOR SERVICE INC](/search.md) | — |
| Sep 16, 2011 | Lunch Room Remodal 2011-07 | [C D CONSTRUCTION & MGMT INC](/search.md) | — |
| Aug 17, 2011 | 2011 Water Main Extensions and Sewer Trench Repair 2011-06 | [LASER UNDRGRND & ERTHWRKS INC](/search.md) | $387,520 |
| Aug 12, 2011 | Lift Station No. 10 Abandonment & Gravity Sewer Bypass 2011-02 | [NEW WEST DEVELOPMENT INC](/search.md) | $3,168,985 |
| May 18, 2011 | 160/112 Sewer Extension Project 2011-01 | [LASER UNDRGRND & ERTHWRKS INC](/search.md) | $445,665 |
| Mar 9, 2011 | Sewer and Water Projects #2011-03 | [R L ALIA COMPANY](/search.md) | $853,131 |

Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.

### Contractors that filed intents on its projects

| Contractor | Intents on this agency's projects |
|---|---|
| [American Surveying and Environmental LLC](/search.md) | 5 |
| [APPLY A LINE INC](/search.md) | 7 |
| [B & B UTILITIES AND EXVTNG LLC](/search.md) | 6 |
| [BOBBY WOLFORD TRKNG & SLVG INC](/search.md) | 4 |
| [BUNO CONSTRUCTION LLC](/search.md) | 6 |
| [Cadman Inc.](/search.md) | 5 |
| [CRESSY DOOR CO INC](/search.md) | 4 |
| [DAVIS DOOR SERVICE INC](/search.md) | 5 |
| [DONALD B MURPHY CONTRS INC](/search.md) | 4 |
| [EVERGREEN CONCRETE CUTTING INC](/search.md) | 4 |
| [FIDALGO PAVING & CONST LLC](/search.md) | 7 |
| [Glacier Northwest dba Calportland](/search.md) | 6 |
| [GROUND UP ROAD CONST INC](/search.md) | 10 |
| [HM PACIFIC NORTHWEST INC](/search.md) | 5 |
| [J B ASPHALT PAVING INC](/search.md) | 7 |
| [LAKERIDGE PAVING CO L L C](/search.md) | 5 |
| [LASER UNDRGRND & ERTHWRKS INC](/search.md) | 5 |
| [NORTHSHORE PAVING INC](/search.md) | 15 |
| [OLSON BROTHERS PRO-VAC LLC](/search.md) | 5 |
| [PR SYSTEMS LLC](/search.md) | 5 |
| [R L ALIA COMPANY](/search.md) | 5 |
| [SALINAS SAWING & SEALING INC](/search.md) | 12 |
| [SHORELINE CONST CO](/search.md) | 11 |
| [STRIPE RITE INC](/search.md) | 6 |
| [WATSON ASPHALT PAVING CO INC](/search.md) | 5 |

Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.

**Do you run a construction company with
20 or more people on site?**

AI labs pay businesses to record first-person video of everyday hands-on
work — filmed by their own crews with a smartphone on a wearable mount, with consent and under contract.

**See the program and apply →** 
 Referral link to micro1: this site may be paid a fee if your business is accepted. Not affiliated with the
Washington State Department of Labor & Industries.

---

Página: https://wa-public-works-records.pages.dev/agency/northshore-utility-district/
Fonte: https://data.wa.gov/d/t9je-9qwa
Recolha: 2026-10-01