# JEFFERSON COUNTY PUBLIC WORKS — public works contracts and contractors (Washington prevailing wage intents)

> 427 public works projects of JEFFERSON COUNTY PUBLIC WORKS: the latest contracts, the prime contractors and the amounts declared on prevailing wage intents.

## JEFFERSON COUNTY PUBLIC WORKS — public works contracts

427 public works projects and 786 intents to pay prevailing wages name JEFFERSON COUNTY PUBLIC WORKS as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: [County](/agency-type/county.md).

Bidding, hiring a subcontractor or checking a competitor? A [dated public works report ($19)](/report.md) on one contractor — or [an agency's awards, every month](/pro.md).

### Intents filed, by year

| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 48 | 44 | 30 | 44 | 28 | 83 | 46 | 104 | 49 | 20 |

### Latest contracts (200)

| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Aug 19, 2026 | Welding at transfer station 153 | [D WELD SHOP](/search.md) | $3,465 |
| Aug 12, 2026 | Grizzly Island Demo work PW PO #151 | [D WELD SHOP](/search.md) | $6,712 |
| Jun 30, 2026 | Grizzly removal PW PO #144 | [Olympic Concrete Cutting](/search.md) | $7,525 |
| May 28, 2026 | Gibbs Lake Shop 2612 | [NW GUTTER PROS](/search.md) | $1,456 |
| Mar 11, 2026 | (title withheld) #112 | [SHOLD EXCAVATING INC](/search.md) | — |
| Mar 6, 2026 | PROPERTY 20 GRINDER PUMP CONNECTION PO #107 | [SHOLD EXCAVATING INC](/search.md) | — |
| Feb 26, 2026 | Oil City Rd MP0.5 Tree Removal RW-2026-001 | [OLYMPIC RESOURCES](/search.md) | $38,250 |
| Feb 13, 2026 | JC Library Backfill Hole 99 | [SHOLD EXCAVATING INC](/search.md) | — |
| Feb 9, 2026 | Ness Corner Utilites #98 | [SHOLD EXCAVATING INC](/search.md) | — |
| Jan 22, 2026 | (title withheld) 93 | [D WELD SHOP](/search.md) | $6,956 |
| Jan 13, 2026 | HJ Carroll Park - Striping 15590 | [AGATE ASPHALT & EXCAVATION](/search.md) | $5,687 |
| Jan 8, 2026 | Transmission Line Mowing DG3218 | [D & L POLES INC](/search.md) | $11,050 |
| Dec 2, 2025 | Hadlock Sewer Emergency Repair PO #87 | [SHOLD EXCAVATING INC](/search.md) | — |
| Nov 7, 2025 | SOLID WASTE TRANSFER STATION 10.17.25 | [SHOLD EXCAVATING INC](/search.md) | — |
| Oct 2, 2025 | 81228-1 - Port Hadlock UGA Water Reclamation - Cell Communicator Install 81228-1 | [GUARDIAN SECURITY SYSTEMS INC](/search.md) | $1,335 |
| Sep 17, 2025 | Alarm - Connect Sewer 71 | [SHOLD EXCAVATING INC](/search.md) | — |
| Sep 8, 2025 | Quilcene County Parks | [SWIFT PLUMBING & HEATING INC](/search.md) | $1,850 |
| Aug 13, 2025 | ANNUAL INSPECTION EES 09.09.25 | [SHOLD EXCAVATING INC](/search.md) | — |
| Aug 13, 2025 | SEPTIC INSPECTION EES 09.09.25 | [SHOLD EXCAVATING INC](/search.md) | — |
| Aug 11, 2025 | UGA WASTEWATER DIVISION 53520/594350/49,40516936 | [SHOLD EXCAVATING INC](/search.md) | $3,822 |
| Aug 4, 2025 | CHECK ALARM COUNTY SHOP | [SHOLD EXCAVATING INC](/search.md) | — |
| Jul 30, 2025 | Gibbs Lake Rd 57 | [VIKING FENCE CO](/search.md) | $5,903 |
| Apr 24, 2025 | Jump Playground Fence 501603 | [RAINBOW SWEEPERS INC](/search.md) | $8,073 |
| Apr 9, 2025 | court house basketball court 3605311744 | [RJC PAINTING & HNDYMN SERV LLC](/search.md) | $6,003 |
| Feb 11, 2025 | Jefferson Co. Reno 22 | [PACIFIC SPORTS TURF INC](/search.md) | $20,750 |
| Dec 5, 2024 | Courthouse Basketball Court 17521200 | [AGATE ASPHALT & EXCAVATION](/search.md) | $17,145 |
| Dec 5, 2024 | Irondale Park Court 17521200 | [AGATE ASPHALT & EXCAVATION](/search.md) | $18,200 |
| Dec 3, 2024 | Jefferson County 5 year PM plan SA3080 | [MICHELLI MEASUREMENT GROUP INC](/search.md) | $3,300 |
| Oct 14, 2024 | Paradise Bay Road 503608 | [IDGAF INCORPORATED](/search.md) | — |
| Oct 3, 2024 | Phase 4 - Stage 1 On-site Grinder Pump Installation 405-2127-0 | [STRIDER CONSTRUCTION CO INC](/search.md) | $2,589,589 |
| Aug 13, 2024 | SLR8000 VHF Repeater Installation N/A | [DAY WIRELESS SYSTEMS](/search.md) | $17,135 |
| Jul 25, 2024 | JC QUILCENE SHOP 295316 HWY 101 | [SHOLD EXCAVATING INC](/search.md) | — |
| Jun 25, 2024 | Skim Pump 49473509 | [GOOD MAN INC](/search.md) | $392 |
| May 7, 2024 | Jefferson Co. Reno 23123 | [PACIFIC SPORTS TURF INC](/search.md) | $18,984 |
| Apr 12, 2024 | Temp power for construction trailer at waste water facility 23187 | [Frederickson Electric](/search.md) | $20,164 |
| Apr 8, 2024 | Ph. 3 Low Pressure Sewer Collection System for Pt. Hadlock UGA County Project #405-2114-0 Commerce Pro. # 22-96515-026 ECY Agree. No. WQC_2024_JCoPWE-00034 | [SETON CONSTRUCTION INC](/search.md) | $4,997,707 |
| Mar 25, 2024 | Naylors Creek at West Valley Road & Gibbs Lake Road 18020592 | [NORDLAND CONST NW INC](/search.md) | $1,696,325 |
| Mar 15, 2024 | Flagging for Potholing PO #23142 | [SETON CONSTRUCTION INC](/search.md) | — |
| Mar 12, 2024 | JCPW Wastewater 23183 | [PACIFIC MOBILE STRUCTURES INC](/search.md) | $4,577 |
| Feb 28, 2024 | SOLID WASTE LOCATE STORM WATER SYSTEM CAMERA LOCATE | [SHOLD EXCAVATING INC](/search.md) | — |
| Feb 20, 2024 | Center Road 2R Overlay MP 10.34 to MP 14.58 1802096 | [LAKESIDE INDUSTRIES INC](/search.md) | $1,112,584 |
| Feb 8, 2024 | CEDAR ST CEDAR ST | [SHOLD EXCAVATING INC](/search.md) | — |
| Jan 19, 2024 | Phase 2 - Membrane Bioreactor Wastewater Treatment Plant for Port Hadlock UGA 405-2114-0 | [INTERWEST CONSTRUCTION INC](/search.md) | $10,020,835 |
| Dec 7, 2023 | T/S BAD BATTERY & WONT SET I-34249 | [DOUBLE D ELECTRICAL INC](/search.md) | $354 |
| Dec 7, 2023 | T/S TANK HEATER FOR HYDRAULIC SYSTEM I-34003 | [DOUBLE D ELECTRICAL INC](/search.md) | $841 |
| Dec 7, 2023 | REPAIR PANEL AT SCALE I-33954 | [DOUBLE D ELECTRICAL INC](/search.md) | $389 |
| Dec 4, 2023 | (title withheld) Collums | [SHOLD EXCAVATING INC](/search.md) | — |
| Nov 14, 2023 | Upper Oak Bay Campground 17520650 | [HENDEN ELECTRIC INC](/search.md) | $78,687 |
| Oct 4, 2023 | Cedar Ave Crosswalks 12332 | [AGATE ASPHALT & EXCAVATION](/search.md) | $5,250 |
| Sep 13, 2023 | PORT HADLOCK POT HOLES POT HOLING | [SHOLD EXCAVATING INC](/search.md) | — |
| Aug 30, 2023 | Quilcene Fiber Hut 12283 | [VIKING FENCE CO](/search.md) | $21,894 |
| Aug 24, 2023 | Jump Park River Rock Entrance 23-61 | [Van Ness Construction](/search.md) | $4,255 |
| Aug 22, 2023 | HJ Carroll Park 23155 | [AGATE ASPHALT & EXCAVATION](/search.md) | $4,105 |
| Jul 14, 2023 | 72 megs way DG01049 | [D & L POLES INC](/search.md) | $2,427 |
| Jun 6, 2023 | Jefferson Co. Reno 23123 | [PACIFIC SPORTS TURF INC](/search.md) | $18,984 |
| May 24, 2023 | Snow Creek Road MP 0.84 18020310 | [BRUCH & BRUCH CONSTRUCTION INC](/search.md) | $1,092,394 |
| May 18, 2023 | Jefferson County Public Works - Jail & EOC 29324220 | [Performance Systems Intgn LLC](/search.md) | $3,738 |
| May 15, 2023 | 2215-T & M - Shine Culvert Crossing 2215- T&M | [SETON CONSTRUCTION INC](/search.md) | $1,653 |
| May 11, 2023 | 2023 Jefferson County Road Striping 18020490 | [SPECIALIZED PAVEMENT MRKG LLC](/search.md) | $516,320 |
| Mar 10, 2023 | 306144 HWY 101 RISERS 03.10.23 | [SHOLD EXCAVATING INC](/search.md) | — |
| Mar 2, 2023 | 980 OLD GARDINER FOLLOW UP 980 OLD GARDINER FOLLOW UP | [SHOLD EXCAVATING INC](/search.md) | — |
| Feb 11, 2023 | (title withheld) | [D & L POLES INC](/search.md) | $2,379 |
| Feb 9, 2023 | Animal Shelter Septic Repairs 112 Critter Lane | [SHOLD EXCAVATING INC](/search.md) | — |
| Jan 24, 2023 | Larry Scott Trail Larry Scott Trail | [SETON CONSTRUCTION INC](/search.md) | — |
| Nov 15, 2022 | Jefferson Co PUD Remove Zoning DG02095 | [AIR SYSTEMS ENGINEERING INC](/search.md) | $6,367 |
| Nov 9, 2022 | JETT & CAMERA SITE MAP | [SHOLD EXCAVATING INC](/search.md) | — |
| Sep 27, 2022 | 2022 Hadlock Sewer Design 2022 Hadlock Sewer Design | [SHOLD EXCAVATING INC](/search.md) | — |
| Sep 9, 2022 | HJ Carrol Park Patching 23086 | [LAKESIDE INDUSTRIES INC](/search.md) | $9,950 |
| Aug 17, 2022 | Jefferson County Solid Waste 2022-068 | [AGATE ASPHALT & EXCAVATION](/search.md) | $21,993 |
| Aug 12, 2022 | Ductles heat for hadlock shop | [DOUBLE D ELECTRICAL INC](/search.md) | $16,985 |
| Aug 2, 2022 | 232 FERN WAY HJ CARROLL 07.12.22 | [SHOLD EXCAVATING INC](/search.md) | — |
| Jul 1, 2022 | 232 Fern Way Check System | [SHOLD EXCAVATING INC](/search.md) | — |
| May 25, 2022 | 8X10 shed wiring I-28246 | [DOUBLE D ELECTRICAL INC](/search.md) | $1,276 |
| May 12, 2022 | January 2022 Storm 2931 | [HERMANN BROS LOGGING/CONST INC](/search.md) | $24,140 |
| May 10, 2022 | (title withheld) HJ Carroll Park | [SHOLD EXCAVATING INC](/search.md) | $8,564 |
| May 10, 2022 | Jefferson County Universal Movement Playground (JUMP) 17520650 | [INTERWEST CONSTRUCTION INC](/search.md) | $756,385 |
| Apr 27, 2022 | JUMP Jefferson Universal Installation 104247-03-02 | [GAMETIME](/search.md) | $61,144 |
| Apr 12, 2022 | Paradise Bay Median Paradise Bay | [DOUBLE D ELECTRICAL INC](/search.md) | $973 |
| Mar 14, 2022 | THORNDYKE ROAD CULVERT REPLACEMENT 18020580 | [NORDLAND CONST NW INC](/search.md) | $1,749,021 |
| Mar 11, 2022 | Jefferson Co. DT 23034 | [PACIFIC SPORTS TURF INC](/search.md) | $16,152 |
| Mar 11, 2022 | HJ Carroll Restroom Repair 1629 | [Hope Roofing](/search.md) | $6,371 |
| Feb 28, 2022 | Paradise Bay Median Paradise Bay | [DOUBLE D ELECTRICAL INC](/search.md) | — |
| Feb 22, 2022 | Point Hudson | [D & L POLES INC](/search.md) | $4,369 |
| Feb 10, 2022 | SEPTIC INSPECTIONS 325 COUNTY LANDFILL RD | [SHOLD EXCAVATING INC](/search.md) | — |
| Jan 24, 2022 | Jefferson Co SS-03320 | [UNITEC CORPORATION](/search.md) | — |
| Dec 20, 2021 | SR 116 & Cedar Avenue Pedestrian/Bike Improvements 637109 | [INTERWEST CONSTRUCTION INC](/search.md) | $573,724 |
| Dec 16, 2021 | Oil City Road - Ruby Creek Washout 2165 | [BRUCH & BRUCH CONSTRUCTION INC](/search.md) | $154,000 |
| Jul 21, 2021 | Decommissioning of Three water wells 18020790 | [OASIS WELL DRILLING INC](/search.md) | $19,865 |
| Jun 24, 2021 | PW SW Equipment Building Slab N/a | [Sound Concrete Solutions Inc](/search.md) | — |
| Jun 14, 2021 | Lopeman Parcel Fencing LP2021 | [MC EXCAVATING LLC](/search.md) | $26,938 |
| May 25, 2021 | (title withheld) Sono Tubes - Multiple | [SHOLD EXCAVATING INC](/search.md) | — |
| May 19, 2021 | Jefferson Co. DT/TD N/A | [PACIFIC SPORTS TURF INC](/search.md) | $14,026 |
| May 17, 2021 | CENTER ROAD 04.22.21 MUD | [SHOLD EXCAVATING INC](/search.md) | — |
| May 17, 2021 | CONCRETE FOR BASE OF SIGNS 04.07.21 | [SHOLD EXCAVATING INC](/search.md) | — |
| Apr 20, 2021 | Olympic Discovery Trail #1 & #2 2601 | [VIKING FENCE CO](/search.md) | $4,469 |
| Apr 20, 2021 | 371 Chimacum Rd 2597 | [VIKING FENCE CO](/search.md) | $2,834 |
| Apr 9, 2021 | Jefferson County Humane Society EST# 1125 | [MOVING EARTH LLC](/search.md) | $5,995 |
| Apr 6, 2021 | (title withheld) Michelle Ham | [SME SOLUTIONS LLC](/search.md) | — |
| Mar 31, 2021 | CHIMACUM RD INT SLAB TICKET 14651 | [SHOLD EXCAVATING INC](/search.md) | — |
| Mar 16, 2021 | Dabob Emergency Repair Dabob Emergency Repair | [SETON CONSTRUCTION INC](/search.md) | $24,598 |
| Feb 16, 2021 | Paradise Bay Rd MP 4.2 Slide Repair 18020830 | [BRUCH & BRUCH CONSTRUCTION INC](/search.md) | $10,607 |
| Feb 12, 2021 | 981 GIBBS LAKE 59054 | [SHOLD EXCAVATING INC](/search.md) | — |
| Feb 4, 2021 | WIRING FOR AUTO SHUT OFF FOR PUMP I-14759 | [DOUBLE D ELECTRICAL INC](/search.md) | $11,352 |
| Nov 4, 2020 | Jefferson County - Memorial Field Gutter Cleaning 40312748 | [JOHNNY TSUNAMI LLC](/search.md) | $2,130 |
| Oct 13, 2020 | EES @ 371 CHIMACUM RD EES | [SHOLD EXCAVATING INC](/search.md) | — |
| Oct 8, 2020 | WIRING FOR VEHICLE LIFT I-14605 | [DOUBLE D ELECTRICAL INC](/search.md) | $2,206 |
| Jul 28, 2020 | QUILCENE GENERATOR 10KW I-13812 | [DOUBLE D ELECTRICAL INC](/search.md) | $6,184 |
| Jul 28, 2020 | CHIMACUM ROAD BANNER POLE REPLACEMENT I-13941 | [DOUBLE D ELECTRICAL INC](/search.md) | $3,052 |
| Jul 28, 2020 | REPAIR STREETLIGHT I-12854 | [DOUBLE D ELECTRICAL INC](/search.md) | — |
| May 21, 2020 | OAKBAY COUNT PARK SIDEWALK SLAB 15001 | [SHOLD EXCAVATING INC](/search.md) | $791 |
| Apr 8, 2020 | CENTER ROAD RESURFACE AND RESTORE 18020500 | [NORDLAND CONST NW INC](/search.md) | $498,514 |
| Feb 25, 2020 | Jefferson Co. DT/TD 22919 | [PACIFIC SPORTS TURF INC](/search.md) | $12,523 |
| Feb 10, 2020 | Fairgrounds 2 buildings 1843-1844 | [Hope Roofing](/search.md) | $49,001 |
| Feb 5, 2020 | UPPER HOH RD MP 8.02 EMERGENCY REPAIR 18020381 | [SETON CONSTRUCTION INC](/search.md) | $102,000 |
| Jan 21, 2020 | Oak Bay Campground Electrical Project 17520650 | [HENDEN ELECTRIC INC](/search.md) | $34,444 |
| Jan 2, 2020 | PIPE AND WIRE FOR GENERATOR I-12190 | [DOUBLE D ELECTRICAL INC](/search.md) | $9,627 |
| Nov 15, 2019 | UPPER HOH RD MP 8.01 EMERGENCY REPAIR 18020381 | [SETON CONSTRUCTION INC](/search.md) | $286,270 |
| Sep 27, 2019 | TRANSFER STATION SITE IMPROVEMENTS 4012043 | [NORDLAND CONST NW INC](/search.md) | $237,620 |
| Sep 17, 2019 | Silent Lake 9235 | [D & L POLES INC](/search.md) | $2,414 |
| Sep 5, 2019 | Sidewalk Extension 4595 | [SHOLD EXCAVATING INC](/search.md) | $11,380 |
| Aug 9, 2019 | JEFFCO SEWER AND LANDFILL I-11557 | [DOUBLE D ELECTRICAL INC](/search.md) | $11,170 |
| Jul 30, 2019 | Castle Hill Parking Lot Castle Hill Parking Lot | [VIKING FENCE CO](/search.md) | $8,284 |
| Jul 25, 2019 | Transfer Station Septic and Water 40120422 | [WHITWORTH EXCAVATING INC](/search.md) | $95,547 |
| Jul 25, 2019 | Valve Installation Hickory and Moose | [L & J ENTERPRISES](/search.md) | $3,049 |
| Jul 25, 2019 | Puget Loop and Walkter Under Ground Electrical Fault Afterhours Emergency Puget Loop | [L & J ENTERPRISES](/search.md) | $3,450 |
| Jul 10, 2019 | Reroute 2 Fiber Optic Conduit 9904 | [L & J ENTERPRISES](/search.md) | $9,789 |
| Jul 3, 2019 | 2019.55 KCDA Jefferson County 4118489 / 22866 | [MODERN BUILDING SYSTEMS INC](/search.md) | $125,950 |
| Jun 12, 2019 | Shine Boat Launch Repair 22865 | [SHOLD EXCAVATING INC](/search.md) | $6,344 |
| May 30, 2019 | TEMP MOVE OF ATTENDANT SHACK I-11095 | [DOUBLE D ELECTRICAL INC](/search.md) | $4,982 |
| Apr 3, 2019 | PAVEMENT MARKING ON JEFFERSON CO ROADS CY2019-2021 18020490 | [APPLY-A-LINE LLC](/search.md) | $402,330 |
| Mar 25, 2019 | South Discovery Road Pavement Preservation Project 18019760 | [LAKESIDE INDUSTRIES INC](/search.md) | $461,322 |
| Mar 5, 2019 | PT CC Playground 17520360 | [VIKING FENCE CO](/search.md) | $34,533 |
| Dec 18, 2018 | PT Fencing 130118900 | [VIKING FENCE CO](/search.md) | $5,559 |
| Oct 30, 2018 | Irondale Comm. Park 22816 | [VIKING FENCE CO](/search.md) | $4,583 |
| Sep 28, 2018 | UPPER HOH RD MP 8 EMERGENCY REPAIR 18020380 | [DIRT & AGGREGATE INTERCHNG INC](/search.md) | $28,999 |
| Sep 11, 2018 | Upper Hoh Road Emergency Repairs 18020380 | [LAKESIDE INDUSTRIES INC](/search.md) | $26,960 |
| Jul 17, 2018 | JC Memorial Field 4111783 | [MUSCO SPORTS LIGHTING LLC](/search.md) | $273,000 |
| Jun 29, 2018 | Parking Lot Castle Hill Lighting Project | [SHOLD EXCAVATING INC](/search.md) | — |
| Jun 19, 2018 | Repair sign shop roof | [OLYMPIC STEEL LLC](/search.md) | $327 |
| Jun 1, 2018 | Jefferson Co. Parks DT/TD 22760 | [PACIFIC SPORTS TURF INC](/search.md) | $9,283 |
| May 22, 2018 | PAVEMENT MARKING ON JEFFERSON CO ROADS FOR CY 2018 18020490 | [APPLY-A-LINE LLC](/search.md) | $306,824 |
| May 3, 2018 | SALMON CREEK BRIDGE 18019341 | [NORDLAND CONST NW INC](/search.md) | $942,367 |
| May 2, 2018 | GRIZZY CRANE INSTALLATION P-5287 | [DOUBLE D ELECTRICAL INC](/search.md) | $14,780 |
| Apr 27, 2018 | Dosewallips Road MP 1.67 Permanent Repair 18019960 | [HANSON EXCAVATION LLC](/search.md) | $131,667 |
| Apr 25, 2018 | Quilcene Campground Picnic Shelter | [Hope Roofing](/search.md) | $12,635 |
| Mar 28, 2018 | SOLID WASTE DISPOSAL FACILITY 2014-2019 | [UNITEC CORPORATION](/search.md) | $1,657 |
| Mar 14, 2018 | REPLACE TRAFFIC SIGNAL I-7970 | [DOUBLE D ELECTRICAL INC](/search.md) | $3,297 |
| Mar 5, 2018 | Pavement Markings & Striping 1805422026 | [Affordable Asphalt Company](/search.md) | $191,756 |
| Feb 1, 2018 | Install Interior Doors | [Rubio & Co](/search.md) | $5,090 |
| Dec 14, 2017 | Jefferson County Courthouse Window | [G LITTLE INC](/search.md) | $2,093 |
| Nov 29, 2017 | Upper Hoh Rd MP 8 ER | [SETON CONSTRUCTION INC](/search.md) | $150,000 |
| Oct 10, 2017 | LIGHTING UPGRADE P-2290 | [DOUBLE D ELECTRICAL INC](/search.md) | $2,810 |
| Sep 26, 2017 | (title withheld) N/A | [PACIFIC ENVIRONMENTAL SRVCS CO](/search.md) | $756 |
| Sep 21, 2017 | Port Townsend Landfill Asphalt Repair 22710 | [NORTHERN ASPHALT LLC](/search.md) | $9,881 |
| Aug 24, 2017 | Quilcene Solid Waste Drop Box Site-Improvements 401 594 1984 | [COULTAS GENERAL CONTRACTING](/search.md) | $180,630 |
| Jun 15, 2017 | Rick Tollefson Memorial Trail, Phase I CR1815 | [SHOLD EXCAVATING INC](/search.md) | $557,319 |
| Jun 14, 2017 | Center Road Overlay Phase 5 18019270 | [LAKESIDE INDUSTRIES INC](/search.md) | $681,103 |
| May 11, 2017 | Griffith Rd Guardrial Replacement | [PETERSEN BROTHERS INC](/search.md) | $17,670 |
| May 11, 2017 | Undi Rd Bypass Guardrail Project | [PETERSEN BROTHERS INC](/search.md) | $35,558 |
| May 4, 2017 | Undie Road Mp 1.1 Culvert Removal 360-385-9234 | [SEALEVEL BULKHEAD BUILDERS INC](/search.md) | $10,486 |
| May 3, 2017 | Teal Lake Road Overlay 18020270 | [LAKESIDE INDUSTRIES INC](/search.md) | $163,322 |
| Mar 28, 2017 | JEFFERSON COUNTY COURTHOUSE VERBALTOM WALKER | [COLE INDUSTRIAL INC](/search.md) | — |
| Mar 28, 2017 | Olympic Discovery Trail 12-1250C | [INTERWEST CONSTRUCTION INC](/search.md) | $987,654 |
| Mar 9, 2017 | REPAIR BROKEN BASE ON GRAPPLE N/A | [PACIFIC ENVIRONMENTAL SRVCS CO](/search.md) | — |
| Mar 1, 2017 | EMERGENCY REPAIR OVERHEAD CABLES I-6505 | [DOUBLE D ELECTRICAL INC](/search.md) | — |
| Jan 25, 2017 | Undie Road Bypass | [INTERWEST CONSTRUCTION INC](/search.md) | $78,025 |
| Dec 27, 2016 | Tree removal None Provided | [DARREL EMEL'S TREE SERVICE INC](/search.md) | $4,224 |
| Dec 21, 2016 | TRANSFER STATION LIGHTS PROJECT PO# 22635 | [DOUBLE D ELECTRICAL INC](/search.md) | $6,241 |
| Nov 11, 2016 | EAST QUILCENE ROAD MP .40 TO MP .55 PAVING XO2011 | [LAKESIDE INDUSTRIES INC](/search.md) | $80,102 |
| Oct 18, 2016 | (title withheld) PO 22523 | [PETERSEN BROTHERS INC](/search.md) | $5,691 |
| Oct 3, 2016 | REPAIR CRACKS ON THE GRISLY GARBAGE EQUIPMENT N/A | [PACIFIC ENVIRONMENTAL SRVCS CO](/search.md) | — |
| Oct 3, 2016 | Oil City Rd | [LAKESIDE INDUSTRIES INC](/search.md) | $12,000 |
| Sep 29, 2016 | Repair Park Office Roof N/A | [OLYMPIC STEEL LLC](/search.md) | $1,100 |
| Aug 5, 2016 | Undie Road Emergency Relocation | [INTERWEST CONSTRUCTION INC](/search.md) | $905,310 |
| Aug 1, 2016 | QUILCENE SHOP IMPROVEMENTS: ENCLOSED EQUIPMENT SHED 180 543 1979 | [JENNINGS HEINS & ASSOC INC](/search.md) | $32,264 |
| Jul 28, 2016 | Oak Bay Road - Grinding | [SETON CONSTRUCTION INC](/search.md) | $3,112 |
| Jul 19, 2016 | Quilcene Community Park Sport Court Project | [PACIFIC ACE LLC](/search.md) | $13,729 |
| Jun 30, 2016 | Transfer Station and MRW | [MATTILA PAINTING INC](/search.md) | $296,210 |
| Jun 16, 2016 | Fleet Services Division Hadlock Shop P.O. No. 1208 | [Hoch Construction](/search.md) | $11,113 |
| May 24, 2016 | Upper Hoh Road MP 6.949 Culvert Replacment CR18962 | [JORDAN EXCAVATING INC](/search.md) | $791,447 |
| Apr 11, 2016 | Center Road MP 6.9 Emergency Repair N/A | [JORDAN EXCAVATING INC](/search.md) | — |
| Apr 4, 2016 | Enviromental Center Project | [WCE General Contractors LLC](/search.md) | $55,143 |
| Mar 29, 2016 | Pavement Marking On Jefferson County Rdwys for 2016 180 542 1994 | [STRIPE RITE INC](/search.md) | $229,885 |
| Mar 14, 2016 | Upper Hoh Rd MP 9.8 ER | [SETON CONSTRUCTION INC](/search.md) | $104,119 |
| Mar 10, 2016 | Oil City Rd MP 8.9 ER | [SETON CONSTRUCTION INC](/search.md) | $96,250 |
| Feb 8, 2016 | Undie Road MP 1.1 Emergency Repair XO1990 | [BRUCH & BRUCH CONSTRUCTION INC](/search.md) | — |
| Nov 23, 2015 | Oil City Rad MP 8.8 Road Washout | [SETON CONSTRUCTION INC](/search.md) | $125,000 |
| Nov 17, 2015 | SIGN SHOP ELECTRICAL 1124 | [DOUBLE D ELECTRICAL INC](/search.md) | $2,834 |
| Aug 8, 2015 | Dowan Crk Rd Realignment CR17993 | [BRUCH & BRUCH CONSTRUCTION INC](/search.md) | $338,467 |
| Jul 1, 2015 | UPPER HOH ROAD MP 3.9 PAVING REPAIR XO1957 | [LAKESIDE INDUSTRIES INC](/search.md) | $32,970 |
| May 29, 2015 | Upper Hoh Road Culvert Replacement 360-385-92010 | [ROGNLINS INC](/search.md) | $515,000 |
| May 26, 2015 | JC Jail Fire Alarm Replacement Project 301 594 1901 | [NORTH SHORE ELECTRIC INC](/search.md) | $134,615 |
| May 5, 2015 | Hell Roaring Creek Bridge Repair None | [Combined Construction Inc](/search.md) | $12,600 |
| Apr 16, 2015 | PARADISE BAY ROAD, PHASE 2 CR1873 | [LAKESIDE INDUSTRIES INC](/search.md) | $971,324 |
| Mar 23, 2015 | QUILCENE TRANSFER STATION 2014 | [DOUBLE D ELECTRICAL INC](/search.md) | $6,818 |
| Mar 4, 2015 | Pavement Marking On Jefferson Cty Rdwys. for calendar yrs 2014 & 2015 | [STRIPE RITE INC](/search.md) | $270,507 |
| Feb 26, 2015 | Recycling Improvement Project N/A | [GRANT STEEL BLDG SYSTEMS INC](/search.md) | $5,666 |
| Feb 18, 2015 | FLEET SERVICES GARGE DOOR OPENERS 932 | [DOUBLE D ELECTRICAL INC](/search.md) | $4,426 |
| Feb 17, 2015 | Jefferson County Courthouse Window Rehabilitation Project 360-385-9380 | [G LITTLE INC](/search.md) | $98,410 |
| Feb 13, 2015 | Oil City Road MP 8.8 ER | [SETON CONSTRUCTION INC](/search.md) | $108,445 |

Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.

### Contractors that filed intents on its projects

| Contractor | Intents on this agency's projects |
|---|---|
| [A. MILLICAN CRANE SERVICE INC](/search.md) | 11 |
| [AGATE ASPHALT & EXCAVATION](/search.md) | 8 |
| [APPLY A LINE INC](/search.md) | 9 |
| [BRUCH & BRUCH CONSTRUCTION INC](/search.md) | 13 |
| [Brundage Bone Concrete Pumping, Inc.](/search.md) | 5 |
| [C & J EXCAVATING INC](/search.md) | 6 |
| [D. A. Development Co., Inc.](/search.md) | 10 |
| [DOUBLE D ELECTRICAL INC](/search.md) | 27 |
| [Frederickson Electric](/search.md) | 24 |
| [GOOD MAN INC](/search.md) | 92 |
| [INTERWEST CONSTRUCTION INC](/search.md) | 6 |
| [JORDAN EXCAVATING INC](/search.md) | 5 |
| [LAKESIDE INDUSTRIES INC](/search.md) | 32 |
| [NORDLAND CONST NW INC](/search.md) | 5 |
| [NORTHWEST ROCK INC](/search.md) | 5 |
| [Olympic Concrete Cutting](/search.md) | 6 |
| [PACIFIC ENVIRONMENTAL SRVCS CO](/search.md) | 10 |
| [PACIFIC SPORTS TURF INC](/search.md) | 7 |
| [PETERSEN BROTHERS INC](/search.md) | 13 |
| [PR SYSTEMS LLC](/search.md) | 10 |
| [RAINBOW SWEEPERS INC](/search.md) | 10 |
| [SETON CONSTRUCTION INC](/search.md) | 25 |
| [SHOLD EXCAVATING INC](/search.md) | 56 |
| [STRIPE RITE INC](/search.md) | 20 |
| [VIKING FENCE CO](/search.md) | 15 |

Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.

**Do you run a construction company with
20 or more people on site?**

AI labs pay businesses to record first-person video of everyday hands-on
work — filmed by their own crews with a smartphone on a wearable mount, with consent and under contract.

**See the program and apply →** 
 Referral link to micro1: this site may be paid a fee if your business is accepted. Not affiliated with the
Washington State Department of Labor & Industries.

---

Página: https://wa-public-works-records.pages.dev/agency/jefferson-county-public-works/
Fonte: https://data.wa.gov/d/t9je-9qwa
Recolha: 2026-10-01