## CAMAS-WASHOUGAL, PORT OF — public works contracts

424 public works projects and 764 intents to pay prevailing wages name CAMAS-WASHOUGAL, PORT OF as the awarding agency, in the L&I file of Oct 1, 2026. L&I classes it as: [Port District](/agency-type/port-district.md).

Bidding, hiring a subcontractor or checking a competitor? A [dated public works report ($19)](/report.md) on one contractor — or [an agency's awards, every month](/pro.md).

### Intents filed, by year

| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 78 | 58 | 38 | 34 | 51 | 45 | 35 | 41 | 33 | 17 |

### Latest contracts (200)

| Intent filed | Contract | Prime contractor | Amount declared |
|---|---|---|---|
| Aug 27, 2026 | Building 11 Insulation SPI-726S | [SPRAY-ON FOAM & COATINGS INC](/search.md) | $54,174 |
| Jul 8, 2026 | Compliance Testing | [MASCOTT EQUIPMENT CO INC](/search.md) | $2,538 |
| Jun 22, 2026 | 2026 Sprinkler Repairs 2026 | [PYE-BARKER FIRE AND SAFETY LLC](/search.md) | $2,390 |
| May 28, 2026 | SE 41st Street Preloading SPI-1122A | [MCDONALD EXCAVATING INC](/search.md) | $678,504 |
| May 26, 2026 | Port Sign (Fabrication & Install) SPO-125 | [CENTER POINTE SIGNS INC](/search.md) | $37,937 |
| May 6, 2026 | I-26-42 BLDG 10 Troubleshoot- Replace Batteries I-26-42 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $711 |
| May 1, 2026 | MB-1 Main Office Heat Pump SPO-226 | [SERVICE FIRST HEATING/CLG INC](/search.md) | $27,907 |
| Apr 20, 2026 | AP-6 Roof Replacement SPA-226 | [A-1 TOP NOTCH ROOFING INC](/search.md) | $28,042 |
| Apr 6, 2026 | Lower Marina Access Road Paving SPM-226 | [LAKESIDE INDUSTRIES INC](/search.md) | $50,392 |
| Mar 16, 2026 | Building 11 Heat Pump SPI-526 | [SERVICE FIRST HEATING/CLG INC](/search.md) | $14,875 |
| Mar 9, 2026 | Building 16 Painting SPI-226 | [ENGLE'S PAINTING LLC](/search.md) | $28,100 |
| Jan 5, 2026 | 623 NE 257th Ave 623 NE 257th Ave | [MINORITY ABATEMENT CONTRS INC](/search.md) | $1,994 |
| Dec 10, 2025 | Relay Wiring Issue | [MASCOTT EQUIPMENT CO INC](/search.md) | $3,344 |
| Nov 25, 2025 | 3-30' Discharge Lines Internal Inspection 360-910-7847 | [BALLARD MARINE LLC](/search.md) | $17,373 |
| Nov 25, 2025 | Fishing Dock Dolphin Fender Pile Replacement SPM-725 | [HME CONSTRUCTION INC](/search.md) | $68,133 |
| Nov 25, 2025 | Gravity Discharge Pipe Inspection Ballard Service Agreement | [BALLARD MARINE LLC](/search.md) | $9,440 |
| Nov 20, 2025 | Fishing Dock Pile Replacement - Electrical SPM-725 | [ACCURATE ELECTRIC UNLIMITD INC](/search.md) | $6,022 |
| Oct 8, 2025 | 813 NE 267th Ave 25-458 | [MINORITY ABATEMENT CONTRS INC](/search.md) | $2,355 |
| Sep 29, 2025 | (title withheld) 24SAST | [CASCADE TREE WORKS LLC](/search.md) | $7,310 |
| Aug 13, 2025 | C ROW HANGER 2506-1439 | [COSCO FIRE PROTECTION INC](/search.md) | $1,178 |
| Jun 19, 2025 | S 35th St Pavement Repair SPI-825 | [GRANITE CONSTRUCTION COMPANY](/search.md) | $145,967 |
| Jun 12, 2025 | Puffin Cafe Dock Inspection SPM-625 | [BALLARD MARINE LLC](/search.md) | $7,270 |
| Jun 11, 2025 | Compliance Testing 630442 | [MASCOTT EQUIPMENT CO INC](/search.md) | $1,469 |
| Jun 3, 2025 | Port Sign - Fabrication & Installation SPO-125 | [CENTER POINTE SIGNS INC](/search.md) | $35,000 |
| May 22, 2025 | MB-1 Maintenance Office Heat Pump SPO-225 | [SERVICE FIRST HEATING/CLG INC](/search.md) | $10,275 |
| May 15, 2025 | 2025 Slurry Seal Projects SPA-225/SPI-225/SPI-325/SPI-725 | [BLACKLINE INC](/search.md) | $76,221 |
| May 2, 2025 | (title withheld) Annuals-2025 | [COSCO FIRE PROTECTION INC](/search.md) | $13,356 |
| Apr 23, 2025 | Marina Fuel Dispenser Replacement SPM-325 | [ANDERSON ENVIRONMNTL CNTRG LLC](/search.md) | $38,023 |
| Apr 9, 2025 | Breakwater Piling Repair 2025 | [MARK MARINE SERVICE INC](/search.md) | $23,500 |
| Apr 9, 2025 | Backflow Testing & Repair 2025 | [SIGNALING SYSTEM SOLUTIONS INC](/search.md) | $1,736 |
| Apr 2, 2025 | Rail Switch Stand & Tie Replacements SPI-525 | [AMERICAN TRACK](/search.md) | $29,664 |
| Mar 5, 2025 | Port of Camas | [METRO OVERHEAD DOOR INC](/search.md) | $7,881 |
| Oct 17, 2024 | I-24-348 Port of CW- Wesley Ford Waterflow Troubleshoot and Repairs I-24-348 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $1,918 |
| Oct 17, 2024 | Public Charging 1 Site Grove Field SPA-524S | [SARKINEN PLUMBING INC](/search.md) | $183,808 |
| Oct 17, 2024 | I-24-371 BLDG 7 Reset Dry Valve Emergency Call I-24-371 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $1,020 |
| Oct 17, 2024 | I-24-389 Port of CW- C-row Hanger Troubles- dialer repairs I-24-389 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $2,783 |
| Sep 11, 2024 | HVAC-AP-1-FlyIt SPA-624 | [SERVICE FIRST HEATING/CLG INC](/search.md) | $38,323 |
| Sep 3, 2024 | I-24-310 BLDG 10 Fire Alarm Troubleshoot Smoke Detectors I-24-310 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $1,297 |
| Aug 16, 2024 | Port of Camas/Washougal Compliance Test | [MASCOTT EQUIPMENT CO INC](/search.md) | $1,469 |
| Aug 1, 2024 | Seal & Paint Exterior IP Building 5 SPI-324 | [ENGLE'S PAINTING LLC](/search.md) | $18,971 |
| Jul 23, 2024 | Black Pearl Pedestrian Pathway SPM-224 | [MICHAEL GREEN CONSTRUCTION INC](/search.md) | $186,642 |
| Jul 12, 2024 | BUILDING #5 #5 | [ANDERSON GLASS COMPANY](/search.md) | $24,409 |
| Jul 12, 2024 | BUILDING #4 #4 | [ANDERSON GLASS COMPANY](/search.md) | $11,935 |
| Jul 5, 2024 | Rail Crossing 28th & Index Street SPI-424 | [AMERICAN TRACK](/search.md) | $139,243 |
| Jul 2, 2024 | Waterfront Soils Removal Project SPW-124 | [SWOFFORD EXCAVATING LLC](/search.md) | $907,971 |
| Jul 2, 2024 | Switchstand Replacements - Switches 6110 & 6114 SPI-624 | [SCHAD CO RAILROAD CONST LLC](/search.md) | $11,392 |
| Jul 2, 2024 | Rail Crossing Repair at Fitesa SPI-924 | [AMERICAN TRACK](/search.md) | $15,516 |
| Jul 2, 2024 | ANNUAL INSPECTIONS 2310-0177 | [COSCO FIRE PROTECTION INC](/search.md) | $13,356 |
| Jun 26, 2024 | IP Shop Storage Yard Fence SPI-524 | [ABLE FENCE CO INC](/search.md) | $15,190 |
| Jun 4, 2024 | Breakwater Pileing Repair SPM-424 | [MARK MARINE SERVICE INC](/search.md) | $25,498 |
| May 29, 2024 | I-24-138 Reset Dry System and Replace Accelerator BLDG 6 I-24-138 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $2,405 |
| May 29, 2024 | I-24-136 BLDG 15 Fire Alarm Ground Fault Repairs I-24-136 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $904 |
| Apr 9, 2024 | Administrative Building Solar Solar-22 | [POWER NORTHWEST INC](/search.md) | $102,486 |
| Apr 9, 2024 | Grove Field Solar Project Solar-22 | [POWER NORTHWEST INC](/search.md) | $219,966 |
| Feb 9, 2024 | Marina Loop Pavement SPM-124 | [KARVONEN SAND & GRAVEL INC](/search.md) | $116,149 |
| Jan 9, 2024 | I-23-547 BLDG 6 Additional work on dry system sprinkler valve I-23-547 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $2,479 |
| Dec 8, 2023 | Pump not dispensing Wyatt 072023 | [MASCOTT EQUIPMENT CO INC](/search.md) | $568 |
| Dec 5, 2023 | (80-1300) Building 5 Panel Testing SPI-1323 | [ACCURATE ELECTRIC UNLIMITD INC](/search.md) | $3,038 |
| Nov 29, 2023 | I-23-307 BLDG 20 Antenna Upgrade I-23-307 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $4,200 |
| Nov 15, 2023 | Rolling Steel Door 17442 | [OREGON CITY GARAGE DOOR LLC](/search.md) | $8,843 |
| Nov 15, 2023 | Building 1104 Bay#1 17457 | [OREGON CITY GARAGE DOOR LLC](/search.md) | $2,712 |
| Nov 10, 2023 | I-23-530: Reset tripped dry sprinkler valve I-23-530 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $575 |
| Oct 23, 2023 | Sidewalk Leveling Project PRJ119950 | [TERRAFIRMA FOUNDATION RPR INC](/search.md) | $5,021 |
| Oct 12, 2023 | building 10 insulation install spi823s | [TEAM PROJECTS LLC](/search.md) | $17,942 |
| Oct 6, 2023 | BW Fishing Dock ER Repairs SPM04230 | [BALLARD MARINE LLC](/search.md) | $53,854 |
| Sep 17, 2023 | AP-5 heat pump AP5 | [SERVICE FIRST HEATING/CLG INC](/search.md) | $13,750 |
| Jul 7, 2023 | Building 10 Sprinkler Head Replacement Quoted Work | [COSCO FIRE PROTECTION INC](/search.md) | $1,899 |
| Jul 7, 2023 | Building 10 Pull Station Replacement Quote Work #1303 | [COSCO FIRE PROTECTION INC](/search.md) | $893 |
| Jun 23, 2023 | I-23-73 Port of C-W Troubleshoot BLDG 15 Ground Fault I-23-73 | [EXPRESS FIRE SYSTEMS INC](/search.md) | — |
| Jun 19, 2023 | F ROW HANGER PIN HOLE LEAK EMG Call | [COSCO FIRE PROTECTION INC](/search.md) | — |
| Jun 5, 2023 | Seal & Paint Exterior IP Building 4 SPI-423 | [ENGLE'S PAINTING LLC](/search.md) | $27,711 |
| May 4, 2023 | Backflow Repairs 17549 | [SIGNALING SYSTEM SOLUTIONS INC](/search.md) | $5,810 |
| May 1, 2023 | (title withheld) SPI-1123 | [OREGON CITY GARAGE DOOR LLC](/search.md) | $13,219 |
| Apr 27, 2023 | Building 7 Panel Replacement Quoted Work | [COSCO FIRE PROTECTION INC](/search.md) | $2,876 |
| Apr 27, 2023 | Building 12 Sprinkler Service Quoted Work | [COSCO FIRE PROTECTION INC](/search.md) | $4,457 |
| Apr 19, 2023 | ANNUAL FIRE INSPECTIONS PW Contract | [COSCO FIRE PROTECTION INC](/search.md) | $21,161 |
| Apr 17, 2023 | Building 9 Sprinkler Service Quoted Work | [COSCO FIRE PROTECTION INC](/search.md) | $2,174 |
| Apr 17, 2023 | F Row Hanger Sprinkler Service EMG Call | [COSCO FIRE PROTECTION INC](/search.md) | — |
| Apr 11, 2023 | Building 6 Sprinkler Service EMG Call | [COSCO FIRE PROTECTION INC](/search.md) | — |
| Apr 10, 2023 | IP BUILDINGS 8, 11 & 15 SEAL & COAT PARKING LOTS N/A | [BLACKLINE INC](/search.md) | $55,761 |
| Apr 8, 2023 | Building #19 Building #19 | [AMER X INC ROOFING BLADES](/search.md) | $22,758 |
| Mar 17, 2023 | I-22-550: Troubleshoot/Repairs at AP-1, BLDG 6, and BLDG 12 I-22-550 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $4,915 |
| Feb 7, 2023 | building 12 mini split installation building 12 mini split installation | [SERVICE FIRST HEATING/CLG INC](/search.md) | $6,060 |
| Jan 17, 2023 | Weed Control Spraying Services 54403 | [GENERAL TREE SERVICE](/search.md) | $144,730 |
| Dec 19, 2022 | Building 15 Sprinkler Service Quoted Work | [COSCO FIRE PROTECTION INC](/search.md) | $689 |
| Dec 15, 2022 | BUILDING 11 SPRINKLER SERVICE QUOTED | [COSCO FIRE PROTECTION INC](/search.md) | $2,208 |
| Oct 11, 2022 | Lawton Creek Repair SPI-621A | [MCDONALD EXCAVATING INC](/search.md) | — |
| Sep 14, 2022 | Building 8 - Overhead Door | [METRO OVERHEAD DOOR INC](/search.md) | $11,640 |
| Jul 13, 2022 | Grove Field Apron Expansion | [MCDONALD EXCAVATING INC](/search.md) | $200,463 |
| Jul 6, 2022 | PORT OF CAMAS/ WASHOUGAL FIRE SPRINKLER INSPECTION AND 5 YRS SIGNED CONTRACT | [COSCO FIRE PROTECTION INC](/search.md) | $14,648 |
| May 25, 2022 | (80-1227) Admin Office EV Charging Station Public works contractual agreement | [ACCURATE ELECTRIC UNLIMITD INC](/search.md) | $37,940 |
| Apr 19, 2022 | Admin Roof Overlay SPO-122 | [ABC ROOFNG A TCTA AMRCA CO LLC](/search.md) | $47,614 |
| Apr 19, 2022 | Rail Repair 5346 | [WEST RAIL CONSTRUCTION CO LLC](/search.md) | $5,691 |
| Apr 2, 2022 | I-22-194 Port of CW Security Monitoring 20703 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $2,642 |
| Mar 21, 2022 | Courthouse Office HVAC 03102022A | [SERVICE FIRST HEATING/CLG INC](/search.md) | $38,780 |
| Mar 16, 2022 | (title withheld) SPI-721 | [BARNHART CRANE AND RIGGING CO](/search.md) | $3,208 |
| Mar 14, 2022 | Courthouse Brick Repair SPI422 | [CORNERSTONE MASONRY INC](/search.md) | $30,322 |
| Mar 7, 2022 | Westley Ford 78864 | [OVERHEAD DOOR CO/PRTL VAN INC](/search.md) | $805 |
| Mar 4, 2022 | Seal & Paint Exterior Bldg 8 | [ENGLE'S PAINTING LLC](/search.md) | $22,271 |
| Mar 4, 2022 | TAXIWAY E SLURRY SEAL N/A | [BLACKLINE INC](/search.md) | $33,549 |
| Mar 4, 2022 | IP BUILDINGS 4, 5, 10 & COURTHOUSE SLURRY SEAL N/A | [BLACKLINE INC](/search.md) | $40,422 |
| Feb 16, 2022 | PORT OF CAMAS FIRE ALARM INSPECTIONS SIGNED CONTRACT | [COSCO FIRE PROTECTION INC](/search.md) | $6,466 |
| Jan 10, 2022 | Breakwater Access Improvements Project 11200945 | [Lee Contractors LLC](/search.md) | $1,235,760 |
| Dec 30, 2021 | I-21-683 Port of Camas-Washougal Fire Alarm Monitoring NA | [EXPRESS FIRE SYSTEMS INC](/search.md) | $6,504 |
| Dec 9, 2021 | Issues with above ground tank valve. James 360-940-7847 | [MASCOTT EQUIPMENT CO INC](/search.md) | $1,493 |
| Dec 7, 2021 | Generator Start up N/A | [PACIFIC POWER GROUP LLC](/search.md) | $938 |
| Nov 3, 2021 | Port of Camas-Washougal Gravity Discharge Inspection SFSA090821 | [BALLARD MARINE LLC](/search.md) | $5,474 |
| Oct 27, 2021 | AP-5 Emergency Electrical Panel Replacement SPA-521 | [UNITED ELECTRIC LLC](/search.md) | $5,600 |
| Oct 20, 2021 | Marina Portable Generator Setup 3905 | [KITCHEN ELECTRIC LLC](/search.md) | $10,168 |
| Oct 19, 2021 | Marina Fuel Dock Replacement SPM-219A | [NORTHBANK CIVIL AND MARINE INC](/search.md) | $419,858 |
| Oct 5, 2021 | H Row Airport Accident Spill Clean Up 8921096 | [COWLITZ CLEAN SWEEP](/search.md) | — |
| Sep 30, 2021 | Switch Replacements 6112 & 6113 6112 & 6113 | [WEST RAIL CONSTRUCTION CO LLC](/search.md) | $6,924 |
| Sep 21, 2021 | Port of Camas-Washougal Building 20 | [ROTSCHY INC](/search.md) | $7,220,900 |
| Sep 1, 2021 | PORTABLE GENERATOR WIRE/AIRPORT 3898 | [KITCHEN ELECTRIC LLC](/search.md) | $5,191 |
| Aug 27, 2021 | (80-1201) IP Pump Station Generator Generator Electrical IP Pump Station | [ACCURATE ELECTRIC UNLIMITD INC](/search.md) | $35,983 |
| Aug 4, 2021 | Waterfront Stormwater Outfall Construction SPW-419 A | [TAPANI INC](/search.md) | $86,753 |
| Jul 1, 2021 | H-Row Hangar Repair SPA-421 | [KALAMA GARG DR & CONST CO LLC](/search.md) | $47,262 |
| Jun 18, 2021 | Install 4 new sprinkler heads in new hard lid ceiling 18 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $2,992 |
| Jun 9, 2021 | Install 4 new sprinkler heads in new hard lid ceiling 18 | [EXPRESS FIRE SYSTEMS INC](/search.md) | $2,992 |
| May 17, 2021 | PORT OF CAMAS FIRE ALARM INSPECTIONS SIGNED CONTRACT | [COSCO FIRE PROTECTION INC](/search.md) | $6,466 |
| May 11, 2021 | Rail Repair - Switch Ties 5227 | [WEST RAIL CONSTRUCTION CO LLC](/search.md) | $5,713 |
| Apr 26, 2021 | Port of Camas, Washougal S91008 | [RUBENSTEIN'S CONTRACT CRPT LLC](/search.md) | $3,990 |
| Apr 23, 2021 | Westlie Ford Overhead Door Openers SPI-821 | [KALAMA GARG DR & CONST CO LLC](/search.md) | $8,767 |
| Apr 21, 2021 | Port of Camas #14 Paint Ext Bldg #14 | [M&C CONSTRUCTION LLC](/search.md) | $19,404 |
| Apr 21, 2021 | Port of Camas #12 Paint Ext Bldg #12 | [M&C CONSTRUCTION LLC](/search.md) | $19,404 |
| Apr 20, 2021 | GATE 3 FDC EXTENSION CONSTRUCTION SPM-220A | [NUTTER UNDERGROUND UTLTS CO](/search.md) | $81,292 |
| Apr 19, 2021 | Westlie Ford Ductwork Repair 04062021 | [SERVICE FIRST HEATING/CLG INC](/search.md) | $4,856 |
| Apr 12, 2021 | Seal & Paint Exterior B-row Hangar SPA-121 | [ENGLE'S PAINTING LLC](/search.md) | $19,296 |
| Mar 24, 2021 | WESTLEY FORD 73346 | [OVERHEAD DOOR CO/PRTL VAN INC](/search.md) | $3,739 |
| Mar 8, 2021 | Slurry Seal Taxiway C/D N/A | [BLACKLINE INC](/search.md) | $12,633 |
| Mar 4, 2021 | Westlie Ford Parking Area N/A | [BLACKLINE INC](/search.md) | $19,463 |
| Feb 4, 2021 | THE PORT OF CAMAS-WASHOUGAL ANNUAL FIRE SPRINKLER INSPECTIONS THE PORT OF CAMAS-WASHOUGAL ANNUAL FIRE SPRINKLER INSPECTIONS | [COSCO FIRE PROTECTION INC](/search.md) | $6,255 |
| Nov 30, 2020 | WESTLIE FORD WESTLIE FORD | [Authority Dock & Door INC](/search.md) | $6,827 |
| Nov 20, 2020 | IP Fitesa Rail Repair 7 | [WEST RAIL CONSTRUCTION CO LLC](/search.md) | $4,336 |
| Oct 11, 2020 | Camas pump station Pushbuutons Not specified | [DESIGN ELECTRIC](/search.md) | $3,468 |
| Aug 22, 2020 | 12469 CAMERAS SIGNED CONTRACT | [CHRISTENSON ELECTRIC INC](/search.md) | $1,795 |
| Aug 22, 2020 | 12603 CAMERA ADDS DEBRA ITZEN | [CHRISTENSON ELECTRIC INC](/search.md) | $5,662 |
| Aug 22, 2020 | (title withheld) SIGNED QUOTE | [CHRISTENSON ELECTRIC INC](/search.md) | $10,019 |
| Jul 31, 2020 | 35th & Truman Light Meter Install 80-1156 | [ACCURATE ELECTRIC UNLIMITD INC](/search.md) | $16,893 |
| Jul 22, 2020 | WESTLIE FORD - FIRE SYSTEM PANEL TROUBLES 266148 | [SONITROL OF SW WASHINGTON](/search.md) | — |
| Jul 22, 2020 | BLDG 12 - BATTERY REPLACEMENT 266150 | [SONITROL OF SW WASHINGTON](/search.md) | — |
| Jul 22, 2020 | BLDG 15 - BATTERY REPLACEMENT 266149 | [SONITROL OF SW WASHINGTON](/search.md) | — |
| Jun 11, 2020 | OVERHEAD DOOR REPAIR 266043 | [SONITROL OF SW WASHINGTON](/search.md) | — |
| Jun 5, 2020 | 28th & Ford Street Rehabilitation 20200601 | [CLARK AND SON'S EXCAVATING INC](/search.md) | $62,872 |
| May 26, 2020 | Concrete curbing | [CURB ACCENTS INC](/search.md) | $6,208 |
| May 19, 2020 | FIRE COMPETENCY TEST 265969 | [SONITROL OF SW WASHINGTON](/search.md) | — |
| May 11, 2020 | Grove Field Airport Tree Removal None | [MCNEALY EXCAVATING INC](/search.md) | $25,848 |
| Apr 27, 2020 | building 10 building 10 | [ANDERSON GLASS COMPANY](/search.md) | $7,436 |
| Mar 23, 2020 | OVERHEAD DOORS MB1 | [Authority Dock & Door INC](/search.md) | $7,566 |
| Mar 20, 2020 | AIRPORT FENCE REPAIR 713102 | [PACIFIC FENCE & WIRE CO](/search.md) | $2,959 |
| Mar 19, 2020 | GROVE FIELD - ANNUAL FIRE TEST 264802 | [SONITROL OF SW WASHINGTON](/search.md) | — |
| Mar 19, 2020 | Steigerwald Mitigation Fence SPI-320 | [ABLE FENCE CO INC](/search.md) | $30,000 |
| Mar 17, 2020 | SECURITY EQUIPMENT INSTALLATION XA3052 | [SONITROL OF SW WASHINGTON](/search.md) | $5,344 |
| Mar 11, 2020 | Rail Repairs Rail Repairs | [SCHAD CO RAILROAD CONST LLC](/search.md) | $59,403 |
| Mar 3, 2020 | SLURRY SEALING PARKING LOT BUILDING 7 N/A | [BLACKLINE INC](/search.md) | $7,371 |
| Mar 3, 2020 | The Port Camas-Washougal Annual Fire Sprinkler Inspection, Testing & Repairs The Port Camas-Washougal Annual Fire Sprinkler Inspection, Testing & Repairs | [COSCO FIRE PROTECTION INC](/search.md) | $6,780 |
| Mar 3, 2020 | SLURRY SEAL RUNWAY & TAXIWAY B N/A | [BLACKLINE INC](/search.md) | $48,336 |
| Feb 18, 2020 | BUILDING 10 - FIRE SYSTEM 264721 | [SONITROL OF SW WASHINGTON](/search.md) | — |
| Feb 13, 2020 | Westlie Ford Overhead Door Repair | [Authority Dock & Door INC](/search.md) | $1,060 |
| Feb 6, 2020 | Seal & Paint Exterior Building 7 SPI-120 | [ENGLE'S PAINTING LLC](/search.md) | $23,810 |
| Jan 28, 2020 | Building 9 HVAC Building 9 HVAC | [SERVICE FIRST HEATING/CLG INC](/search.md) | $30,189 |
| Jan 6, 2020 | Building 10 Building 10 | [BETTER AIR NORTHWEST LLC](/search.md) | $1,626 |
| Dec 13, 2019 | Weed Control In Designated Areas 54403 | [GENERAL TREE SERVICE](/search.md) | $107,918 |
| Dec 10, 2019 | Building 10 Sheetrock Installation SPI-1219A | [E & K PAINTING LLC](/search.md) | $3,524 |
| Nov 18, 2019 | Building 10 HVAC bldg10 | [SERVICE FIRST HEATING/CLG INC](/search.md) | $10,027 |
| Nov 18, 2019 | Building 15 Mitigation Plantings 2019.01 | [CLARK AND SON'S EXCAVATING INC](/search.md) | $7,046 |
| Nov 11, 2019 | 80-1130 Bldg 10 Electrical Upgrade SPI1219 | [ACCURATE ELECTRIC UNLIMITD INC](/search.md) | $34,650 |
| Nov 8, 2019 | BREAKWATER FISHING DOCK PILING REPAID SPM419 | [BALLARD MARINE LLC](/search.md) | $12,932 |
| Nov 7, 2019 | Airport Well Pumps SPA519 | [MATHER & SONS PUMP SERV INC](/search.md) | $6,358 |
| Oct 21, 2019 | Building 8 HVAC 19C-0302 | [BLAIRCO INC](/search.md) | $19,961 |
| Sep 13, 2019 | WESTLIE FORD WESTLIE FORD | [Authority Dock & Door INC](/search.md) | $440 |
| Sep 5, 2019 | Grant Street Electrical Extension 061319 | [MILL PLAIN ELECTRIC INC](/search.md) | $41,052 |
| Aug 26, 2019 | Roof and Gutter Rehabilitation Bldg. 7 SPI-919 | [NOBLE SHEET METAL INC](/search.md) | $27,425 |
| Aug 1, 2019 | WINDOW REPLACEMENT BLD 17 BUILDING 17 | [ANDERSON GLASS COMPANY](/search.md) | $732 |
| Jul 22, 2019 | Solenoid Repair 1757 | [4C'S ENVIROMENTAL INC](/search.md) | $4,000 |
| Jun 4, 2019 | Washougal Waterfront Park-Sasquatch SPM-316 | [NORTHWEST PLAYGROUND EQUIP INC](/search.md) | $29,502 |
| Jun 3, 2019 | B-Row and D-Row Hangars 360-835-2196 | [M&C CONSTRUCTION LLC](/search.md) | $36,187 |
| Jun 3, 2019 | Waterfront Park Natural Play Area Fence Able | [ABLE FENCE CO INC](/search.md) | $15,624 |
| May 21, 2019 | Annual Fire Test 259182 | [SONITROL OF SW WASHINGTON](/search.md) | $5,658 |
| Apr 25, 2019 | Riverside Marine Riverside Marine | [Authority Dock & Door INC](/search.md) | $1,069 |
| Mar 20, 2019 | Taxiway Slurry Sealing 020719 | [BLACKLINE INC](/search.md) | $9,919 |
| Feb 13, 2019 | Steigerwald Mitigation Plantings Unknown | [Clark And Sons Excavating INC](/search.md) | $48,780 |
| Jan 31, 2019 | Gutter replacement spi319 | [LIBERTY CONSTRUCTION](/search.md) | $12,910 |
| Jan 28, 2019 | Rail Improvements SPI-419 | [Schad Co. Railroad Construction, LLC](/search.md) | $65,984 |
| Jan 16, 2019 | Marina J Dock Repair | [BALLARD MARINE LLC](/search.md) | $41,111 |
| Jan 11, 2019 | Waterfront Park Natural Play Area | [KEYSTONE CONTRACTING INC](/search.md) | $394,576 |
| Dec 11, 2018 | Rail Repair - Switch 6104 Public Works Agreement | [RAILWORKS TRACK SYSTEMS INC](/search.md) | — |
| Dec 11, 2018 | Building 11 Repair doors | [Authority Dock & Door INC](/search.md) | $2,705 |
| Dec 10, 2018 | 27th & Index Derailment Repairs | [WEST RAIL CONSTRUCTION CO LLC](/search.md) | $13,282 |
| Dec 6, 2018 | Panther RV Restroom | [CEDAR MILL CONSTRUCTION CO LLC](/search.md) | $19,512 |
| Nov 29, 2018 | STOCKPILE CLEARING & GRADING PROJECT SPW118 | [HAAG & SHAW INC](/search.md) | $143,651 |
| Nov 20, 2018 | (title withheld) SPA418 | [REMNANT RANCH](/search.md) | $2,908 |
| Nov 19, 2018 | Airport Roof Seal A-Row Hangar | [FIRST CASCADE CORPORATION](/search.md) | $16,304 |
| Oct 17, 2018 | Admin Office Parking Lot Restoration | [A-LINE ASPHALT MAINTENANCE INC](/search.md) | $88,497 |
| Sep 11, 2018 | Asphalt Sealing and Taxiway Widening | [CLARK AND SON'S EXCAVATING INC](/search.md) | $37,000 |
| Sep 11, 2018 | Building 16 Siding Replacement spi-1018 | [TROFFER CONTRACTING INC](/search.md) | $71,544 |
| Sep 4, 2018 | Port of Camas/Washougal Basin Installation | [MCDONALD EXCAVATING INC](/search.md) | $12,553 |
| Aug 20, 2018 | Seal Coat Parking Lot Building 12 | [A-LINE ASPHALT MAINTENANCE INC](/search.md) | $11,510 |
| Aug 7, 2018 | Airport Fire System Check Valve Repair 2843 | [PUMP DYNAMICS LLC](/search.md) | $4,421 |
| Jul 26, 2018 | Broken Rail Emergency | [WEST RAIL CONSTRUCTION CO LLC](/search.md) | — |

Most recent first. Each amount is the figure declared on the prime contractor's intent; amounts are not added up. Project addresses are not published.

### Contractors that filed intents on its projects

| Contractor | Intents on this agency's projects |
|---|---|
| [A-LINE ASPHALT MAINTENANCE INC](/search.md) | 9 |
| [ACCURATE ELECTRIC UNLIMITD INC](/search.md) | 7 |
| [ANDERSON GLASS COMPANY](/search.md) | 9 |
| [Authority Dock & Door INC](/search.md) | 6 |
| [BALLARD MARINE LLC](/search.md) | 7 |
| [BLACKLINE INC](/search.md) | 9 |
| [CHRISTENSON ELECTRIC INC](/search.md) | 8 |
| [COSCO FIRE PROTECTION INC](/search.md) | 26 |
| [DAN JONES INC](/search.md) | 7 |
| [ENGLE'S PAINTING LLC](/search.md) | 7 |
| [EXPRESS FIRE SYSTEMS INC](/search.md) | 18 |
| [GENERAL TREE SERVICE](/search.md) | 11 |
| [Glacier Northwest dba Calportland](/search.md) | 11 |
| [KITCHEN ELECTRIC LLC](/search.md) | 14 |
| [MASCOTT EQUIPMENT CO INC](/search.md) | 6 |
| [MCDONALD EXCAVATING INC](/search.md) | 8 |
| [MCNEALY EXCAVATING INC](/search.md) | 9 |
| [METRO OVERHEAD DOOR INC](/search.md) | 8 |
| [MICHAEL GREEN CONSTRUCTION INC](/search.md) | 8 |
| [Ralph's Concrete Pumping](/search.md) | 8 |
| [SERVICE FIRST HEATING/CLG INC](/search.md) | 10 |
| [SONITROL OF SW WASHINGTON](/search.md) | 9 |
| [Taylor Transport, Inc.](/search.md) | 8 |
| [VIKING AUTO SPRINKLER CO](/search.md) | 8 |
| [WEST RAIL CONSTRUCTION CO LLC](/search.md) | 9 |

Alphabetical order; the 25 contractors with the most filings on this agency's projects, prime and subcontractors together.

**Do you run a construction company with
20 or more people on site?**

AI labs pay businesses to record first-person video of everyday hands-on
work — filmed by their own crews with a smartphone on a wearable mount, with consent and under contract.

**See the program and apply →** 
 Referral link to micro1: this site may be paid a fee if your business is accepted. Not affiliated with the
Washington State Department of Labor & Industries.

---

Página: https://wa-public-works-records.pages.dev/agency/camas-washougal-port-of/
Fonte: https://data.wa.gov/d/t9je-9qwa
Recolha: 2026-10-01