# KETTLE FALLS SCHOOL DISTRICT #212 — public works contracts and contractors (Washington prevailing wage intents)

> 183 public works projects of KETTLE FALLS SCHOOL DISTRICT #212: the latest contracts, the prime contractors and the amounts declared on prevailing wage intents.

## KETTLE FALLS SCHOOL DISTRICT #212 — public works contracts

183 public works projects and 245 intents to pay prevailing wages name KETTLE FALLS SCHOOL DISTRICT #212 as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: [School District](/agency-type/school-district.md).

Bidding, hiring a subcontractor or checking a competitor? A [dated public works report ($19)](/report.md) on one contractor — or [an agency's awards, every month](/pro.md).

### Intents filed, by year

| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 48 | 16 | 15 | 5 | 12 | 14 | 21 | 33 | 29 | 29 |

### Latest contracts (176)

| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Aug 17, 2026 | Crawlspace lights KFSD081326 | [FLOENER ELECTRIC](/search.md) | $1,933 |
| Aug 4, 2026 | Kettle Falls Elementary School Michael | [LMK FLOORS](/search.md) | $13,880 |
| Aug 4, 2026 | K.F. Early Learning Center inv. 5467 | [LMK FLOORS](/search.md) | $8,583 |
| Aug 4, 2026 | HVAC/R MAINT/REPAIR 8560104 | [DIVCO INCORPORATION](/search.md) | $23,244 |
| Jun 25, 2026 | (title withheld) KFSD-HS Drywell | [HACHISOFT GENERAL CONTRS INC](/search.md) | $16,502 |
| Jun 24, 2026 | KFSD-Elementary Concrete KFSD-Elementary Concrete | [HACHISOFT GENERAL CONTRS INC](/search.md) | $63,148 |
| Jun 24, 2026 | KFSD-HS Concrete KFSD-HS Concrete | [HACHISOFT GENERAL CONTRS INC](/search.md) | $32,125 |
| Jun 11, 2026 | KFSD-Indoor Practice Facility KFSD-Indoor Practice Facility | [HACHISOFT GENERAL CONTRS INC](/search.md) | $433,455 |
| May 26, 2026 | Kitchen Sink Repair | [VANCE FABRICATION LLC](/search.md) | $1,000 |
| Apr 28, 2026 | Security Cameras KFSD0410SC | [FLOENER ELECTRIC](/search.md) | $1,209 |
| Apr 28, 2026 | Trouble shoot hood fan KFSDHF040226 | [FLOENER ELECTRIC](/search.md) | — |
| Apr 22, 2026 | ELC Path - KFSD ELC Path - KFSD | [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | $4,100 |
| Apr 20, 2026 | KF ELC KF ELC | [HACHISOFT GENERAL CONTRS INC](/search.md) | — |
| Apr 14, 2026 | Convection Oven fan repair 8236979 Convection Oven fan repair 9236979 | [HOBART](/search.md) | — |
| Mar 23, 2026 | Semi-Annual Kitchen Suppression Inspection 12691411 | [Performance Systems Intgn LLC](/search.md) | $730 |
| Mar 13, 2026 | Early Learning Center Roof Drain Leak i5971 | [NORTHSIDE HEAT & COOL](/search.md) | $19,293 |
| Mar 9, 2026 | KFHS ADA Pathway KFHS ADA Pathway | [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | $17,100 |
| Feb 23, 2026 | Kettle Falls Elementary DW Repair9177157 9177157 | [HOBART](/search.md) | — |
| Jan 28, 2026 | washer not coming to tempature Kettle Falls Middle School | [HOBART](/search.md) | $408 |
| Jan 28, 2026 | disposer leaking water Kettle Falls Middle School | [HOBART](/search.md) | $1,763 |
| Dec 29, 2025 | (title withheld) KF ES AC Enclosures | [HACHISOFT GENERAL CONTRS INC](/search.md) | — |
| Dec 15, 2025 | light blinking and making noise Kettle Falls Elementary | [HOBART](/search.md) | $722 |
| Dec 12, 2025 | NL2238 FA REPAIRS NL2238 FA REPAIRS | [WESTERN STATES FIRE PRTCTN CO](/search.md) | $21,028 |
| Dec 8, 2025 | KETTLE FALLS SD AC CAMS 02 KETTLE FALLS SD AC CAMS 02 | [SECURITY SOLUTIONS NW LLC](/search.md) | $15,690 |
| Dec 8, 2025 | unit pausing to heat up between loads Kettle Falls Elementary | [HOBART](/search.md) | $999 |
| Nov 11, 2025 | Kettle Falls High School Oven Repair 9003578 | [HOBART](/search.md) | — |
| Nov 10, 2025 | KETTLE FALLS SD AC CAMS 01 KETTLE FALLS SD AC CAMS 01 | [SECURITY SOLUTIONS NW LLC](/search.md) | $18,405 |
| Oct 6, 2025 | 9896508 Kettle SD Pre-K Learning Solarguard Restore Michael Olsen/Signed Proposal | [WEATHERPROOFING TECH INC](/search.md) | $63,720 |
| Oct 2, 2025 | Kettle Falls Middle School DW Repair 8975053 | [HOBART](/search.md) | — |
| Oct 1, 2025 | Kettle Falls High School 8975059 | [HOBART](/search.md) | — |
| Sep 26, 2025 | Kettle Falls Elem 8941509 | [HOBART](/search.md) | — |
| Sep 26, 2025 | Kettle Falls Middle School 8951602 | [HOBART](/search.md) | — |
| Sep 25, 2025 | (title withheld) Kettle Falls Middle School | [HOBART](/search.md) | $1,489 |
| Sep 23, 2025 | receptacle installation 47059063 | [FLOENER ELECTRIC](/search.md) | — |
| Sep 23, 2025 | troubleshoot kitchen hood fan 46956147 | [FLOENER ELECTRIC](/search.md) | — |
| Sep 16, 2025 | Stove Troubleshooting Stove0925 | [FLOENER ELECTRIC](/search.md) | — |
| Aug 29, 2025 | Oven Electrical Issues OVEN082825 | [FLOENER ELECTRIC](/search.md) | $500 |
| Aug 25, 2025 | KETTLE FALLS ELEMENTARY SCHOOL 13308 | [SRE, LLC](/search.md) | $32,035 |
| Aug 11, 2025 | HVAC/R MAINT/REPAIR 8560104 | [DIVCO INCORPORATION](/search.md) | $23,244 |
| Jul 25, 2025 | Kette Falls SD Bus Parking Lot KFSD Bus Parking Lot | [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | $20,295 |
| Jul 23, 2025 | MISC electrical MISC06172025 | [FLOENER ELECTRIC](/search.md) | — |
| Jun 26, 2025 | KF ES Cooler KF ES Cooler | [HACHISOFT GENERAL CONTRS INC](/search.md) | $10,000 |
| Apr 8, 2025 | (title withheld) KFSD4226SB | [FLOENER ELECTRIC](/search.md) | $1,129 |
| Feb 25, 2025 | (title withheld) KFSDSTVE0209 | [FLOENER ELECTRIC](/search.md) | $1,900 |
| Feb 12, 2025 | HVAC/R MAINT/REPAIR 320252020 | [DIVCO INCORPORATION](/search.md) | $5,903 |
| Feb 7, 2025 | Kettle Falls School District Greenhouse KFSD212GH | [FLOENER ELECTRIC](/search.md) | $25,045 |
| Feb 6, 2025 | installed rebuild kit Kettle Falls Elementary | [HOBART](/search.md) | $778 |
| Jan 3, 2025 | touch screen cable not seated Kettle Falls Middle School | [HOBART](/search.md) | $100 |
| Dec 16, 2024 | upper and lower arms need replacement Kettle Falls Elementary | [HOBART](/search.md) | $2,120 |
| Nov 27, 2024 | case dripping on rear inner rail Kettle Falls Middle School | [HOBART](/search.md) | $100 |
| Nov 27, 2024 | (title withheld) Kettle Falls Middle School | [HOBART](/search.md) | $100 |
| Oct 24, 2024 | inlet water valve replaced Kettle Falls Elementary | [HOBART](/search.md) | $723 |
| Oct 9, 2024 | Kettle Falls School Football Field Lights/Scoreboard KFField1024 | [FLOENER ELECTRIC](/search.md) | — |
| Oct 9, 2024 | Kettle Falls Middle School - Rebuild Heat Exchanger 15187 | [ATLAS BOILER/EQUIPMENT CO INC](/search.md) | $22,950 |
| Sep 27, 2024 | Rinse pump is noisier than it should be Kettle Falls Elementary | [HOBART](/search.md) | $1,809 |
| Sep 25, 2024 | Inspection Kettle Falls High School | [HOBART](/search.md) | $551 |
| Sep 12, 2024 | Middle school heat exchanger abatement 5097386625 | [AIR TECH ABATEMENT TECH INC](/search.md) | $7,900 |
| Sep 12, 2024 | KF Greenhouse KF Greenhouse | [HACHISOFT GENERAL CONTRS INC](/search.md) | $125,000 |
| Sep 10, 2024 | Kettle Falls Bus Station Proposal 24313 | [AXIOM CONST & CONSULTING LLC](/search.md) | $42,552 |
| Aug 6, 2024 | HVAC/R MAINT/REPAIRS 8560104 | [DIVCO INCORPORATION](/search.md) | $22,567 |
| Aug 2, 2024 | Kettle Falls Bus Chargers 10407 | [COLVICO INC](/search.md) | $77,725 |
| Jul 18, 2024 | Garage Conduit Repair KFSDGarage724 | [FLOENER ELECTRIC](/search.md) | — |
| Jun 28, 2024 | KF Bus Slab KF Bus Slab | [HACHISOFT GENERAL CONTRS INC](/search.md) | $20,520 |
| Jun 21, 2024 | 2024 Kitechen Equipment Reapirs/Maint 2024 Kitechen Equipment Reapirs/Maint | [HOBART](/search.md) | — |
| May 30, 2024 | KETTLE FALLS SCHOOL DISTRICT HIGH SCHOOL & ELEMENTARY SCHOOL | [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | $89,888 |
| May 9, 2024 | Kettle Falls High School Washer & Dryer Replacement KFHSWASH524 | [FLOENER ELECTRIC](/search.md) | — |
| May 2, 2024 | KF Star KF Star | [HACHISOFT GENERAL CONTRS INC](/search.md) | $13,750 |
| Mar 15, 2024 | HS Misc Concrete HS Misc Concrete | [HACHISOFT GENERAL CONTRS INC](/search.md) | — |
| Mar 13, 2024 | DISHWASHER INSTALL 15141 | [HOBART](/search.md) | $10,622 |
| Feb 29, 2024 | Kettle Falls Middle School 15141 | [HOBART](/search.md) | $10,622 |
| Jan 16, 2024 | Kettle Falls Elementary 1743 | [T&M Restoration LLC](/search.md) | $12,000 |
| Dec 27, 2023 | KF Library Maintenance 23427573 | [Systech Mechanical LLC](/search.md) | — |
| Nov 6, 2023 | Power for Door Lock Down KFSDMID92623 | [FLOENER ELECTRIC](/search.md) | — |
| Nov 6, 2023 | Library Outlets for Elementary KFSCEL10623 | [FLOENER ELECTRIC](/search.md) | — |
| Nov 3, 2023 | 23801 CCTV 23801 | [ABSCO ALARMS INC](/search.md) | $271,552 |
| Nov 3, 2023 | (title withheld) 24267-4 | [ABSCO ALARMS INC](/search.md) | $307,679 |
| Oct 9, 2023 | Remote Access Panel Cable KFSCGAR923 | [FLOENER ELECTRIC](/search.md) | — |
| Oct 9, 2023 | District Office Light Switches KFSCDIST923 | [FLOENER ELECTRIC](/search.md) | — |
| Oct 9, 2023 | Elementary School Classroom Receptacles KFSCEL923 | [FLOENER ELECTRIC](/search.md) | — |
| Sep 6, 2023 | Kettle Falls Middle School Glass Replacement 35534 | [GSI COMPLETE GLASS INC](/search.md) | $88,999 |
| Aug 10, 2023 | Elementary Beam Repair HGC 3 | [HACHISOFT GENERAL CONTRS INC](/search.md) | — |
| Aug 10, 2023 | Transportation Shed HGC 4 | [HACHISOFT GENERAL CONTRS INC](/search.md) | $25,000 |
| Aug 2, 2023 | HVAC/R MAINT/REPAIR 8560104 | [DIVCO INCORPORATION](/search.md) | $22,567 |
| Jul 31, 2023 | ELC Shade HGC1 | [HACHISOFT GENERAL CONTRS INC](/search.md) | $43,040 |
| Jul 31, 2023 | ELC Steps HGC2 | [HACHISOFT GENERAL CONTRS INC](/search.md) | — |
| Jul 27, 2023 | KF Elementary Interior Doors 26349 | [MERLE DOOR & WINDOW LLC](/search.md) | — |
| Feb 10, 2023 | Kitchen equipment repair/installs 2023 School Year | [HOBART](/search.md) | — |
| Jan 23, 2023 | Elementary School Washer/Dryer 120122elementaryoutlet | [FLOENER ELECTRIC](/search.md) | — |
| Dec 12, 2022 | Kettle Falls High School & Elementary School Roof Project 158280364.2 | [FISHER CONSTRUCTION GROUP INC](/search.md) | $1,557,808 |
| Dec 1, 2022 | Middle School Gym Lighting 101922Gym | [FLOENER ELECTRIC](/search.md) | — |
| Oct 31, 2022 | Kettle Falls School District Score Board 080122SCOREBOARD | [FLOENER ELECTRIC](/search.md) | — |
| Oct 31, 2022 | Kettle Falls School District Ball Field 080122BallField | [FLOENER ELECTRIC](/search.md) | — |
| Oct 6, 2022 | Boiler Room Compressor 20220927 | [FLOENER ELECTRIC](/search.md) | — |
| Oct 4, 2022 | MIDDLE SCHOOL KITCHEN 20220824 | [FLOENER ELECTRIC](/search.md) | — |
| Sep 29, 2022 | (title withheld) PO#15065 | [MERLE DOOR & WINDOW LLC](/search.md) | $18,547 |
| Sep 28, 2022 | HVAC/R MAINT/REPAIR 320222121 | [DIVCO INCORPORATION](/search.md) | $5,236 |
| Aug 9, 2022 | HVAC MAINT/REPAIR 8560104 | [DIVCO INCORPORATION](/search.md) | $21,828 |
| Jun 13, 2022 | Kitchen equipment repair/installs 2022 school year | [HOBART](/search.md) | — |
| May 24, 2022 | Troubleshoot Kitchen Appliance not Working 20220505 | [FLOENER ELECTRIC](/search.md) | — |
| Apr 6, 2022 | KETTLE FALLS SCHOOLS 320222041 | [DIVCO INCORPORATION](/search.md) | $11,124 |
| Feb 3, 2022 | BUS BARN DUCTLESS SPLIT 320212150 | [DIVCO INCORPORATION](/search.md) | $16,824 |
| Jan 19, 2022 | High School Bleachers 303494 | [FLOENER ELECTRIC](/search.md) | — |
| Aug 27, 2021 | Roofing & Painting 08302021 | [CHEWELAH CONSTRUCTION LLC](/search.md) | $50,895 |
| Aug 17, 2021 | Middle School Gym Floor Replacement 15014 | [NORTHERN HARDWOOD CO INC](/search.md) | $209,095 |
| Aug 17, 2021 | HVAC/R Maintenance 8560104 | [DIVCO INCORPORATION](/search.md) | $20,988 |
| Aug 17, 2021 | High School Gym Refinish 15015 | [NORTHERN HARDWOOD CO INC](/search.md) | $41,035 |
| Aug 4, 2021 | Elementary School Roof Replacement Project 15012 | [FISHER CONSTRUCTION GROUP INC](/search.md) | $328,383 |
| Jul 27, 2021 | Kettle Falls HS new bleachers 303494 Ext po 15003/KCDA 4131001 | [NOR-PAC SEATING COMPANY INC](/search.md) | $114,522 |
| Jul 14, 2021 | Dry Well Repair/ District Office Pave 741510 | [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | $35,442 |
| Jun 7, 2021 | HVAC Upgrade 320212057 | [DIVCO INCORPORATION](/search.md) | $14,734 |
| Apr 5, 2021 | Replace heat reclaim coil. 320212022 | [DIVCO INCORPORATION](/search.md) | $15,778 |
| Mar 15, 2021 | Rebuild Condensate Tank 320212014 | [DIVCO INCORPORATION](/search.md) | $8,480 |
| Aug 14, 2020 | Kettle Falls Bus Garage 740506 | [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | $21,007 |
| Aug 10, 2020 | HVAC R/Maintenance 8560104 | [DIVCO INCORPORATION](/search.md) | $19,990 |
| Jun 25, 2020 | Kitchen Fire Suppression Re-work po# 10667 | [GENERAL FIRE EQUIP CO INC](/search.md) | $8,082 |
| Apr 7, 2020 | Kettle Falls Middle School Office | [I R S ENVIRONMENTAL OF WA INC](/search.md) | $17,512 |
| Mar 16, 2020 | Kettle falls middle school 5096908408 | [T&M Restoration LLC](/search.md) | $5,000 |
| Nov 15, 2019 | Kettle Falls School Dist 10654 | [M & M HARRISON ELECTRIC CO](/search.md) | $6,220 |
| Oct 22, 2019 | Kettle Falls Middle School n/a | [I R S ENVIRONMENTAL OF WA INC](/search.md) | $4,528 |
| Aug 19, 2019 | Kettle Falss School 081919 | [CHEWELAH CONSTRUCTION LLC](/search.md) | $10,222 |
| Aug 8, 2019 | HVAC/R Maintenance 8560104 | [DIVCO INCORPORATION](/search.md) | $17,432 |
| Aug 2, 2019 | ELC remodel/Elementary school circuit | [NORSTAR HEATING & COOLING INC](/search.md) | $11,000 |
| Aug 1, 2019 | Kettle Falls E.S. Portable Bldg. | [I R S ENVIRONMENTAL OF WA INC](/search.md) | $4,052 |
| Jul 9, 2019 | Remove/Replace Spilt System 320192054 | [DIVCO INCORPORATION](/search.md) | $14,003 |
| Jun 18, 2019 | Kettle Falls Elementry School 749500 | [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | $56,973 |
| May 17, 2019 | Kettle Falls Elementary Fire Sprinkler Upgrades Contract Award Date 04/12/2019 | [PATRIOT FIRE PROTECTION INC](/search.md) | $119,751 |
| Apr 26, 2019 | Elementary School Fire line none | [COLVILLE CONSTRUCTION CO INC](/search.md) | $18,250 |
| Mar 11, 2019 | KFHS Storm water project 2019/Coman | [COMAN CONST & EXCAVATION INC](/search.md) | $56,750 |
| Mar 5, 2019 | Kettle Falls Elementary School 43538 | [ATLAS BOILER/EQUIPMENT CO INC](/search.md) | $6,178 |
| Feb 7, 2019 | Kettle Falls Middle School Boiler Service 43491 | [Atlas Boiler](/search.md) | $6,845 |
| Dec 8, 2018 | KFSD Repair | [FLYNN BEC LP](/search.md) | — |
| Nov 29, 2018 | Kettle Falls Middle School Boiler Service 43361 | [ATLAS BOILER/EQUIPMENT CO INC](/search.md) | $2,195 |
| Aug 13, 2018 | HVAC/R MAINTENANCE 8560104 | [DIVCO INCORPORATION](/search.md) | $17,432 |
| Aug 13, 2018 | Early Learning | [SYTE NET SERVICES INC](/search.md) | $2,266 |
| Aug 10, 2018 | Kettle Falls Early Learning Center Project | [CURRENT ELECTRICAL INC](/search.md) | — |
| Jul 16, 2018 | Kettle Falls School District 5097386625 | [MCINELLY'S MAGIC CARPETS INC](/search.md) | $64,235 |
| Jun 12, 2018 | Early Learning Center 10583 | [DAVID HALL CONSTRUCTION LLC](/search.md) | $57,921 |
| May 29, 2018 | Kettle Falls High School PO 1174 | [T&M Restoration LLC](/search.md) | $15,000 |
| May 7, 2018 | WIRE 2 BASEMENT ROOMS 6401 | [KAN-DHO ELECTRICAL INC](/search.md) | $9,138 |
| May 7, 2018 | FURNACE ADDITION 320182041 | [DIVCO INCORPORATION](/search.md) | $13,446 |
| Jan 23, 2018 | Kettle Falls Middle School Boiler Install 42830 | [ATLAS BOILER/EQUIPMENT CO INC](/search.md) | — |
| Jan 22, 2018 | TEMPORARY FEEDER TO PORTABLE BOILER TRAILER N/A | [FLOENER ELECTRIC](/search.md) | — |
| Dec 11, 2017 | kettle Falls School District | [MCINELLY'S MAGIC CARPETS INC](/search.md) | $71,343 |
| Oct 17, 2017 | CVA 28x66 Modular Office 114348 | [PACIFIC MOBILE STRUCTURES INC](/search.md) | $205,767 |
| Sep 29, 2017 | ELEMENTARY SCHOOL KITCHEN UPGRADES N/A | [FLOENER ELECTRIC](/search.md) | $18,898 |
| Sep 29, 2017 | MIDDLE SCHOOL KITCHEN UPGRADES N/A | [FLOENER ELECTRIC](/search.md) | $10,645 |
| Sep 29, 2017 | HIGH SCHOOL KITCHEN UPGRADES N/A | [FLOENER ELECTRIC](/search.md) | $3,834 |
| Sep 20, 2017 | HVAC/R MAINTENANCE 8560104 | [DIVCO INCORPORATION](/search.md) | $16,603 |
| Sep 14, 2017 | CVA Modular sidewalks and parking area. Repair drywell and sidewalk KFHS. | [DAVID HALL CONSTRUCTION LLC](/search.md) | $9,168 |
| Aug 8, 2017 | MODULAR CLASSROOM 200A SVC N/A | [FLOENER ELECTRIC](/search.md) | — |
| Aug 3, 2017 | Modular Cabling PO 10548 | [SYTE NET SERVICES INC](/search.md) | $6,450 |
| Jul 19, 2017 | Kettle Falls School District PO SS80213554/SS80213555 | [COBRA BEC INC](/search.md) | — |
| Jul 17, 2017 | Sewer & water lines to new modular building | [DAVID HALL CONSTRUCTION LLC](/search.md) | $17,754 |
| Jun 21, 2017 | HVAC/R MAINTENANCE 320172050 | [DIVCO INCORPORATION](/search.md) | $12,008 |
| Jun 7, 2017 | Kettle Falls Elementary Abatement PO 960 | [T&M Restoration LLC](/search.md) | — |
| May 31, 2017 | Foundation for Modular Building | [DAVID HALL CONSTRUCTION LLC](/search.md) | $22,058 |
| Apr 27, 2017 | Kettle Falls SD / 12753 | [CHARLES H BERESFORD CO INC](/search.md) | $70,550 |
| Apr 6, 2017 | Kettle Falls High School Partial Re-Roof and Replacement | [HALME BUILDERS INC](/search.md) | $414,260 |
| Mar 24, 2017 | KFHS STEM Classroom Modernization | [DARDAN ENTERPRISES INC](/search.md) | $1,153,056 |
| Aug 24, 2016 | HVAC/R MAINTENANCE 8560104 | [DIVCO INCORPORATION](/search.md) | $16,277 |
| Feb 5, 2016 | Elementary Sped Room | [T&M Restoration LLC](/search.md) | $20,300 |
| Aug 26, 2015 | SCHEDULED MAINTENANCE 2015-8560104 | [DIVCO INCORPORATION](/search.md) | $15,957 |
| Aug 6, 2015 | KF HS & MS gym floors | [Cougar Mountain Wood Floors](/search.md) | $1,349 |
| Jan 8, 2015 | Kettle Falls HS gym | [Cougar Mountain Wood Floors](/search.md) | $1,349 |
| Sep 17, 2014 | High School Shop Improvements 4755 | [KAN-DHO ELECTRICAL INC](/search.md) | $15,903 |
| Aug 20, 2014 | Schedule Maintenance 2014-8560104 | [DIVCO INCORPORATION](/search.md) | $12,921 |
| Jun 9, 2014 | Phase IV Re-roof Middle School and Admin Buildings | [MEYER ROOFING SOLUTIONS LLC](/search.md) | $99,640 |
| Sep 13, 2013 | Scheduled Maintenance 8560104-2013 | [DIVCO INCORPORATION](/search.md) | $12,189 |
| Jul 30, 2013 | Kettle Falls gym floor | [Cougar Mountain Wood Floors](/search.md) | $1,278 |
| Jun 11, 2013 | Kettle Falls Middle School Phase III Re-roof | [MEYER ROOFING SOLUTIONS LLC](/search.md) | $121,161 |
| Apr 9, 2013 | Kettle Falls Middle School Jeff Graves | [SIMPLEXGRINNELL LP](/search.md) | $4,582 |
| Sep 7, 2012 | Basketball court post replacement 97-00-64-7000-101-04 | [K WILDER CONSTRUCTION LLC](/search.md) | $11,427 |
| Aug 27, 2012 | Building Engineering Services 8560104 | [DIVCO INCORPORATION](/search.md) | $11,950 |
| May 30, 2012 | Kettle Falls Middle School Phase II Re-roof 95-05 | [MEYER ROOFING SOLUTIONS LLC](/search.md) | $112,725 |
| Jan 23, 2012 | Roofing Repairs Repairs | [MEYER ROOFING SOLUTIONS LLC](/search.md) | — |
| Aug 17, 2011 | Kettle Falls HS gym floors 9136 | [Cougar Mountain Wood Floors](/search.md) | $1,278 |

Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.

### Contractors that filed intents on its projects

| Contractor | Intents on this agency's projects |
|---|---|
| [ARLINGTON UNIQUE INTERIORS INC](/search.md) | 2 |
| [ARTISTIC DRAPERIES INC](/search.md) | 2 |
| [ATLAS BOILER/EQUIPMENT CO INC](/search.md) | 5 |
| [CHAMPION CONCRETE PUMPING INC](/search.md) | 4 |
| [CHEWELAH CONSTRUCTION LLC](/search.md) | 2 |
| [COLVILLE CONSTRUCTION CO INC](/search.md) | 2 |
| [COLVILLE VALLEY CONCRETE CORP](/search.md) | 2 |
| [Cougar Mountain Wood Floors](/search.md) | 4 |
| [DAVID HALL CONSTRUCTION LLC](/search.md) | 4 |
| [DIVCO INCORPORATION](/search.md) | 28 |
| [FLOENER ELECTRIC](/search.md) | 25 |
| [FLOENER ELECTRIC](/search.md) | 9 |
| [HACHISOFT GENERAL CONTRS INC](/search.md) | 16 |
| [HOBART](/search.md) | 25 |
| [I R S ENVIRONMENTAL OF WA INC](/search.md) | 5 |
| [INTERSTATE CONCRETE/ASPHALT CO](/search.md) | 18 |
| [KAN-DHO ELECTRICAL INC](/search.md) | 2 |
| [MCINELLY'S MAGIC CARPETS INC](/search.md) | 3 |
| [MEYER ROOFING SOLUTIONS LLC](/search.md) | 4 |
| [PATRIOT FIRE PROTECTION INC](/search.md) | 2 |
| [PRO MECHANICAL SERVICES INC](/search.md) | 2 |
| [SECURITY SOLUTIONS NW LLC](/search.md) | 2 |
| [SUMMIT ENVIRONMENTAL INC](/search.md) | 3 |
| [SYTE NET SERVICES INC](/search.md) | 2 |
| [T&M Restoration LLC](/search.md) | 5 |

Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.

**Do you run a construction company with
20 or more people on site?**

AI labs pay businesses to record first-person video of everyday hands-on
work — filmed by their own crews with a smartphone on a wearable mount, with consent and under contract.

**See the program and apply →** 
 Referral link to micro1: this site may be paid a fee if your business is accepted. Not affiliated with the
Washington State Department of Labor & Industries.

---

Página: https://wa-public-works-records.pages.dev/agency/kettle-falls-school-district-212/
Fonte: https://data.wa.gov/d/t9je-9qwa
Recolha: 2026-10-01