## FRIDAY HARBOR, TOWN OF — public works contracts

202 public works projects and 381 intents to pay prevailing wages name FRIDAY HARBOR, TOWN OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: [Town](/agency-type/town.md).

Bidding, hiring a subcontractor or checking a competitor? A [dated public works report ($19)](/report.md) on one contractor — or [an agency's awards, every month](/pro.md).

### Intents filed, by year

| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 24 | 34 | 43 | 24 | 35 | 21 | 19 | 23 | 17 | 7 |

### Latest contracts (143)

| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Sep 10, 2026 | Water Supply Pipe and Valves Replacement at Lawson Pond 3039 | [RICHARD LAWSON CONST INC](/search.md) | $80,129 |
| Aug 25, 2026 | Town of Friday Harbor PMs LBs Q08092026-413 | [Legacy Telecommunications, LLC](/search.md) | $21,775 |
| Jul 17, 2026 | Parking Lot Fence Replacement 2026 RES 3035 07/16/2026 | [DISCOUNT FENCE](/search.md) | $14,641 |
| Feb 27, 2026 | Sidewalk Grinding Improvement Project Resolution No. 3005 | [N W DEVELOPMENT & UNDERGR LLC](/search.md) | $60,507 |
| Jan 2, 2026 | 2025 Annual Maintenance Inv.54401-2025 annual maint. | [T M G SERVICES INC](/search.md) | $4,258 |
| Dec 9, 2025 | Town of Friday Harbor Waste Management 3000 | [WEST MECHANICAL INC](/search.md) | $27,255 |
| Sep 8, 2025 | WWTP gen Swap Q081225-479 | [Legacy Telecommunications, LLC](/search.md) | $1,414 |
| Sep 2, 2025 | City of Friday Harbor WWTP Repair Q081125-478 | [Legacy Telecommunications, LLC](/search.md) | $5,382 |
| Jul 28, 2025 | Town of Friday Harbor PMs LBs Q072125-451 | [Legacy Telecommunications, LLC](/search.md) | $21,775 |
| Jul 10, 2025 | Friday Harbor Wastewater Treatment Plant Owners Contract # Res. 2958 | [BOSS CONSTRUCTION INC](/search.md) | $10,319,354 |
| May 19, 2025 | Sewer Plant N. Roof 58464Z-2 | [LOBERG ROOFING.COM INC](/search.md) | $155,818 |
| May 8, 2025 | Sunken Park Maintance G&O No. 25-445 | [RICHARD LAWSON CONST INC](/search.md) | $49,407 |
| May 8, 2025 | Town Firehall Rooftop Heat Pump Replacement 2945 | [SAN JUAN HEATING LLC](/search.md) | $27,304 |
| Apr 24, 2025 | Sand Shelter G&O#23532 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $93,933 |
| Feb 12, 2025 | Annual Service 2024 Annual Service 2024 | [T M G SERVICES INC](/search.md) | $3,425 |
| Jan 30, 2025 | Finance Office 2024-FINOFF-Carpet | [FLOORING CONNECTIONS INTL INC](/search.md) | $7,335 |
| Dec 27, 2024 | Wastewater Treatment Department 58464R | [LOBERG ROOFING.COM.INC](/search.md) | $2,050 |
| Nov 27, 2024 | City of Friday Harbor TS Q112724-545 | [Legacy Telecommunications, LLC](/search.md) | $374 |
| Nov 20, 2024 | Sunshine Alley Restroom 2895 | [ISLAND HOME FINISHES LLC](/search.md) | — |
| Oct 29, 2024 | Sunshine Alley Bathroom Repair Project 2887 and 2891 | [TOP NOTCH PLUMBING SRVICS LLC](/search.md) | $60,112 |
| Sep 30, 2024 | Wastewater Treatment Plant HVAC 2885 | [WEST MECHANICAL INC](/search.md) | $57,289 |
| Sep 7, 2024 | 245 Spring Street 235279961 | [BARRON HEATING & A/C INC](/search.md) | $1,791 |
| Sep 6, 2024 | Water Main -Mullis to Argyle 001 | [SPEER TAPS INC](/search.md) | $21,006 |
| Aug 26, 2024 | Water Treatment Plant Repair Q082624-382 | [Legacy Telecommunications, LLC](/search.md) | $748 |
| Aug 19, 2024 | Town of Friday Harbor PMs LBs Q081924-360 | [Legacy Telecommunications, LLC](/search.md) | $23,952 |
| Jul 11, 2024 | WTP Roof Repair 57085Z | [LOBERG ROOFING.COM.INC](/search.md) | $21,523 |
| Jul 2, 2024 | Margerite Place Improvements C44.21.10 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $2,241,864 |
| Jun 11, 2024 | San Juan Transfer Station Shop 57088 | [LOBERG ROOFING.COM.INC](/search.md) | $6,305 |
| Feb 14, 2024 | Town Hall Roof Repair Small Works Contract | [LOBERG ROOFING.COM.INC](/search.md) | $54,398 |
| Jan 10, 2024 | PM ON OSEC SYSTEM 51081 | [T M G SERVICES INC](/search.md) | $3,219 |
| Dec 18, 2023 | PUMP REPAIR OF VOGELSANG VX139 TBD | [BECKWITH & KUFFEL INC](/search.md) | — |
| Aug 8, 2023 | Malcom St Sewer Replacement 2023 | [RICHARD LAWSON CONST INC](/search.md) | $22,173 |
| Jun 30, 2023 | Vaughan Self Primer replacements S/N 61062 A & B 4202891 | [PUMPTECH LLC](/search.md) | $30,450 |
| Jun 26, 2023 | Nash Street Improvement (Spruce St to Market St) C44.19.09 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $876,757 |
| Apr 26, 2023 | Town of Friday Harbor Generator Preventative Maintenance. Q041823-179 | [Legacy Telecommunications, LLC](/search.md) | $28,408 |
| Mar 24, 2023 | TOWN OF FRIDAY HARBOR AC 01 TOWN OF FRIDAY HARBOR AC 01 | [SECURITY SOLUTIONS NORTHWEST](/search.md) | $4,169 |
| Mar 22, 2023 | Spring St Emergency Sewer Repair S.42.23.04 | [MIKE CARLSON ENTERPRISES INC](/search.md) | — |
| Mar 2, 2023 | service-annual maint 23 serviceannual2023 | [T M G SERVICES INC](/search.md) | $5,040 |
| Dec 30, 2022 | repair goulds smvt pump tbd | [BECKWITH & KUFFEL INC](/search.md) | — |
| Oct 14, 2022 | 2022 Pavement Repairs G&O#22548.02 | [RICHARD LAWSON CONST INC](/search.md) | $58,925 |
| Oct 14, 2022 | 2022 Curb, Gutter & Sidewalk Repairs 22548.02 | [GULL WING CONSTRUCTION LLC](/search.md) | $10,850 |
| Aug 23, 2022 | McDonald Street Improvements 22548.01 | [RICHARD LAWSON CONST INC](/search.md) | $249,696 |
| Aug 18, 2022 | UW Lab - block heater N/A | [PACIFIC POWER GROUP LLC](/search.md) | — |
| Aug 18, 2022 | WWTP 350kw - overspeed alarm N/A | [PACIFIC POWER GROUP LLC](/search.md) | — |
| Apr 4, 2022 | First Street Overlay Project TIB NO. 6-W-831(008)-1 | [KONNERUP CONSTRUCTION INC](/search.md) | $607,210 |
| Dec 21, 2021 | 2021 STORM DRAIN REPAIRS 2699 | [MEM ENTERPRISES LLC](/search.md) | $119,077 |
| Nov 23, 2021 | MARGUERITE Fiber Optic (2021) | [KONNERUP CONSTRUCTION INC](/search.md) | $34,720 |
| Oct 18, 2021 | Installation of Sidewalk Improvements at 105 Spring St S.44.21.07 | [GULL WING CONSTRUCTION LLC](/search.md) | $18,445 |
| Oct 4, 2021 | Harrison Street Sewer Main Replacement Project 2021 | [KONNERUP CONSTRUCTION INC](/search.md) | $237,500 |
| Sep 20, 2021 | Sewer Outfall Replacement | [REDSIDE CONSTRUCTION LLC](/search.md) | $2,872,266 |
| Sep 15, 2021 | Pocket Park - First St & Court St S.44.1908 | [GULL WING CONSTRUCTION LLC](/search.md) | $129,186 |
| Aug 25, 2021 | Road Maintenance-Trout Lake Watershed | [MIKE CARLSON ENTERPRISES INC](/search.md) | — |
| Jul 19, 2021 | Spring Street & Second Pedestrian Access Improvements S.44.21.04 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $18,490 |
| May 19, 2021 | Argyle & Foxhall Sidewalks Argyle & Foxhall Sidewalks | [GULL WING CONSTRUCTION LLC](/search.md) | $3,798 |
| Mar 30, 2021 | Spring Street Sewer and Storm Drain Replacement, 1st Street to 2nd Street C.44.21.02 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $448,365 |
| Mar 2, 2021 | MULLIS STREET IMPROVEMENTS 6-W-831(007)-1 | [KONNERUP CONSTRUCTION INC](/search.md) | $759,199 |
| Feb 26, 2021 | West Street Sidewalk Replacement S.44.21.01 | [GULL WING CONSTRUCTION LLC](/search.md) | $35,642 |
| Dec 25, 2020 | WTP Backup Generator & ATS Installation 2592 | [JL Electric LLC](/search.md) | $48,237 |
| Dec 17, 2020 | TOFH SJ Valley-Strawberry Ln | [MIKE CARLSON ENTERPRISES INC](/search.md) | — |
| Nov 10, 2020 | Elsworth Sewer Replacement and Rhone Street Sewer Relocation Project C.42.20.07 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $212,536 |
| Oct 27, 2020 | WWTP Sealcoat & Striping WWTP Sealcoat & Striping | [SAN JUAN STRIPING LLC](/search.md) | $15,100 |
| Oct 27, 2020 | Generator Call out/Repair - Ferry Landing Call Out | [PACIFIC POWER GROUP LLC](/search.md) | $3,622 |
| Oct 9, 2020 | AUG -2 Pump Station Upgrade SQ-15 | [JL Electric LLC](/search.md) | $72,893 |
| Oct 7, 2020 | Manhole Concrete Collar & Sidewalk Repair S.41.20.10 | [GULL WING CONSTRUCTION LLC](/search.md) | $4,540 |
| Oct 2, 2020 | Generator Maintenance and Loadbank Service N/A | [PACIFIC POWER GROUP LLC](/search.md) | $12,931 |
| Aug 31, 2020 | Town Hall | [WASHINGTON ALARM INC](/search.md) | $1,890 |
| Aug 31, 2020 | Wastewater Treatment Plant, 375 Tucker Fire | [WASHINGTON ALARM INC](/search.md) | $627 |
| Aug 31, 2020 | Wastewater Treatment Plant 375 Sec | [WASHINGTON ALARM INC](/search.md) | $2,490 |
| Aug 31, 2020 | Wastewater Treatment Plant 530 Security | [WASHINGTON ALARM INC](/search.md) | $3,503 |
| Jul 17, 2020 | 2020 AC Pavement Repairs 2020 AC Repairs | [RICHARD LAWSON CONST INC](/search.md) | $119,265 |
| Jul 8, 2020 | Trout Lake Spillway Restoration 281000030 | [MEM ENTERPRISES LLC](/search.md) | — |
| Jul 8, 2020 | Port of Friday Harbor Curb and Gutter S.44.20.03 | [GULL WING CONSTRUCTION LLC](/search.md) | $20,344 |
| Apr 16, 2020 | 2020 Pavement Repair-Second Street Second | [RICHARD LAWSON CONST INC](/search.md) | $125,552 |
| Apr 1, 2020 | SBR Basin Cleanout 4202695 | [BAI ENVIRONMENTAL SERVICES](/search.md) | — |
| Mar 9, 2020 | QuikValve- 1st Street 4102421 | [SPEER TAPS INC](/search.md) | $6,985 |
| Oct 28, 2019 | Construct Improvements at Wastewate Treatment Plant S.42.19.13 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $42,183 |
| Sep 26, 2019 | Marguerite Place Pavement repairs 2493 | [RICHARD LAWSON CONST INC](/search.md) | $37,632 |
| Aug 13, 2019 | TUCKER AVE - DRIVEWAY S.44.19.07 | [MEM ENTERPRISES LLC](/search.md) | — |
| Aug 1, 2019 | SPRING ST - SIDEWALK REPAIR S44.19.06 | [MEM ENTERPRISES LLC](/search.md) | — |
| Jul 10, 2019 | Nash, Caines, and Price Street Project C.44.19.02 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $761,863 |
| Jul 10, 2019 | Whale Museum Street Patch 10005 | [MIKE CARLSON ENTERPRISES INC](/search.md) | — |
| Jun 27, 2019 | QuikValve Improvement/Spring & Lampard 001 | [SPEER TAPS INC](/search.md) | $6,985 |
| May 30, 2019 | Sewer Repair Argyle at Caines ESR-1901 | [MIKE CARLSON ENTERPRISES INC](/search.md) | — |
| May 13, 2019 | Biofilter Media Removal | [BAYSIDE SERVICES](/search.md) | — |
| Mar 13, 2019 | Linder St Storm Drian Linder | [RICHARD LAWSON CONST INC](/search.md) | $65,701 |
| Mar 13, 2019 | Transfer station RLC-511 | [RICHARD LAWSON CONST INC](/search.md) | $1,649 |
| Feb 23, 2019 | Water 327 Zone Booster Station Improvements 2016-083 | [Equity Builders LLC](/search.md) | $610,704 |
| Feb 7, 2019 | ARGYLE AVENUE SIDEWALK WIDENING R2449 | [M.E.M. ENTERPRISES, LLC](/search.md) | $110,891 |
| Jan 17, 2019 | Emergency Repair AUG II Pumpstation | [MIKE CARLSON ENTERPRISES INC](/search.md) | — |
| Nov 29, 2018 | Town of Friday Harbor WWTP Headworks Res. 2414 | [MCCLURE & SONS INC](/search.md) | $2,625,639 |
| Sep 25, 2018 | Spring Street Handicap Ramps | [MIKE CARLSON ENTERPRISES INC](/search.md) | $71,191 |
| Jun 12, 2018 | Web St, A St and Nichols St Improvements | [MIKE CARLSON ENTERPRISES INC](/search.md) | $1,380,359 |
| May 9, 2018 | Painted Roundabout | [KAMPS PAINTING COMPANY INC](/search.md) | $39,405 |
| May 9, 2018 | Painted Roundabout | [KAMPS PAINTING COMPANY INC](/search.md) | $39,405 |
| Jan 30, 2018 | Install 3 manholes on Franck St at Linder, Geneste and C st S.44.17.09 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $24,000 |
| Jan 9, 2018 | Tucker Avenue Reconstruction Phase 2 TA-5829 | [STRIDER CONSTRUCTION CO INC](/search.md) | $2,828,894 |
| Jan 8, 2018 | University Way Emergency Sewer Replacement #C.42.18.01 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $109,000 |
| Jan 5, 2018 | WWTP Effluent Filter | [TIGER CONSTRUCTION LTD](/search.md) | $144,364 |
| Oct 5, 2017 | Manholes, catch basin & valve boxes | [RICHARD LAWSON CONST INC](/search.md) | $20,280 |
| Jul 11, 2017 | Waterline Replacement Project Phase 2 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $1,045,981 |
| Jun 21, 2017 | Jensen Alley Speed humps | [RICHARD LAWSON CONST INC](/search.md) | $7,500 |
| Jun 21, 2017 | 2017 Pothole Repairs | [RICHARD LAWSON CONST INC](/search.md) | $71,707 |
| Jun 16, 2017 | (title withheld) | [MIKE CARLSON ENTERPRISES INC](/search.md) | $10,323 |
| May 26, 2017 | Park Street & Reed Street Sidewalk Improvements | [ARISTON PACIFIC INC](/search.md) | $143,520 |
| May 23, 2017 | Price Street Repair | [RICHARD LAWSON CONST INC](/search.md) | $17,695 |
| May 23, 2017 | UW Pumping Station #1 and #2 | [EQUITY BUILDERS LLC](/search.md) | $675,250 |
| May 17, 2017 | Front Street CIPP Project | [FLOW TECHNOLOGIES INC](/search.md) | $26,500 |
| Apr 3, 2017 | Sewer Main & Water Main Replacemetn Project | [ARISTON PACIFIC INC](/search.md) | $440,989 |
| Mar 27, 2017 | LED Streetlight Retrofit | [NORTHWEST EDISON INC](/search.md) | $47,199 |
| Feb 27, 2017 | Spring Street Pocket Park S.44.15.09 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $192,050 |
| Sep 12, 2016 | (title withheld) | [MIKE CARLSON ENTERPRISES INC](/search.md) | $112,428 |
| May 26, 2016 | Waterline Replacement | [INTERWEST CONSTRUCTION INC](/search.md) | $3,881,353 |
| Apr 15, 2016 | Tucker Avenue Improvements C44.15.03 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $1,119,075 |
| Apr 14, 2016 | Trout Lake Dam-Concrete Restoration Project | [EQUITY BUILDERS LLC](/search.md) | $48,194 |
| Feb 3, 2016 | Spring Street Water, Sewer and Storm Drain Replacement Project | [MIKE CARLSON ENTERPRISES INC](/search.md) | $468,067 |
| Dec 11, 2015 | Drop Inlet & handicap ramps | [RICHARD LAWSON CONST INC](/search.md) | $20,620 |
| Sep 15, 2015 | Marguerite Place Sidewalk and Pavement Restoration Project C.44.15.04 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $302,763 |
| Jul 24, 2015 | Sewer Pump Station #2 Rebuild 2014-099 | [EQUITY BUILDERS LLC](/search.md) | $552,666 |
| Jun 4, 2015 | Small Paving patches various locations | [RICHARD LAWSON CONST INC](/search.md) | $125,104 |
| Feb 9, 2015 | Marguerite Water Line Replacement | [MIKE CARLSON ENTERPRISES INC](/search.md) | $96,365 |
| Nov 14, 2014 | Emergency Digester Repairs | [STELLAR J CORPORATION](/search.md) | $59,058 |
| May 27, 2014 | Blair Ave Improvements 6-W-831(002)-1 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $1,435,492 |
| May 19, 2014 | Sunken Park CIPP Project 2027 | [MICHELS CORP](/search.md) | $52,150 |
| Apr 8, 2014 | New Walkways at WWTP S.42.14.06 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $23,458 |
| Apr 8, 2014 | Blair Ave Sewer Main Replacement Project | [MIKE CARLSON ENTERPRISES INC](/search.md) | $72,654 |
| Apr 1, 2014 | Warbass Way Tree Trimming | [EAGER BEAVER TREE SERVICE INC](/search.md) | $3,243 |
| Feb 21, 2014 | Spring street ramps res 2010 | [ATLANTIS CONSTRUCTION INC](/search.md) | $10,938 |
| Feb 12, 2014 | Town Water Plant - Ductless Heat Pumps S.41.14.04 | [JIM'S HEATING](/search.md) | $10,135 |
| Jan 30, 2014 | Spring Street Front st. to First st. Water and Sewer C.41.13.01 | [RICHARD LAWSON CONST INC](/search.md) | $225,000 |
| Dec 16, 2013 | Mullis street sidewalk Market-Airport | [RICHARD LAWSON CONST INC](/search.md) | $37,972 |
| Sep 19, 2013 | Warbass & Hillcrest Gutters 1961 & 1962 | [ATLANTIS CONSTRUCTION INC](/search.md) | $7,329 |
| Aug 29, 2013 | Web Street Overlay | [RICHARD LAWSON CONST INC](/search.md) | $11,625 |
| Aug 19, 2013 | Spring St. & Marguerite St. Corner | [RICHARD LAWSON CONST INC](/search.md) | $8,720 |
| Aug 12, 2013 | Sunken Park Basketball Court Repairs | [RICHARD LAWSON CONST INC](/search.md) | $17,125 |
| Jul 18, 2013 | stair tread replacement between grange and legion resolution 1954 | [ROBERT ROBERTSON CONST LLC](/search.md) | $5,797 |
| May 30, 2013 | stair tread replacement between grange and legion resolution 1954 | [ROBERT ROBERTSON CONST LLC](/search.md) | $5,797 |
| Apr 22, 2013 | Tucker Ave Asphalt Replacement 2013-01 | [RICHARD LAWSON CONST INC](/search.md) | $53,720 |
| Oct 25, 2012 | Spring Street Water Main Replacement Project | [RICHARD LAWSON CONST INC](/search.md) | $85,700 |
| Oct 10, 2012 | Town Shop Fence Project | [MCBRIDE FENCE INC](/search.md) | $29,194 |
| Sep 25, 2012 | Spring St. Water Break Patch 5000924 | [RICHARD LAWSON CONST INC](/search.md) | — |
| Sep 30, 2011 | Spruce Street Storm Drainage Improvements N/A | [RICHARD LAWSON CONST INC](/search.md) | $338,997 |
| Apr 14, 2011 | Odor Control Improvement Project 1837 | [MIKE CARLSON ENTERPRISES INC](/search.md) | $579,262 |
| Feb 23, 2011 | Sewer Replacement Project Phase II | [STRIDER CONSTRUCTION CO INC](/search.md) | $214,190 |

Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.

### Contractors that filed intents on its projects

| Contractor | Intents on this agency's projects |
|---|---|
| [ATLANTIS CONSTRUCTION INC](/search.md) | 6 |
| [BACKSTROM CURB & SIDEWALK INC](/search.md) | 7 |
| [EQUITY BUILDERS LLC](/search.md) | 4 |
| [FRIDAY HARBOR ELECTRIC](/search.md) | 6 |
| [GROUND UP ROAD CONST INC](/search.md) | 7 |
| [GULL WING CONSTRUCTION LLC](/search.md) | 7 |
| [H D FOWLER CO INC](/search.md) | 4 |
| [ISLAND ELECTRIC](/search.md) | 4 |
| [JL Electric LLC](/search.md) | 4 |
| [KAMPS PAINTING COMPANY INC](/search.md) | 10 |
| [KONNERUP CONSTRUCTION INC](/search.md) | 4 |
| [Legacy Telecommunications, LLC](/search.md) | 8 |
| [LOBERG ROOFING.COM.INC](/search.md) | 5 |
| [MEM ENTERPRISES LLC](/search.md) | 27 |
| [MIKE CARLSON ENTERPRISES INC](/search.md) | 35 |
| [PACIFIC POWER GROUP LLC](/search.md) | 4 |
| [Pacific Surveying & Engineering, Inc.](/search.md) | 11 |
| [R & T CONSTRUCTION INC](/search.md) | 4 |
| [RICHARD LAWSON CONST INC](/search.md) | 55 |
| [SAIL ELECTRIC INC](/search.md) | 3 |
| [Smugglers Cove Flagging LLC](/search.md) | 11 |
| [SPEER TAPS INC](/search.md) | 8 |
| [Star Surveying, Inc.](/search.md) | 4 |
| [T M G SERVICES INC](/search.md) | 4 |
| [WASHINGTON ALARM INC](/search.md) | 4 |

Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.

**Do you run a construction company with
20 or more people on site?**

AI labs pay businesses to record first-person video of everyday hands-on
work — filmed by their own crews with a smartphone on a wearable mount, with consent and under contract.

**See the program and apply →** 
 Referral link to micro1: this site may be paid a fee if your business is accepted. Not affiliated with the
Washington State Department of Labor & Industries.

---

Página: https://wa-public-works-records.pages.dev/agency/friday-harbor-town-of/
Fonte: https://data.wa.gov/d/t9je-9qwa
Recolha: 2026-10-01